PROJECT JOB NO. 2017 Bridges SUBJECT SHEET NO. Load Posting Map ORIGINATED BY PROJECT LOCATION MAP BCPW P-05-0076 – Quarry Rd 45 Ton Load Limit 0.9 Miles East of STH 32 DATE 01-09-17 OF CHECKED BY DATE CALC. NO. REV. NO. WRB P-05-0080 – Brookside Dr 20 Ton Load Limit 0.5 Miles North of CTH U Van Lanen Rd 10 Ton Load Limit 0.1 Miles West of STH 57 P-05-0106 – CTH MM 25 Ton Load Limit 1.1 Miles East of CTH G P-05-0906 – Wanek Rd 10 Ton Load Limit 0.05 Miles North of Cooperstown Rd P-05-0145 – Park View Rd 40 Ton Load Limit 0.12 Miles South of Cooperstown Rd X:\BRIDGES\GENERAL INFO\BCPW BRIDGE POSTING MAP 2017.DOCX P-05-0932 – Cooperstown Rd 10 Ton Load Limit 1.6 Miles East of CTH NN
© Copyright 2026 Paperzz