Public Version MISO 2013 Summer Coordinated Seasonal Transmission Assessment May 31, 2013 Final Report 1 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version CONTENTS Contents .................................................................................................................................................. 2 1.0 Executive Summary .......................................................................................................................... 4 2.0 Introduction .................................................................................................................................... 10 3.0 Study Criteria .................................................................................................................................. 13 4.0 Study Participants ........................................................................................................................... 15 5.0 Models and Input Data .................................................................................................................... 17 6.0 Study Methodology ......................................................................................................................... 22 6.1 Steady State AC Contingency Analysis ...................................................................................................22 6.2 FCITC Transfer Analysis ..........................................................................................................................23 6.3 Critical Interface Voltage Stability Analysis ............................................................................................23 6.4 Large Load Area Analysis .......................................................................................................................23 7.0 Steady-State Analysis Results......................................................................................................... 25 7.1 Summary....................................................................................................................................................25 7.2 Prior Outages to Watch .............................................................................................................................25 8.0 Transfer Analysis Results ............................................................................................................... 26 8.1 Carmel Region to St. Paul Region ............................................................................................................27 8.2 Carmel Region + SPP to NW Dakotas ....................................................................................................28 8.3 St. Paul Region to Carmel Region ...........................................................................................................29 8.4 MISO Indiana/Illinois to TVA .................................................................................................................30 8.5 PJM N. Illinois to PJM Ohio....................................................................................................................31 8.6 MISO IL/MO to MISO South Region & TVA .......................................................................................32 8.7 Missouri to Indiana...................................................................................................................................33 8.8 Southern Carmel Region & PJM Ohio to Michigan ................................................................................34 8.9 MISO Southern Carmel Region to IESO..................................................................................................35 8.10 IESO to MISO Southern Carmel Region ...............................................................................................36 8.11 Entergy Texas + AEPW to Southern Company .....................................................................................37 8.12 S. MISO South Region to MISO IN/IL ..................................................................................................38 8.13 MISO South Region to TVA ..................................................................................................................39 8.14 TVA to MISO South Region ..................................................................................................................40 8.15 MISO South Region to PJM Mid-Atlantic .............................................................................................41 8.16 Southern Company to AEPW + Entergy Texas .....................................................................................42 8.17 PJM Ohio to PJM Northern Illinois ........................................................................................................43 9.0 Critical Interface Analysis Results ................................................................................................. 44 9.1 9.2 9.3 9.4 9.5 Minnesota-Wisconsin Export (MWEX) ..................................................................................................45 Southern Louisiana HV Interface ............................................................................................................49 Down Stream of Gypsy HV Interface......................................................................................................51 MISO South’s Western HV Interface ......................................................................................................53 St. Louis South Interface ..........................................................................................................................54 10.0 Large Load Area Analysis Results................................................................................................ 55 10.1 Vectren/BREC Combined Metro LLA ...................................................................................................56 10.2 West Of The Atchafalaya Basin (WOTAB) ...........................................................................................58 10.3 Little Rock Metro Area ...........................................................................................................................60 10.4 Indianapolis Metro Area .........................................................................................................................62 10.5 Detroit Metro Area ..................................................................................................................................64 2 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 11.0 Wind Generation Sensitivity Analysis .......................................................................................... 66 12.0 IROL Limits ................................................................................................................................. 68 13.0 Nuclear Plant Interface requirements ............................................................................................ 69 14.0 Appendices .................................................................................................................................... 79 15.0 Abbreviations and acroynms ......................................................................................................... 80 3 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 1.0 EXECUTIVE SUMMARY The MISO Coordinated Seasonal Transmission Assessment (CSA) is a reliability assessment that tests the performance of MISO’s transmission network under anticipated operating horizon loading conditions. This study is coordinated with other studies performed by MISO members and other planning entities. This study includes the new MISO South region which consists of Entergy transmission system that began receiving Reliability Coordination services in December 2012. Fourteen new members resulting in seven new Local Balancing Authorities (LBA) in the MISO South Region, will begin receiving Reliability Coordination services on June 1, 2013 and have declared intent to join MISO as a Transmission Owning member in 2013, was included in this CSA. None of these LBAs were MISO transmission owning members when this study was performed. This Summer transmission system assessment is produced in order to provide system operators with guidance as to possible acute system conditions that would warrant close observation to ensure system reliability. The sensitivity cases and outage contingencies contained herein often go beyond regional planning criteria and such criteria used by the local transmission owners. The 2013 Summer CSA performed the following transmission system assessments: Steady State AC Contingency Analysis was performed of the MISO system. Transfer Analysis was performed to identify thermal limitations using First Contingency Incremental Transfer Capability (FCITC) analysis. The transfers considered in the study are shown below: MISO Carmel Region to MISO St. Paul Region MISO S. Carmel & SPP to NW & Dakotas MISO St. Paul Region to MISO Carmel Region MISO IN/IL to TVA PJM Northern Illinois to PJM Ohio MISO MO/IL to MISO South & TVA MISO Missouri to Indiana Southern Carmel Region & PJM Ohio to Michigan Southern Carmel Region to IESO IESO to Southern Carmel Region AEPW + EES_TX to SOCO S. MISO South Region to MISO IN/IL MISO South Region to TVA TVA to MISO South Region MISO South Region to PJM Mid-Atlantic SOCO to AEPW + EES_TX PJM Ohio to PJM N. Illinois 4 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version Critical Interface Voltage Stability Analysis was performed for those areas that are either known to experience voltage stability limitations under certain operating conditions or are suspected of having potential voltage stability limitations. The areas analyzed were: MWEX Interface S. Louisiana HV Interface Down Stream of Gypsy (DSG) HV Interface MISO South’s Western HV Interface St. Louis South Interface Large Load Area Screening Analysis was performed within the MISO footprint for potential voltage instability arising from limited local reactive reserves under severe disturbances and load sensitivities. The large load areas covered in this assessment are: Vectren and Big Rivers Metro WOTAB area Little Rock Metro Indianapolis Metro Detroit Metro 5 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version Summary of Results Steady State AC Contingency Analysis In general, the MISO transmission system performed well. There are some contingencies that may require operator action to avoid potential overloads or low voltages during the 2013 Summer peak conditions, depending on system conditions. These contingencies have been identified and tabulated, with the actions required to address these potential issues contained in Section 7 of this report. FCITC Transfer Analysis There were seventeen transfers studied in the 2013 Summer assessment; however, the following transfer is being discussed in this section because it has been one of the most limiting transfers in prior Summer assessments and it has been one of the top binding constraints seen in real-time operations in years past. PJM Ohio to PJM Northern Illinois: This transfer was requested by NIPSCO as they expect to see issues this summer for high transfers from PJM Ohio sinking into PJM N. Illinois. This transfer simulates high east-to-west transfers over NIPSCOs system. PJM N. Illinois is now an importing control area, they were an exporting control area in years past. - The inter-Regional transfer limit was observed at 1,500 MW. The limiting element for this transfer was the [CE] Kincaid—[AMIL] Pana 345 kV line for a category B contingency. This transfer was not performed last year. A Shift in PJM N. Illinois summer peak interchange of exporting 2,800 MW in 2012 to importing 50 MW in 2013 is one cause for this limit. PJM N. Illinois is now importing. See Section 8 for additional details on the remaining transfers studied. Critical Interface Voltage Analysis The purpose of this analysis was to determine voltage stability and voltage violation limitations. Minnesota-Wisconsin Export Interface: This interface is voltage stability limited by the transfer from Minnesota to the southeast direction through and into ATC under certain operating scenarios. By evaluating 2013 Summer peak base case scenario flow on the MWEX Interface may be limited from 800 MW to 1,800 MW to avoid voltage instability for a category B contingency event. This 1,000 MW range is a slight decrease over the prior year result as observed in the 2012 Summer CSA. This interface was studied with the Sherburne County unit No. 3 online. It was later discovered that it will be offline again for the 2013 Summer season. It is expected that the MWEX results to be similar to the 2012 Summer CSA in which this interface was analyzed with Sherburne County unit No. 3 offline. Southern Louisiana HV Interface: Localized issues limited this analysis to the point that we could not stress this fourteen EHV interface without observing a local thermal loading issue far from the interface. 6 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version Down Stream of Gypsy Interface: This interface is voltage stability limited by transfers from Central Louisiana into the Down Stream of Gypsy Region of Entergy under certain operating scenarios. By evaluating 2013 Summer peak base case scenario flow, the DSG Interface may be limited 1,800 MW to 2,200 MW to avoid voltage instability for a category C3 contingency event plus a prior outage. This 400 MW range is considered adequeate for the upcoming season. This transfer was not performed in the 2012 Summer CSA. Western portion of the West Of The Atchafalaya Basin Interface: This interface is voltage stability limited by transfers from an increase in Entergy’s Western subregion load and a decrease in remaining Entergy area load outside of the Western subregion. By evaluating 2013 Summer peak base case scenario flow, the Western Interface may be limited from 2,200 MW to 2,600 MW; to avoid voltage instability for the loss of several category B events. This 400 MW range is considered adequeate for the upcoming season. This transfer was not performed in the 2012 Summer CSA. St. Louis South Interface: No voltage stability issues were observed. See Section 9 for additional P/V analysis details. 7 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version Large Load Area Analysis The purpose of this analysis is to stress the transmission network supporting large load areas by subjecting it to multiple contingency events leading to low reactive power supply. Further analysis was also undertaken to investigate the sensitivity of the area to increases in forecast demand and to changes in load power factor. Vectren/BREC Area: The combined Vectren and BREC load areas have low reactive reserves for some extreme conditions for the 2013 summer season. The least reactive reserves were seen for a category D contingency event. Also the load was increased by 5 percent and the power factor was decreased by 4 percent. The second lowest reactive reserves were seen under a category C3 contingent event. Again, the load was increased by 5 percent and the power factor was decreased by 4 percent. These severe events are beyond what would typically be expected. In the event one of these or a variation occurs, some operational actions may be required to improve voltage stability margins: ensure all switched shunts are on, and bring on peaking units as is appropriate. West Of The Atchafalaya Basin (WOTAB): The WOTAB Region is a high profile industrial area that accounts for 25 percent of the total Entergy load. The least reactive reserves were seen for the category C3 contingency event. This reactive reserve decrease was observed through a severe load condition that increased the load by 5 percent (90/10 load profile) along with a power factor reduction of 4 percent. The severity of a category C3 contingency on top of a category B prior outage is beyond what would typically be expected. In the event one of these or a variation occurs, some operational actions may be required to improve voltage stability margins: ensure all switched shunts are on, and bring on peaking units as is appropriate. Little Rock Metro Area: In general, the Little Rock metro load area is projected to have sufficient reactive reserves and be voltage stable for the upcoming 2013 Summer season. The least reactive reserves were seen for a category B contingency event. This reactive reserve decrease was observed through a severe load condition that increases the load by 5 percent (90/10 load profile) along with a power factor reduction of 5 percent. These severe events are beyond what would typically be expected. In the event one of these or a variation occurs, some operational actions may be required to improve voltage stability margins: ensure all switched shunts are on, and bring on peaking units as is appropriate. The Little Rock Metro area was determined to have sufficient reactive reserves and is voltage stable for the 2013 Summer season. Indianapolis Metro Area: In general, the Indianapolis metro load area is projected to have sufficient reactive reserves and be voltage stable for the upcoming 2013 Summer season. The least reactive reserves were seen for a category B contingency event. This reactive reserve decrease was observed through a severe load condition that increases the load by 5 percent (90/10 load profile) along with a power factor reduction of 9 percent. These severe events are beyond what would typically be expected. In the event one of these or a variation occurs, some 8 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version operational actions may be required to improve voltage stability margins: ensure all switched shunts are on, and bring on peaking units as is appropriate. The Indianapolis Metro area was determined to have sufficient reactive reserves and is voltage stable for the 2013 Summer season. Detroit Metro Area: The Detroit Metro area accounts for 75 percent of the total ITCT load. The least reactive reserves were seen for several category B contingency events as well as a category C5 contingency event along with the independent prior outages of a category B contingency event. This reactive reserve decrease was observed through a severe load condition that increased the load by 5 percent (90/10 load profile) along with a power factor reduction of 4 percent. The severity of a category B contingency on top of a prior outage category B event is beyond what would typically be expected. In the event one of these or a variation occurs, some operational actions may be required to improve voltage stability margins: ensure all switched shunts are on, and bring on peaking units as is appropriate. See Section 10 for additional details on Large Load Area analysis. 9 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 2.0 INTRODUCTION MISO was approved by FERC as the nation’s first Regional Transmission Organization (RTO) in 2001. MISO launched its wholesale electricity market in 2005 and the Ancillary Services Market (ASM) in year 2009, providing both energy and operating reserves as well as regulation and response services that support reliable transmission system operation and equal acess to high voltage transmission system in 14 U.S. states and the Canadian province of Manitoba. The geographic location of the MISO CSA study footprint is shown below in Figure 2.0-1. Note again that Entergy’s transmission system is included in this diagram as party receiving RC services and as a party who has declared intent to become a MISO transmission owner. For the purposes of this study report, any references to the MISO transmission system include non-transmission owning member, Entergy, as their transmission system was assessed as part of this study. Figure 2.0-1: MISO CSA Study footprint The Bulk Power System (BPS) within the MISO CSA study footprint consists of an extensive 115 kV to 500 kV network. The 500 kV network in MISO is located in Arkansas, Louisiana, Minnesota, Mississippi, and Texas. The 345 kV networks are located in Arkansas, Illinois, Indiana, Iowa, Kentucky, Louisiana, Michigan, Missouri, Minnesota, North Dakota, South Dakota, Texas, and Wisconsin. The 230 kV networks are located in Arkansas, Illinois, Indiana, Iowa, Louisiana, Michigan, Mississippi, Missouri, Minnesota, North Dakota, South Dakota, Texas, and Wisconsin. MISO’s BPS lies in the following NERC regions: Midwest Reliability Organization (MRO), ReliabilityFirst Corporation (RFC) and Southeastern Reliability Corporation (SERC) regions. 10 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version MISO Regions MISO is providing Reliability Coordination services to Entergy as of December 1, 2012; therefore, the MISO transmission system consists of three operating regions. The three operating regions are called St. Paul Region, Carmel Region, and South Region; see Figure 2.0-2 below. St. Paul Carmel South Figure 2.0-2: MISO RC Operating Regions The St. Paul Region contains the MISO transmission systems in the states of Iowa, Minnesota, North Dakota, South Dakota and Wisconsin, consisting of the following control areas: Alliant Energy West [ALTW], Dairyland Power Cooperative [DPC], Great River Energy [GRE], MidAmerican Energy Company [MEC], Minnesota Power [MP], Montana-Dakotas Utilities [MDU], Muscatine Power and Water [MPW], Otter Tail Power [OTP], Southern Minnesota Municipal Power Agency [SMMPA] and Xcel Energy [XEL]. These St. Paul subregions all belong to the NERC approved MRO Region. The Carmel Region contains the MISO transmission systems in the states of Illinois, Indiana, Kentucky Michigan, Missouri, and (Eastern) Wisconsin consisting of the following control areas: Alliant Energy East [ALTE], Ameren Missouri [AMMO], Ameren Illinois [AMIL], Big Rivers Electric Cooperation [BREC], Columbia Water & Light Division [CWLD], City of Springfield (IL), Water Light & Power [CWLP], Duke Energy Indiana [DEI], Hoosier Energy [HE], Indianapolis Power and Light [IPL], International Transmission Company [ITCT], Madison Gas and Electric [MGE], Michigan Electric Transmission Company [METC], Northern Indiana Public Service Company [NIPSCO], Southern Illinois Power Cooperative [SIPC] and Southern Indiana Gas & Electric [SIGE], We Energies Corporation [WEC], Wisconsin Public Service [WPS], Wolverine Power [WPSC] and Upper Peninsula Power Company [UPPC]. The Carmel subregions belong to MRO, SERC or RFC regions of NERC. The South Region contains the MISO transmission systems in the states of Arkansas, Louisiana, Mississippi, and Texas consisting of the following control areas: Batesville generation [BBA], Brazos Electric Cooperative 11 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version [BRAZ], Cleco [CLEC], City of Benton AR [BUBA], City of Conway AR [CWAY], City of North Little Rock AR [NLR], City of Osceola AR [OMLP], City of Ruston, LA [DERS], City of West Memphis AR [WMU], Entergy Transmission [EES], Lafayette Utilities System [LAFA], Louisiana Energy and Power Authority [LEPA], Louisiana Generating, LLC [LAGN], Plum Point Energy Associates LLC [PLUM], South Mississippi Electric Power Associations [SMEPA], and Union Power Partners L.P. [PUPP]. The South subregions belong to the SERC Region of NERC. Study Purpose The purpose of this Coordinated Seasonal Transmission Assessment (CSA) is to analyze and assess the MISO transmission system under projected peak load conditions for the 2013 Summer peak season. The coordination of this study across MISO’s area provides the benefit of reviewing the network over a much larger area than would normally be assessed by the individual participating transmission owners. This assessment has focused on the performance of large scale steady-state contingency analysis, critical interface analysis P/V for selected areas where voltage stability margins are known to be small, and screening for potential voltage instability (VQ) in large metropolitan areas under multiple contingent events and increased load sensitivities, as well as wide area transfer analyses under NERC category B contingencies. The contingency levels and sensitivity cases included in this assessment are, in many cases, beyond those typically considered and are beyond regional planning criteria. These events have been evaluated in order to provide system operators with guidance as to possible but unlikely system conditions that would warrant close observation to ensure system security. This CSA report does not attempt to determine Available Transfer Capability (ATC), Available Flowgate Capacity (AFC), the availability of transmission service, or provide a forecast of anticipated dispatch patterns for the 2013 Summer season. There were no Capacity Benefit Margins (CBM) or Transmission Reliability Margins (TRMs) included in this assessment. Also, the assessments documented in this report are not intended to fulfill all of the study requirements for Transmission Planners or Planning Coordinators listed in NERC Standards TPL-001 through TPL-004. The results from this year’s assessment do not override the currently posted operating guide limits and values. 12 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 3.0 STUDY CRITERIA The NERC Planning Standards TPL-001, TPL-002, TPL-003 and TPL-004 are the applicable study criteria for this assessment. This assessment evaluates NERC contingency categories A, B, and C as well as combinations of category B and C; for example, a generator outage plus a category C event. The MISO members’ thermal and voltage thresholds are used to flag thermal and voltage violations and voltage deviation exceptions on their respective systems. Monitored element files for system intact and contingency conditions are included in Appendix A. MISO members’ system elements (> 69 kV) were monitored. Precontingency equipment loadings above 100 percent of normal rating (Rate A) were flagged. Post-contingency equipment loadings above 100 percent of emergency rating (Rate B) were also flagged. Equipment loadings above 125 percent of emergency rating were identified for cascade screening review. All of the MISO members’ systems were studied, except one small radial system. Below is a list of MISO members shown in Table 3-0-1. The table also includes the operating Region and their associated control areas or zones in the powerflow model. Note some members are within other members’ control areas so area number is blank. Table 3.0-1: MISO CSA Systems Studied Region Carmel Carmel Area 206 207 Abbrev OVEC HE System Ohio Valley Electric Corporation Hoosier Energy Rural Electric Cooperative Carmel 208 DEI Duke Energy Indiana Carmel in 208 IMPA Indiana Municipal Power Agency Carmel in 208 WVPA Wabash Valley Power Association Carmel 210 SIGE Vectren (Southern Indiana Gas & Electric Co) Carmel 216 IPL Indianapolis Power & Light Company Carmel 217 NIPS Northern Indiana Public Service Company Carmel 218 METC Michigan Electric Transmission Co. Carmel in 218 LBWL Lansing Board of Water & Light (zone 1261) Carmel in 218 MSCPA Michigan South Central Power Agency Carmel in 218 WPSC Wolverine Power Supply Cooperative (zone 1262) Carmel 219 ITC International Transmission Company Carmel in 219 MPPA Michigan Public Power Agency Carmel 295 WEC Wisconsin Electric Power Company (ATC) Carmel 314 BREC Big Rivers Electric Corporation Carmel 333 CWLD Columbia, MO Water and Light Department Carmel 356 AMMO Ameren Missouri Carmel 357 AMIL Ameren Illinois Carmel 360 CWLP City of Springfield (IL) Water Light & Power Carmel 361 SIPC Southern Illinois Power Cooperative Carmel 694 ALTE Alliant Energy East (ATC) Carmel 696 WPS Wisconsin Public Service Corporation (ATC) 13 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version Region Area Abbrev System Carmel 697 MGE Madison Gas & Electric Company (ATC) Carmel 698 UPPC Upper Peninsula Power Company (ATC) South 325 BRAZ Brazo Electric Cooperative South 328 PLUM Plum Point Energy Associates, LLC South 329 OMLP City of Osceola, LA South 332 LAGN Louisiana Generating, LLC South 334 WMU City of West Memphis, AR South 335 CWAY City of Conway, AR South 336 BUBA City of Benton, AR South 337 PUPP Union Power Partners, L.P. South 338 DERS City of Ruston, LA South 339 NLR City of North Little Rock, AR South 349 SMEPA South Mississippi Electric Association South 351 EES Entergy Transmission South 502 CLEC Cleco South 503 LAFA Lafayette Utilities System South 504 LEPA Louisiana Energy and Power Authority St. Paul 600 XEL Xcel Energy St. Paul 608 MP St. Paul in 608 NWEC St. Paul 613 SMMPA Minnesota Power & Light Northwestern Wisconsin Electric (radial, not studied) Southern Minnesota Municipal Power Agency St. Paul 615 GRE Great River Energy St. Paul 620 OTP Otter Tail Power Company St. Paul in 620 MPC Minnkota Power Cooperative St. Paul 627 ALTW ITC Midwest St. Paul 633 MPW Muscatine Power & Water St. Paul 635 MEC MidAmerican Energy Company St. Paul in 635 CFU Cedar Falls Utility St. Paul 652 WAPA Western Area Power Administration St. Paul 661 MDU Montana-Dakota Utilities Company St. Paul 667 MH Manitoba Hydro St. Paul 680 DPC Dairyland Power Cooperative 14 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 4.0 STUDY PARTICIPANTS Table 4.0-1 below shows the individuals who actively participated in this study. Table 4.0-1: MISO's 2013 Summer CSA Participation List1 1 First Name Last Name Company Name First Name Last Name Company Name Tony Gott AECI* Jason Brown MISO Evan Shuvo Ameren David Duebner MISO Eric Fleming ATC Scott Goodwin MISO Kerry Marinan ATC Virat Kapur MISO Nate Wilke ATC Josh Netherton MISO Kyle Minnix BRAZ Joe Reddoch MISO Chris Bradley BREC Tony Rowan MISO Mike Doyle BUBA Kris Ruud MISO Ken Kagy Cedar Falls Kevin Sherd MISO Michelle Corley CLECO Raja Thappetaobula MISO Donald Idzior CMS Energy Jeff Webb MISO Denis Leitch CMS Energy Andy Witmeier MISO George Heintzen CNWY Ruth Pallapati MP Adam Schuttler CWLD Peter Schommer MP Chris Daniels CWLP Will Lovelace MPC Steve Rose CWLP Matt Dykstra MPPA Phil Briggs DEI Mark Nelson MPW Bob Evanich DEI Lewis Ross MPW John Jozefowski DEI John Stolley MPW Darrell Caraway DERS Bob Vargus MPW Steve Porter DPC David Austin NIPS Samrat Datta EES Mike Melvin NIPS Sharma Kolluri EES Syedkhair Quadri NIPS Scott McMahan EES Jessica Stephens NLR Joe Payne EES Cody Moore OMLP Maryclaire Peterson EES Luis Leon OTP Jared Shaw EES Jeff McLaughlin PJM* Cameron Warren EES Russell Abel PLUM Richa Singhal GRE John Heisey PUPP Todd Taft HE Ryan Abshier SIGE Jonathan Mendoza IESO* Jeff Jones SIPC Ovidiu Vasilachi IESO* Pat Egan SMMPA Robert Grubb IPL Sam Copeland SOCO* * denotes non-MISO member participant 15 MISO Coordinated Seasonal Assessment – 2013 Summer Dave Osterkamp Company Name ITCM Bahbaz Company Name SPP* Joshua Hurst ITCT Jason Smith SPP* Sherry Tang ITCT Tim Fritch TVA* Ron Gary LAFA Roy Mathai TVA* Jennifer Vosburg LAGN Nate Schweighart TVA* Lynn McKintry LBWL Scott Walker TVA* Cordell Grand LEPA Chris Bultsma WAPA Shawn Heilman MDU Todd Pederson WMU Dan Rathe MEC Tom King WPSCI Kris Long MH Dan Wilkinson WPSCI Gayan Wijeweera MH Michelle Wood XEL Tim Aliff MISO Khalid Yousif XEL First Name Last Name First Name Yassar Public Version Last Name In addition to the aforementioned list of participants above, the final 2013 Summer CSA report will also be distributed to the following entities in accordance with NERC FAC-013-1 and FAC-014-2 standards. Table 4.0-2: Final Report Distribution List Adjacent Planning Authorities AECI MH ATC Ontario IESO LGE/KU PJM EEI PS EKPC Sask Power Entergy SOCO SPP GTC MAPP TVA Reliability Coordinators MISO Transmission Operators Ameren MDU ATC MEC BREC MH CWLD MPC CWLP MP DPC MPW DEM NIPS EEI OTP EES RPU GRE SIGE HE SIPC IPL SMEPA ITCM WAPA ITCT WPSCI METC XEL Transmission Planners Ameren LBWL ATC MEC Basin Electric METC BREC MH Cedar Falls MPC CIPC MP CWLD MPW CWLP NIPS DEM OTP DPC RPU EEI SIGE Entergy SIPC GRE SMMPA HE WAPA IPL WPSCI ITCM XEL ITCT Transmission Service Provider BREC MPC CIPC MISO DPC RPU Entergy WPA MH XEL Adjacent Reliability Coordinators Ontario IESO SOCO PJM Interconnection SPP Sask Power TVA WECC 16 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 5.0 MODELS AND INPUT DATA A power flow model used for the 2013 Summer peak CSA was built from the ERAG/MMWG 2012 series Summer peak load base case in coordination with the MMWG, which modeled firm, capacity backed transfers, as base case interchange. This case was further updated with the most recent transmission system status information and projected capacity backed transfers across the entire eastern interconnect. The MISO data was submitted by MISO stakeholders to MISO’s Model-on-Demand (MOD) tool. The case was then reviewed by CSA study participants for accuracy of the topology, load, generation and interchange values. The dispatch used was MISO’s Security Constrained Economic Dispatch (SCED) which was achieved by re-dispatch of MISO generation while maintaining MISO’s interchange. The projected non-coincident 2013 Summer peak demand of MISO’s footprint in the power flow model used for this transmission assessment is 140, 611 MW. This does include the projected Summer peak demand of the fourteen new LBAs in the MISO South region; since they are receiving RC services from MISO starting on June 1, 2013. Power flow model control areas of MISO member utilities include loads of other utilities that are not MISO members. Therefore, the demand in the power flow model is not directly comparable to the resource assessment demand forecast for MISO member utilities. The total amount of generation available to serve MISO load from internally and externally designated capacity resources during the 2013 Summer peak period is 148,516 MW. The net scheduled interchange for MISO in the power flow model is 4,161 MW, which indicates a net export of power by the MISO member utilities in the 2013 Summer peak. The following seasonal outages were included because the outages were scheduled for all of July and August; the Summer peak months. Table 5.0-1: Seasonal Outages Operating Region Control Area Type Planned Start Planned End From Station Equip Type kV Capacity Carmel Ameren E 2011-2212 2015-0101 Hutsonville unit No. 3 UN 13 75.8 Carmel Ameren E 2011-1220 2014-1231 Meredosia unit No. 3 UN 19 208.7 Carmel Ameren F 2011-1222 2015-0101 Hutsonville unit No. 4 UN 13 76.8 Carmel Ameren F 2010-0104 2015-1108 Meredosia unit No. 1 UN 14 67 Carmel Ameren F 2010-0104 2015-1108 Meredosia unit No. 2 UN 14 67 Carmel Ameren P 2012-0925 2015-1001 Meredosia unit No. 4 UN 19 73.5 Carmel ATC P 2013-0426 2013-1017 Blue Mound—96th St 138 kV LN 138 Carmel ATC P 2013-0503 2013-1108 Blue Mound—S 43rd St 138 kV line LN 138 Carmel ATC P 2012-1221 2013-1231 Hiawha—Engadine Tap 69 kV LN 69 Carmel ATC P 2012-1221 2013-1231 Hiawha—Indian Lake 69 kV LN 69 Carmel ATC P 2012-1203 2013-1205 Racine 345/138 kV Transformer XF 345 17 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version Operating Region Control Area Type Planned Start Planned End From Station Equip Type kV Capacity Carmel ATC P 2013-0412 2014-0321 Lakefront unit No. 6 UN 69 27.9 Carmel ITCT F 2012-0705 2013-1001 Hancock unit No. 11 UN 42 13 Carmel ITCT F 2010-0805 2014-0101 Northeast unit No. 11 UN 24 11.6 Carmel ITCT F 2010-0304 2013-1231 Superior unit No. 11 UN 42 20 Carmel ITCT P 2011-0328 2014-0328 Montcalm UN 13 29 Carmel ITCT P 2013-0301 2020-0301 Dayton unit No. 11 UN 42 10 Carmel ITCT P 2013-0301 2020-0301 Essex unit No. 11 UN 24 4.6 Carmel ITCT P 2012-1121 2016-0101 Harbor Beach unit No. 11 UN 120 3.4 Carmel ITCT P 2012-1209 2015-0101 Oliver unit No. 11 UN 42 9.2 Carmel METC F 2012-0923 2013-1101 Straits unit No. 1 UN 14 20 Carmel METC P 2012-0501 2015-0301 Campbell unit No. A UN 14 11.2 Carmel METC P 2008-0408 2036-1231 Gaylord unit No. 5 UN 14 21 Carmel METC P 2010-0412 2013-1101 Gaylord unit No. 4 UN 14 17 Carmel METC P 2012-0212 2015-0211 Morrow unit No. A UN 14 12.8 Carmel METC P 2012-0212 2015-0211 Morrow unit No. B UN 14 10.6 Carmel METC P 2009-1118 2013-1014 Thetford unit No. 7 UN 14 19 Carmel METC P 2010-1028 2013-1014 Thetford unit No. 1 UN 14 30 Carmel METC P 2010-1028 2013-1014 Thetford unit No. 2 UN 14 30 Carmel METC P 2010-1028 2013-1014 Thetford unit No. 5 UN 14 15 Carmel METC P 2010-1028 2013-1014 Thetford unit No. 6 UN 14 15 Carmel METC P 2012-0601 2015-0515 Thetford unit No. 3 UN 14 22.5 Carmel METC P 2012-0601 2015-0515 Thetford unit No. 4 UN 14 24.6 Carmel METC P 2012-0601 2015-0515 Thetford unit No. 8 UN 14 11.1 Carmel METC P 2012-0601 2015-0515 Thetford unit No. 9 UN 14 10.6 Carmel METC P 2010-1028 2013-1014 Weadcock unit No. A UN 14 13 Carmel METC P 2010-1028 2013-1014 Whiting unit No. A UN 14 21 Carmel METC P 2012-0316 2014-1230 Fermi unit No. 11 UN 120 12.2 St. Paul ALTW F 2012-0702 2014-0131 Lansing unit No. 3 UN 22 42 St. Paul ALTW F 2010-0414 2013-1230 Fairmount unit No. 5 UN 69 20 18 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version Operating Region Control Area Type Planned Start Planned End From Station Equip Type kV St. Paul ALTW P 2012-1201 2013-1226 Collins—Collins Tap 69 kV LN 69 St. Paul ALTW P 2012-1201 2013-1226 Collins—Mario 69 kV LN 69 St. Paul ALTW P 2012-1201 2013-1226 Collins—Hiawha 69 kV LN 69 St. Paul MH F 2011-1101 2013-1231 Jenepeg unit No. 4 UN 4.2 30.5 St. Paul MH P 2013-0402 2013-1130 Great Falls unit No. 4 UN 11 22 St. Paul MH P 2010-0720 2015-0930 PTD unit No. 5 UN 6.9 4.7 St. Paul MH P 2011-1225 2013-1231 Jenpeg 230/4 kV Transformer XF 230 St. Paul MP F 2012-0620 2014-0101 Thompson unit No. 6 UN 115 34.1 St. Paul NSP F 2011-0221 2015-1231 French unit No. 3 UN 14 100 St. Paul NSP F 2012-0828 2013-1101 Byron 161/345 kV Transformer XF 345 St. Paul SMMPA F 2009-1027 2015-1231 Owatanawa unit No. 5 UN 69 Capacity 21 The following major 100 kV and above facility additions were included in the power flow model because the new facility was scheduled to be in service after the 2012 Summer season but before 2013 Summer season. Table 5.0-2: New Major Facility Additions >100 kV MISO Operating Region Control Area ISD Carmel 218 METC 10/15/2012 Carmel 218 METC 6/1/2013 Carmel 218 METC 12/31/2012 Carmel 218 METC 12/31/2012 Carmel 218 METC 12/31/2012 Carmel 218 METC 9/30/2012 Carmel 218 METC 9/30/2012 Carmel 219 ITC 6/1/2013 Carmel 219 ITC 6/1/2013 Carmel 219 ITC 6/1/2013 Project Name - Description Nelson Road - Loop the existing Nelson Road-Goss 345 kV line into Slate, New Slate substation, Nelson Road sub work, Goss sub work Eagles Landing - Eagles Landing Taps the Cottage Grove - East Tawas 138 kV circuit - Eagles Landing Taps the Cottage Grove - East Tawas 138 kV circuit Tompkins - Loop Tompkins-Kipp Rd into new URV Jct. Station Alma - New line created by looping the existing Alma-Summerton 138 kV line into Begole Summerton - New line created by looping the existing Alma-Summerton 138 kV line into Begole Karn - New line created by looping the existing KarnClaremont 138 kV line into Manning Claremont - New line created by looping the existing Karn-Claremont 138 kV line into Manning Wayne 345 kV - replace overloaded station equipment - replace overloaded station equipment ClydeTP - Clyde taps the Placid-Durant 120 kV circuit - Clyde taps the Placid-Durant 120 kV circuit ScioTP - Scio Taps the Lark-Spruce 120 kV circuit Scio Taps the Lark-Spruce 120 kV circuit Voltage (kV) 345 138 138 138 138 138 138 345 120 120 19 MISO Coordinated Seasonal Assessment – 2013 Summer MISO Operating Region Control Area ISD Carmel 219 ITC 5/31/2013 Carmel 219 ITC 6/1/2013 Carmel 219 ITC 6/1/2013 Carmel 219 ITC 11/2/2012 Carmel 219 ITC 11/2/2012 Carmel 295 WEC 8/14/2013 Carmel 314 BREC 12/1/2012 Carmel 314 BREC 12/1/2012 Carmel 357 AMIL 6/1/2013 Carmel 357 AMIL 6/1/2013 Carmel 361 SIPC 9/1/2012 St Paul 600 XEL 12/1/2012 St Paul 600 XEL 6/20/2013 St Paul 600 XEL 6/1/2013 St Paul 600 XEL 6/1/2013 St Paul 600 XEL 6/1/2013 St Paul 608 MP 12/31/2012 St Paul 608 MP 4/1/2013 St Paul St Paul 608 MP 608 MP 12/31/2012 4/1/2013 St Paul 615 GRE 5/7/2013 St Paul 615 GRE 8/15/2013 Public Version Project Name - Description Tahoe - Creates at new Tahoe-Wixom 120 kV;constructs 2.6 miles of 120 kV line circuit Dexter Twp - Loop Madrid to Majestic 120 kV line and new breaker station Dexter Twp - Loop Madrid to Majestic 120 kV line and new breaker station Harbor Beach - New line created by looping the Harbor Beach-Rapson 120 kV line into Minden Rapson - New line created by looping the Harbor Beach-Rapson 120 kV line into Minden Pleasant Prairie - Construct a new Pleasant-Zion Energy Center 345 kV line Wilson - 10.5 Mile 161 kV of line from Wilson Substation to new 161 kV station - only 600 feet of new construction required. BR Tap (3 terminal midpoint) - 10.5 Mile 161 kV of line from Wilson Substation to new 161 kV station only 600 feet of new construction required. LaFarge - Provide 161 kV supply to customer substation Line 1364 (new tap) - Tap 138 kV Line 1364 for 'inout' arrangement, replace Line 1326 w/ 'in-out' Power Plant - 25-mile 161 kV transmission line from Southern Illinois Power Cooperative's power plant to a new 161/69 kV substation - 25-mile 161 kV transmission line from Southern Illinois Power Cooperative's power plant to a new 161/69 kV substation Stone Lake - New 161 kV line from Stone Lake to Edgewater Hiawatha - Double Circuit 1.25 mile line Park Falls - Install ~1.5 miles of 336 ACSR 115 kV line Norrie - The existing 115 kV heading south out of the Ironwood substation will be re-directed into the Norrie substation. This will involve removing about a mile of lattice structures and builting a new mile of line into the sub. All 100 kV plus line is planned at 795 ACSR. Norrie - New 336 ACSR line from Norrie to Orvana mine site. Boswell - Essar Line 94L Line reroute Essar Steel Sub (McCarthy Lake) - Essar 94L Line reroute Essar Mine Sub (Calumet) - Essar new Line Boswell - reroute existing MP Line #28 Alexandria SS - Add a new 345 kV line from Alexandria Switching Station to Waite Park and terminal works - Add a new 345 kV line from Alexandria Switching Station to Waite Park and terminal works Cedar Mountain - 69 miles of new 345 kV line - new line Voltage (kV) 120 120 120 120 120 345 161 161 161 138 161 161 115 115 115 115 230 230 230 115 345 345 20 MISO Coordinated Seasonal Assessment – 2013 Summer MISO Operating Region St Paul Public Version Control Area ISD Project Name - Description 615 GRE 12/31/2012 St Paul 615 GRE 5/1/2013 St Paul 620 OTP 7/1/2013 Northport - New Distribution Parkers Prairie - Parkers Prairie Conversion from 41.6 to 115 kV Buffalo 115 kV - Construct new 16-mile 115 kV line from Buffalo - Casselton St Paul 627 ITCM 5/1/2013 St Paul St Paul 635 MEC 635 MEC 4/1/2013 4/1/2013 St Paul 661 MDU 7/31/2013 St Paul 661 MDU 10/31/2012 Salem - 81 miles of new 345 kV line - Construct a new 345-161 kV dbl ckt line(54 miles) and all new ROW for 27 miles of new single ckt 345 kV. Pony Creek - 345 kV line tap Sugar Creek - 161 kV line tap (tap miles only) Keystone tap - Radial 115 kV line tapping the BakerCabin Creek 115 kV line Matheson tap - Radial 115 kV line tapping the Dickinson Basin-Green River Jct 115 kV line to the Matheson distribution substation Voltage (kV) 115 115 115 345 345 161 115 115 21 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 6.0 STUDY METHODOLOGY The following power system analysis software tools were utilized: Siemens PTI’s PSS/e (ver32.05), MUST (ver11.1) and Powertech’s Voltage Security Assessment Tool (VSAT), ver12.0. 6.1 Steady State AC Contingency Analysis Siemens PTI’s MUST ver11.1 program was used to analyze the steady-state voltage levels and thermal loadings of the MISO footprint under base case transfers for system intact and contingency conditions. MISO’s three operating regions, greater than 60 kV, were analyzed for category B and C contingencies. Also, the entire MISO tier-1 footprint was analyzed for both category B and C contingencies. Single generator outages and double generator outages by control area were examined. Automated category C3 analysis was performed across the MISO’s three operating regions, for 200 kV and above facilities, using double branch and double-tie contingency specifications by MISO operating Region. Some neighboring system contingencies were also analyzed, if included by members or non-member participants. The MUST solutions options used in the thermal and voltage analysis is shown below in Table 6.1-1. The analyses were conducted enabling transformer taps and switched shunts. These settings were chosen as they represent the post-contingency steady state condition, which is assumed to be at a time when all operator actions have been deployed in order to maintain/re-establish system security levels. The MUST’s default dispatch option (governor control dispatch) was used to specify that all MISO and adjacent control area generators would respond to a generator outage, not just the system swing bus. Table 6.1-1: MUST Options used for ACCC Analysis MUST AC Load Flow Solution Options Tap Adjustments Area Interchange Control Mvar Limits AC LF Method Non Divergent LF Stepping Disabled Apply immediately Full Newton Only If Normal Diverged Solution Options Phase Shift Adjustment General Solution Options Maximum Load Flow Iterations 20 MW/Mvar tolerance 1 Reactive Adj. De-acceleration Factor 0.9 Low Voltage Break Point Max Iteration to freeze adjustment 0.7 99 22 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 6.2 FCITC Transfer Analysis The bulk transmission systems of the MRO, RFC and SERC regions were evaluated using linear analysis to identify congested transmission facilities for large scale transfers of energy in the Regional Reliability Organizations’ (RRO’s) respective seasonal assessments. In order to avoid duplication of effort, the CSA study team selected several system transfers based on historical transfers seen on the system. The analysis was intended to identify those facilities that may become heavily loaded for both base case and first contingent cases with the transfer applied. This transfer may simulate the system’s ability to replace needed generation for a possible outage of a large base load plant. The MISO Transfer Capability Methodology was followed in this analysis. This study report identifies any assets that may be required to operate beyond the limits specified below, which applies to both transmission and generation contingencies. Table 6.2-2: Transfer Distribution Factor Cutoff Transfer Case Equipment Rating Applied Transfer Distribution Factor Base Normal > 3% First Contingency Outage Emergency > 3% Transfer scenarios were modeled as either area generation shifts (i.e. reducing generation in study area) or as area load shifts (i.e. increasing load in study area). The generation shifts were modelled with the assumption that the subsystem would only use available generation including off-line units. Machine maximum generation limits (Pmax) was honored. 6.3 Critical Interface Voltage Stability Analysis Voltage stability P/V analysis was performed on several critical interfaces either suspected to have potential for voltage instability under transfer or known to have the potential for voltage instability. The analysis was performed using Powertech’s VSAT ver12.0. The study was performed by incrementally increasing the energy transfer and solving a power flow under base and contingent cases until a steady-state voltage violation was detected, or voltage instability was detected. Interfaces critical to the transfer were monitored and plotted against critical bus voltages. The VSAT input files may be seen in Appendix F. 6.4 Large Load Area Analysis Load flow analysis, contingency analysis and VQ curve plotting were performed to study the system voltage performance of the large load areas. The study methodology was classified into two phases: Phase 1: Identification of critical prior generation outage scenarios, contingencies, and buses to be monitored through feedback from TOs and MISO RT-Operations, previous reports and/or contingency analysis with selected single and multiple contingencies for the area of interest. Phase 2: VQ plotting for the base case, the generator outage cases, the load escalation cases, the load power factor reduction cases, and the transfer and/or import cases. 23 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version Phase 1 AC contingency analysis was used to identify the critical buses with the lowest voltages and largest voltage drops. Contingencies included (n-1) and (n-2) events. Contingency analysis was performed on the base case as well as cases with single and multiple prior outages. No more than three simultaneous outages, either prior or contingent, were studied. Once the critical contingencies and buses were identified, VQ plotting was performed to calculate the reactive margin from the operating point to the instability point. Using the PSS/e program, a fictitious synchronous condenser was modeled at the critical bus, the scheduled bus voltage was adjusted step-by-step, and the corresponding reactive power of the fictitious synchronous condenser was recorded. A VQ curve was then plotted for this bus, which served as a reference curve for the sensitivity cases created in the Phase 2. Phase 2 VQ curves were also plotted for the following system conditions: Base case conditions Selected generator/transmission prior outage scenarios Load escalation scenarios - a 5% increase in the total summer peak load for the area of interest Load power factor reduction scenarios - a 2% total load power factor reduction and a 4% total load power factor reduction to address the load forecasting uncertainty and reactive power uncertainty. Excessively hot weather may produce a larger than predicted load within the uncertainty factor. It should be noted that contingency screenings were run on the sensitivity cases defined above as well as the base case in order to determine if the scenarios created any additional thermal loadings or voltage levels outside of the criteria. 24 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 7.0 STEADY-STATE ANALYSIS RESULTS 7.1 Summary In general, the MISO transmission system is projected to perform well. There are a number of contingencies that may require operator action to avoid potential overloads or low voltages during the 2013 Summer peak season. There were zero category A violations and 100 category B contingency violations found in MISO’s BPS (>100 kV). Operational procedures were identified for all category A and B thermal and voltage violations. These contingencies have been tabulated with the actions required to address these potential issues. The steady-state AC contingency analysis results may be seen in Appendix B. 7.2 Prior Outages to Watch There are a number of frequently reoccurring contingencies among the category C3 AC contingency analysis results. If the contingency occurred just one time in a category C3 pair, these were flagged as prior outages to watch. With an outage of one of the facilities2 there is a possibility for a thermal overload to occur with the next contingency. Note the area number may be associated with the contingent limiter (limiting element), not the prior outage elements. The complete list of category C results is provided in Appendix B. 2 Prior Outage Critical Facilities list is shown in the non-public version of this report. 25 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 8.0 TRANSFER ANALYSIS RESULTS There were seventeen transfers analyzed for the 2013 Summer peak period. The First Contingency Incremental Transfer Capability (FCITC) for each transfer was calculated, along with the Transfer Distribution Factor (TDF) on some crucial flowgates. Typical tested transfer level is 5,000 MW which is a high transfer. A graphic of the transfer and associated constraint location are shown on a geographic map. The flowgates analyzed in this section3 were monitored for potential bottlenecks across the transmission system. New flowgates in the MISO South Region and neighboring entities to MISO South were monitored. The transfer capability values obtained from this evaluation are not used for OASIS posting purposes. 3 Flowgate definitions are only available in the non-public version of this report. 26 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 8.1 Carmel Region to St. Paul Region A high transfer from MISO Carmel Region to MISO St. Paul Region was analyzed. The observed intra-Regional transfer capability of 1,900 MW is determined to be adequate for this upcoming summer season. The limiting element for this transfer was the [ALTW] Grand Mound—[ALTW] Maquoketa 161 kV line under a category B contingency event. The transfer capability of 1,900 MW is an increase from the 2012 Summer CSA in which transfer capability was observed at 1,550 MW for the same transfer. This limit has shifted to Iowa due to outages related to the construction of the [ALTW] Salem—[ALTW] Hazleton 345 kV line. The new limit is due to a NERC Alert that derated this line. Also, the increase in Transfer Capability is due to Sherburne County unit No. 3 being back on line. Table 8.1-1: Carmel Region to St. Paul Region Transfer FCITC Limiting Element TDF(%) on the Limiting Element FCITC Flow on the Limiting Element Base Flow on the Limiting Element Limiting flow on the Limiting Element Summer Emergency Rating Contingency Description Carmel Region to St. Paul Region 1,900 [ALTW] Grand Mound—[ALTW] Maquoketa 161 kV line 3.00% 57 MW 109 MW 166 MW 168 MVA NERC Category B As shown below on Table 8.1-2 this transfer had a significant impact on the following flowgates. Table 8.1-2: Transfer Impact on Flowgates Pre-Cont Pre-Transfer (MW) Post-Cont Post-Transfer (MW) TDF (%) FG 3810: Werner West—Werner 138 kV line (flo) NERC Category B Contingency -83 -190 7.8 FG 6183: Quad Cities—Sub 91 345 kV line (flo) NERC Category B Contingency 641 847 10.7 FG 6001: NDEX FG 6193: MWEX 96 739 -128 12 17 Flowgate 409 27 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 8.2 Carmel Region + SPP to NW Dakotas A high transfer from the southwest portion of MISO’s Carmel region and SPP to the northwest Dakotas portion of the MISO St. Paul region was analyzed. The observed inter-Regional transfer capability is 1,600 MW for this upcoming Summer season. The limiting element for this transfer was the [ALTW] Lime Creek—[ALTW] Emery 161 kV line No. 1 for a category B contingency event. The transfer capability of 1,600 MW is a decrease from the 2012 Summer CSA in which transfer capability was observed at 1,900 MW for the same transfer. This limit has shifted to Iowa due to outages related to the construction of the [ALTW] Salem—[ALTW] Hazleton 345 kV line. The limit is new this Summer due to a NERC Alert that derated this line. Also, the increase in Transfer Capability is due to Sherburne County unit No. 3 being back on line. Table 8.2-1: Carmel Region + SPP to NW Dakotas Transfer FCITC Limiting Element TDF(%) on the Limiting Element FCITC Flow on the Limiting Element Base Flow on the Limiting Element Limiting flow on the Limiting Element Summer Emergency Rating Contingency Description Carmel Region + SPP to NW Dakotas 1,600 [ALTW] Lime Creek—[ALTW] Emery 161 kV line No. 1 3.00% 48 MW 133.5 MW 181.5 MW 185 MVA NERC Category B Contingency As shown below on Table 8.2-2 this transfer had a significant impact on the following flowgates. Table 8.2-2: Transfer Impact on Flowgates Flowgate FG 3810: Werner—Werner 138 kV line (flo) NERC Category B Contingency FG 3706: Arnold—Hazleton 345 kV line_PTDF FG 3529: North Appleton—Werner West 345 kV line PTDF FG 6193: MWEX FG 6001: NDEX Pre-Cont Pre-Transfer (MW) Post-Cont Post-Transfer (MW) TDF (%) -83 -332 6.4 227 385 9 406 620 13 739 96 468 -209 16 18 28 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 8.3 St. Paul Region to Carmel Region A high transfer from the MISO St. Paul region to the MISO Carmel region was analyzed. The observed intra-Regional transfer capability is 1,800 MW for this upcoming Summer season. The limiting element for this transfer was the [CE] Byron Red—[CE] Cherry Valley Red 345 kV line for a category B contingency event. The transfer capability of 1,800 MW is a decrease from the 2012 Summer CSA in which transfer capability was greater than 5,000 MW for the same transfer. The decrease in transfer capability from the 2013 Summer limit is due to several system condition changes from last Summer. First, the Sherburne County unit No. 3 is back online. Second, the Salem—Hazleton 345 kV line is in service. Finally, there was a shift in the CE summer peak interchange from exporting 2,800 MW (last Summer) to importing 50 MW. Table 8.3-1: St. Paul Region to Carmel Region Transfer FCITC Limiting Element TDF(%) on the Limiting Element FCITC Flow on the Limiting Element Base Flow on the Limiting Element Limiting flow on the Limiting Element Summer Emergency Rating Contingency Description St. Paul Region to Carmel Region 1,800 MW [CE] Byron Red—[CE] Cherry Valley Red 345 kV line 4.50% 81 MW 1,394 1,475 MW 1,479 MVA NERC Category B Contingency As shown below on Table 8.3-3 this transfer had a significant impact on the following flowgates. Table 8.3-2: Transfer Impact on Flowgates Pre-Cont Pre-Transfer (MW) Post-Cont Post-Transfer (MW) TDF (%) FG 3810: Werner—Werner 138 kV line (flo) NERC Category B Contingency -83 33 6 FG 6183: Quad Cities—Sub 91 345 kV line (flo) NERC Category B Contingency 641 474 8.9 FG 6001: NDEX FG 6193: MWEX 96 739 270 1,013 9 14.5 Flowgate 29 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 8.4 MISO Indiana/Illinois to TVA A high transfer from the MISO Indiana and Illinois states to TVA was analyzed. The observed inter-Regional transfer capability is greater than 5,000 MW for this upcoming Summer season. Table 8.4-1: MISO Indiana/Illinois to TVA Transfer FCITC Limiting Element TDF(%) on the Limiting Element FCITC Flow on the Limiting Element Base Flow on the Limiting Element Limiting flow on the Limiting Element Summer Emergency Rating Contingency Description MISO Indiana/Illinois to TVA >5,000 n/a n/a n/a n/a n/a n/a n/a As shown below on Table 8.4-2 this transfer had a significant impact on the following flowgates. Table 8.4-2: Transfer Impact on Flowgates Flowgate FG 1624: Summershade—Summershade Tap 161 kV (flo) NERC Category B Contingency FG 1625: Summershade—Summershade 161 kV (flo) NERC Category B Contingency FG 1617: SNP—Consauga 500 kV (flo) NERC Category B Contingency FG 1638: Sans Souci—Dell 500 kV PTDG FG 1634: Bull Run—Volunteer 500 kV (flo) NERC Category B Contingency FG 1613: Volunteer—Phipps Bend 500 kV PTDF Pre-Cont Pre-Transfer (MW) Post-Cont Post-Transfer (MW) TDF (%) 150 -14 3.7 150 -14 3.7 447 245 4.5 -576 -983 9 -1,275 -749 11.8 781 188 13 30 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 8.5 PJM N. Illinois to PJM Ohio A high transfer from PJM Northern Illinois to PJM Ohio was analyzed. The observed inter-Regional transfer capability is 1,900 MW for this upcoming Summer season. The limiting element for this transfer was the [FE] Lakeview—[FE] Ottawa 138 kV line for a category B contingency event. The transfer capability of 1,900 MW is a slight decrease from the 2012 Summer CSA in which transfer capability was observed at 2,140 MW for the same transfer. Ameren’s Prairie State generation is the main contributor in moving this limit out of the MISO system. Table 8.5-1: PJM N. Illinois to PJM Ohio Transfer FCITC Limiting Element TDF(%) on the Limiting Element FCITC Flow on the Limiting Element Base Flow on the Limiting Element Limiting flow on the Limiting Element Summer Emergency Rating Contingency Description PJM N. Illinois to PJM Mid-Atlantic (1%) 1,900 MW [FE] Lakeview—[FE] Ottawa 138 kV line 2.70% 51.3 MW 322 MW 373 MW 375 MVA NERC Category B Contingency As shown below on Table 8.5-2 this transfer had a significant impact on the following flowgates. Table 8.5-2: Transfer Impact on Flowgates Flowgate FG 2974: Dune Acres-Michigan City 138 kV PTDF FG 2520: Dune Acres—Michigan City 138 kV No. 1 (flo) NERC Category B Contingency FG 2521: Dune Acres—Michigan City 138 kV No. 2 (flo) NERC Category B Contingency FG 3270: State Line—Wolf Lake 138 kV (flo) NERC Category B Contingency FG 3271: State Line—Wolf Lake 138 kV (flo) NERC Category B Contingency FG 2980: Dune Acres-Michigan City 138 kV (1 &2) FG 2337: Cook—Palisades 345 kV (flo) NERC Category B Contingency FG 106: Cleveland Bowl FG 2286: Burnham Munster 345 kV line (flo) NERC Category B Contingency Pre-Cont Pre-Transfer (MW) Post-Cont Post-Transfer (MW) TDF (%) -7.5 98 1.9 -24 96 2.1 -24 96 2.1 59 226 3 38 221 3.2 -48 192 4.3 -526 -188 6 1,077 1,428 6.3 -410 237 11.6 31 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 8.6 MISO IL/MO to MISO South Region & TVA A high North to South transfer from MISO Illinois and Missouri states to MISO South Region plus TVA was analyzed. The observed inter-Regional transfer capability is 3,700 MW for this upcoming Summer season. The limiting element for this transfer was the [AMIL] W. Frankfort East—[AMIL] West Frankfort 138 kV for a category B contingency event. The transfer capability of 3,700 MW is an increase from the 2013 Summer CSA in which a transfer capability was observed at the maximum generation limit (from source) of 2,800 MW for the same transfer. The increase in transfer capability from the 2012 Summer is due to an improvement in the source subsystem definition. This time, the source was a combination of load decrease and generation increase, thus allowing the transfer to go beyond the 2,800 MW of generation capacity that was observed last Summer. Table 8.6-1: MISO Illinois/Missouri to MISO South Region & TVA Transfer FCITC Limiting Element TDF(%) on the Limiting Element FCITC Flow on the Limiting Element Base Flow on the Limiting Element Limiting flow on the Limiting Element Summer Emergency Rating Contingency Description MISO Illinois/Missouri to MISO South & TVA 3,700 MW [AMIL] W. Frankfort East—[AMIL] West Frankfort 138 kV 4.40% 162 MW 141 MW 303 MW 308 MVA NERC Category B Contingency As shown below on Table 8.6-2 this transfer had a significant impact on the following flowgates. Table 8.6-2: Transfer Impact on Flowgates Flowgate FG 18207: Lakeover 500/115 kV Transformer (flo) NERC Category B Contingency FG 16451: Mabelvale—Kn Wrightsville 500 kV line (flo) NERC Category B Contingency FG 17272: El Dorado EHV—Sterlington 500 kV PTDF Pre-Cont Pre-Transfer (MW) Post-Cont Post-Transfer (MW) TDF (%) 267 400 3.5 392 117 7 -769 -390 10 32 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 8.7 Missouri to Indiana A high West to East transfer from Missouri (including AECI) to Indiana was analyzed. The observed inter-Regional transfer capability is 3,100 MW for this upcoming Summer season. The limiting element for this transfer was the [AMIL] Casey—[AMIL] Newton 345 kV line for a category B contingency event. This transfer is slightly different than the one performed last Summer. Last year, the source subsystem was Illinois sinking into Indiana which observed an intra-Regiona transfer capability of 4,400 MW. This year, the source subsystem was moved farther west and now includes Associated Electric (AECI). Table 8.7-1: Missouri to Indiana Transfer FCITC Limiting Element TDF(%) on the Limiting Element FCITC Flow on the Limiting Element Base Flow on the Limiting Element Limiting flow on the Limiting Element Summer Emergency Rating Contingency Description Missouri to Indiana 3,100 MW [AMIL] Casey—[AMIL] Newton 345 kV line 14.00% 434 MW 880 MW 1,314 MW 1,319 MVA NERC Category B Contingency As shown below on Table 8.7-2 this transfer had a significant impact on the following flowgates. Table 8.7-2: Transfer Impact on Flowgates Flowgate FG 104: Thomas Hill Trans (flo) NERC Category B Contingency FG 3430: St. Louis East Interface FG 3405: Bunsonville—Eugene 345 kV line PTDF Pre-Cont Pre-Transfer (MW) Post-Cont Post-Transfer (MW) TDF (%) 525 445 2.8 58 123 -415 700 16 20 33 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 8.8 Southern Carmel Region & PJM Ohio to Michigan A high transfer from the southern portion of MISO Southern Carmel Region & PJM Ohio sinking into the state of Michigan was analyzed. The observed interRegional transfer capability is greater than 5,000 MW for this upcoming Summer season. This transfer was not performed last year. Table 8.8-1: Southern Carmel Region to Michigan Transfer FCITC Limiting Element TDF(%) on the Limiting Element FCITC Flow on the Limiting Element Base Flow on the Limiting Element Limiting flow on the Limiting Element Summer Emergency Rating Contingency Description Southern Carmel Region & PJM Ohio to Michigan > 5,000 MW n/a n/a n/a n/a n/a n/a n/a As shown below on Table 8.8-2 this transfer had a significant impact on the following flowgates. Table 8.8-2: Transfer Impact on Flowgates Flowgate FG 2337: Cook—Palisades 345 kV_PTDF Pre-Cont Pre-Transfer (MW) -526 Post-Cont Post-Transfer (MW) TDF (%) 323 28 34 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 8.9 MISO Southern Carmel Region to IESO A high transfer from MISO Southern Carmel region to IESO was analyzed. The observed inter-Regional incremental transfer capability of 350 MW is determined to be adequate for this upcoming summer season. The limiting element for this transfer was the [IESO] Lambton TS—[IESO] Lambton GS 220 kV line for the category C contingency event. This contingency is category C in accordance with the NPCC transmission operating criteria which requires IESO to consider Category C contingencies in addition to Category B contingencies in the operation of the Bulk Power System (BPS, as defined by NPCC). All Michigan/IESO PARs are inservice. The model used for this transfer already had a 1,200 MW MISO to IESO bias across the controlled interface with the PARs set to control these flows at this level. The combination of the 1,200 MW plus the 350 MW transfer capability (shown below) means the total transfer capability from MISO to IESO is 1,550 MW. Table 8.9-1: MISO Southern Carmel Region to IESO Transfer FCTTC Limiting Element TDF(%) on the Limiting Element FCITC Flow on the Limiting Element Base Flow on the Limiting Element Limiting flow on the Limiting Element Summer Emergency Rating Contingency Description S. Carmel Region to IESO 350 + 1,200 = 1,550 MW [IESO] Lambton TS—[IESO] Lambton GS 220 kV line 26.00% 91 MW 743 MW 834 MW 845 MVA NERC Category C Contingency As shown below on Table 8.9-2 this transfer had a significant impact on the following flowgates. Table 8.9-2: Transfer Impact on Flowgates Flowgate Interface 9: Ontario-Michigan Interface 10: Ontario-New York Pre-Cont Pre-Transfer (MW) -1,200 -19 Post-Cont Post-Transfer (MW) TDF (%) -1,370 -199 49 46 35 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 8.10 IESO to MISO Southern Carmel Region A high transfer from IESO to the MISO Southern Carmel Region was analyzed. The observed inter-Regional incremental transfer capability of -50 MW is determined to be adequate for this upcoming summer season. The limiting element for this transfer was the [IESO] Lambton TS—[IESO] Lambton GS 220 kV line for the category C contingency event. This contingency is category C in accordance with the NPCC transmission operating criteria which requires IESO to consider Category C contingencies in addition to Category B contingencies in the operation of the Bulk Power System (BPS, as defined by NPCC). All 4 Michigan/IESO PARs are in service. The model used for this transfer already had a 1,500 MW IESO-toMISO bias across the controlled interface with the PARs set to control these flows at this level. The combination of the 1,500 MW plus the (-50) MW transfer capability (shown below) means the total transfer capability from IESO to MISO is 1,450 MW. For the contingency loss shown below, SPS action with generation rejection of only one unit was considered. With generation rejection of additional units, through SPS action, the total transfer capability from IESO to MISO would increase. Table 8.10-1: IESO to MISO Southern Carmel Region Transfer FCTTC Limiting Element TDF(%) on the Limiting Element FCITC Flow on the Limiting Element Base Flow on the Limiting Element Limiting flow on the Limiting Element Summer Emergency Rating Contingency Description IESO to S. Carmel Region -50 + 1,500 = 1,450 MW [IESO] Lambton TS—[IESO] Lambton GS 220 kV line 33.00% -16.5 MW 861 MW 844 MW 845 MVA NERC Category C Contingency As shown below on Table 8.10-2 this transfer had a significant impact on the following flowgates. Table 8.10-2: Transfer Impact on Flowgates Flowgate Interface 9: Ontario-Michigan Interface 10: Ontario-New York Pre-Cont Pre-Transfer (MW) 1,500 -6 Post-Cont Post-Transfer (MW) TDF (%) 1,472 -27 55 41 36 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 8.11 Entergy Texas + AEPW to Southern Company A West to East transfer from Entergy Texas plus AEPW to Southern Company through MISO’s Southern Region was analyzed. The observed inter-Regional transfer capability is 2,950 MW for this upcoming Summer season. The limiting element for this transfer was the [EES] Grimes—[EES] Mount Zion 138 kV line for a category B contingency event. This transfer was not performed in the 2012 Summer assessment. This transfer limit is close to the 3,000 MW test level of what Entergy would evaluate at. Entergy has a project in its 2013-2017 Construction Plan, the Grimes—Ponderosa 230 kV line Project, which will alleviate this constraint. This project, which includes the construction of approximately 39 miles of new 230 kV transmission in the Western Region of Entergy Texas is currently planned to be placed in service by the summer of 2016. Table 8.11-1: Entergy Texas + AEPW to Southern Company Transfer Entergy Texas + AEPW to Southern Company FCITC 2,950 Limiting Element [EES] Grimes—[EES] Mount Zion 138 kV line TDF(%) on the Limiting Element 3.10% FCITC Flow on the Limiting Element 91.5 MW Base Flow on the Limiting Element 112 MW Limiting flow on the Limiting Element 204 MW Summer Emergency Rating 206 MVA Contingency Description NERC Category B Contingency As shown below on Table 8.11-2 this transfer had a significant impact on the following flowgates. Table 8.11-2: Transfer Impact on Flowgates Flowgate FG 16272: Nelson 500/230 KV Transformer (flo) NERC Category B Contingency FG 18135: Big Cajun—Fancy Point 500 kV (flo) NERC Category B Contingency FG 17965: Champaigne—Bobcat 138 KV Line (flo) NERC Category B Contingency FG 18207: Lakeover 500/115 kV Transformer (flo) NERC Category B Contingency FG 17272: El Dorado EHV—Sterlington 500 kV PTDF FG 16451: Mabelvale—Kn Wrightsville 500 kV line (flo) NERC Category B Contingency FG 17408: Cypress 500/138 kV Transformer (flo) NERC Category B Contingency Pre-Cont Pre-Transfer (MW) Post-Cont Post-Transfer (MW) TDF (%) -75 -328 8 1,416 1,942 18 69 225 5 267 100 6 -769 -374 13 392 936 18 381 217 6 37 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 8.12 S. MISO South Region to MISO IN/IL A high South to North transfer from the Southern portion of MISO South region sinking into MISO Indiana and Illinois region was analyzed. The observed inter-Regional transfer capability was found to be greater than the 1,400 MW transfer test level. The limiting element for this transfer was the [EES] Winnfield 230/115 kV Transformer No. 1 for a category B contingency event. This transfer was not performed in the 2012 Summer assessment. Table 8.12-1: Southern Portion of MISO South Region to MISO IN/IL Transfer FCITC Limiting Element TDF(%) on the Limiting Element FCITC Flow on the Limiting Element Base Flow on the Limiting Element Limiting flow on the Limiting Element Summer Emergency Rating Contingency Description S. MISO Southern Region to MISO IN/IL 1,400 MW [EES] Winnfield 230/115 kV Transformer No. 1 4.50% 63 MW 237 MW 300 MW 300 MVA NERC Category B Contingency As shown below on Table 8.12-2 this transfer had a significant impact on the following flowgates. Table 8.12-2: Transfer Impact on Flowgates Flowgate FG 16272: Nelson 500/230 KV Transformer (flo) NERC Category B Contingency FG 18135: Big Cajun—Fancy Point 500 kV (flo) NERC Category B Contingency FG 17965: Champaigne—Bobcat 138 KV Line (flo) NERC Category B Contingency FG 18207: Lakeover 500/115 kV Transformer (flo) NERC Category B Contingency FG 17272: El Dorado EHV—Sterlington 500 kV PTDF FG 16451: Mabelvale—Kn Wrightsville 500 kV line (flo) NERC Category B Contingency FG 17408: Cypress 500/138 kV Transformer (flo) NERC Category B Contingency Pre-Cont Pre-Transfer (MW) Post-Cont Post-Transfer (MW) TDF (%) -75 -328 8 1,416 1,942 18 69 225 5 267 100 6 -769 -374 13 392 936 18 381 217 6 38 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 8.13 MISO South Region to TVA A high transfer from MISO South Region to TVA was analyzed. The observed inter-Regional transfer capability is 3,100 MW for this upcoming Summer season. The limiting element for this transfer was the [EES] West Memphis 500/161 kV Transformer for a category B contingency event. This transfer was not performed in the 2012 Summer assessment. Table 8.13-1: MISO Southern Region to TVA Transfer FCITC Limiting Element TDF(%) on the Limiting Element FCITC Flow on the Limiting Element Base Flow on the Limiting Element Limiting flow on the Limiting Element Summer Emergency Rating Contingency Description MISO South Region to TVA 3,100 MW [EES] West Memphis 500/161 kV Transformer 3.30% 102 MW 345 MW 447 MW 450 MVA NERC Category B Contingency As shown below on Table 8.13-2 this transfer had a significant impact on the following flowgates. Table 8.13-2: Transfer Impact on Flowgates Flowgate FG 16272: Nelson 500/230 KV Transformer (flo) NERC Category B Contingency FG 18135: Big Cajun—Fancy Point 500 kV (flo) NERC Category B Contingency FG 17965: Champaigne—Bobcat 138 KV Line (flo) NERC Category B Contingency FG 18207: Lakeover 500/115 kV Transformer (flo) NERC Category B Contingency FG 17272: El Dorado EHV—Sterlington 500 kV PTDF FG 16451: Mabelvale—Kn Wrightsville 500 kV line (flo) NERC Category B Contingency FG 17408: Cypress 500/138 kV Transformer (flo) NERC Category B Contingency Pre-Cont Pre-Transfer (MW) Post-Cont Post-Transfer (MW) TDF (%) -75 -328 8 1,416 1,942 18 69 225 5 267 100 6 -769 -374 13 392 936 18 381 217 6 39 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 8.14 TVA to MISO South Region A high North to South transfer from Tennessee Valley Authority (TVA) to MISO South region was analyzed. The observed inter-Regional transfer capability is 1,400 MW for this upcoming Summer season. The limiting element for this transfer was the [EES] Freeport—[EES] Twinkletown 230 kV line for a category B contingency event. This transfer was not performed in the 2012 Summer assessment. Table 8.14-1: TVA to MISO South Region Transfer FCITC Limiting Element TDF(%) on the Limiting Element FCITC Flow on the Limiting Element Base Flow on the Limiting Element Limiting flow on the Limiting Element Summer Emergency Rating Contingency Description TVA to MISO South Region 1,400 MW [EES] Freeport—[EES] Twinkletown 230 kV line 3.30% 46.2 MW 414 MW 460 MW 462 MVA NERC Category B Contingency As shown below on Table 8.14-2 this transfer had a significant impact on the following flowgates. Table 8.14-2: Transfer Impact on Flowgates Flowgate FG 16272: Nelson 500/230 KV Transformer (flo) NERC Category B Contingency FG 18135: Big Cajun—Fancy Point 500 kV (flo) NERC Category B Contingency FG 17696: Fancy 500/230 kV Transformer (flo) NERC Category B Contingency FG 18207: Lakeover 500/115 kV Transformer (flo) NERC Category B Contingency FG 17272: El Dorado EHV—Sterlington 500 kV PTDF FG 16451: Mabelvale—Kn Wrightsville 500 kV line (flo) NERC Category B Contingency Pre-Cont Pre-Transfer (MW) Post-Cont Post-Transfer (MW) TDF (%) -75.0 -19.0 3.8 1416.0 1276.0 9.6 -586.0 -687.0 6.9 267.0 402.0 9.3 -769.0 -601.0 11.5 392 111 19.3 40 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 8.15 MISO South Region to PJM Mid-Atlantic A high South to North transfer from MISO South Region to PJM Mid-Atlantic was analyzed. The observed inter-Regional transfer capability is 2,900 MW for this upcoming Summer season. The limiting element for this transfer was the [EES] West Memphis 500/161 kV Transformer for a category B contingency event. This transfer was not performed in the 2012 Summer assessment. Table 8.15-1: MISO’s South Region to PJM Mid-Atlantic Transfer FCITC Limiting Element TDF(%) on the Limiting Element FCITC Flow on the Limiting Element Base Flow on the Limiting Element Limiting flow on the Limiting Element Summer Emergency Rating Contingency Description MISO South Region to PJM Mid-Atlantic 3,200 MW [EES] West Memphis 500/161 kV Transformer 3.20% 102 MW 345 MW 447 MW 450 MVA NERC Category B Contingency As shown below on Table 8.15-2 this transfer had a significant impact on the following flowgates. Table 8.15-2: Transfer Impact on Flowgates Flowgate FG 16272: Nelson 500/230 KV Transformer (flo) NERC Category B Contingency FG 18135: Big Cajun—Fancy Point 500 kV (flo) NERC Category B Contingency FG 17696: Fancy 500/230 kV Transformer (flo) NERC Category B Contingency FG 18207: Lakeover 500/115 kV Transformer (flo) NERC Category B Contingency FG 17272: El Dorado EHV—Sterlington 500 kV PTDF FG 16451: Mabelvale—Kn Wrightsville 500 kV line (flo) NERC Category B Contingency Pre-Cont Pre-Transfer (MW) Post-Cont Post-Transfer (MW) TDF (%) -75.0 -19.0 3.8 1416.0 1276.0 9.6 -586.0 -687.0 6.9 267.0 402.0 9.3 -769.0 -601.0 11.5 392 111 19.3 41 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 8.16 Southern Company to AEPW + Entergy Texas A high East to West transfer from Southern Company to AEPW and Entergy Texas was analyzed. The observed inter-Regional transfer capability is 2,100 MW for this upcoming Summer season. The limiting element for this transfer was the [CLECO] Montgomery—[CLECO] Clarence 230 kV line for a category B contingency event. This transfer was not performed in the 2012 Summer assessment. Table 8.16-1: Southern Company to AEPW + Entergy Texas Transfer FCITC Limiting Element TDF(%) on the Limiting Element FCITC Flow on the Limiting Element Base Flow on the Limiting Element Limiting flow on the Limiting Element Summer Emergency Rating Contingency Description Southern Company to AEPW & Entergy Texas 2,100 MW [CLECO] Montgomery—[CLECO] Clarence 230 kV line 3% 63 MW 344 MW 407 MW 414 MVA NERC Category B Contingency As shown below on Table 8.16-2 this transfer had a significant impact on the following flowgates. Table 8.16-2: Transfer Impact on Flowgates Flowgate FG 16272: Nelson 500/230 KV Transformer (flo) NERC Category B Contingency FG 18135: Big Cajun—Fancy Point 500 kV (flo) NERC Category B Contingency FG 17965: Champaigne—Bobcat 138 KV LINE (flo) NERC Category B Contingency FG 18207: Lakeover 500/115 kV Transformer (flo) NERC Category B Contingency FG 17272: El Dorado EHV—Sterlington 500 kV PTDF FG 16451: Mabelvale—Kn Wrightsville 500 kV line (flo) NERC Category B Contingency FG 17408: Cypress 500/138 kV Transformer (flo) NERC Category B Contingency Pre-Cont Pre-Transfer (MW) Post-Cont Post-Transfer (MW) TDF (%) -75 171 11 1,416 982 20 69 -58 6 267 393 6 -769 -1,023 12 392 5 18 381 546 8 42 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 8.17 PJM Ohio to PJM Northern Illinois A high East to West transfer from PJM Ohio to PJM Northern Illinois was analyzed. The observed inter-Regional transfer capability is 1,500 MW for this upcoming Summer season. The limiting element for this transfer was the [CE] Kincaid—[AMIL] Pana 345 kV line for a category B contingency event. This transfer was not performed in the 2012 Summer assessment. Table 8.17-1: PJM Ohio to PJM Northern Illinois Transfer FCITC Limiting Element TDF(%) on the Limiting Element FCITC Flow on the Limiting Element Base Flow on the Limiting Element Limiting flow on the Limiting Element Summer Emergency Rating Contingency Description PJM Ohio to PJM Northern Illinois [CE] Kincaid—[AMIL] Pana 345 kV line 1,500 MW 6.00% 90 MW 1,101 MW 1,191 MW 1,195 MVA NERC Category B Contingency 43 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 9.0 CRITICAL INTERFACE ANALYSIS RESULTS Critical interface voltage stability analysis (P/V analysis) was performed on areas that are either known to experience voltage stability limits under some operating conditions or are suspected to experience potential voltage stability limits. All results displayed in Sections 9.1 through 9.5 are reflected to interface flows. The areas analyzed were as follows: MWEX Interface S. Louisiana HV Interface Down Stream of Gypsy (DSG) HV Interface MISO South’s Western HV Interface St. Louis South Interface Voltage instability may occur fast or slow. If voltage instability occurs fast, there may not be time for transformer tap adjustment, capacitor bank switching, and phase shifter MW flow control. For the voltage stability study, transformer taps, switched shunts, and phase shifters are all locked after the contingency. So the calculated voltage stability limit may be conservative. For the voltage violation study, transformer taps, switched shunts, and phase shifters may all be adjusted after the contingency. This provides a reasonable transfer level for identifying voltage violations. Please refer to Appendix C for complete results of the five critical interfaces studied. 44 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 9.1 Minnesota-Wisconsin Export (MWEX) Twin Cities Metro The Wisconsin Upper Michigan System (WUMS) has experienced low steady state voltages and has been susceptible to potential voltage instability during heavy transfers from Minnesota into and through Wisconsin. This interface was studied with the Sherburne County unit No. 3 online. It was later discovered that it will be offline again for the 2013 Summer season. It is expected that the MWEX results to be similar to the 2012 Summer CSA in which this interface was analyzed with Sherburne County unit No. 3 offline. Study Results The studies include thirty one scenarios, base case and thirty prior outage cases: Scenario 0 * NERC Category A: The category A voltage stability limit for the MWEX Interface is determined to be 1,790 MW for loss of a category B contingency event. The MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This 1,790 MW limit is a slight decrease from the prior year result of 1,816 MW as reported in the 2012 Summer CSA. Scenario 1 * NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 1,406 MW for loss of a category B contingency event. The MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This prior outage was not performed in the 2012 Summer CSA. Scenario 2 * NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 783 MW for loss of a category B contingency event. MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This 783 MW limit is a slight decrease from the prior year result of 870 MW as reported in the 2012 Summer CSA. Scenario 3 * NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 1,465 MW for loss of a category B contingency event. MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This 1,465 MW limit is a slight decrease from the prior year result of 1,596 MW as reported in the 2012 Summer CSA. 45 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version Scenario 4 * NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 1,158 MW for loss of a category B contingency event. MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This 1,158 MW limit is a slight decrease from the prior year result of 1,247 MW as reported in the 2012 Summer CSA. Scenario 5 * NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 1,789 MW for loss of a category B contingency event. MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This prior outage was not performed in the 2012 Summer CSA. Scenario 6 * NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 1,745 MW for loss of a category B contingency event. MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This prior outage was not performed in the 2012 Summer CSA. Scenario 7 * NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 1,697 MW for loss of a category B contingency event. MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This was not performed in the 2012 Summer CSA. Scenario 8 * NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 1,790 MW for loss of a category B contingency event. MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This was not performed in the 2012 Summer CSA. Scenario 9 * NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 1,067 MW for loss of a category B contingency event. MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This was not performed in the 2012 Summer CSA. See Figure 9.1-8 below for PV plot. Scenario 10 * NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 1,684 MW for loss of a category B contingency event. The MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This 1,684 MW limit is a slight increase from the prior year result of 1,967 MW as reported in the 2012 Summer CSA. Scenario 11 * NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 1,743 MW for loss of a category B contingency event. The MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This was not performed in the 2012 Summer CSA. 46 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version Scenario 12 * NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 1,648 MW for loss of a category B contingency event. MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This was not performed in the 2012 Summer CSA. Scenario 13 * NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 1,272 MW for loss of the a category B contingency event. MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This 1,272 MW limit is a slight increase from the prior year result of 1,624 MW as reported in the 2012 Summer CSA. Scenario 14 * NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 1,696 MW for loss of a category B contingency event. MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This was not performed in the 2012 Summer CSA. Scenario 15 * NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 1,659 MW for loss of a category B contingency event. MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This 1,659 MW limit is a slight increase from the prior year result of 1,889 MW as reported in the 2012 Summer CSA. Scenario 16 * NERC Category C Prior Outage: The category C voltage stability limit for the MWEX Interface is determined to be 1,677 MW for loss of a category B contingency event. MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This was not performed in the 2012 Summer CSA. Scenario 17 * NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 1,640 MW for loss of a category B contingency event. MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This was not performed in the 2012 Summer CSA. Scenario 18 * NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 1,662 MW for loss of a category B contingency event. MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This was not performed in the 2012 Summer CSA. Scenario 19 * NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 1,479 MW for loss of a category B contingency event. 47 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This was not performed in the 2012 Summer CSA. Scenario 20 * NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 1,452 MW for loss of a category B contingency event. The MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This was not performed in the 2012 Summer CSA. Scenario 21 * NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 1,519 MW for loss of a category B contingency event. The MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This was not performed in the 2012 Summer CSA. Scenario 22 * NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 1,311 MW for loss of a category B contingency event. MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This was not performed in the 2012 Summer CSA. See Figure 9.1-12 below for PV plot. Scenario 23 * NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 1,760 MW for loss of the a category B contingency event. MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This was not performed in the 2012 Summer CSA. Scenario 24 * NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 1,763 MW for loss of a category B contingency event. MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This was not performed in the 2012 Summer CSA. Scenario 25 * NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 1,525 MW for loss of a category B contingency event. MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This was not performed in the 2012 Summer CSA. Scenario 26 * NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 1,547 MW for loss of a category B contingency event. MWEX flows are measured at the Apple River 161 kV bus. This was not performed in the 2012 Summer CSA. Scenario 27 NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 1,711 MW for loss of a category B contingency event. 48 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This was not performed in the 2012 Summer CSA. Scenario 28 * NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 1,704 MW for loss of a category B contingency event. MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This 1,704 MW limit is a slight increase from the prior year result of 1,700 MW as reported in the 2012 Summer CSA. Scenario 29 * NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 1,764 MW for loss of a category B contingency event. MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This was not performed in the 2012 Summer CSA. Scenario 30 * NERC Category B Prior Outage: The category B voltage stability limit for the MWEX Interface is determined to be 1,756 MW for loss of a category B contingency event. MWEX flows are measured at the Arrowhead 230 kV bus and A.S. King 345 kV bus. This was not performed in the 2012 Summer CSA. 9.2 Southern Louisiana HV Interface A P/V analysis was performed to examine the impact of excess generation from Northern Louisiana and Arkansas moving south into the southern portion of Louisiana. The S. Louisiana HV interface supports 70% of MISO South’s total load. The S. Louisiana HV interface is comprised of fourteen HV lines which support the southern portion of MISO South’s load. 49 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version Study Results The studies include six scenarios, base case and five prior outage cases: Scenario 0 * Base Case: There was no voltage stability limit observed on the S. Louisiana HV interface for loss of a category B contingency event. The maximum generation level of 3,600 MW was reached in the source subsystem prior to any thermal overloads. Scenario 1 * NERC Category B Prior Outage: There was no voltage stability limit observed on the S. Louisiana HV interface for loss of a category B contingency event. The maximum generation level of 3,600 MW was reached in the source subsystem prior to any thermal overloads. Scenario 2 * NERC Category B line Prior Outage: There was no voltage stability limit observed on the S. Louisiana HV interface for loss of a category B contingency event. The maximum generation level of 3,600 MW was reached in the source subsystem prior to any thermal overloads. Scenario 3 * NERC Category B Prior Outage: There was no voltage stability limit observed on the S. Louisiana HV interface for loss of a category B contingency event. The maximum generation level of 3,600 MW was reached in the source subsystem prior to any thermal overloads. Scenario 4 * NERC Category B Prior Outage: There was no voltage stability limit observed on the S. Louisiana HV interface for loss of a category B contingency event. The maximum generation level of 3,600 MW was reached in the source subsystem prior to any thermal overloads. Scenario 5 * NERC Category B Prior Outage: There was no voltage stability limit observed on the S. Louisiana HV interface for loss of a category B contingency event. The maximum generation level of 3,600 MW was reached in the source subsystem prior to any thermal overloads. 50 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 9.3 Down Stream of Gypsy HV Interface Lake Pontchartrain Gulf Of Mexico DSG The DSG (Down Stream of Gypsy) Region of Entergy is a subset of the Amite South load pocket and includes the area in and around metro New Orleans. The DSG Region is supported by five 230 kV lines plus two 138 kV lines from the north and west; however, only two of the four 138 kV lines were used in the interface definition. Under extreme conditions the DSG Region can become a voltage constrained area. DSG generation consist of resources at Ninemile and Michoud. The Slidell—Front Street 230 kV line is a long line supporting DSG from the North and may be susceptible to voltage issues under one of the prior outages being considered below. Study Results The studies include five scenarios, base case and four prior outage cases: Scenario 0 * Base Case: The category C3 voltage stability limit for the DSG HV interface is determined to be 2,638 MW for the loss of a category C3 contingency event. The DSG voltage is measured at the Fourchon 115 kV bus. This interface was not analyzed in the 2012 CSA. Scenario 1 * NERC Category B Prior Outage: The category C3 voltage stability limit for the DSG HV interface is determined to be 2,523 MW for the loss of a category C3 contingency event. The DSG voltage is measured at the Fourchon 115 kV bus. This interface was not analyzed in the 2012 CSA. Scenario 2 * NERC Category B Prior Outage: The category C3 voltage stability limit for the DSG HV interface is determined to be 1,874 MW for the loss of a category C3 contingency event. The DSG voltage is measured at the Fourchon 115 kV bus. This interface was not analyzed in the 2012 CSA. Scenario 3 * NERC Category B Prior Outage: The category C3 voltage stability limit for the DSG HV interface is determined to be 2,129 MW for the loss of a category C3 contingency event. The DSG voltage is measured at the Fourchon 115 kV bus. This interface was not analyzed in the 2012 CSA. 51 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version Scenario 4 * NERC Category B Prior Outage: The category C3 voltage stability limit for the DSG HV interface is determined to be 2,005 MW for the loss a category C3 contingency event. The DSG voltage is measured at the Fourchon 115 kV bus. This interface was not analyzed in the 2012 CSA. 52 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 9.4 MISO South’s Western HV Interface Houston Metro The Western Region of Entergy is a subset of the WOTAB (West Of The Atchafalaya Basin) Region supported by one 345 kV line from the North, two 230 kV lines and five 138 kV lines from the East. The Western Region is a voltage dependent area. Generation in the area consists of Entergy resources at Lewis Creek and external resources at Frontier and San Jacinto (Pelican Road). These resources make up for approximately 1,020 MW. Peak load of Western is approximately 1,800 MW. An N-2 planning criteria is enforced through the use of Required Must Run (RMR) units. Study Results The studies include two scenarios, base case and one prior outage case: Scenario 0 * Base Case: The category B voltage stability limit for the Western Interface is determined to be 2,600 MW for the loss of a category B contingency event. The Western Interface voltages are measured at various 69 kV and 138 kV buses. A 15% safety margin for the Western interface brings the tolerable transfer limit down to 2,200 MW and is shown below in each PV plot with the red line. Scenario 1 NERC Category B Prior Outage: The category B voltage stability limit for the Western Interface is determined to be 2,200 MW for the loss of a category B contingency event. The Western Interface flows are measured at various 69 kV and 138 kV buses. A 15% safety margin for the Western interface brings the tolerable transfer limit down to 1,870 MW and is shown below in each PV plot with the red line. 53 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 9.5 St. Louis South Interface St. Louis Metro A P/V analysis was performed to examine the impact of light St. Louis Metro load scenario in which excess generation moved south to north higher than forecasted load levels to the south of St. Louis Metro area. The St. Louis Missouri area voltage levels of selected buses within the St. Louis metro area were monitored. The St. Louis South Interface is calculated and monitored, which consists of the following lines: Study Results The studies include four scenarios, base case and three prior outage cases: Scenario 0 * Base Case: There was no voltage stability limit observed on the St. Louis South interface. The maximum generation level of 5,000 MW was reached in the source subsystem prior to any thermal overloads. Scenario 1 * NERC Category B Prior Outage: There was no voltage stability limit observed on the St. Louis South interface. The maximum generation level of 5,000 MW was reached in the source subsystem prior to any thermal overloads. Scenario 2 * NERC Category B Prior Outage: There was no voltage stability limit observed on the St. Louis South interface. The maximum generation level of 5,000 MW was reached in the source subsystem prior to any thermal overloads. Scenario 3 * NERC Category B Prior Outage: There was no voltage stability limit observed on the St. Louis South interface. The maximum generation level of 5,000 MW was reached in the source subsystem prior to any thermal overloads. 54 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 10.0 LARGE LOAD AREA ANALYSIS RESULTS Objectives Determine for a defined load/generation area: Minimum voltages at critical buses relative to voltage stability margin criteria Critical bus and voltage at point of voltage instability Reactive power margin between post contingency operating point and point of voltage instability on a V-Q curve Adequacy of operating and reactive power resources for the defined areas for 2013 Summer Examine contingent events to find the limits of the system Indication of what action (s) may be beneficial to prevent voltage instability for multiple contingency conditions involving generators, transmission lines/ transformers Five Large Load Areas were selected for analysis in this assessment: Vectren and Big Rivers Metro WOTAB area Little Rock Metro Indianapolis Metro Detroit Metro Areas are subject to voltage instability when there is inadequate reactive Mvar supply. This may be due to key generator(s) being unavailable due to tripping or being out on maintenance, or transmission contingencies of lines that serve as the main path of Mvar supply to the load area. The V-Q Curves provide an illustration of the reactive power margin at the bus that is tested. The Mvar margin is determined by the difference between the point of instability (knee of the curve) and the zero reactive power point (y-axis). The larger the Q-Margin, the more stable the bus. The V-Q plots are in Appendix E. 55 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 10.1 Vectren/BREC Combined Metro LLA Overview The combination of the Vectren and Big Rivers Electric Corporation (BREC) transmission systems was selected by MISO Planning & Operations staff for Large Load Analysis. Vectren’s service territory is located in southwest Indiana, while Big Rivers Electric Corp. (BREC) is in northwest Kentucky and borders Vectren’s southern territory (See Figure 10.1-1 below). Vectren provides power to the city of Evansville and several major industrial customers. Big Rivers Electric Corp provides power to its three member cooperatives and the major industrial customers of Century Aluminum and Rio Tinto Alcan aluminum smelters. The intent of this analysis is to identify crucial contingencies and the substations (buses) operating personnel should monitor in the event of an acute transmission system scenario. Figure 10.1-1: Vectren & BREC Transmission Systems Vectren/BREC Metro Analysis Results Four scenarios were run to analyse the Mvar injection capability of the Vectren/BREC combined metro area for the 2013 Summer season. The results of the analysis are shown below in both narrative and tabular format. See a brief synopsis of the analysis results for each scenario below. 56 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version Scenario 0 * Base Case * 50/50 Load * PF @ 0.94: The Mvar injection capability for the Vectren/BREC region is limited to slightly under 100 Mvar of injection at a 138 kV bus for a category C contingency event. Scenario 1 * Base Case * 90/10 Load * PF @ 0.90: The Mvar injection capability for the Vectren/BREC region is is 0.00 Mvar of injection at a 161 kV bus for the category C contingency event. There is a standing op-guide to close the Newtonville transformers under this extreme condition. Scenario 2 * Prior Outage of NERC Category B * 90/10 Load * PF @ 0.90: The Mvar injection capability for the Vectren/BREC region is is 0.00 Mvar of injection at a 161 kV and 138 kV bus and the Henderson County 138 kV bus for a category C contingency event. There is a standing op-guide to close the Newtonville transformers under this extreme condition. Scenario 3 * Prior Outage of NERC Category B * 90/10 Load * PF @ 0.90: The Mvar injection capability for the Vectren/BREC region is is 0.00 Mvar of injection at a 161 kV and 138 kV bus for a category C contingency event. There is a standing op-guide to close the Newtonville transformers under this extreme condition. 57 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 10.2 West Of The Atchafalaya Basin (WOTAB) Overview The Entergy WOTAB transmission system was selected by MISO Planning and Operations staff for Large Load Analysis. WOTAB stands for “West Of The Atchafalaya Basin” and is located in Southeast Texas and Southwest Louisiana, see Figure 10.2-1 below. The WOTAB Region is a high profile industrial area that accounts for 25 percent of the total Entergy load. The intent of this analysis is to identify crucial contingencies and the substations (buses) operating personnel should monitor in the event of an acute transmission system scenario. Figure 10.2-1: WOTAB Transmission Systems Western Houston Metro WOTAB Louisiana Texas Gulf of Mexico Analysis Results Five scenarios were run to analyse the Mvar injection capability of WOTAB for the 2013 Summer season. The results of the analysis are shown below in both narrative and tabular format. See a brief synopsis of the analysis results for each scenario below. Scenario 0 * Base Case * 50/50 Load * PF @ 0.94: The Mvar injection capability for the WOTAB Region of Entergy is limited to 287 Mvar of injection at a 138 kV bus for a category C3 contingency event. 58 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version Scenario 1 * Base Case * 90/10 Load * PF @ 0.90: The Mvar injection capability for the WOTAB Region of Entergy is 0.00 Mvar of injection at the Neches 138 kV bus for a category C3 contingency event. Also, the Mvar injection capability is reduced to 0.00 Mvar of injection at eight buses monitored for a category C3 contingency event. Scenario 2 * Prior Outage of Category B * 90/10 Load * PF @ 0.90: The Mvar injection capability for the WOTAB Region of Entergy is 0.00 Mvar of injection at eight buses monitored for a category C3 contingency event. Scenario 3 * Prior Outage of Category B * 90/10 Load * PF @ 0.90: The Mvar injection capability for the WOTAB Region of Entergy is 0.00 Mvar of injection at a Neches 138 kV bus for a category C3 contingency event. Also, the Mvar injection capability is reduced to 0.00 Mvar of injection at eight buses monitored for a category C3 contingency event. Scenario 4 * Prior Outage of Category B * 90/10 Load * PF @ 0.90: The Mvar injection capability for the WOTAB Region of Entergy is 0.00 Mvar of injection at a 138 kV bus for a category C3 contingency event. Also, the Mvar injection capability is reduced to 0.00 Mvar of injection at eight buses monitored for a category C3 contingency event. 59 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 10.3 Little Rock Metro Area Overview The Little Rock metropolitan area is served by Entergy Arkansas and is geographically located in the middle of the state of Arkansas, see Figure 10.3-1 below. For the purposes of this study the Little Rock metro area is defined as all urban areas both north and south of the Arkansas river which runs straight through the city. Figure 10.3-1: Little Rock Metropolitan Area Little Rock Metro Analysis Results Four scenarios were run to analyse the Mvar injection capability of the Little Rock metro area for the 2013 Summer season. See a brief synopsis of the analysis results for each scenario below. Scenario 0 * Basecase * 50/50 Load * PF @ 0.98: The Mvar injection capability for the Little Rock metro is limited to 530 Mvar of injection at a 115 kV bus for a category B contingency event. Scenario 1 * Basecase * 90/10 Load * PF @ 0.93: The Mvar injection capability for the Little Rock metro is limited to 429 Mvar of injection at a 115 kV bus for a category B contingency event. 60 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version Scenario 2 * Prior Outage of NERC Category B * 90/10 Load * PF @ 0.93: The Mvar injection capability for the Little Rock metro is limited to 430 Mvar of injection at a 115 kV bus for a category B contingency event. Scenario 3 * Prior Outage of NERC Categpry B * 90/10 Load * PF @ 0.93: The Mvar injection capability for the Little Rock metro is limited to 429 Mvar of injection at a 115 kV bus for a category B contingency event. 61 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 10.4 Indianapolis Metro Area Overview The Indianapolis metropolitan area is served by Indianapolis Power and Light (IPL) and is geographically located in the middle of the state of Indiana, see Figure 10.4-1 below. For the purposes of this study the Indianapolis metro area is defined as all urban areas within highway 465 which circles Indianapolis completely. Figure 10.4-1: Indianapolis Metropolitan Area Indianapolis Metro Analysis Results Four scenarios were run to analyse the Mvar injection capability of the Indianapolis Metro area for the 2013 Summer season. The results of the analysis are shown below in both narrative and tabular format. See a brief synopsis of the analysis results for each scenario below. Scenario 0 * Base Case * 50/50 Load * PF @ 0.99: The Mvar injection capability for the Indianapolis Metro is limited to 734 Mvar of injection at a 138 kV bus for a category B contingency event. The Mvar injection capability for the Indianapolis Metro is limited to 845 Mvar of injection at a 138 kV bus for a category C3 contingency event. Scenario 1 * Basecase * 90/10 Load * PF @ 0.95: The Mvar injection capability for the Indianapolis Metro is limited to 552 Mvar of injection at a 138 kV bus for a category B 62 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version contingency event. The Mvar injection capability for the Indianapolis Metro is limited to 633 Mvar of injection at a 138 kV bus for a category C3 contingency event. Scenario 2 * Prior Outage of NERC Category B * 90/10 Load * PF @ 0.95: The Mvar injection capability for the Indianapolis Metro is limited to 484 Mvar of injection at a 138 kV bus for a category B contingency event. The Mvar injection capability for the Indianapolis Metro is limited to 529 Mvar of injection at a 138 kV bus for a category C3 contingency event. Scenario 3 * Prior Outage of NERC Category B * 90/10 Load * PF @ 0.90: The Mvar injection capability for the Indianapolis Metro is limited to 318 Mvar of injection at a 138 kV bus for a category B contingency event. The Mvar injection capability for the Indianapolis Metro is limited to 289 Mvar of injection at a 138 kV bus for a category C3 contingency event. 63 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 10.5 Detroit Metro Area The Detroit metropolitan area is served by International Transmission Company is geographically located in the southeast edge of the state of Michigan, see Figure 10.5-1 below. For the purposes of this study the Detroit metro area is defined as all urban areas inside the Monroe—Wayne—Wixom—Pontiac—Belle River 345 kV transmission system. Figure 10.5-1: Detroit Metropolitan Area Detroit Metro Analysis Results Four scenarios were run to analyse the Mvar injection capability of the Detroit Metro area for the 2013 Summer season. The results of the analysis are shown below in both narrative and tabular format. See a brief synopsis of the analysis results for each scenario below. Scenario 0 * Base Case * 50/50 Load * PF @ 0.93: The Mvar injection capability for the Deroit Metro is limited to approximately 700 Mvar of injection at two 120 kV buses for two category B contingency events. Scenario 1 * Basecase * 90/10 Load * PF @ 0.90: The Mvar injection capability for the Deroit Metro drops below 300 Mvar of injection at several 120 kV buses for three category B 64 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version contingency events. The Mvar injection capability drops below 50 Mvar for one of the category C5 contingency events. Scenario 2 * Prior Outage of NERC Category B * 90/10 Load * PF @ 0.90: The Mvar injection capability for the Deroit Metro drops below 150 Mvar of injection at several 120 kV buses for multiple category B contingency events. The Mvar injection capability drops to 0.00 Mvar for two category C5 contingency events. Scenario 3 * Prior Outage of NERC Category B * 90/10 Load * PF @ 0.90: The Mvar injection capability for the Detroit Metro is drops to 0.00 Mvar of injection at several buses for two category B contingency events. The Mvar injection capability drops to 0.00 Mvar for two category C5 contingency events. 65 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 11.0 WIND GENERATION SENSITIVITY ANALYSIS The total nameplate capacity of wind power generation in the MISO footprint in 2013 Summer is roughly 12,655 MW, as shown below in Table 11.0-1. The table also shows the metered wind generation output at the time of the peak load for each year. A geographical map of the wind generation units in MISO’s footprint may be seen in Figure 11.0-1 below. Approximately 90 percent of the wind capacity is concentrated in the high wind regions in the states of Iowa, Minnesota, and the Dakotas. Table 11.0-1: MISO Wind Capacity and Output at Peak Load Summer Peak Year Installed Wind Capacity (MW) 2005 Metered Output at Peak Load hour MW % of Installed Capacity 907 109 12% 2006 1,251 700 56% 2007 2,064 43 2% 2008 3,085 401 13% 2009 5,636 79 1% 2010 8,179 1,718 21% 2011 9,107 4,200 46% 2012 12,594 1,169 9% 2013 12,655 In the 2013 Summer CSA power flow case, wind generators in the MISO areas were dispatched at 15 percent of their nameplate capacity. In order to identify potential voltage stability issues due to high wind generation output from Iowa, Minnesota, and the Dakotas, an abbreviated voltage stability P/V analysis was performed. To identify potential thermal limits an FCITC was performed. The methodology used in the P/V analysis was to gradually increase wind generation output, while at the same time, the same amount of the highest cost peaking generation in MISO was decreased according to merit order. Specific contingencies in Iowa and other contingencies used for the critical interface voltage stability P/V analysis of MWEX, and St. Louis South interfaces were included in the analysis. All facilities 100 kV and greater were monitored across all three MISO operating regions; Carmel Region, South Region and the St. Paul Region. In addition, an FCITC analysis was performed using all MISO category B contingencies. The analysis results may be seen in Table 11.0-2 below, for which the most limiting thermal constraint was found at the transfer level of 2,500 MW. 66 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version Table 11.0-2: FCITC Constraints found in Illinois FCITC (MW) 2,500 Monitored Line Contingency [CE] Byron Red—[CE] Cherry Valley 345 kV line NERC Category B 3,300 [CE] Byron Blue—[CE] Cherry Valley 345 kV line NERC Category B Study results and input files may be seen in Appendix G. Below is a geographical map of the wind generation units in MISO’s footprint. Figure 11.0-1: MISO Registered Wind Capacity 67 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 12.0 IROL LIMITS Interconnection Reliability Operating Limits (IROL) are system operating limits which, if violated, could lead to instability, uncontrolled separation, or cascading outages that adversely impact the reliability of the Bulk Power System. All NERC category B and C1, C2, and C5 contingencies from the MUST AC analysis that caused facility loading of more than 125 percent of the emergency rating were flagged to determine its potential to become an IROL. The assumption is that cascading or collapse would occur when the monitored element loads to 125 percent or more and trips. All of the aforementioned overloaded elements were screened along with its associated contingency and independently re-analyzed to find any subsequent overloaded branches (line loading > 100 percent of emergency rating). Any branches over 100 percent were manually opened and the process was continued until there were either no overloaded branches or the system collapsed. When the system settles with no overloads, you add up the load that was shed. If the load shed is less than 1,000 MW then there is no IROL event. There were approximately 60 facilities that were evaluated for IROL candidacy in this analysis. Some were not reported because the facility was below the NERC defined BES criteria of 100 kV. Others were not reported due to them being associated with HVDC reduction schemes; thus making them invalid category B or C contingencies. No IROLs were found in this analysis. 68 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 13.0 NUCLEAR PLANT INTERFACE REQUIREMENTS There are nine nuclear plants in the MISO market currently. Each nuclear plant has a set of Nuclear Plant Interface Requirements (NPIR) that need to be met. These NPIRs are all outlined in the Nuclear Plant Operating Agreements (NPOA) that each nuclear plant has reached between the Transmission Planner (TP), the Planning Authority (PA) and the Geneator Operator (GOP). It is outlined in each of the NPOAs that the TP will perform the assessment to assure the NPIRs are met. MISO will then provide those results in the CSA report. See Table 13.0-1 for the list of nuclear plants within the MISO market. There are five additional nuclear units in the MISO South region but because those units are not part of the MISO market they are not part of this section. Table 13.0-1: MISO Nuclear Plants Operating Region Plant Name Capacity ( MW) Carmel Callaway 1,369 Carmel Clinton 1,264 Carmel Enrico Fermi 1,138 Carmel Kewaunee 576 Carmel Palisades 955 Carmel Point Beach 1,162 St. Paul Duane Arnold 630 St. Paul Monticello 718 St. Paul Prairie Island 1,318 The results below are from our Transmission Owning Stakeholders who have a nuclear unit within their control area. The timeline of their assessments do not always match that of which MISO requests this information; therefore, in some instances their most recent assessment results were provided. On top of the Transmission Planner’s assessment MISO also screened each nuclear bus for NPIR violations in the 2013 Summer CSA. 69 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version Callaway Description: The Callaway Nuclear Plant is comprised of one 1,373 MVA unit with a maximum auxiliary station service load of 75 MW and 35 Mvar. The step-up transformer is comprised of three 456 MVA, 25/345 kV units for a total capability of 1,369 MVA. The Callaway Nuclear Plant Substation is connected to the eastern interconnection. The 345 kV bus is configured with a breaker and a half scheme. Ameren Services owns and operates this plant. Analysis: In accordance with NUC-001-2 R9.2.3, Ameren Services tested the effects of various system configurations on the Callaway 345 kV bus voltage. The 2012 Summer ERAG model was used as the basis for this study work, with the detailed Ameren representation inserted into the model. The load level modeled in the Ameren system was set to the projected 1-in-10 level for 2012 summer. The Loss Of Coolant Accident (LOCA) load (auxilary load) modeled in these cases was 75 + j35 (MW + jMvar). Power was imported to the Ameren control area from the MISO footprint to make up for the power loss from the outage of the Callaway and Labadie units. The following table summarizes the results at the Callaway bus, under none of the configurations tested did the Callaway bus voltage fall below the allowed limit. Table 13.0-2: Ameren's Callaway assessment results Configuration 1. Callaway Offline 2a. Condition #1 & NERC Category B 2b. Condition #2 & NERC Category B 3a. Condition #1 & NERC Category B 3b. Condition #1 & NERC Category B 3c. Condition #1 & NERC Category B 3d. Condition #1 & NERC Category B Callaway 345 kV Bus Limit Simulation 333 357.4 330 356.8 330 357 330 346.3 330 356.3 330 355.7 330 355.7 70 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version Clinton Description: Clinton Power Station is comprised of one 1,264 MVA unit with an auxiliary station service load of 43 MW and 16 Mvar. The step-up transformer is a 1,425 MVA, 22/345 kV unit. The Clinton substation is connected to the eastern interconnection. The 345 kV bus is a ring bus configuration and the 138 kV bus is a straight bus configuration. The 345 kV bus and 138 kV bus are not connected by transformation at the Clinton switchyard. Exelon owns and operates this plant. Analysis: In accordance with NUC-001-2 R9.2.3, Ameren Services tested the effects of various system configurations on the Clinton 345 kV and 138 kV bus voltages. The 2012 Summer ERAG model was used as the basis for this study work, with the detailed Ameren control areas representation inserted into the model. The load level modeled in the Ameren system was set to the projected 1-in-10 level for 2012 summer. The LOCA load modeled in these cases was 44 + j27 (MW + jMvar). Power was imported to the Ameren control area from the MISO cloud to make up for the power loss from the outage of the Clinton and Kincaid units. The following table Summarizes the results at the Clinton bus, under none of the configurations tested did the Clinton bus voltages fall below the allowed limit. Table 13.0-3: Ameren's Clinton assessment results Clinton Bus Voltages Configuration 345 kV 138 kV Limit Simulation Limit Simulation Base Case 327.8 362.2 129.7 140.5 1. Clinton Offline & NERC Category B 327.8 357.6 129.7 139.6 2. Clinton Offline & NERC Category B 327.8 355.9 129.7 138.8 3. Clinton Offline & NERC Category B 327.8 355.5 129.7 138.7 4. Clinton Offline & NERC Category B 327.8 357.2 129.7 135.6 5. Clinton Offline & NERC Category B 327.8 357.5 129.7 142.7 71 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version Enrico Fermi Description: Enrico Fermi II Nuclear Plant (Fermi) is comprised of one 1,350 MVA unit connected to eastern interconnect. The Fermi nuclear plant has two independent switchyards the 345 kV yard in which the unit is connected has two 345 kV lines. The 120 kV switchyard which contains the interconnections for 4 Combustion Turbine Generators normally used for peaking power has three 120 kV lines. Station service load is split between the two switchyards. The 345 kV yard has a normal loading of 47 MW and 28 Mvar with an additional accident loading adder of 2.69 MW and 11.682 Mvar. The 120 kV yard has a normal loading of 26 MW and 17 Mvar with an additional accident loader of 2.59 MW and 12.095 Mvar. The plant is owned and operated by DTE Electric Company (DECO). Analysis: As required by the Nuclear Plant Operating Agreement between ITC, DECO, Fermi II and MISO ITC performs an annual grid analysis to insure that the system can meet the above requirements. In addition to the detailed annual grid analysis all planning studies, including but not limited to load interconnections, generator interconnections, seasonal system studies, and system reliability projects are required to use the above limits and values to insure that the transmission system can be operated to meet them. Results: Past studies have indicated potential issues meeting the voltage drop limits and steady state voltage limits in certain shutdown plus contingency scenarios. Long term solutions to these potential issues are currently being developed in coordination with DECO, MISO and the Fermi II Nuclear Power Plant staff and to be proposed in the MISO MTEP process. 72 DTE's Fermi MISO Coordinated Seasonal Assessment – 2013 Summer Public Version Palisades Description: Palisades Nuclear Generating Plant is comprised of one 955 MVA unit connected to eastern interconnect. The Palisades Nuclear Generating Plant has one switch yard with six networked 345 kV transmission lines arranged in a breaker and a half configuration. In addition there is one 345 kV line that runs to the Covert Generating Plant. The plants auxiliary load of 43 MW and 31 Mvar is fed by two independent transformers. Safe-Guard transformer is connected to the “F” bus of the switchyard while Start-up transformer is connected to the “R” bus of the switchyard. Entergy Nuclear Palisades (ENP) is the owner and operator of the plant. Analysis: As required by the NPOA between METC, ENP, and MISO, METC performs an annual grid analysis to insure that the system can meet the above requirements. In addition to the detailed annual grid analysis all planning studies, including but not limited to load interconnections, generator interconnections, seasonal system studies, and system reliability projects are required to use the above limits and values to insure that the transmission system can be operated to meet them. Results: METC’s annual grid study, as well as the other studies in the area, has not indicated any issues with meeting the above NPIRs. However; METC, MISO and ENP are currently engaged in negotiations surrounding proposed changes to the High and Low voltage limits. It is unlikely this will affect the summer season. 73 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version Kewaunee Description: The Kewaunee Nuclear plant retired on May 7, 2013. Analysis: MISO’s incorporated the Kewaunee NPIRs into its bi-annual assessments. The analysis was performed as part of the MISO Coordinated Seasonal Transmission Assessment (CSA). Results: The Nuclear Plant Interface Requirements (NPIRs) for Kewaunee were incorporated into the MISO CSA study. The results showed that the NPIRs met the required Kewaunee performance criteria. : Entergy's Palisades Nuclear Power Plant located on the Eastern shore of Lake Michigan 74 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version Prairie Island Description: Prairie Island is located in Southeast Minnesota, along the Mississippi river. It is owned and operated by Xcel Energy. The Prairie Island Plant is comprised of two 659 MVA Generator Step-Up Transformers with a maximum combined auxiliary station service load of 63.2 MW and 35.3 Mvar. There are two 600 MVA, 20 kV step-up transformers. It has four off site sources, two from the 345 kV bus, one from the 161 kV bus and one from the 345/161 kV transformer tertiary bus. NSPM is the sole provider of off site power. Analysis: The analysis indicated that the 99.5% voltage criteria at 161 kV bus is not met during certain contingencies, however this is not a concern as additional plant sources are available from the 345 kV bus. The Category D contingency of a two unit trip was also analyzed with all voltages remaining acceptable for the plant. Results: Prairie Island NPIRs are satisfactorily met during this transmission assessment. 75 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version Point Beach Description: The Point Beach Nuclear Plant is located in the eastern interconnect. This plant has a real gross output of 1,189 MW and is connected to the 345 kV transmission system. The Point Beach Nuclear Plant is owned and operated by Nextera Energy Resources. Analysis: MISO’s incorporated the Point Beach NPIRs into its bi-annual assessments. The analysis was performed as part of the MISO Coordinated Seasonal Transmission Assessment (CSA). Results: The Nuclear Plant Interface Requirements (NPIRs) for Point Beach were incorporated into the MISO CSA study. The results showed that the NPIRs met the required Point Beach performance criteria. 76 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version Monticello Plant Description: The Monticello plant is located in the eastern interconnect. It is owned and operated by Xcel Energy. The Monticello Plant is comprised of one 718 MVA Generator Step Up Transformer with no unit connected auxiliary station service transformer. There is one 800 MVA, 22/345 kV generator step-up transformer. It has four off site sources, two from 345 kV bus, one from the 115 kV bus and one from 345/115 kV transformer tertiary bus. NSPM is the sole provider of off-site power. Analysis: The analysis indicated that the 99.1% voltage on the 115 kV bus is not met during certain contingencies (mainly C3), this is not a concern as there are two sources available from the 345 kV bus. The 345 kV low voltage can be addressed by adjusting the generation set point to hold a higher voltage at the 345 kV bus. Results: Monticello NPIRs are satisfactorily met during this transmission assessment. 77 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version Duane Arnold Energy Center Description: The Duane Arnold Energy Center (DAEC) is the eastern interconnect. This plant has a real gross output of 630 MW and is connected to the 161 kV. This nuclear plant is owned and operated by NextEra Energy. Analysis: ITCM Planning incorporated the Duane Arnold Energy Center (DAEC) into its annual transmission assessment. The analysis was performed as part of the MAPP Transmission Reliability Assessment Subcommittee (TRAS) study performed annually. Results: The Nuclear Plant Interface Requirements (NPIRs) for DAEC were incorporated into the TRAS study. The DAEC load was modeled per the NPIRs. The results showed that the Iowa area meets the required DAEC NPIRs performance criteria. 78 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 14.0 APPENDICES Appendices contain the actual study input files and detailed results of the analysis and are located in separate folders on the extranet. Appendix A – Subsystem, Monitored Element, and Contingency Files Appendix B – Steady-State AC Contingency Results Appendix C – FCITC Results Appendix D – Critical Interface Results Appendix E – Large Load Area Results Appendix F – VSAT input files Appendix G – Wind Generation Sensitivity Analysis Appendix H – FCITC Stability Analysis Results 79 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version 15.0 ABBREVIATIONS AND ACROYNMS MISO Carmel Region: AMIL AMMO ATC ALTE MGE UPPC WEC WPS BREC CWLD CWLP DEI HE IPL ITC ITCT METC LBWL MPPA NIPSCO OVEC SIGE SIPC WPSCI Ameren Illinois Ameren Missouri American Transmission Company Alliant Energy East Madison Gas and Electric Company Upper Peninsula Power Company Wisconsin Electric Power Company (WE) Wisconsin Public Service Corporation Big Rivers Electric Company Columbia Water & Light Department City of Springfield (IL), Water Light & Power Duke Energy Indiana Hoosier Energy Indianapolis Power & Light ITC Holdings Corporation International Transmission Company Michigan Electric Transmission Company City of Lansing Board of Water & Light Michigan Public Power Agency Northern Indiana Public Service Company Ohio Valley Electric Corporation Southern Indiana Gas & Electric (Vectren) Southern Illinois Power Cooperative Wolverine Power Supply Cooperative, Inc. MISO South Region: BRAZ CLEC EAI PUPP PLUM OMLP CWAY NLR BUBA WMU EES DER LAFA LAGN LEPA SMEPA BBA Brazos Electric Cooperative Cleco Power LLC Entergy Arkansas Union Power Partners, L.P. Plum Point Energy Associates, LLC City of Osceola, AR City of Conway, AR City of North Little Rock, AR City of Benton, AR City of West Memphis, AR Entergy (Louisiana, Texas, Mississippi, New Orleans) City of Ruston, LA Lafayette Utilities System Louisiana Generation, LLC Louisiana Energy and Power Authority Southerm Mississippi Electric Power Association Batesville Generation 80 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version MISO St. Paul Region: ALTW BEPC DPC GRE ITC ITCM MHEB MDU MEC MP MPC MPW NWPS OTP RPU SMMPA WAPA XEL Alliant Energy West Basin Electric Power Cooperative Dairyland Power Cooperative Great River Energy ITC Holdings Corporation International Transmission Company Midwest Manitoba Hydro-Electric Board Montana-Dakota Utilities Company MidAmerican Energy Company Minnesota Power Minnkota Power Cooperative, Incorporated Muscatine Power and Water Company Northwestern Public Service Company Otter Tail Power Company Rochester Public Utilities Southern Minnesota Municipal Power Agency Western Area Power Administration Xcel Energy MISO Tier-1: AEC AECI AEP AEPW ATSI CE DAY DEO&K EEI EKPC LGE/KU EMDE GMO IESO KACP LES NPPD OKGE OPPD PS SOCO SPC SPP SWPA TVA Alabama Electric Corporation Associated Electric Cooperative, Inc. American Electric Power AEP – Southwest Power Company FirstEnergy Corp. Commonwealth Edison (Exelon) Dayton Power Duke Energy Ohio & Kentucky Electric Energy, Inc. East Kentucky Power Cooperative Louisville Gas & Electric and Kentucky Utility Empire Electric Disctict KCP&L Greater Missouri Operations Independent Electricity System Operator Kansas City Power & Light Lincoln Electric Services Nebraska Public Power District Oklahoma Gas & Electric Omaha Public Power District Power South Southern Company Saskatchewan Power Company Southwest Power Pool Southwestern Power Administration Tennessee Valley Authority 81 MISO Coordinated Seasonal Assessment – 2013 Summer Public Version Non-MISO: DOE FERC MAPP MRO NERC PJM RCDC RFC SERC WECC Department Of Energy Federal Energy Reliability Council Mid-Continent Area Power Pool Midwest Reliability Organization North America Electric Reliability Corporation PJM Interconnection, LLC Rapid City DC Interconnect ReliabilityFirst Corporation Southeast Electric Reliability Corporation Western Electric Coordinating Council 82
© Copyright 2026 Paperzz