Public Disclosure Authorized Public Disclosure Copy The World Bank Implementation Status & Results Report Fifth Power System Development Project (P115566) Fifth Power System Development Project (P115566) SOUTH ASIA | India | Energy & Extractives Global Practice | IBRD/IDA | Specific Investment Loan | FY 2010 | Seq No: 13 | ARCHIVED on 24-Jul-2015 | ISR19654 | Public Disclosure Authorized Implementing Agencies: Key Dates Key Project Dates Board Approval date:22-Sep-2009 Effectiveness Date:08-Jan-2010 Planned Mid Term Review Date:16-Sep-2013 Actual Mid-Term Review Date:26-Oct-2013 Original Closing Date:30-Jun-2015 Revised Closing Date:31-May-2017 Public Disclosure Authorized Project Development Objectives Project Development Objective (from Project Appraisal Document) The project development objective is to strengthen India's electricity transmission system in order to increase reliable power exchange between regions and states. Has the Project Development Objective been changed since Board Approval of the Project Objective? No PHRPDODEL Components Name Public Disclosure Authorized Transmission System Stregthening Schemes:(Cost $1000.00 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Low Low Implementation Status and Key Decisions The implementation support mission for the project was carried out from April 13-June 30, 2015. Almost 66% of the loan stands disbursed as on date 7/24/2015 Public Disclosure Copy Page 1 of 6 Public Disclosure Copy The World Bank Implementation Status & Results Report Fifth Power System Development Project (P115566) with two years remaining for loan closing date. As of end March 2015, the outcome indicator (inter-regional power exchange in a year) has out-performed (provisional: 84,368MU) its revised targets (70,000 MU). In addition to the Outcome Indicator, four other key results indicators that helped track project performance are: (a) transmission capacity measured in overall circuit kilometers of transmission lines built and operated by POWERGRID; (b) transformation capacity - measured in circuit kilometer; (c) Percent of project affected people rehabilitated - measured in percent; and, (d) cumulative transmission capacity per meter width of rightof-way within forest area.. At the end of March 2015, the transmission capacity was 115,637ckm (actual) against a target of 114,000 ckm. Similarly, POWERGRID's transformation capacity was 231,709MVA (actual) against a target of 200,000 MVA. With regard to indicators on environment and social, POWERGRID has also met its targets for FY2015 (% of people rehabilitated - Actual 100% against target of 100%); and, cumulative transmission capacity per meter width of RW within forest areas - Actual 23.08 MW/ meter against target of 21.5 MW / meter. Risks Systematic Operations Risk-rating Tool Risk Category 7/24/2015 Rating at Approval Public Disclosure Copy Previous Rating Current Rating Page 2 of 6 Public Disclosure Copy The World Bank Implementation Status & Results Report Fifth Power System Development Project (P115566) Political and Governance -- Low Low Macroeconomic -- Moderate Moderate Sector Strategies and Policies -- Moderate Moderate Technical Design of Project or Program -- Moderate Moderate Institutional Capacity for Implementation and Sustainability -- Low Low Fiduciary -- Low Low Environment and Social -- Low Low Stakeholders -- Moderate Moderate Other -- -- -- Overall -- Low Low Results Project Development Objective Indicators PHINDPDOTBL Growth in power exchange between and across regions (Millions kWh) (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 46,027 Gwh 78,384 GWh 84,368 GWh 75,000 Gwh Date 31-Mar-2009 31-Mar-2014 31-Mar-2015 31-May-2017 Baseline Actual (Previous) Actual (Current) End Target Value 71,447 ckt-km 106,804 ckm 115,637 ckm 125,000 ckm Date 31-Mar-2009 31-Mar-2014 31-Mar-2015 31-May-2017 Overall Comments Intermediate Results Indicators PHINDIRITBL Growth in transmission capacity (circuit km) (Text, Custom) 7/24/2015 Public Disclosure Copy Page 3 of 6 Public Disclosure Copy The World Bank Implementation Status & Results Report Fifth Power System Development Project (P115566) PHINDIRITBL Growth in transformation capacity (MVA) (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 79,522 MVA 205,923 MVA 231,709 MVA 222,000 MVA Date 31-Mar-2009 31-Mar-2014 31-Mar-2015 31-May-2017 PHINDIRITBL Implementation of ESPP - Social (percent of PAPs rehabilitated) (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0% 100% 100% 100% Date 31-Mar-2009 31-Mar-2014 31-Mar-2015 31-May-2017 PHINDIRITBL Implementation of ESPP - Environment - Cumulative transmission capacity (MW) per meter width of right-of-way within forest area (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 18.6 MW/metre 22.15 23.08 21.7 MW/metre Date 31-Mar-2009 31-Mar-2014 31-Mar-2015 31-May-2017 PHINDIRITBL Transmission lines constructed or rehabilitated under the project (Kilometers, Core) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 1115.00 1115.00 3628.00 Date 31-Mar-2009 31-Mar-2014 31-Mar-2015 31-May-2017 7/24/2015 Public Disclosure Copy Page 4 of 6 Public Disclosure Copy The World Bank Implementation Status & Results Report Fifth Power System Development Project (P115566) PHINDIRITBL Transmission lines rehabilitated under the project (Kilometers, Core Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 0.00 Date 31-Mar-2009 31-Mar-2014 31-Mar-2015 31-May-2017 PHINDIRITBL Transmission lines constructed under the project (Kilometers, Core Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 1115.00 1115.00 3628.00 Date 31-Mar-2009 28-Feb-2014 31-Mar-2015 31-May-2017 Overall Comments Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P115566 IBRD-77870 Effective USD 1,000.00 1,000.00 0.00 664.01 335.99 66% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P115566 IBRD-77870 Effective 22-Sep-2009 13-Oct-2009 08-Jan-2010 30-Jun-2015 31-May-2017 Cumulative Disbursements 7/24/2015 Public Disclosure Copy Page 5 of 6 Public Disclosure Copy The World Bank Implementation Status & Results Report Fifth Power System Development Project (P115566) Restructuring History Level 2 Approved on 23-May-2014 Related Project(s) There are no related projects. 7/24/2015 Public Disclosure Copy Page 6 of 6
© Copyright 2026 Paperzz