ELECTRIC POWER INDUSTRY MANAGEMENT BUREAU (EPIMB) PROCESS ENGAGEMENT OF GENERATION COMPANIES IN ENERGY REGULATIONS NO. 1‐94 PROGRAM (THROUGH THE ESTABLISHMENT OF TRUST ACCOUNTS) DURATION (WORKING DAYS) FROM TO 68 48 68 + 4.5 CERTIFICATE OF ENDORSEMENT (COE) TO THE ENERGY REGULATORY COMMISSION (ERC) 24 GRANTING OF FINANCIAL BENEFITS TO HOST COMMUNITIES UNDER ER 1‐94, AS AMENDED PROCESS FLOW IN ACCESSING DLF AND RWMHEEF 76 45 DAYS per Project Proposal GRANTING OF FINANCIAL BENEFITS TO HOST COMMUNITIES UNDER ELECTRIFICATION FUND OF ER 1‐ 94, AS AMENDED 64 57 DAYS AVAILMENT OF SUBSIDY UNDER THE NATIONWIDE INTENSIFICATION OF HOUSEHOLD ELECTRIFICATION (NIHE) PROGRAM 51 44 Days per Project Proposal QUALIFIED THIRD PARTY APPLICATIONS FOR ENDORSEMENT TO ERC New 57.5 APPLICATIONS FOR PV MAINSTREAMING PROGRAM UNDER ELECTRIFICATION FUND OF ER1‐94, AS AMENDED New 64 1ST ENDORSEMENT TO THE SECURITIES AND EXCHANGE COMMISSION (SEC) New 2.5 CLEARANCE TO UNDERTAKE SYSTEM IMPACT STUDY (SIS) ENDORSEMENT TO THE NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) New 2.5 (Non – RE) CLEARANCE TO UNDERTAKE SYSTEM IMPACT STUDY (SIS) ENDORSEMENT TO THE NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) New 4.5 (RE) ENDORSEMENT OF CERTIFICATE OF NON‐OVERLAP (CNO) & CERTIFICATION PRECONDITION (CP) TO THE NATIONAL COMMISSION ON INDIGENOUS PEOPLES (NCIP) New 2.5 CERTIFICATION TO THE PHILIPPINE NATIONAL POLICE (PNP) AS A REQUIREMENT FOR THE ISSUANCE OF THE LICENSE TO POSSESS EXPLOSIVES/EXPLOSIVE INGREDIENTS/CONTROLLED CHEMICALS AS PURCHASER New 2.5 APPLICATION FOR DIRECT CONNECTION New 65 ENGAGEMENT OF GENERATION COMPANIES IN ENERGY REGULATIONS NO. 1-94 PROGRAM (THROUGH THE ESTABLISHMENT OF TRUST ACCOUNTS) RESPONSIBLE PERSONNEL/ OFFICE / UNIT NORMAL PROCESSING TIME (WORKING DAYS) PROCEDURES CONTACT NUMBERS LOCATION OF OFFICE Submission of application with complete supporting documents Office of the Director, EPIMB Receipt/Endorsement of the application to Power Planning & Development Division (PPDD) and Rural Electrification and Management Division (REAMD) 1 Sr. SRS, REAMD/PPDD/REMB Evaluation of Application and Determine the completeness of documentations 4 REAMD coordinate with GENCOs for the transmittal of E‐Copy Template MOA 2 Forging / Review of MOA 10 Submission of signed and notarized MOA/Review of Legal 22 Approval and Signing of memorandum to the secretary endorsing * 3 Notarization of MOA 5 Releasing of MOA to PPDD 1 Sr. SRS‐REAMD REAMD / Legal Services Sr. SRS‐REAMD / GENCOs OSEC / USEC / OD/IAS / FS Legal Services Sr. SRS, REAMD/PPDD LEGEND Applicant DOE For Signing/Approval of MOA Office of the Secretary * MOA signing will be scheduled 3 times a week in a designated room at Power Bureau. A Memo will be issued to the concerned DOE officials informing them of the scheduled MOA signing REQUIREMENTS 1.) Letter Request addressed to the Office of the Secretary, Attention to the Office of the Undersecretary, copy furnished Office of Director of Electric Power Industry Management Bureau 2.) Company Profile of the Generation Company 3.) Articles of Incorporation 4.) By-Laws 5.) Project Background/Description 6.) Official name of the Generation Facility 7.) Exact Location/Address of the Generation Facility 8.)Commissioning Target/Date 9.) Off-taker of Electricity as confirmed with the signed PSA 10.) Host Community/ies and/or People affected while on Commercial Operations 11.) Installed Capacity/Dependable Capacity 12.) Historical Power Generation Data (for existing Generation Facility) 13.) Service/Operating Contract (for Renewable Energy-Based Generation Facility) 14.) Certificate of Assumption of Accountability (applicable to the Successor Generation Company that takes on the Ownership/Operatorship of the Previous Generation Company whether under a new name or using the same company name as the case maybe) 15.) Contact details of the Generation Company to include the name, designation, telephone numbers and e-mail address of its designated contact person/s CHARGES & FEES No fees TL: 4792900 Loc. 414 4F, DOE Main Building Loc. 417 4F, DOE Main Building Loc. 403 ERL Building 3 LEGAL BASES ‐ Sec. 5(i) of RA7638 ‐ Rule 29 Part A of RA9136‐IRR 48 DAYS (68 Days) CERTIFICATE OF ENDORSEMENT (COE) TO THE ENERGY REGULATORY COMMISSION (ERC) RESPONSIBLE PERSONNEL/ OFFICE / UNIT NORMAL PROCESSING TIME (WORKING DAYS) PROCEDURES CONTACT NUMBERS LOCATION OF OFFICE Submission of application with complete supporting documents SRS II, Power Planning & Development Division (PPDD) 0.5 Evaluation of application MOA on the establishment of trust accounts SRS II, PPDD 4F, DOE Main Building Loc. 414 4F, DOE Main Building For Renewable Energy (RE) projects REMB endorsement Senior SRS, REAMD TL: 4792900 Loc. 202/386 2 15 Preparation of COE and memorandum 0.5 Review and endorsement of COE and MOA Chief SRS, PPDD EPIMB Director Assistant Secretary Undersecretary Review & Signing of memorandum, endorsing the MOA and COE for his approval and signature Approval & Signing of COE & MOA DOE Secretary Office of the DOE Secretary 3 Transmittal to EPIMB‐PPDD of signed COE & MOA Senior SRS, REAMD / Legal Services Notarization of MOA 0.5 1 Payment of Processing Fee for COE 0.5 Clerk, PPDD LEGEND Applicant DOE Release of notarized MOA and COE to Applicant REQUIREMENTS 1. Letter of Request addressed to the DOE Secretary, Attention to the Undersecretary for Power and EPIMB Director (parallel submission to DOE Records Division and EPIMB‐PPDD) 2. Company Profile 3. Project Background/Description to include the installed capacity, plant type, exact location/address of the power‐ generating facility, official name of the power‐generating facility, target commissioning date, off‐ taker of the electricity, host community/ies, etc.) 4. Articles of Incorporation of Company 5. By‐Laws of the Company 6. Certificate of Assumption of Accountability (applicable to the successor company that takes on the Ownership and/or takes‐over the operations of the previous generation company whether under a new name or using the same company name as the case maybe) Additional for Renewable Energy Power Projects: 7. Copy of the Service Contract 8. Copy of Certificate of Registration of Proponent as RE developer 9. DOE‐approval on the transfer of assignment 10. DOE‐REMB endorsement of the project (status of service contract, transfer of assignment, increase/decrease in capacity CHARGES & FEES Minimum of P500.00 (<1MW) P1,000.00 (1MW to <10MW) Maximum of P10,000.00 or P100.00 per MW of installed capacity whichever is higher for 10MW and above LEGAL BASES ERC Guidelines for the issuance of Certificate of Compliance for Generating Companies/Facilities 24 DAYS (68 + 4.5 Days) GRANTING OF FINANCIAL BENEFITS TO HOST COMMUNITIES UNDER ER 1-94, AS AMENDED PROCESS FLOW IN ACCESSING DLF AND RWMHEEF RESPONSIBLE PERSONNEL/ OFFICE / UNIT PROCEDURES NORMAL PROCESSING TIME (WORKING DAYS) CONTACT NUMBERS LOCATION OF OFFICE Submission of project proposal Office of the Director, EPIMB / NEPMAS, REAMD Receive / Verify application / Checking of Documents 1 Evaluate complete project proposal 5 Review / endorsement of project proposal 3 SRS / SSRS, REAMD Chief, REAMD / Office of the Director, EPIMB / USEC Approval of project proposal* 5 Preparation / Review of MOA on project implementation 9 OSEC Chief, REAMD / Legal Services Endorsement of MOA for Signature and Notarization by GENCOs and LGU Signing of MOA LGU/Region/GENCOs OSEC / USEC / IAS / Financial Services / EPIMB / Legal Signing and Notarization of MOA*** Chief, Accounting Division / OD / Treasury Division Releasing of fund** DV and OS Preparation (upon receipt of complete bid docs) LEGEND Applicant * For Approval of Projects Office of the Secretary (regardless of amount) ** For approval of project fund transfer Bureau Director for projects < 1M Php DOE Undersecretary for projects < 5M Php DOE Secretary for projects = / > 5M Php *** Energy Project: DOE & Distribution Utilities Non-Energy Project: DOE / LGU / Generating Companies (regardless of project cost) *** MOA signing will be scheduled 3 times a week in a designated room at Power Bureau. A Memo will be issued to the concerned DOE officials informing them of the scheduled MOA signing ****60 WD required for NPC‐Mindanao generation of Agus 1, 2, 4, 5, 6, 7 (Facilities & Resources) 4F, DOE Main Building Loc. 221 (Acctg.) Loc. 373 (FS – OD) Loc. 233 (TD) 2F, DOE Annex Building 2F, DOE Annex Building GF, DOE Annex Building 20 WD **** required for the GENCOs & HC’s REQUIREMENTS DOE TL: 4792900 Loc. 416/417 For Approval of Projects Pls refer to Schedules A, B, & C For approval of project fund transfer Pls refer to Schedule D ER 1-94 FUNDS DLF – Development and Livelihood Fund RWMHEEF – Reforestation, Watershed Management, Health and/or Environmental Enhancement Fund 3 19 CHARGES & FEES No fees LEGAL BASES ‐ Sec. 5(i) of RA7638 ‐ Rule 29 Part A of the RA9136‐IRR 45 DAYS (76 Days) per Project Proposal “ANNEX B” “ANNEX A” ER 1-94 NON-ELECTRIFICATION PROJECTS DOCUMENTARY REQUIREMENTS ER 1-94 NON-ELECTRIFICATION PROJECTS DOCUMENTARY REQUIREMENTS A. REFORESTATION WATERSHED MANAGEMENT HEALTH AND ENVIRONMENTAL ENHANCEMENT FUND: A. DEVELOPMENT AND LIVELIHOOD FUND: TYPE OF PROJECT ✓ 2 Feasibility study for projects* ✓ ✓ ✓ ✓ ✓ ✓ 3 Sketch/location map of the project 4 Disbursement schedule, detailed cost estimate, bill of materials, plans, drawings, specifications, program of work duly signed by the Municipal/Provincial Engineer and Mayor/Governor 5 List of cooperative/association members/borrowers with corresponding amount to be borrowed and purpose* 6 Cooperative/association's latest financial statement (6 mos – 1 yr prior to project application)** 7 Three ‐ Five year projected income statement 8 Training design 9 Notarized copy of Deed of Donation/Proof of Transfer of Private Property/Transfer Certificate of Title or equivalent legal documents justifying public ownership of lot/site ✓ ✓ ✓ Resolution from the concerned sanggunian endorsing the project identified during the LGU consultation ✓ ✓ ✓ ✓ ✓ ✓ ✓ 2 Feasibility Study for projects* ✓ ✓ ✓ ✓ ✓ ✓ ✓ 3 Justification of the project to include the following which should be stipulated and/or attached in the Project ✓ ✓ ✓ ✓ ✓ ✓ ✓ 3.1 Total areas to be planted & type and number of flora species to be planted ✓ ✓ ✓ ✓ 1 DOCUMENTS ✓ ✓ 3.2 3.3 ✓ 3.4 10 11 12 13 ✓ Sanggunian resolution stipulating date of transfer of property, existing use of transferred property ✓ Certification of road classification from the concerned host LGU's engineer's office Certified True Copy of SEC/CDA/DOLE Certificate of Registration** ✓ ✓ ✓ ✓ Relevant permits from concerned agencies** ✓ ✓ ✓ * as applicable ** for projects with cooperative/association as project implementor *** training as a component of a project or solely training List of existing medical and/or health personnel in the area and existing proposed health and/or medical related activities Certification from local water utility of the adequacy of water supply Certification from DOH/local water utility for the potability of water Water Supply System Communal Toilets Solid Waste Management Training Needs (IEC Equipment) ✓ Health Center/ Medical Facility/ Equipment ✓ Erosion Structural Measures 1 Nursery/ Reforestation / Agroforestry Training*** Infrastructure Resolution from the concerned Sanggunian endorsing the project identified during the LGU consultation TYPE OF PROJECT Income Generating Livelihood Projects DOCUMENTS ✓ ✓ ✓ 3.5 List of existing number of dump/garbage trucks ✓ 3.6 Certification from the LGU of the existing dump site ✓ 3.7 Average daily volume of garbage ✓ 3.8 Target beneficiaries ✓ ✓ ✓ ✓ ✓ ✓ ✓ 3.9 Project location sketch map ✓ ✓ ✓ ✓ ✓ * as applicable ** for projects with cooperative/association as project implementor *** training as a component of a project or solely training ✓ “ANNEX D” “ANNEX C” Check list of Bidding Documents for submission to DOE ER 1-94 NON-ELECTRIFICATION PROJECTS DOCUMENTARY REQUIREMENTS 1) 2) A. REFORESTATION WATERSHED MANAGEMENT HEALTH AND ENVIRONMENTAL ENHANCEMENT FUND: 3) Disbursement schedule, detailed cost estimate/bill of materials/detailed 3.10 specifications/program of work/plans/ drawing duly signed by the Municipal/Provincial Engineer and Mayor/Governor Cooperative/association's latest 3.11 financial audit (6 mos. to 1 year prior to project application)** Three ‐ Five ‐ year projected income 3.12 statement 3.13 SEC/CDA/DOLE Certificate of Registration** 3.14 Training design 3.15 3.16 3.17 3.18 Notarized copy of Deed of Donation/Proof of Transfer of Private Property/Transfer Certificate of Title or equivalent legal documents justifying public ownership of lot/site Municipal Helath Officer/DOH endorsement to manage the project and Certification that there is no existing health center in the area/feasibility& standard of equipment/facilities Endorsement/Certification from the concerned DENR Office/Watershed Administrator as to the feasibility of the project Relevant permits from concerned agencies Solid Waste Managemen t Training Needs (IEC Equipment) Communal Toilets Erosion Structural Measures Health Center/ Medical Facility/ Equipment Water Supply System DOCUMENTS Nursery/ Reforestatio n/ Agroforestry TYPE OF PROJECT 4) 5) 6) 7) 8) ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ 10.b 10.c 10.d 10.e ✓ ✓ ✓ 10) ✓ ✓ ✓ Bid Price in the Bill of Quantities Bid Evaluation Report Bid Schedule Cash Flow/Payment Schedule 11) 12) 13) 14) Abstract of Bids signed by BAC Contract Agreement by LGU and winning Bidder Notice of Award signed by LGU and winning bidder Notice to Proceed duly acknowledge by Contractor indicating actual date of receipt 15) 16) 17) 18) Land Bank Certificate DOE Notice to Proceed MOA among DOE, LGU and Power Plant Sangguniang Resolution proposing and endorsing the Project Sangguniang Resolution authorizing the concerned Gov't Officials 19) ✓ Invitation to Apply To Bid/PHILGEPS PHILGEPS/Copy of News Clipping with project cost of 500 Thousand and above Evaluation Result/Evaluation Report of Bidders/Suppliers ___ 3.a Pre‐Qualification ___ 3.b Post Qualification Instruction to Bidders/Suppliers Bidder's Bond with specified date Performance Bond and Bank Guarantee with specified date Minutes of BAC meeting/ Minutes of Bidding containing the Name and signatures of the BAC attendees BAC Resolutions duly signed by BAC and the concerned LGU Official. 9.a Recommending Mode of Procurement 9.b Resolution of Award 9.c Declaring LCRB and Recommending Approval duly approved by the concerned LGU official. Bid Form/Bid Price/Bidded Cost /Detailed Estimated Cost 10.a Detailed Estimate re: to enter and sign all contracts/aggreements concerning ER 1‐94 projects ✓ ✓ ✓ ✓ ✓ ✓ Note: For photocopied documents‐ all copies submitted should bear the full name and signature of the person certifying that the same are true, complete, exact, and unaltered copies from the orginal document. * as applicable ** for projects with cooperative/association as project implementor *** training as a component of a project or solely training “Annex E” ER 1-94 NON-ELECTRIFICATION PROJECTS SAMPLE FORMAT OF PROJECT PROPOSAL GRANTING OF FINANCIAL BENEFITS TO HOST COMMUNITIES UNDER ELECTRIFICATION FUND OF ER 1-94, AS AMENDED RESPONSIBLE PERSONNEL/ OFFICE / UNIT PROCEDURES NORMAL PROCESSING TIME (WORKING DAYS) CONTACT NUMBERS LOCATION OF OFFICE Submission of project proposal* Director‐EPIMB/Chief/Supvg. SRS, REAMD Receiving/Verification/ Checking of Document 1 Sr. SRS/SRS II‐REAMD Evaluation of COMPLETE project proposal 5 Chief‐REAMD/Director‐EPIMB/Assistant Secretary/Undersecretary Endorsement of project proposal for funding approval 3 Secretary Funding approval of project proposal 5 REAMD/Legal Services (LS) Preparation of Memorandum of Agreement (MOA) on project implementation 10 Distribution Utility (DU)/ Generation Company (GenCo) Signing and Notarization of by DUs and GenCos (20Days) REAMD/EPIMB/Financial Service(FS)/Assistant Secretary/ Undersecretary/Secretary/LS Signing and Notarization of MOA by DOE** REAMD/EPIMB/FS/Assistant Secretary/Undersecretary/ Secretary/Treasury Division Processing of Disbursement Voucher*** (DV) and releasing of the Initial Fund equivalent to 15% of Approved project cost) upon signing of MOA Distribution Utility (DU) DU to conduct the Public Bidding and Submit to DOE the pertinent Bidding Documents (28‐144Days as per RA 9184) REAMD/EPIMB/FS/Assistant Secretary/Undersecretary/ Secretary/Treasury Division LEGEND Applicant DOE * PROJECT PROPOSAL 1. Staking Sheets/Plans/Design / Project Cost Estimate 2. Resolution from LGU ** Signatorites on the MOA DOE, DU/Project Implimentor and Generation Company *** For approval of project fund transfer Bureau Director for projects < 1M Php DOE Undersecretary for projects = 1M / < 5M Php DOE Secretary for projects = / > 5M Php Processing of DV*** and releasing of the remaining 85% of the project fund (based on the result of competitive public bidding****) upon receipt of COMPLETE documents from DU/Project Implementor ****LIST OF BIDDING DOCUMENTS AS PER DOE‐ACCOUNTING 1. Invitation to Apply for Eligibility and to Bid OR Notice of Bidding/ PhilGEPS Invitation to Bid 2. Copy of News Clipping with project cost of 500 thousand and above and/or posted in conspicuous place pursuant to IRR R.A. No. 9184 3. Evaluation Result / Evaluation Report of Bidders/Suppliers 4. Instruction to Bidders/Suppliers 5. Bidder's Bond/Security Bond &Performance Bond 6. Complete copy of Minutes of BAC Meeting / Bidding & Attendance Sheet 7. BAC Resolution for Recommending Mode of Procurement, Resolution of Award, Declaring Lowest Calculated and Responsive Bid (LCRB) and Recommending Approval 8. Bid Form – Detail Estimate, Bid Price in Bill of Quantities, Evaluation Report 9. Abstract of Bids signed by Bids and Awards Committee 10. Contract/ Memorandum of Agreement between Distribution Utility and the winning Public Bidder 11. Notice Award and Notice to Proceed duly Acknowledge by Contractor indicating date of receipt TL: 4792900 Loc. 418 4F, DOE Main Building 3 15 15 CHARGES & FEES No Fees LEGAL BASES 57 DAYS ‐ Sec. 5(i) of RA7638 ‐ Rule 29 Part A of the RA9136 ‐IRR (64 Days) AVAILMENT OF SUBSIDY UNDER THE NATIONWIDE INTENSIFICATION OF HOUSEHOLD ELECTRIFICATION (NIHE) PROGRAM RESPONSIBLE PERSONNEL/ OFFICE / UNIT PROCEDURES NORMAL PROCESSING TIME (WORKING DAYS) CONTACT NUMBERS LOCATION OF OFFICE Submission of project proposal* Director‐EPIMB/Chief/Supvg. SRS, REAMD Sr. SRS/SRSII‐REAMD Chief‐REAMD/Director‐EPIMB/Assistant Secretary/Undersecretary Secretary REAMD/Legal Services (LS) Distribution Utility (DU) REAMD/EPIMB/Financial Service(FS)/Assistant Secretary/ Undersecretary/Secretary/LS Receiving/Verification/ Checking of Document 1 Evaluation of COMPLETE project proposal 5 Endorsement of project proposal for funding approval 3 Funding approval of project proposal 5 Preparation of Memorandum of Agreement (MOA) on project implementation 10 Signing and Notarization of MOA by DOE** REAMD/EPIMB/FS/Assistant Secretary/Undersecretary/ Secretary Processing of Disbursement Voucher*** for the release of Project Fund (based on the result of competitive public bidding****) upon receipt of COMPLETE Bidding Documents from Distribution Utility (DU) 15 FS Request for Issuance of Letter of Introduction (LOI) from Bank where DU opened an account 1 Treasury Division Release of Project Fund to DU’s Bank Account to proceed Project Implementation DOE * PROJECT PROPOSAL 1. Project Briefer from DU 2. Resolution from LGU on the list of eligible potential households ** Signatorites on the MOA DOE, Distribution Utility (DU) *** For approval of project fund transfer Bureau Director for projects < 1M Php DOE Undersecretary for projects = 1M / < 5M Php DOE Secretary for projects = / > 5M Php Loc. 373 2F, DOE Annex Building 3 DU to conduct the Public Bidding and Submit to DOE the pertinent Bidding Documents (28‐144Days as per RA 9184) Applicant 4F, DOE Main Building Signing and Notarization of MOA by DU (10 Days) Distribution Utility (DU) LEGEND TL: 479‐2900 Loc. 418 ****LIST OF BIDDING DOCUMENTS AS PER DOE‐ACCOUNTING 1. Invitation to Apply for Eligibility and to Bid OR Notice of Bidding/ PhilGEPS Invitation to Bid 2. Copy of News Clipping with project cost of 500 thousand and above and/or posted in conspicuous place pursuant to IRR R.A. No. 9184 3. Evaluation Result / Evaluation Report of Bidders/Suppliers 4. Instruction to Bidders/Suppliers 5. Bidder's Bond/Security Bond &Performance Bond 6. Complete copy of Minutes of BAC Meeting / Bidding & Attendance Sheet 7. BAC Resolution for Recommending Mode of Procurement, Resolution of Award, Declaring Lowest Calculated and Responsive Bid (LCRB) and Recommending Approval 8. Bid Form – Detail Estimate, Bid Price in Bill of Quantities, Evaluation Report 9. Abstract of Bids signed by Bids and Awards Committee 10. Contract/ Memorandum of Agreement between Distribution Utility and the winning Public Bidder 11. Notice Award and Notice to Proceed duly Acknowledge by Contractor indicating date of receipt 1 CHARGES & FEES No fees LEGAL BASES - Sec. 5(i) of RA7638 - Rule 29 Part A of the RA9136 -IRR 44 DAYS (51 Days) QUALIFIED THIRD PARTY APPLICATIONS FOR ENDORSEMENT TO ERC RESPONSIBLE PERSONNEL/ OFFICE / UNIT NORMAL PROCESSING TIME (WORKING DAYS) PROCEDURES CONTACT NUMBERS LOCATION OF OFFICE Submission of complete set of requirements 1 Checking of submitted documents Science Research Specialist, REAMD TL: 4792900 Loc. 417 4F, DOE Main Building Loc. 414 4F, DOE Main Building Loc. 403 (LS) Loc. 271 (IAS) ERL Building 3 3F, DOE Annex Building No Complete? Yes Office of the Director, EPIMB Legal Services, Internal Audit Services, Request evaluation / assessment from concerned bureau/s and institution/s 1 Legal, Financial, and Technical Evaluation of the Project REAMD ‐ EPIMB 40 No Acceptable? Yes Office of the Director, EPIMB Review of Evaluation Report 5 Office of the Director, EPIMB Issuance of recommendation to NPC for signing of QTP Subsidy and Service Contract 1 NPC Office of the Director, EPIMB Assistant Secretary Undersecretary Review and Endorsement of Project for Assistant Secretary/ Undersecretary’s approval 5 Recommendation of the Endorsement to the Secretary for Signature 1‐3 Signing of Endorsement 1 Recording and Release of Endorsement 1/2 Secretary Science Research Specialist, REAMD LEGEND Applicant DOE 30 REQUIREMENTS As prescribed under DOE Circulars No. 2004‐06‐006 and 2005‐ 12‐011 (See details in “Annex F”) CHARGES & FEES No fees LEGAL BASES EPIRA IRR Rule 14 DOE Circular No. 2004‐06‐006 DOE Circular No. 2005‐12‐011 57.5 DAYS “ANNEX F” As prescribed under DOE Circulars No. 2004-06-006 and No. 2005-12-011 General Official Letter of Intent Profile of Company or Organization Relevant registration from Securities and Exchange Commission, Department of Trade and Industry, NEA or Cooperative Development Authority Technical Requirements Full details of the technical skills and experience of the key management team responsible for the operation of the system. These details should include relevant technical and business management qualifications as well as full descriptions of experience relevant to the technical and commercial operation of electric power generation and supply systems. Details of the proposed arrangements for the acquisition, training and contracting of the necessary expertise that the applicant does not possess at the time of application. Details of how the applicant proposes to design, construct, operate, and maintain the generation and associated distribution system to be used in its operations, including its proposed plans for dealing with major operating contingencies such as a failure of its generating plant or a major fault on its distribution system. Details of the procedures that the applicant proposes to put in place for the billing to and collection of payment from customers and maintain accounting records of its commercial operations. An undertaking that the applicant will allow DOE and/or ERC to open its accounting records relating to its operations, when necessary. A statement certifying that the applicant intends to design, construct, operate and maintain its generation and distribution systems in full compliance with the relevant requirements prescribed under the applicable laws including EPIRA and its attendant rules and regulations. Other information as may be requested by DOE to demonstrate technical capacity. Financial Requirements Evidence of the total net assets of the organization. A letter of credit or letter of intent to invest from a bank or another organization provided that the DOE is satisfied that the other party has adequate financial capacity and indeed has the intent to invest or provide credit. The most recent annual report or financial accounts of the applicant duly certified as correct by a registered auditor or accountant. Proof of adequate insurance coverage and compliance with all Philippine labor laws. Good Standing Proof of Good Standing APPLICATIONS FOR PV MAINSTREAMING PROGRAM UNDER ELECTRIFICATION FUND OF ER1-94, AS AMENDED RESPONSIBLE PERSONNEL/ OFFICE / UNIT PROCEDURES NORMAL PROCESSING TIME (WORKING DAYS) CONTACT NUMBERS LOCATION OF OFFICE Submission of complete set of Project Proposal* Office of the Director/ Chief/ Supvg. SRS, REAMD Evaluation of COMPLETE Project Proposal 5 Endorsement of Project Proposal for funding approval 5 Sr. SRS/ SRS II, REAMD Chief, REAMD/ Director/ Asst . Secretary/ Undersecretary Secretary Funding Approval of Project Proposal REAMD/Legal Services (LS) 10 Signing of MOA** 3 REAMD/EPIMB/FS/Asst Secretary/ Undersecrdetary/ Secretary/ Treasury Division Processing of Disbursement Voucher*** (DV) and releasing of the Initial Fund equivalent to 15% of Approved project cost) upon signing of MOA Processing of DV*** and releasing of the remaining 85% of the project fund (based on the result of competitive public bidding****) upon receipt of COMPLETE documents LEGEND Applicant LIST OF THE REQUIREMENTS DOE * PROJECT PROPOSAL 1. Board Resolution adaption of PVM 2. Complete List of Beneficiaries as result of Hhold Survey 3. Business Plan 4. Project Implementation Plan 5. Signed Policy Manual with corresponding Board Resolution 6. Proposed Monthly Tariff **MOA Signatories 1. DOE 2. DU/Project Implementor Generation Company ***DV SIGNATORY 1. EPIMB Director <1M Php 2. DOE Undersecretary = 1M / <5M Php 3. DOE Secretary = / > 5M Php PROJECT PROPOSAL 1. 2. 3. 4. 5. 6. Board Resolution adaption of PVM Complete List of Beneficiaries as result of Household Survey Business Plan Project Implementation Plan Signed Policy Manual with corresponding Board Resolution Proposed Monthly Tariff ****Refer to “Annex D” TL: 4792900 Loc. 414 / 417 4F, DOE Main Building 10 Preparation of Memorandum of Agreement (MOA) on Project Implementation REAMD/EPIMB/Financial Service(FS)/Asst Secretary/ Undersecrdetary/ LS REAMD/EPIMB/FS/Asst Secretary/ Undersecrdetary/ Secretary/ Treasury Division 1 Receiving/Verification/ Checking of Documents 15 15 CHARGES & FEES No fees LEGAL BASES ER 1‐94, as amended/ EPIRA‐IRR 64 DAYS Matrix of Changes of Processing of PV Mainstreaming Program ELECTRIFICATION FUND OF ER1-94, AS AMENDED First submission Second Submission Reason for Changes “Preparation of OS and DV upon receipt of COMPLETE documents” Amended to “Processing of Disbursement Providing the details of the process Voucher (DV) and releasing of the Initial considering up to 10‐15 days as Fund equivalent to 15% of Approved harmonized to the process under ER1‐94 project cost) upon signing of MOA” “Release of Funds for Project Implementation (Based on the result of competitive public bidding)” Amended to “Processing of DV and releasing of the remaining 85% of the project fund (based on the result of competitive public bidding) upon receipt of COMPLETE documents” Providing the details of the process considering up to 10‐15 days as harmonized to the process under ER1‐94 1ST ENDORSEMENT TO THE SECURITIES AND EXCHANGE COMMISSION (SEC) RESPONSIBLE PERSONNEL/ OFFICE / UNIT NORMAL PROCESSING TIME (WORKING DAYS) PROCEDURES CONTACT NUMBERS LOCATION OF OFFICE Submission of application with complete supporting documents SRS II, PPDD 0.5 Evaluation of application SRS II, PPDD TL: 4792900 Loc. 202 4F, DOE Main Building Loc. 414 4F, DOE Main Building Preparation of SEC 1st endorsement 0.5 Chief SRS, PPDD Review/Endorsement Approval/Signing Director, EPIMB 1 Payment of Processing Fee 0.5 Clerk, PPDD LEGEND Applicant DOE Release of 1st endorsement LIST OF REQUIREMENTS 1. Letter of request addressed to the DOE Secretary, Attention to the Undersecretary for Power and EPIMB Director (parallel submission to DOE Records Division and EPIMB‐PPDD); 2. SEC prescribed Cover Sheet; 3. Draft Articles of Incorporation (AOI) or Articles of Limited Partnership of the Company; and 4. By‐Laws of the Company For Amendment of AOI or Articles of Limited Partnership of the Company 1. Draft AOI or Articles of Limited Partnership of the Company; and 2. Directors’ Certificate CHARGES & FEES Php 500.00 LEGAL BASES SEC Requirements for Primary Registration for Corporation & Partnerships 2.5 DAYS CLEARANCE TO UNDERTAKE SYSTEM IMPACT STUDY (SIS) ENDORSEMENT TO THE NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) RESPONSIBLE PERSONNEL/ OFFICE / UNIT NORMAL PROCESSING TIME (WORKING DAYS) PROCEDURES CONTACT NUMBERS LOCATION OF OFFICE Submission of application with complete supporting documents SRS II, PPDD Evaluation of application TL: 4792900 Loc. 202 4F, DOE Main Building Loc. 414 4F, DOE Main Building 0.5 For Renewable Energy (RE) Projects REMB endorsement SRS II, PPDD 2 Preparation of SIS endorsement 0.5 Chief SRS, PPDD Review/Endorsement Director, EPIMB Clerk, PPDD LEGEND Applicant DOE Signing of SIS endorsement 1 Release of SIS endorsement to Applicant and NGCP 0.5 LIST OF REQUIREMENTS 1. Letter of Request addressed to the DOE Secretary, Attention to the Undersecretary for Power and EPIMB Director (parallel submission to DOE Records Division and EPIMB-PPDD) 2. Company Profile 3. Project Background/Description to include the following: exact location, official name of the powergenerating facility, commissioning date, off-taker of the electricity, etc.) Additional for Renewable Energy Power Projects: 4. Copy of the Service Contract 5. Copy of Certificate of Registration of Proponent as RE developer CHARGES & FEES No Fees LEGAL BASES Internal arrangement between DOE & NGCP 2.5 DAYS (Non-RE) 4.5 DAYS (RE) ENDORSEMENT OF CERTIFICATE OF NON-OVERLAP (CNO) & CERTIFICATION PRECONDITION (CP) TO THE NATIONAL COMMISSION ON INDIGENOUS PEOPLES (NCIP) RESPONSIBLE PERSONNEL/ OFFICE / UNIT NORMAL PROCESSING TIME (WORKING DAYS) PROCEDURES CONTACT NUMBERS LOCATION OF OFFICE Submission of application with complete supporting documents SRS II, PPDD 0.5 Evaluation of application SRS II, PPDD TL: 4792900 Loc. 202 4F, DOE Main Building Loc. 414 4F, DOE Main Building Preparation of letter of endorsement 0.5 Chief SRS, PPDD Review and initial on the letter of endorsement Director, EPIMB Signing of letter of endorsement 1 Release of letter of endorsement to Applicant 0.5 Clerk, PPDD LEGEND Applicant DOE LIST OF REQUIREMENTS 1. Letter of request addressed to the DOE Secretary, Attention to the Undersecretary for Power and EPIMB Director (parallel submission to DOE Records Division and EPIMB‐PPDD); 2. Letter of request addressed to NCIP; 3. Company Profile; 4. Project Background; and 5. Vicinity Map CHARGES & FEES No Fees LEGAL BASES NCIP Administrative Order No.1, Series of 2006 2.5 DAYS CERTIFICATION TO THE PHILIPPINE NATIONAL POLICE (PNP) AS A REQUIREMENT FOR THE ISSUANCE OF THE LICENSE TO POSSESS EXPLOSIVES/EXPLOSIVE INGREDIENTS/CONTROLLED CHEMICALS AS PURCHASER RESPONSIBLE PERSONNEL/ OFFICE / UNIT PROCEDURES NORMAL PROCESSING TIME (WORKING DAYS) CONTACT NUMBERS LOCATION OF OFFICE Submission of application with complete supporting documents SRS II, PPDD TL: 4792900 Loc. 202 4F, DOE Main Building Loc. 414 4F, DOE Main Building 0.5 Evaluation of application SRS II, PPDD Preparation of Certification to PNP 0.5 Chief SRS, PPDD Director, EPIMB Review and initial on the Certification to PNP Signing of Certification to PNP 1 Clerk, PPDD LEGEND Applicant DOE Release to Applicant of Certification to PNP LIST OF REQUIREMENTS 1. Letter of request addressed to the DOE Secretary, Attention to the Undersecretary for Power and EPIMB Director (parallel submission to DOE Records Division and EPIMB‐PPDD) indicating the specific purpose to purchase/possession the explosives/explosive ingredients/ controlled chemicals and the detailed information on the name of chemicals/explosive ingredients/explosives, quantities, etc., which will be used in the power generation; 2. Letter of request addressed to the PNP Chief, Attention to the Chief of Firearms and Explosives Office for the issuance of license to possess explosives/explosive ingredients/controlled chemicals as a PURCHASER including the information on the tentative date of delivery, quantity for delivery and the name of chemicals; 3. Accomplished Form from PNP Explosives Management Division for the Request to Possess/Purchase Explosives/Explosive Ingredients/Controlled Chemicals; 4. Copy of DOE Certificate of Endorsement to the Energy Regulatory Commission for the issuance of the Certificate of Compliance; 5. If the company is the winning bidder of NPC‐PSALM’s assets for privatization, the company must submit copy of any notarized pertinent documents related to the transfers of assets from NPC – PSALM to the winning bidder such as Asset Purchase Agreement (APA), Land Lease Agreement (LLA) Amendment, Accession and Assumption Agreement (AAAA), Deed of Absolute Sales (DOAS), etc; and 6. Proof of Registration of the requesting company and the name of the resource facility registered in the Wholesale Electricity Spot Market 0.5 CHARGES & FEES No Fees LEGAL BASES PNP‐Explosives Management Division Requirements for Issuance of License to Possess Explosives/Explosive Ingredients/Controlled Chemicals 2.5 DAYS APPLICATION FOR DIRECT CONNECTION RESPONSIBLE PERSONNEL/ OFFICE / UNIT NORMAL PROCESSING TIME (WORKING DAYS) PROCEDURES CONTACT NUMBERS LOCATION OF OFFICE Submission of written application with complete requirements Payment of processing fee Direct Connection Review and Evaluation Committee (DREC) – Chairperson (Undersecretary for Power) Referring the application 2 DREC Secretariat, PMDD TL: 4792900 Loc. 387 Checking of submitted requirements No 4F, DOE Main Building 3 Complete? Yes DREC TWG DREC TWG Conduct of consultation, group discussion, validation and/or ocular inspection, evaluation and recommendation Endorsement to DREC DREC Endorsement to the Secretary of DREC’s Approval/ Disapproval Secretary Approval of DREC’s Endorsement LEGEND Applicant DOE 45 LIST OF REQUIREMENTS 1. Letter of Application addressed to DOE Secretary, Attention Undersecretary for Power, D‐REC Chairperson 2. Corporate/ Business Profile 3. Location of Installation, plant or factory which direct supply is sought, including the nearest NGCP/ Distribution Utility substation 4. Delivery Voltage 5. Requested Schedule for connection 6. Load Demand for the past 12months 7. Certification from NGCP 8. Cost Benefit Analysis 9. Information on Intent and/or Arrangement for a PSA 10. Certificate of Contestability 11. Other relevant technical information/documents that may support the application 15 CHARGES & FEES (subject to approval by the DOE Committee on Fees and Charges) PhP3, 052.00 LEGAL BASES ‐ Supreme Court Decision (G.R. No.172960) ‐ House Rules Governing the Review and Evaluation Of Direct Connection Applications of Industrial, Commercial and Other Qualified Electricity End‐ Users, Economic Zones and Ecozone Enterprises ‐ Electric Power Industry Reform Act (R.A. No. 9136) 65 DAYS
© Copyright 2026 Paperzz