Technical Assistance for the Conversion of River Basin Action Plans into River Basin Management Plans 29 December 2014 – 29 December 2017 Progress report Characterisation reports Main focus Preparation of monitoring Training and capacity building program 32 Outputs 8 3 Completed 21 Ongoing Completed outputs To be started later in the project Existing monitoring systems Data requirements analysis 4 of Gap analysis Meeting-Event-Activity Basin Non Key Coordinator Expert Beneficiary PIU Meeting on EQSs 1 Meeting for data assessment Meeting on the comments on the Article 5 Report 1 Training on transboundary cooperation 3 Capacity building strategy presentation 7 2 28 8 7 48 15 2 7 7 19 4 4 1 4 3 12 44 20 Meeting with the Biology Team and NEN 4 3 3 Meeting on monitoring Preparatory Meeting with the Biology Team and NEN SUM Consortium (NEN) 12 109 Institute Relation with the project Ministry of Food, Agriculture and Livestock All agricultural data and fisheries Ministry for Health Drinking water quality and bathing water Ministry of Environment and Urbanisation Coastal zones and waste water Ministry of Foreign Affairs Transboundary and international issues Ministry of EU Affairs Transboundary and international issues Ministry of Energy and Natural Resources Energy and sustainable development Ministry of Interior Local Administrations, Municipalities Ministry of Science, Industry and Technology Industry Institute Relation with the project DG Forestry Forestry DG for Combatting Desertification and Erosion Desertification and erosion control Union of Municipalities/Municipalities Drinking water supply and waste water DG Nature Conservation and National Parks Nature protected areas TUIK All kinds of data SUEN Training, conferences and international activities DSI Hydro morphology, irrigation and drainage, monitoring Challenges Solution Data collection and analysis Monitoring Increased human resources Strong cooperation with NEN Program for training and capacity building Enhancement of training and capacity building ToR WORKPLAN Act. No Act. Name 1.1.1. Report on the existing monitoring system and tools for monitoring data assessment 1.1.2. 1.1.3. GIS map of delineated water bodies and typologies in the pilot basins Report on the pressures and impact analyses in the pilot basin 1.1.4. Report on the data requirements analysis 1.1.5. 1.2.1. 1.2.2. 1.2.3. 1.3.3. Four monitoring programmes for the pilot basins Results of monitoring data for the Susurluk river basin in accordance with WFD Results of monitoring data for the Meriç-Ergene river basin in accordance with WFD Results of monitoring data for Konya basin in accordance with WFD Collected datasets on water use, population equivalent and waste water production; establishing a decision support system for the programme of measures by reflecting Turkey specific conditions for the pilot basins Collected datasets on protected areas, determination and register of protected areas and GIS maps GIS map of defined agglomerations in the pilot basins 1.3.4. Collected datasets on economic data 1.4.1. Fully operational data management system, for the storage, process and analysis of collected monitoring data, including drafting of knowledge rules for Turkish specific conditions, including a system for calculating the cost-effectiveness of the measures 1.4.2. All required GIS maps for RBMP in the scope of WFD 1.4.3. 2.1.1. 2.1.2. Modelling results Gap analysis of RBPAP and RBMP Report on the execution of the National Implementation Plan for WFD in Turkey 2.1.3. Report on the actual water management situation in Turkey including proposals for future steps in water management, the tasks and responsibilities of different management levels for RBMPs and the analysis of required financial and human resources, including data needs assessment 2.2.1. Characterisation Reports for 4 pilot basins (in English and Turkish) 1.3.1. 1.3.2. Planning for the next period: 1. Article 5 Report 2. Monitoring 3. Training and capacity building 2.2.2. 2.2.3. 2.2.4. Significant water management issues reports, ready to be submitted to the EU Commission (in English and Turkish) Reports on economic analysis of water use by using economic modelling (in English and Turkish) Monitoring report, ready to be submitted to the EU commission (in English and Turkish) 2.2.8. 2.2.9. 2.3.1. Report on the environmental objectives for the water bodies, ready to be submitted to the EU Commission (in English and Turkish) Programme of measures, ready to be submitted to the EU Commission Chapters of RBMP on the register of related programmes and plans, the list of competent authorities and the contact lists for RBMPs ready Draft RBMPs for the pilot river basins Twelve stakeholder consultation events (three in each pilot basin) Reports on training workshops, trainings sessions and training programmes 2.3.2. Report on Cross-border cooperation and experience sharing in the Meriç-Ergene basin 2.3.3. Guidelines and manuals for each chapter of RBMPs Three Study visit reports on the best practices of river basin management planning in Member States 2.2.5. 2.2.6. 2.2.7. 2.3.4. 2.4.1. Report on the results of the public involvement and awareness raising activities Tasks Interim/Draft Outputs Outputs Public activities / Meetings / Trainings Transboundary cooperation meeting Study visit 9 of 2015 2016 2017 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 Thank you
© Copyright 2026 Paperzz