International Public Bid for the concession of the project: LPG SUPPLY SYSTEM FOR LIMA AND CALLAO LPG SUPPLY SYSTEM FOR LIMA AND CALLAO CALLED Location: Ica and Lima. Description: Concession of the design, financing, construction, operation and maintenance of a LPG transportation system from the producer (Pisco) to Lurin. The transport capacity will be 2800 TM/day when the commercial operation starts, and the fifth year will be 3500 TM/day. The system will include the following assets: A pipeline of about 250 Km of length, from Pisco to Lurin Storage and dispatch terminals to be located in Lurín Pumping station, valves, pig traps and measurement and communication equipment • Estimated investment (VAT not included): US$ 250 million • Modality: Self-sustained • Concession period: 20 years plus the construction period (36 months). • Competence factor: Lower transportation fees. Current project status: The project schedule will be modified and all its activities. Estimated date of award: II QUARTER 2014. SHORT-LISTING CRITERIA Investors will go through a qualification process to be considered bidders and file a proposal. The financial, technical and legal criteria are: Requirements Financial *: Minimum Net Equity US$ 130 million Minimum Total Assets US$ 260 million Technical *: Bidders shall demonstrate that they directly operate hydrocarbon transportation systems by pipelines that meet the following requirements: Pipeline length above five hundred kilometers (500 Km) Dispatch of liquid fuels for no less than five million (5,000,000) barrels per year, or dispatch of natural gas for no less than seven hundred million cubic feet per year (700,000,000 cu ft/yr). Legal: Not having any legal impediments to enter a contract with the Peruvian Government. Not participating with another Bidder. Waiving rights of complaint through diplomatic means. Other conditions to be defined in the Bidding Terms. * Requirements to be updated according to the new project scheme. 33 SCHEDULE Call for Public Bid 2010 First contract draft IV quarter 2010 Second contract draft III quarter 2013 New Contract Request for shirt-listing I quarter 2014 Contract final version Submission of Proposals and Award II quarter 2014 Closing date III quarter 2014 44 CONTACT INFORMATION Aníbal del Águila Head of Electricity and Hydrocarbon Affairs Telephone E-mail (51-1) 200-1200 extension 1340 [email protected] [email protected] [email protected] 55
© Copyright 2026 Paperzz