P-92-P Fleet-Lift Erection Anchor with Shear Plate

Fleet-Lift System
P-92-P Fleet-Lift Erection
Anchor with Shear Plate
A
Fleet-Lift System
The P-92-P Fleet-Lift Erection Anchor with Shear Plate is designed specifically
for edge tilting precast concrete elements from the horizontal to a vertical position.
An integral shear plate eliminates any possibility of forgetting to install a required
shear bar.
As on other Fleet-Lift Erection Anchors, two steel protrusions or “ears” at the
head of the anchor provide protection against concrete spalling. These “ears”
restrict the ring clutch rotation during lateral pulls. As a result, lateral forces are
transmitted directly to the edge of the anchor instead of the concrete.
B
The body of the erection anchor is shaped to allow full reinforcement for secure
support and spall-free rotation.
C
P-92-P Erection Anchors are available plain or hot-dipped galvanized.
To Order:
D
Specify: (1) quantity, (2) name, (3) product code, (4)
corrosion resistance, if required.
Example:
200, P-92-P Fleet-Lift Erection Anchor with Shear
Plate, FL148, hot-dipped galvanized.
Safe Working
Load
P-92-P Fleet-Lift
Erection Anchor
with Shear Plate
B
C
2-1/2"
3/4"
3"
2-1/2"
1-1/4"
3"
Product Code
A
2
FL147
4
FL148
6
FL449
3"
1-5/8"
3-1/2"
8
FL149
3"
1-5/8"
3-1/2"
(Tons)
Anchor dimensions not shown are the same as the P-92 Erection
Anchor of the same load range.
Shear Reinforcement
Stress is caused during the edge lifting of a precast panel, making
supplemental reinforcement around the anchor necessary in thin
panels. The Fleet-Lift P-92-P Erection Anchor with integral Shear
Plate is designed expressly for this purpose. Install the anchor so
that the shear plate is opposite the direction of lift.
Tension Reinforcement
Direction of Lift
Typical P-92-P Fleet-Lift
Erection Anchor with
Shear Plate Application
The P-92-P with Shear Plate Fleet-Lift Erection Anchor is
manufactured with a steel tension pin that resists pullout during
normal erection situations. The safe working load chart on the
following page lists two sets of tension values. If the higher safe
working load is used, the anchor must be properly reinforced
using the P-60-T Tension Bar. The tension bar should be placed
through the lower hole.
Typical P-92-P
Fleet-Lift Erection
Anchor Shear Plate/
Tension Bar Application
52
07/07
Fleet-Lift System
P-92-P Fleet-Lift Erection Anchor with Shear Plate Capacities
Shear Safe Working Tension Safe Working Tension Safe Working
Load with Shear Plate Load with Anchor Only Load With Tension Bar
Product
Code
Precast Concrete
Panel Thickness
2-ton x 8" long
FL147
3-1/2" Min.
1,450 lbs.
2,575 lbs.
4,000 lbs.
2-ton x 8" long
FL147
4"
1,625 lbs.
2,575 lbs.
4,000 lbs.
2-ton x 8" long
FL147
5"
2,050 lbs.
3,350 lbs.
4,000 lbs.
2-ton x 8" long
FL147
6"
2,350 lbs.
3,750 lbs.
4,000 lbs.
2-ton x 8" long
FL147
7"
2,625 lbs.
3,850 lbs.
4,000 lbs.
2-ton x 8" long
FL147
8"
2,850 lbs.
4,000 lbs.
4,000 lbs.
2-ton x 8" long
FL147
9"
3,050 lbs.
4,000 lbs.
4,000 lbs.
2-ton x 8" long
FL147
10"
3,225 lbs.
4,000 lbs.
4,000 lbs.
2-ton x 8" long
FL147
11"
3,425 lbs.
4,000 lbs.
4,000 lbs.
2-ton x 8" long
FL147
12"
3,675 lbs.
4,000 lbs.
4,000 lbs.
4-ton x 10-7/16" long
FL148
4" Min.
2,150 lbs.
3,450 lbs.
8,000 lbs.
4-ton x 10-7/16" long
FL148
5"
2,625 lbs.
4,250 lbs.
8,000 lbs.
4-ton x 10-7/16" long
FL148
6"
3,100 lbs.
5,075 lbs.
8,000 lbs.
4-ton x 10-7/16" long
FL148
7"
3,525 lbs.
5,825 lbs.
8,000 lbs.
4-ton x 10-7/16" long
FL148
8"
3,925 lbs.
6,600 lbs.
8,000 lbs.
4-ton x 10-7/16" long
FL148
9"
4,275 lbs.
7,350 lbs.
8,000 lbs.
4-ton x 10-7/16" long
FL148
10"
4,600 lbs.
8,000 lbs.
8,000 lbs.
4-ton x 10-7/16" long
FL148
11"
4,900 lbs.
8,000 lbs.
8,000 lbs.
4-ton x 10-7/16" long
FL148
12"
5,150 lbs.
8,000 lbs.
8,000 lbs.
6-ton x 13-1/4" long
FL449
6" Min.
4,000 lbs.
5,580 lbs.
12,000 lbs.
6-ton x 13-1/4" long
FL449
7"
4,250 lbs.
6,870 lbs.
12,000 lbs.
6-ton x 13-1/4" long
FL449
8"
4,475 lbs.
7,775 lbs.
12,000 lbs.
6-ton x 13-1/4" long
FL449
9"
4,725 lbs.
8,300 lbs.
12,000 lbs.
6-ton x 13-1/4" long
FL449
10"
4,950 lbs.
8,800 lbs.
12,000 lbs.
6-ton x 13-1/4" long
FL449
11"
5,200 lbs.
10,000 lbs.
12,000 lbs.
6-ton x 13-1/4" long
FL449
12"
5,450 lbs.
11,300 lbs.
12,000 lbs.
8-ton x 13-1/4" long
FL149
6" Min
4,000 lbs.
5,580 lbs.
16,000 lbs.
8-ton x 13-1/4" long
FL149
7"
4,250 lbs.
6,870 lbs.
16,000 lbs.
8-ton x 13-1/4" long
FL149
8"
4,475 lbs.
7,775 lbs.
16,000 lbs.
8-ton x 13-1/4" long
FL149
9"
4,725 lbs.
8,300 lbs.
16,000 lbs.
8-ton x 13-1/4" long
FL149
10"
4,950 lbs.
8,800 lbs.
16,000 lbs.
8-ton x 13-1/4" long
FL149
11"
5,200 lbs.
10,000 lbs.
16,000 lbs.
8-ton x 13-1/4" long
FL149
12"
5,450 lbs.
11,300 lbs.
16,000 lbs.
(ton x length)
Fleet-Lift System
P-92 Fleet-Lift
Erection Anchor
Safe Working Load is based on an approximate factor of safety of 4 to 1 in 3,500 psi normal weight concrete.
07/07