Welcome to the NEW Project Timeline! The Project Timeline organizes all of the important steps from the Section 106 Review into a linear graph found in the project record. Effect Finding will be: “No Effect Finding” “Adverse Effect Finding” or “No Historic Properties Affected” Check here first to see if Section 106 is complete! This box will display the Effect Finding and Section 106 status. If the project has been labeled Exempt it will also be shown on the timeline. Clicking on this question mark will bring up a key to explain the buttons on timeline What does Exempt mean? What does Section 106 Complete mean? Each step in the Section 106 review process is represented on the timeline. They are represented by the large blue buttons. The small buttons are postings. The postings are a combination of actions and documents that support each decision or step on the timeline. Scoping: A Cultural Resource Effect: The CRP determines if the project Professional (CRP) evaluates for the poten- will affect the historic resources. An tial impact to historic resources. adverse effect is found when the characteristics that make a property eligible APE: Area of Potential Effect. for the National Register are indirectly, or Determined during Scoping. Documents directly altered, and the integrity of the the size and nature of potential effect on property is surrounding resources. diminished. Identification: Historic resources in the APE are identified and evaluated for historical significance. Learn more about the Section 106 Review Process! Now that you understand the Section 106 review process its time to use the Project Timeline! Clicking on a Step (large blue button) will bring up this page. It is a list of all the documents that support the Section 106 Step. Postings are represented by the small blue buttons. You can access these documents three ways: Click on the document in the list (shown in the box above) OR Click on the small blue button “postings” buttons on the Project Timeline OR Click on the Posting Details tab at the bottom of the page The ProjectPATH database was created in 2010. Projects that were completed prior to that year will not have available uploaded documents. Project details for these projects will be available but the online searchable database does not include the NOTE: Not all steps will have postings, some are combined. Often the Scoping and APE steps will be completed at the same time and included in the Identification and Evaluation step. supporting documents at this time. Please contact Ira Beckerman ([email protected] or 717-772-0830) with questions. Feel free to contact us for more information on the ProjectPATH database or the new Project Timeline!
© Copyright 2026 Paperzz