PUR 707 REQUEST FOR QUALIFICATION STATEMENTS (RFQ) PROFESSIONAL ENGINEERING CONSULTING SERVICES CITY OF ROCK HILL, SOUTH CAROLINA GENERAL INFORMATION The City of Rock Hill, SC is requesting Statements of Qualifications from interested and qualified consulting firms to provide design services including, but not limited to: engineering, land surveying, geotechnical, etc. for multiple civil projects within the city. The professional services can include, but not be limited to the design of the following: the reconstruction of the 100 Block of East Main Street, the construction of a multimodal pedestrian/cyclist sidewalk improvement on Dave Lyle Blvd. with a driveway entrance and parking lot improvements and the relocation of a driveway Entrance on Main Street. The scope of services will include associated land surveying, design of demolition plans, roadways, curb, sidewalk, traffic improvements, landscaping, associated stormwater improvements and utility adjustments, traffic signalization, acquiring all necessary permits, rights-of-way acquisition, construction cost estimates, construction administration and observation, etc. Potential qualified firms must demonstrate their corporate and individual staff experience in designing the proposed types of facilities in this area and in an urban environment. The firm should be well versed in the permitting requirements of both the City of Rock Hill and South Carolina. PURPOSE The purpose of this Request for Qualifications is to obtain information about consulting firms interested in providing professional engineering and land surveying services to construct the following projects. The information obtained will be utilized by the City of Rock Hill to evaluate each interested firm or team by utilizing the criteria outlined in this Request for Qualifications (RFQ). 1 100 Block East Main Street—A portion of the 100 block of E. Main Street will be reconstructed. This work will need to be coordinated with the proposed apartment development at 108 E. Main Street. Scope of the design will entail demolition, creation of on street parking, landscaping, roadway reconstruction, curb and sidewalk, modification of existing utilities as necessary. In addition, this project will need to be coordinated with the design of the Dave Lyle Blvd. Streetscape project. Please see the enclosed concept renderings. 2 Dave Lyle Blvd. Streetscape Project—A segment of Dave Lyle Blvd. will be improved to provide a multimodal sidewalk for both pedestrian and cyclist accessibility. It is estimated that the sidewalk will need to be at least 14 feet wide. In addition, intersection corner improvements in conjunction with traffic signal modification will need to occur at Black, White and Main Streets. Scope of the design will entail demolition, landscaping, curb and sidewalk, driveway entrance design, traffic signal and accessibility at roadway intersections and modification of existing utilities as necessary. This work will need to be coordinated with the proposed apartment development at 108 E. Main Street. As well as the design of the 100 Block of East Main Street project. Please see the enclosed concept renderings. 3 Driveway Entrance—The driveway entrance will be relocated to align across from Black Street at the intersection of Main Street. Scope of the design will entail demolition, landscaping, curb and sidewalk, roadway, hardscaping, driveway entrance design, traffic signal and pedestrian City of Rock Hill, SC 100 Block E. Main Street Reconstruction, Dave Lyle Blvd. Streetscape and Driveway Entrance Projects PUR 707 accessibility at roadway intersections and modification of existing utilities as necessary. Please see the enclosed concept renderings. Design of this project will need to be coordinated with the General Services staff. SCOPE OF WORK To be considered for selection, the Firm shall be qualified and capable to deliver the following services for the identified projects: Obtaining topographic survey in the area – sufficient to generate one-foot contours. Checking for any utility conflicts with proposed improvements Designing improvements to tie into existing conditions. Designing of roadways, sidewalk, landscaping and traffic measures. Preparation and submittal of construction documents Obtaining required permits and approvals for construction Providing quantities and a construction cost estimates Preparation of bid documents Ability to provide construction administration and observation as the engineer of record PROPOSAL FORMAT To facilitate review of your Statement of Qualifications by the City of Rock Hill, it is requested that your submission conform to the following format: 1. Coversheet: List RFQ Statement, the name of your firm, and the name, address and telephone number of a contact person for questions concerning the proposal submitted. 2. Qualifications & Experience of the Firm: History and organization of the firm, legal entity that contract will be entered into, location of the office that the work will be performed, and the name and title of the person that is authorized to enter into a contract agreement (must be an officer, partner or member of the firm). Provide a narrative of your firm’s prior experience and qualifications as it pertains to the above Scopes of Work and provide a list of projects with similar scopes for all three (3) projects. The design of all three projects will be awarded to the same firm. The selected firm(s)/company(s) must obtain a business license from the City of Rock Hill and provide proof of professional authorization in the State of South Carolina (Certificate of Authorization) prior to the execution of the agreement. 3. Project Team: Provide a list of the project team members, including the office location where they currently work, that you propose to use and identify the responsibility of each team member. Provide a brief resume for each person listing specific similar project experience, educational experience and licensure/certifications. List any sub-consultants and their office location. Provide an hourly rate summary for project team members. 4. Project Management. Approach to the Project & Quality Control: Demonstrate project management, approach to the project and quality control methods that will be employed by your firm. This section shall also include an organizational chart each team member (including subconsultants) and list their roles responsibilities. City of Rock Hill, SC 100 Block E. Main Street Reconstruction, Dave Lyle Blvd. Streetscape and Driveway Entrance Projects PUR 707 5. Capacity and Response Capability: Provide a statement of your firm’s current workload, and capacity to meet the proposed project schedule. 6. References: Provide the name, address and telephone number of at least three (3) references familiar with the quality of work done by your firm of similar nature as contained in the above Scope of Work. By submission of the references, you are authorizing the City of Rock Hill to contact these references. 7. Legal, Safety, Insurance, and Financial: The Firm’s submittal shall provide documentation of any history of litigation associated with project performance or professional liability during the past ten years. A short statement of any safety problems that the Firm may have encountered in projects designed or inspected. A statement or other information to describe the firm’s general financial standing and current insurance coverage. 8. Other Supporting Data: Include any other information you feel to be relevant to the selection of your firm. The Statement of Qualifications shall not exceed twenty (20) pages, including the cover, back page, letters of introduction and table of contents. Clear, external binder pages shall not be included in the page count. Font size shall be no smaller than ten (10). Statement of Qualifications exceeding the twenty (20) page count may be returned and not considered, at the sole discretion of the City of Rock Hill. EVALUATION CRITERIA 1 Qualifications of the Firm: Outline and specify the qualifications of the firm to provide professional and construction services to manage the design and construction of the projects. This shall include any sub-consultants that may be part of the team (if applicable). 2 Overall Qualifications of the Project Manager and Project Team: Clear identification of the project manager and team personnel that will be assigned to the project. This section shall include the demonstrated project management and quality control methods employed by the team. 3 Understanding of Roadway, Stormwater, Traffic and Landscaping Design: Demonstrate experience and understanding of roadway construction, multimodal requirements (Vehicle, Biking and pedestrian), drainage design, traffic signal and landscaping design as well as permitting submittal/approval process. 4 Response Capability Project Understanding: Preference shall be afforded to those firms that, in the opinion of the City of Rock Hill, will be able to adequately respond to requests for consultation meetings or project administration requirements, and firms having a detailed understanding of the project requirements, testing procedures and the local community environment. City of Rock Hill, SC 100 Block E. Main Street Reconstruction, Dave Lyle Blvd. Streetscape and Driveway Entrance Projects PUR 707 5 Insurance Capacity: The submitting firm (lead firm if submitting as a team) shall be able to post the minimum, specified insurance requirements for this project as follows: Professional Liability -$1,000,000.00 per claim Worker's Compensation -$500,000.00 Automobile Liability -$1,000,000.00 Comprehensive/General Liability -$1,000,000.00 per claim SELECTION PROCESS Firms shall have no contact related to this project with City of Rock Hill elected or appointed officials or City of Rock Hill employees during this RFQ process, other than the contact person specified within this document. Any such contact will subject the firm to immediate disqualification for consideration for this project. All questions regarding this RFQ must be directed in writing or by e-mail to: Marty Burr, Performance Manager, at the address below no later than two weeks prior to the due date of the RFQ submittal. Questions later than two weeks prior to submittal of the RFQ will not be considered. The City of Rock Hill will review all qualified Statement of Qualifications received and may select one or more firms/teams for contract consideration. The City of Rock Hill, at its sole discretion, may conduct interviews prior to selection of any firms/teams for contract consideration. CONTRACT A detailed scope of work will be developed with the selected firm(s) and fees shall be established based upon the agreed upon scope of work by and between the selected firm(s) and the City of Rock Hill. This detailed scope of work and the associated fees will be incorporated as part of the contract. After all the Statement of Qualifications have been screened and ranked by the City of Rock Hill’s Selection Committee, the top ranked firm will be invited to negotiate a contract with the City of Rock Hill. The selected consultant(s) will be required to use the City of Rock Hill's standard contract for professional services. Any required changes or exceptions to this contract must be presented to the City for consideration prior to execution. Since this is a time sensitive project, the selected firm(s) will be required to produce a completed design with construction drawings/calculations within 120 days of receipt of signed contract, all applicable permits to begin construction within 210 days from the notice to proceed and bid documents within 30 days of acquiring of approved permits. TERMS AND CONDITIONS City of Rock Hill, SC 100 Block E. Main Street Reconstruction, Dave Lyle Blvd. Streetscape and Driveway Entrance Projects PUR 707 The City of Rock Hill reserves the right to reject any and all submissions to this RFQ if it is deemed in the best interest of the City. The City assumes no responsibility for costs incurred in responding to this RFQ. The RFQ process shall not be considered final until a contract for professional services has been successfully executed with the selected firm(s). SUBMISSION OF QUALIFICATIONS STATEMENT AND CONTACT PERSON Statement of Qualifications is to be submitted in 8.5" x 11" format. Facsimile or emailed copies will not be accepted. Five (5) hard copies and one (1) digital copy (PDF) shall be submitted no later than 4 p.m. on February 26, 2016 to: Marty Burr RE: PUR 707 Address: 757 S. Anderson Rd. Post Office Box 11706 Rock Hill, South Carolina 29731 Tel: 803-329-5551 Fax: 803-329-7052 E-Mail: [email protected] All questions shall be directed, in writing, to the person specified above. Any addendums or clarifications to this RFQ will be posted on the City of Rock Hill's website at www.cityofrockhill.com. City of Rock Hill, SC 100 Block E. Main Street Reconstruction, Dave Lyle Blvd. Streetscape and Driveway Entrance Projects
© Copyright 2026 Paperzz