File No. 25-2/2013-BE Government of India Ministry of New and Renewable Energy (Biogas Power (off-grid) Group) Block No. 14, CGO Complex Lodi Road, New Delhi – 110 003 Dated: 30th November 2015 To The Pay and Accounts Officer Ministry of New and Renewable Energy New Delhi – 110 003 Subject: Continuation of Biogas Power (off-grid) Programme for decentralized power generation applications and thermal applications during 2015-16 and the remaining period of 12th Five Year Plan – Administrative approval – reg. Sir, In continuation of this Ministry’s sanction of even number dated 26.08.2014 on the above mentioned subject, the undersigned is directed to convey the approval of competent authority that the Biogas Power (off-grid) Programme of MNRE will be implemented employing properly designed, developed and proven biogas plants, engines and accessories and standard input and output measuring systems, and that such biogas power plants will be operated for effective promotion of biogas for decentralized power generation(in the range 3 - 250kW) and thermal applications as outlined in the Administrative Approval of the Scheme dated 03.01.2014. The CFA is provided on power generation capacity of biogas plants. The project submission, implementation and submission of completion reports will be done as follows; Project submission 2. The proposals have to be developed with complete understanding of biogas generation from the available feedstock and load management at user end. The proposals to be submitted in the format as annexed to the Administrative Approval of the scheme dated 3.1.2014 with complete details of cattle’s and quantity of feedstock available, estimated power to be generated with a minimum 10 hours of operation per day, load distribution, details of biogas plants, generators and power control units, scrubber and other accessories with make and cost of each item. All biogas plants of biogas generation capacity of 85 m3 and above will necessarily employ standard gas flow meter for measuring biogas generated from the biogas plant. Implementation 3. The biogas power projects will be properly installed and operated and performance monitored by the implementing agencies. The performance data will be recorded on daily basis by beneficiaries/ implementing agencies at sites. The performance data includes quantity of feedstock fed into biogas plants, biogas generation and power generation/ units generated and operating hours and usage of the same on daily basis. The plants will be operated for minimum 10 hours per-day. 4. The installation/commissioning of biogas power plants should be completed within a year and in any case not more than 18 months from the date of sanction of the project. The condition of successful commissioning of projects would, inter-alia, imply operation of the project for three months, including 72 hours continuous operation at a minimum of 80% of rated capacity supported by verified data logged by the project. The project developer/implementing agency will be required to provide data on its biogas power generation and performance on six-monthly basis to MNRE. Project Completion 5. On completion of the project, the implementing agency will submit the completion report in bound form with audited SOE for release of Central Financial Assistance (CFA). The completion report will include the details of the project in the following order: i) Complete technical details of biogas plant with design and drawing, scrubber, biogas flow meter, generator including power control panel, energy meter and accessories. ii) Photographs of all above with specifications make and address of manufacturers given on plant/equipment/ component. iii) Commissioning report with plant operating continuously for 74 hours for consecutive 3 days with data on power generation/ units and operating hours. iv) Three months performance report giving quantity of feedstock fed into plant on daily basis, biogas and power generated with operating hours on daily basis and usage of the electricity. v) The inspection report by the agency authorized by MNRE will verify the details of biogas power plants, which includes make and capacity of biogas plant and power generation/control panel unit installed, and power generated certifying the electricity generated with operating hours in a day. vi) The audited SOE should be submitted on the letterhead of CA/ auditor indicating inter alia the FR No. and Membership No. with cost of each item given therein. 6. The implementing agencies will maintain the record of projects with performance data of projects implemented by them. The details of biogas plants with performance data will be updated by the implementing agencies at their website, which will be linked and updated at the concerned SNAs website and also with MNRE’s website. 7. The other terms and conditions and outlay for the Scheme will remain unchanged. 8. This issues with the concurrence of Integrated Finance Division of this Ministry under their Dy. No. 1253/IFD dated 15.10.2015. Yours faithfully, Encl: As above (Dr. B.S. Negi) Director (BPP) Telefax: 011-2436 8581 Copy to: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. State Nodal Department/ State Nodal Agencies of all States/ Union Territories Khadi & Village Industries Commission, Mumbai All Biogas Development & Training Centres (BDTCs) supported by MNRE. The Accountant General (Audit) – All States/UTs The Director of Accounts (All States/ UTs) The Principal Director of Audit (Scientific Deptt.), AGCR Building, IJP Estate, New Delhi. The Principal Director (Local Bodies Accounts)/ Director (Local Bodies), Office of the C&AG of India, 9 Deen Dayal Upadhaya Marg, New Delhi Secretary, Finance/ Planning Department (All States/ UTs) RBI, Bombay/ NABARD, Bombay Ministry of Programme Implementation, Government of India, New Delhi Managing Director, IREDA, New Delhi PS to Hon’ble Minister of Power, Coal and New and Renewable Energy(IC), New Delhi PSO to Secretary, MNRE, New Delhi Director (Finance), MNRE, New Delhi PS to JS & FA, MNRE, New Delhi PS to JS (Bio Energy), MNRE, New Delhi All Group Heads, MNRE All Directors, MNRE DS (Fin)/ US (Fin)/ IFD, MNRE NIC Cell, MNRE (Dr. B.S. Negi) Director (BPP (off-grid)) Annexure III-b FORMAT FOR BASIC INFORMATION FOR PROJECTS ABOVE 8 KW BIOGAS POWER (OFFGRID) PROGRAMME S. No 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Name of the Project Name of the Beneficiary and address Geographical details of the proposed site A) Name of the village B) Post C) Block D) Taluk E) District F) Pin code Number G) State H) Nearest bus stand /Railway station I) Name of the contact person J) Telephone /Mobile Nos of contact person K) Telephone No. of the site Name of address of the State Agency/BDTC who propose to undertake the work Category of Beneficiary / Institution Please (√) tick Proposed use of generated power with detailed configuration Mode of use and total requirement of power kWh/day Proposed size of Biogas plant in cubic meter (m3) Available cattle a) Details of Cattle (Availability of dung in kg.) b) Any other like goats, pigs, poultry etc. Please specify the Nos & its dropping in kg. c) Agricultural waste in kg. d) Other degradable biomass in kg. (please attach separate sheet along with the full details of each raw material) e) No. of latrine attached & No. of users f) Availability of land for proposed biogas plant and housing generator etc. Procurement and commissioning of ( Name of the proposed power generating system, Mechanism for manufacturers and operation & Maintenance of the system suppliers to be given) Estimated quantum of power to be generated through biogas plant, keeping in view the minimum 10 hours daily operation of the proposed power plant entirely based on Biogas based power generation a) b) c) d) General Private Government Public organization e) Other 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. Date Place Date Place Date Place Biogas generation Proposed Electrical Load Distribution with Biogas power plant a) Domestic (Details to be given) b) Village industry (Details to be given) c) Irrigation/Agriculture (Details to be given) Types of engine proposed for power generation Capacity of engine / micro turbines etc. in kVA a) Cost of 100% biogas engine coupled with Genset, associated Central panel and power room etc. (in Rs.) b) Cost of internal transmission system used for electrification (for a & b please attach separate sheet along with full details) Cost of proposed biogas plant (in Rs.) Manure management system Approximated cost of electricity that may be generated through gas ( Rs./kWh) Source of funding of the project (in Rs.) a) Own fund b) Bank loan c) Central financial assistance d) Total Cost (in Rs.) Source of funds for meeting operation and maintenance cost of the system Undertaking from State Nodal Deptt.../Agencies/BDTC (An undertaking to this effect from agency for procurement installation, operation and maintenance of the system on regular basis.) Mechanism to transfer the power plant to user / Panchayat/ Society/ Entrepreneur etc. by SNA/SND/BDTC after specific period. Any other information with regard to the project Signature of the Beneficiary Who undertakes the project Signature of the agency who promote/ Undertake the work of power generation & construction of Biogas plants etc. Verified & countersigned by the Head of the concerned SND / SNA / KVIC / BDTC
© Copyright 2026 Paperzz