tips on using the new Project Timeline

Welcome to the NEW Project Timeline!
The Project Timeline organizes all of the important steps from the Section 106 Review into a linear graph
found in the project record.
Effect Finding will be: “No Effect
Finding” “Adverse Effect Finding”
or “No Historic Properties Affected”
Check here first to see if Section 106 is
complete! This box will display the
Effect Finding and Section 106 status.
If the project has been labeled Exempt it
will also be shown on the timeline.
Clicking on this question mark
will bring up a key to explain
the buttons on timeline
What does Exempt mean?
What does Section 106
Complete mean?
Each step in the Section 106 review process is represented on the
timeline. They are represented by the large blue buttons. The small
buttons are postings. The postings are a combination of actions and
documents that support each decision or step on the timeline.
Scoping: A Cultural Resource
Effect: The CRP determines if the project
Professional (CRP) evaluates for the poten- will affect the historic resources. An
tial impact to historic resources.
adverse effect is found when the
characteristics that make a property eligible
APE: Area of Potential Effect.
for the National Register are indirectly, or
Determined during Scoping. Documents directly altered, and the integrity of the
the size and nature of potential effect on
property is
surrounding resources.
diminished.
Identification: Historic resources in the
APE are identified and evaluated for
historical significance.
Learn more about the Section
106 Review Process!
Now that you understand the Section 106 review process its time to use the
Project Timeline!
Clicking on a Step (large blue
button) will bring up this page. It is a
list of all the documents that support
the Section 106 Step.
Postings are represented by the
small blue buttons.
You can access these documents three ways:
Click on the document in the list (shown in the box above)
OR
Click on the small blue button “postings” buttons on the Project Timeline
OR
Click on the Posting Details tab at the bottom of the page
The ProjectPATH database was created in 2010. Projects that
were completed prior to that year will not have available
uploaded documents. Project details for these projects will be
available but the online searchable database does not include the
NOTE:
Not all steps will have postings, some
are combined. Often the Scoping and
APE steps will be completed at the
same time and included in the
Identification and Evaluation step.
supporting documents at this time. Please contact Ira Beckerman
([email protected] or 717-772-0830) with questions.
Feel free to contact us for more information on the
ProjectPATH database or the new Project Timeline!