Rack Elevation IT Equipment – Room 144D 6 3 5 2 4 1 6 3 5 4 1 6 5 4 3 2 1 6 5 4 2 D 6 5 4 3 2 1 6 5 4 3 2 C 1 A B D CATALYST C6880-X CATALYST C6880-X C6880-X-FAN C6880-X-FAN ID ID Fan Status Fan Status 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 2 3 4 5 6 7 8 9 10 11 12 13 14 15 2 – Core/Distribution Routers (Redundant) Management 16 Management 16 C6880-X C6880-X 16 Port 10/1 GbE Supervisor XL Tables Status Management USB 16 Port 10/1 GbE Supervisor XL Tables Status Reset System ID Management USB Reset System ID Console Console ! ! C6880-X-3KW-AC IN OUT FAULT ID C6880-X-3KW-AC IN OUT FAULT ID C6880-X-3KW-AC IN I O I O I O 5 4 3 2 1 0 1 MGMT 0 USB 0 D1 6 DD 7 HD 8 0 9 PS SFP/SFP+ M M EJECT T CONSOLE AR 0 AUX PS 1 USB 2 – Firewall/IPS/Proxy/ Anti-Virus (Redundant) Cisco ASA 5585-X SSP-20 HDD0 AC 0 DD MGMT D1 1 0 0 PS 1 PS 1 2 HD 3 T 4 AC 5 VP N 6 AR 7 PW R 8 AL 9 HDD1 VP N Cisco ASA 5585-X SSP-20 HDD0 SFP/SFP+ 100-240V ~ / 16A / 50 - 60Hz PW R HDD1 BO OT SPARE EQUIPMENT RACK/CABINET SPACE FOR FUTURE BUILDING 100-240V ~ / 16A / 50 - 60Hz AL I 100-240V ~ / 16A / 50 - 60Hz 100-240V ~ / 16A / 50 - 60Hz SPARE EQUIPMENT RACK/CABINET SPACE FOR FUTURE BUILDING OUT FAULT ID OUT FAULT ID BO OT C6880-X-3KW-AC IN O 1 – 24 strand cable to TC-1 Rm 126 1 – 24 strand cable to TC-2 Rm 208 1 – 24 strand cable to TC-3 Rm 316 1 – 24 strand cable to Server Rm 310 1 – 48 PCH 02U SC Fiber Patch panel for 24 SM fiber cable from Fiber Loop 6 5 4 3 2 1 6 4 1 5 C 3 B 2 A D 1 B 3 C 6 5 4 3 2 1 6 5 4 3 2 1 A 2 2 – 48 PCH 02U SC Fiber Patch panel for four (4) 24 SM fiber cable As distribution to remote TCs (Include a spare PCH) 6 3 5 2 4 1 6 3 5 4 1 – 24 strand cable Feed to TC-3 Rm 316 2 1 – 24 strand cable Feed to TC-2 Rm 208 1 1 – 24 strand cable Feed to Server Rm 310 1 – 24 strand cable Feed to TC-1 Rm 126 AUX CONSOLE EJECT · · · · · · · Sample portrait rack elevation drawing to clarify the location, size, quantity, placement and association of the ISP, Data Equipment, and Audio/Video equipment. 8000VA UPS I Smart-UPS Test 5 0 0 0 O www.apcc.com 50 foot Service loop 3 – 2ru, 48 Port Fiber Patch Panel 1 – 2ru, Blank Panel 2 – 5ru, Core/Distribution Routers 2 – 2ru, Firewall/IPS 8 – 2ru, Cable Management (one below each device) 2 – 6ru 8000VA UPS 8000VA UPS I Smart-UPS Test 5 0 0 0 O www.apcc.com OSP Entry Conduits to TC-1 1 – 24 SM cable to UNGC Fiber Loop DWG # 1 11/03/2015 Rack Elevation TC-01 – Room 126 Conduit to TC-3 6 5 4 3 2 1 6 5 4 3 2 C 1 A · · · · · B WAP – Wireless Access Point LAN – Tele/Data Outlets FB – Floor Box Data Outlets WB – Wall Box Data Outlets SIM – 25 51 14 21 - Mode MGMT TOTAL D SYST STAT MAST STACK 1 Console 50 foot Service loop 6 3 5 2 4 1 6 3 5 4 1 DATA/VoIP CAT-6 CABLE COUNT 2 1 – 24 strand cable Feed to TC-1 2 SPEED CATALYST C6800IA – 48FPD 10G Uplink Catalyst 6800 Instant Access Series RPS Console 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 1 48 SFP+ 2 111 Mode MGMT Mode MGMT SYST STAT MAST STACK 1 Console 2 SYST STAT MAST STACK Console 1 2 SPEED CATALYST C6800IA – 48FPD 10G Uplink Catalyst 6800 Instant Access Series RPS Console 3 4 SPEED 5 6 35 36 37 38 39 40 41 42 43 44 45 46 47 SFP+ 2 1 – 2ru, Fiber Patch Panel 3 – 2ru, CAT 6 Patch Panels 3 – 1ru, 48 Port Access Switches 6 – 1ru, Cable Management (one below each device) 1 – 4ru, 4000VA UPS CATALYST C6800IA – 48FPD 10G Uplink Catalyst 6800 Instant Access Series RPS 1 48 1 – 24 strand cable to TC-2 Rm 208 1 – 24 strand cable to TC-3 Rm 316 1 – 24 strand cable to Server Rm 310 Console 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 1 SFP+ 2 Sample portrait rack elevation drawing to clarify the location, size, quantity, placement and association of the ISP, Data Equipment, and Audio/Video equipment. 4000VA UPS 100% Power 110V 20A (NO Backup) Panel 1RA-18 25% 5125 Cable Home run to IT Room 144D DWG # 2 11/03/2015 Rack Elevation TC-02 – Room 208 Conduit to TC-3 6 5 4 3 2 1 6 5 4 3 2 C 1 A · · · · · B WAP – Wireless Access Point LAN – Tele/Data Outlets FB – Floor Box Data Outlets WB – Wall Box Data Outlets SIM 20 145 66 18 - Mode MGMT TOTAL D SYST STAT MAST STACK 1 Console 50 foot Service loop 6 3 5 2 4 1 6 3 5 4 1 DATA/VoIP CAT-6 CABLE COUNT 2 1 – 24 strand cable Feed to TC-2 2 SPEED 1 – 2ru, Fiber Patch Panel 6 – 2ru, CAT 6 Patch Panels 6 – 1ru, 48 Port Access Switches 12 – 1ru, Cable Management (one below each device) 1 – 4ru, 6000VA UPS CATALYST C6800IA – 48FPD 10G Uplink Catalyst 6800 Instant Access Series RPS Console 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 1 48 SFP+ 2 249 Mode MGMT Mode MGMT Sample portrait rack elevation drawing to clarify the location, size, quantity, placement and association of the ISP, Data Equipment, and Audio/Video equipment. STAT STACK 1 2 SYST STAT STACK 2 SYST STAT STACK 1 2 SYST STAT MAST STACK Console 1 Console SPEED 2 5 6 40 41 42 43 44 45 46 47 1 48 SFP+ 2 CATALYST C6800IA – 48FPD 10G Uplink Catalyst 6800 Instant Access Series RPS Console 4 SPEED 5 6 40 41 42 43 44 45 46 47 SFP+ 2 CATALYST C6800IA – 48FPD 10G Uplink Catalyst 6800 Instant Access Series RPS 1 48 Console 3 MAST CATALYST C6800IA – 48FPD 10G Uplink Catalyst 6800 Instant Access Series RPS 4 3 MAST 1 SPEED 3 SYST Console Mode MGMT 2 MAST Console Mode MGMT STAT STACK 1 Console Mode MGMT SYST MAST Console 1 – 24 strand cable to TC-3 Rm 316 1 – 24 strand cable to Server Rm 310 4 5 SPEED 6 40 41 42 43 44 45 46 47 1 48 2 CATALYST C6800IA – 48FPD 10G Uplink Catalyst 6800 Instant Access Series RPS SFP+ Console 3 4 SPEED 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 SFP+ 2 CATALYST C6800IA – 48FPD 10G Uplink Catalyst 6800 Instant Access Series RPS 1 Console 3 4 5 6 40 41 42 43 44 45 46 47 48 1 SFP+ 2 6000VA UPS I Smart-UPS Test 5 0 0 0 O www.apcc.com Power 110V 20A (NO Backup) Panel 2RA-1 Conduits From TC-1 Cable Home run to IT Room 144D DWG # 3 11/03/2015 Rack Elevation TC-03 – Room 316 Cable Tray To Server Room 310 1 – 24 strand cable to TC-3 6 3 5 2 4 1 6 3 5 4 1 2 1 – 24 strand cable to Server Room DATA/VoIP CAT-6 CABLE COUNT 6 5 4 3 2 1 6 5 4 3 2 C 1 A B · · · · · Cable Tray WAP – Wireless Access Point LAN – Tele/Data Outlets FB – Floor Box Data Outlets WB – Wall Box Data Outlets SIM 20 160 02 - Mode MGMT TOTAL D SYST STAT MAST STACK 1 Console 2 SPEED 1 – 2ru, Fiber Patch Panel 4 – 2ru, CAT 6 Patch Panels 4 – 1ru, 48 Port Access Switches 9 – 1ru, Cable Management (one below each device) 1 – 4ru, 4000VA UPS CATALYST C6800IA – 48FPD 10G Uplink Catalyst 6800 Instant Access Series RPS Console 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 1 48 SFP+ 2 182 Mode MGMT Mode MGMT STAT STACK 1 2 SYST STAT STACK 1 2 SYST STAT STACK 1 2 CATALYST C6800IA – 48FPD 10G Uplink Catalyst 6800 Instant Access Series RPS Console 4 SPEED 5 6 35 36 37 38 39 40 41 42 43 44 45 46 47 SFP+ 2 50 foot Service loop CATALYST C6800IA – 48FPD 10G Uplink Catalyst 6800 Instant Access Series RPS 1 48 Console 3 MAST Console SPEED 3 MAST Console Mode MGMT SYST MAST Console 4 5 SPEED 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 1 48 2 CATALYST C6800IA – 48FPD 10G Uplink Catalyst 6800 Instant Access Series RPS SFP+ Console 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 1 SFP+ 2 Sample portrait rack elevation drawing to clarify the location, size, quantity, placement and association of the ISP, Data Equipment, and Audio/Video equipment. 4000VA UPS 100% Power 110V 20A (NO Backup) Panel 3RA-1 25% 5125 Conduits From TC-2 Cable Home run to IT Room 144D DWG # 4 11/03/2015 Rack Elevation SERVER Room 310 Cable Tray To All Video/Audio Rooms 6 5 4 3 2 1 6 5 4 3 2 B D STATUS 100240V 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 RESERVED ~ 50~ 60Hz 1.2A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 1 2 3 4 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 1 2 3 4 ID Cisco Nexus 3064-T STAT 1 2 3 4 5 6 ID STAT Cisco Nexus 3064-T 6U 1 – 2ru, Fiber Patch Panel 2 – 1ru, Data Center Access 1 – 2ru, CAT 6 Patch Panels 1 – 6ru, Blade Server 1 – 3ru, Raid Storage 4 – 1ru, Cable Management (one below each device) 1 – 4ru, 4000VA UPS Matrix Switch 3U Sample portrait rack elevation drawing to clarify the location, size, quantity, placement and association of the ISP, Data Equipment, and Audio/Video equipment. AUDIO/VIDEO/CAMERA CAT-6 CABLE COUNT · · · · · · 37 - Cat-6 Audio and Video Cables C 1 A 1 – Data Center Access Switches 1 – Blade Server 1 Storage Array 169 - Cat-6 Audio and Video Cables 6 3 5 2 4 1 6 3 5 4 2 1 – 48 PCH 02U SC Fiber Patch panel for 24 SM fiber cable from Room 316 1 Cable Tray To TC-3 Room 316 1 – 24 strand cable to TC-03, Room 316 N1A/D - NETWORK OUTLET – FLOOR N5B - NETWORK OUTLET - ABOVE COUNTER N8D - NETWORK OUTLET – STANDARD N14 - NETWORK PULL BOX FOR CEILING CAMERA N16 - NETWORK OUTLET - ON WIRE TRAY N50A - NETWORK OUTLET - FLAT PANEL DISPLAY 2nd 3rd 10 56 08 84 150 24 21 16 20 11 Floor TOTAL Ceiling 37 20 169 174 5 – 2ru, CAT 6 Patch Panels Patch Panel count does not include termination of the Ceiling mounted Cat 6 terminations on 2nd, 3rd floor, and above server cabinets. (Add three addional panels) 1 3 2 5 4 7 6 9 8 10 11 13 15 17 19 21 23 25 27 29 31 12 14 16 18 20 22 24 26 28 30 32 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 1 – 1ru, Control Processor 2 – 4ru, Encoders 1 – 14ru, Matrix Switch 4 – 1ru, Midspan PoE Injectors 6 – 1ru, Cable Management (one below each device) 1 – 4ru, 8000VA UPS APC PDU 9626 I Smart-UPS Test 5 0 0 0 O www.apcc.com 4000VA UPS www.apcc.com Spare Cabinet 100% 25% Spare Cabinet Spare Cabinet 5125 www.apcc.com DWG # 5 11/03/2015 Conduits From 2nd Floor Room 202 Health Assessment Backboard Elevation Storage, Time Warner Cable – Room 134 Cable Tray To TC-3 Room 316 & IT Room 144D TWC cable feed TWC Eq Service loop Small UPS 48" x 96" fire treated backboard Sample portrait rack elevation drawing to clarify the location, size, quantity, placement and association of the ISP, Data Equipment, and Audio/Video equipment. Power 110V 20A (Generator Backup) Panel 1SR-14 Cable Home run to Time Warner Cable Junction Box DWG # 6 11/03/2015 Backboard Elevation Storage, at&t – Room 132C Cable Tray In Adjacent Storage Room 134 Use J-Hooks as Pathway to Tray at&t cable feed at&t Eq Service loop Small UPS 48" x 96" fire treated backboard Sample portrait rack elevation drawing to clarify the location, size, quantity, placement and association of the ISP, Data Equipment, and Audio/Video equipment. Power 110V 20A (Generator Backup) Panel 1SR-15 Cable Home run to at&t Cable Junction Box DWG # 7 11/03/2015
© Copyright 2026 Paperzz