Biogas Power (Off-grid)

File No. 25-2/2013-BE
Government of India
Ministry of New and Renewable Energy
(Biogas Power (off-grid) Group)
Block No. 14, CGO Complex
Lodi Road, New Delhi – 110 003
Dated: 30th November 2015
To
The Pay and Accounts Officer
Ministry of New and Renewable Energy
New Delhi – 110 003
Subject:
Continuation of Biogas Power (off-grid) Programme for decentralized power
generation applications and thermal applications during 2015-16 and the
remaining period of 12th Five Year Plan – Administrative approval – reg.
Sir,
In continuation of this Ministry’s sanction of even number dated 26.08.2014 on
the above mentioned subject, the undersigned is directed to convey the approval of
competent authority that the Biogas Power (off-grid) Programme of MNRE will be
implemented employing properly designed, developed and proven biogas plants, engines
and accessories and standard input and output measuring systems, and that such biogas
power plants will be operated for effective promotion of biogas for decentralized power
generation(in the range 3 - 250kW) and thermal applications as outlined in the
Administrative Approval of the Scheme dated 03.01.2014. The CFA is provided on power
generation capacity of biogas plants. The project submission, implementation and
submission of completion reports will be done as follows;
Project submission
2.
The proposals have to be developed with complete understanding of biogas
generation from the available feedstock and load management at user end. The
proposals to be submitted in the format as annexed to the Administrative Approval of
the scheme dated 3.1.2014 with complete details of cattle’s and quantity of feedstock
available, estimated power to be generated with a minimum 10 hours of operation per
day, load distribution, details of biogas plants, generators and power control units,
scrubber and other accessories with make and cost of each item. All biogas plants of
biogas generation capacity of 85 m3 and above will necessarily employ standard gas flow
meter for measuring biogas generated from the biogas plant.
Implementation
3.
The biogas power projects will be properly installed and operated and
performance monitored by the implementing agencies. The performance data will be
recorded on daily basis by beneficiaries/ implementing agencies at sites.
The
performance data includes quantity of feedstock fed into biogas plants, biogas
generation and power generation/ units generated and operating hours and usage of the
same on daily basis. The plants will be operated for minimum 10 hours per-day.
4.
The installation/commissioning of biogas power plants should be completed
within a year and in any case not more than 18 months from the date of sanction of the
project. The condition of successful commissioning of projects would, inter-alia, imply
operation of the project for three months, including 72 hours continuous operation at a
minimum of 80% of rated capacity supported by verified data logged by the project. The
project developer/implementing agency will be required to provide data on its biogas
power generation and performance on six-monthly basis to MNRE.
Project Completion
5.
On completion of the project, the implementing agency will submit the
completion report in bound form with audited SOE for release of Central Financial
Assistance (CFA). The completion report will include the details of the project in the
following order:
i)
Complete technical details of biogas plant with design and drawing, scrubber,
biogas flow meter, generator including power control panel, energy meter
and accessories.
ii)
Photographs of all above with specifications make and address of
manufacturers given on plant/equipment/ component.
iii)
Commissioning report with plant operating continuously for 74 hours for
consecutive 3 days with data on power generation/ units and operating hours.
iv)
Three months performance report giving quantity of feedstock fed into plant
on daily basis, biogas and power generated with operating hours on daily basis
and usage of the electricity.
v)
The inspection report by the agency authorized by MNRE will verify the details
of biogas power plants, which includes make and capacity of biogas plant and
power generation/control panel unit installed, and power generated
certifying the electricity generated with operating hours in a day.
vi)
The audited SOE should be submitted on the letterhead of CA/ auditor
indicating inter alia the FR No. and Membership No. with cost of each item
given therein.
6.
The implementing agencies will maintain the record of projects with performance
data of projects implemented by them. The details of biogas plants with performance
data will be updated by the implementing agencies at their website, which will be
linked and updated at the concerned SNAs website and also with MNRE’s website.
7.
The other terms and conditions and outlay for the Scheme will remain unchanged.
8.
This issues with the concurrence of Integrated Finance Division of this Ministry
under their Dy. No. 1253/IFD dated 15.10.2015.
Yours faithfully,
Encl: As above
(Dr. B.S. Negi)
Director (BPP)
Telefax: 011-2436 8581
Copy to:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
State Nodal Department/ State Nodal Agencies of all States/ Union Territories
Khadi & Village Industries Commission, Mumbai
All Biogas Development & Training Centres (BDTCs) supported by MNRE.
The Accountant General (Audit) – All States/UTs
The Director of Accounts (All States/ UTs)
The Principal Director of Audit (Scientific Deptt.), AGCR Building, IJP Estate, New
Delhi.
The Principal Director (Local Bodies Accounts)/ Director (Local Bodies), Office of
the C&AG of India, 9 Deen Dayal Upadhaya Marg, New Delhi
Secretary, Finance/ Planning Department (All States/ UTs)
RBI, Bombay/ NABARD, Bombay
Ministry of Programme Implementation, Government of India, New Delhi
Managing Director, IREDA, New Delhi
PS to Hon’ble Minister of Power, Coal and New and Renewable Energy(IC), New
Delhi
PSO to Secretary, MNRE, New Delhi
Director (Finance), MNRE, New Delhi
PS to JS & FA, MNRE, New Delhi
PS to JS (Bio Energy), MNRE, New Delhi
All Group Heads, MNRE
All Directors, MNRE
DS (Fin)/ US (Fin)/ IFD, MNRE
NIC Cell, MNRE
(Dr. B.S. Negi)
Director (BPP (off-grid))
Annexure III-b
FORMAT FOR BASIC INFORMATION FOR PROJECTS ABOVE 8 KW BIOGAS POWER (OFFGRID) PROGRAMME
S. No
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
Name of the Project
Name of the Beneficiary and address
Geographical details of the proposed site
A) Name of the village
B) Post
C) Block
D) Taluk
E) District
F) Pin code Number
G) State
H) Nearest bus stand /Railway station
I) Name of the contact person
J) Telephone /Mobile Nos of contact person
K) Telephone No. of the site
Name of address of the State Agency/BDTC who propose
to undertake the work
Category of Beneficiary / Institution
Please (√) tick
Proposed use of generated power with detailed
configuration
Mode of use and total requirement of power kWh/day
Proposed size of Biogas plant in cubic meter (m3)
Available cattle
a) Details of Cattle
(Availability of dung in kg.)
b) Any other like goats, pigs, poultry etc. Please
specify the Nos & its dropping in kg.
c) Agricultural waste in kg.
d) Other degradable biomass in kg.
(please attach separate sheet along with the full
details of each raw material)
e) No. of latrine attached & No. of users
f) Availability of land for proposed biogas plant and
housing generator etc.
Procurement and commissioning of ( Name of the
proposed power generating system, Mechanism for
manufacturers and operation & Maintenance of the system
suppliers to be given)
Estimated quantum of power to be generated through
biogas plant, keeping in view the minimum 10 hours daily
operation of the proposed power plant entirely based on
Biogas based power
generation
a)
b)
c)
d)
General
Private
Government
Public
organization
e) Other
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
Date
Place
Date
Place
Date
Place
Biogas generation
Proposed Electrical Load Distribution with Biogas power
plant
a) Domestic (Details to be given)
b) Village industry (Details to be given)
c) Irrigation/Agriculture (Details to be given)
Types of engine proposed for power generation
Capacity of engine / micro turbines etc. in kVA
a) Cost of 100% biogas engine coupled with Genset,
associated Central panel and power room etc. (in
Rs.)
b) Cost of internal transmission system used for
electrification (for a & b please attach separate
sheet along with full details)
Cost of proposed biogas plant (in Rs.)
Manure management system
Approximated cost of electricity that may be generated
through gas ( Rs./kWh)
Source of funding of the project (in Rs.)
a) Own fund
b) Bank loan
c) Central financial assistance
d) Total Cost (in Rs.)
Source of funds for meeting operation and maintenance
cost of the system
Undertaking from State Nodal Deptt.../Agencies/BDTC
(An undertaking to this effect from agency for procurement
installation, operation and maintenance of the system on
regular basis.)
Mechanism to transfer the power plant to user /
Panchayat/ Society/ Entrepreneur etc. by SNA/SND/BDTC
after specific period.
Any other information with regard to the project
Signature of the Beneficiary
Who undertakes the project
Signature of the agency who promote/
Undertake the work of power generation & construction of Biogas
plants etc.
Verified & countersigned by the Head of the concerned
SND / SNA / KVIC / BDTC