Installation/Erection Charges Rural Electrification works inKHED'MA SDN Idar Division Of Himmatnagar Circle Project in Gujarat State under IPDS(PART-1) (Schedule of rates and prices) Bidder's Name & Address: All prices in Indian Rupees Installation / Erection Charges : F Augmentation, Renovation and Modernisation of existing lines and substations Sr. No. 1 F(IV) - A 4.00 Unit 2 3 4 0 0 0 150 935 140250 140250 0 0 0 120 788 94560 94560 Qty. Qty. 7 Conversion of existing LT lines on bare conductor to Areal bunch XLPE cable Erection of following types of poles for LT overhead line by providing and installing danger plate, anti-climbing devices (barbed wire), earthing with separate pit (coil and 8SWG GI wire), red oxide & aluminium paint, pole numbering excluding cement concrete foundation or refilling by bolders using cement concreting foundation 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) or/and 200 mm average size bolders mixed with excavated earth etc as per scope of work, approved drawings and specifications: 8 Mtr PSC Pole No 6.00 Erection of complete stay set with GI stay wire (7x3.15 mm dia), binding of stay wire, by providing Guy stay insulator (2 Nos.) and 0.2 cmt concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) as per technical specifications, approved drawings and scope of works. Set Dismantling of existing LT bare conductor line & fixtures, depositing to stores of employer, taking delivery from DISCOM/Power Deptt. stores, loading, transportation, enroute stacking, unloading at site and erection, testing & commissioning of new areal bunched XLPE cable by supplying & erection of tension clamps for dead end, suspension clamps, clamps for neutral, piercing connectors type-I & type-II, 16 mm dia MS nuts & bolts, pole clamps, spring loaded bus bar suitable for single phase and three phase systems etc. as required as per technical specification, approved drawings and scope of work: Dismantling of existing LT bare conductor line, depositing to stores of employer DISCOM/Power Deptt. Stores Km 0 0 0 45 1695 76275 76275 Dismantling of existing LT line fabrication/fixtures, depositing to stores of employer DISCOM/Power Deptt. Stores No 0 0 0 375 95 35625 35625 Taking delivery from DISCOM/Power Deptt. stores, loading, transportation, enroute stacking, unloading at site and erection, testing & commissioning of new areal bunched XLPE cable by supplying & erection of tension clamps for dead end, suspension clamps, clamps for neutral, piercing connectors type-I & type-II, 16 mm dia MS nuts & bolts, pole clamps, spring loaded bus bar suitable for single phase and three phase systems etc. as required as per technical specification, approved drawings and scope of work: AERIAL BUNCHED XLPE CABLE 3X50 + 1x35 + 1x16 SQ. MM. Km 0 0 0 15 10000 150000 150000 No 60 135 8100 60 0 0 8100 No 315 150 47250 315 0 0 47250 No No No 60 750 2250 135 38 60 8100 28500 135000 60 750 0 0 0 0 0 0 0 8100 28500 135000 Special Accessories for AB Cable Self tightening anchoring (Dead end) clamp with pole bracket using Stainless Steel Strap & Buckle Self locking Suspension Clamp witth pole bracket using Stainless Steel Strap & Buckle Pre Insulated mid span joints for phase & neutral for 16 sq mm to50mm2 Stainless Steel of Size Strap 20mm*0.7mm & Buckle width 20 mm Piercing connector F(IV) - B Erection Unit Total Grand Total Amt. in Rs. Rate in Amt. in Rs. Rs 8 9 10 Item Description 4.01 7.00 Supply Unit Total Rate in Amt. in Rs. Rs 5 6 Conversion of existing HT lines on bare conductor to Areal bunch XLPE cable Page 1 of 2 F Installation/Erection Charges Augmentation, Renovation and Modernisation of existing lines and substations Sr. No. Unit 3 4 0 0 0 200 3220 644000 644000 0 0 0 30 788 23640 23640 1 2 Erection of following types of poles for LT overhead line by providing and installing danger plate, anti-climbing devices (barbed wire), earthing with seoerate pits (coil and 8SWG GI wire), red oxide & aluminium paint, pole numbering including cement concrete foundation or refilling by bolders using cement concreting foundation 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) or/and 200 mm average size bolders mixed with excavated earth etc as per scope of work, approved drawings and specifications: 4.02 10 Mtr PSC Pole - Cement concreting 0.5 cmt No 6.00 Erection of complete stay set with GI stay wire (7x3.15 mm dia), binding of stay wire, by providing Guy stay insulator (2 Nos.) and 0.2 cmt concreting 1 part cement, 3 part sand, 6 part 40 mm size stone aggregate chips (1:3:6) as per technical specifications, approved drawings and scope of works. Set 10.00 Qty. 7 Dismantling of existing HT bare conductor line, depositing to stores of employer DISCOM/Power Deptt. Stores Km 0 0 0 15 1695 25425 25425 Dismantling of existing HT line fabrication/fixtures, PSC Pole, depositing to stores of employer DISCOM/Power Deptt. Stores No 0 0 0 150 425 63750 63750 Taking delivery from DISCOM/Power Deptt. stores, loading, transportation, enroute stacking, unloading at site and erection, testing & commissioning of new areal bunched XLPE cable by supplying & erection of tension clamps for dead end, suspension clamps, clamps for neutral, piercing connectors type-I & type-II, 16 mm dia MS nuts & bolts, pole clamps, spring loaded bus bar suitable for single phase and three phase systems etc. as required as per technical specification, approved drawings and scope of work: AERIAL BUNCHED XLPE CABLE 3X70(Ph)+1X70 (bare messenger cum neutral) SQ. MM. Km 0 0 0 5 20000 100000 100000 No 20 135 2700 20 0 0 2700 No 105 150 15750 105 0 0 15750 No 90 135 12150 90 0 0 12150 No 250 38 9500 250 0 0 9500 METERING Relacement of Single Phase Service Connection by 4mm2 Twin Core Armoure Cable No 0 0 0 0 195 0 0 Relacement of Single Phase MMB by SMC No 0 0 0 267050 0 195 0 1353525 0 1620575 Cable for Grand Total Bidder's Offer (+/-) in % Bidder's Final Offer in Rs. Note: Qty. Dismantling of existing HT bare conductor line & fixtures, depositing to stores of employer, taking delivery from DISCOM/Power Deptt. stores, loading, transportation, enroute stacking, unloading at site and erection, testing & commissioning of new areal bunched XLPE cable by supplying & erection of tension clamps for dead end, suspension clamps, clamps for neutral, piercing connectors type-I & type-II, 16 mm dia MS nuts & bolts, pole clamps, spring loaded bus bar suitable for single phase and three phase systems etc. as required as per technical specification, approved drawings and scope of work: Special Accessories for AB Cable Self tightening anchoring (Dead end) clamp with pole bracket using Stainless Steel Strap & Buckle Self locking Suspension Clamp witth pole bracket using Stainless Steel Strap & Buckle Providing & fixing Heat Shrinkable type Cable Jointing kit suitable for 11 KV 1C x 70 sqmm AB Outdoor Termination application Stainless Steel of Size Strap 20mm*0.7mm & Buckle width 20 mm H 9.00 Erection Unit Total Grand Total Amt. in Rs. Rate in Amt. in Rs. Rs 8 9 10 Item Description 4.00 7.00 Supply Unit Total Rate in Amt. in Rs. Rs 5 6 Each And Every Size Of Galvanized Nut Bolts Provided By Contractor. % discount, if any: __________________ Page 2 of 2
© Copyright 2026 Paperzz