IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2014 - 2020 PROPOSALS REPORT First Draft Report 28 February 2017 2017_03_01_Proposals_FirstDraft_.docx 1 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 TABLE OF CONTENTS 6.5.2 1 INTRODUCTION...................................................................................................................... 4 2 THE VISION ............................................................................................................................ 5 3 PRIMARY SPATIAL GOAL ......................................................................................................... 6 4 METROPOLITAN ROLE ............................................................................................................ 7 5 OBJECTIVES/BUILDING BLOCKS .............................................................................................. 8 5.1 Theme 1: Complete and Integrated Communities ........................................................ 9 5.2 Theme 2: Urban Management ................................................................................... 10 5.3 Theme 4: Restructuring.............................................................................................. 11 6 6.1 SPATIAL FRAMEWORK.......................................................................................................... 12 Gateways ................................................................................................................... 13 6.2 Nodes/Destination Places .......................................................................................... 13 6.2.1 Nodal Clusters/Hubs ............................................................................................... 13 6.3 Linkages ..................................................................................................................... 14 6.3.1 Primary Linkages ..................................................................................................... 14 6.3.2 Secondary Linkages ................................................................................................. 14 6.3.3 NMT Linkages .......................................................................................................... 14 6.4 Activity Corridors ....................................................................................................... 14 6.4.1 Metropolitan Activity Corridors .............................................................................. 14 6.4.2 Neighbourhood Corridors ....................................................................................... 14 6.5 Urban Function .......................................................................................................... 15 6.5.1 residential................................................................................................................ 15 Employment ............................................................................................................ 15 6.6 Biodiversity and Open Space ..................................................................................... 15 6.6.1 Biodiversity .............................................................................................................. 15 6.6.2 Open Space ............................................................................................................. 15 6.6.3 Sports and Recreation ............................................................................................. 15 6.7 Conceptual Framework ............................................................................................. 16 7 CATALYTIC INTERVENTIONS ................................................................................................. 17 8 TARGETED LAND PARCELS .................................................................................................... 18 9 SPATIAL PROPOSALS............................................................................................................. 19 9.1 Social Infrastructure .................................................................................................. 20 9.1.1 Parks Proposals ....................................................................................................... 20 9.1.2 Place of Worship ..................................................................................................... 23 9.1.3 Libraries ................................................................................................................... 23 9.1.4 Schools .................................................................................................................... 24 9.2 Residential Infrastructure .......................................................................................... 25 9.2.1 Informal Formalisation ............................................................................................ 25 9.2.2 Relocation Areas ..................................................................................................... 25 9.2.3 Back Yard Dwellings ................................................................................................ 26 9.2.4 Formal Housing ....................................................................................................... 26 9.2.5 Conversion of Underutilised Land ........................................................................... 27 9.2.6 Middle Income Housing .......................................................................................... 27 9.3 Basic Infrastructure ................................................................................................... 28 9.3.1 Water ...................................................................................................................... 28 9.3.2 Sanitation ................................................................................................................ 28 9.3.3 Stormwater ............................................................................................................. 28 9.3.4 Electricity ................................................................................................................. 28 9.3.5 Solid Waste.............................................................................................................. 28 9.3.6 Road Network ......................................................................................................... 29 2017_03_01_Proposals_FirstDraft_.docx 2 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 9.4 Sustainable Development .......................................................................................... 30 9.4.1 Integrated Transportation and Land Use ................................................................ 30 9.4.2 Development Focus................................................................................................. 31 9.4.3 Food Security........................................................................................................... 36 9.4.4 Repurposing Buildings ............................................................................................. 37 9.4.5 Climate Change ....................................................................................................... 38 10 INTEGRATED SPATIAL PROPOSALS.................................................................................... 40 10.1 Ward Proposals.......................................................................................................... 41 10.1.1 Ward 14 (2016) ....................................................................................................... 41 10.1.2 Ward 15 (2016) ....................................................................................................... 48 10.1.3 Ward 16 (2016) ....................................................................................................... 52 10.1.4 Ward 17 (2016) ....................................................................................................... 59 10.1.5 Ward 18 (2016) ....................................................................................................... 64 10.1.6 Ward 19 (2016) ....................................................................................................... 72 10.1.7 Ward 20 (2016) ....................................................................................................... 81 10.1.8 Ward 21 (2016) ....................................................................................................... 87 10.1.9 Ward 22 (2016) ....................................................................................................... 95 10.1.10 Ward 25 (2016) ................................................................................................. 101 11 URBAN MANAGEMENT .................................................................................................. 105 11.1 Neighbourhood Planning ......................................................................................... 105 11.2 Land Use Management Guidelines ........................................................................... 106 11.2.1 Precinct Planning ................................................................................................... 106 11.2.2 Metro Corridor ...................................................................................................... 107 11.2.3 Neighbourhood Corridor ....................................................................................... 108 12 FIGURES Figure 1: Biodiversity and Open Space Concept .................................................................... 15 Figure 2: Conceptual Framework .......................................................................................... 16 Figure 3: Targeted Land Parcels ............................................................................................ 18 Figure 4: Parks ...................................................................................................................... 20 Figure 5: Place of Public worship Sites .................................................................................. 23 Figure 6 :Education/Schools Proposals .................................................................................. 24 Figure 7: Residential infrastructure ....................................................................................... 25 Figure 8: Backyard Dwellings ................................................................................................ 26 Figure 9: Residential Infill ...................................................................................................... 27 Figure 10: Basic Infra. – Water, Sanitation, Stormwater ........................................................ 28 Figure 11: Basic Infra. - Road Network .................................................................................. 29 Figure 12: Integrated transportation and Land USe .............................................................. 30 Figure 13: Development Focus .............................................................................................. 31 Figure 14: Corridor - Residential Density ............................................................................... 32 Figure 15:Constraining Cadastral Layout ............................................................................... 33 Figure 16: Non-Motorised TransportationNon-Motorised Transportation ............................ 34 Figure 17: Sustainable DevelopmentLivelihoods and Employment ....................................... 35 Figure 18: Food Security ........................................................................................................ 36 Figure 19: Repurposing Buildings .......................................................................................... 37 Figure 20: Potential Inundation Areas ................................................................................... 38 Figure 21: Natural Assets and Systems Natural Assets and Systems...................................... 39 Figure 22:Integrated Spatial Plan .......................................................................................... 40 Figure 235: Ward 14 Proposals .............................................................................................. 43 Figure 246: Ward 15 Proposals .............................................................................................. 49 Figure 25: Neighbourhood Planning .................................................................................... 105 Figure 26: Nodes-Precinct plan focus .................................................................................. 106 BIBLIOGRAPHY ............................................................................................................... 110 2017_03_01_Proposals_FirstDraft_.docx 3 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 1 INTRODUCTION This report recaps the Spatial Vision, Goals and Key Building Blocks which guided the formulation of the Conceptual Framework and sets out the spatial proposals which will give effect to the conceptual framework for the study area. The following Phase will establish land use management guidelines to achieve the proposals as well as identify the associated key projects and programmes. Wards 14 to 22 and 25 (2016). MAP 1: STUDY AREA 2017_03_01_Proposals_FirstDraft_.docx 4 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 2 THE VISION o Will contain a number of identifiable and integrated mixed use and high density urban nodes and precincts each with their own role and purpose. o The nodes and precincts will be interconnected by a nonmotorised movement network as well as an affordable, fully integrated and convenient public transportation system. Ibhayi o A well designed network and hierarchy of public places will serve the sport and recreational needs of the residents in an affordable manner o Urban development will be balanced with nature to ensure a realistic level of adaptability resilience to effects of climate change. o A vibrant and integrated economy which provides sustainable livelihoods to the broader Ibhayi community o Residents have affordable housing within a crime free and safe environment. 2017_03_01_Proposals_FirstDraft_.docx 5 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 3 PRIMARY SPATIAL GOAL Resilience Adaptability In the long term, Ibhayi's sustainability (resilience and adaptability) and prosperity will ultimately be determined by its ability to respond to changing circumstances – rapid urbanisation, contrasting wealth and poverty, high unemployment, infrastructure and service backlogs, energy and water supply constraints as well as to the effects of climate change. This involves adopting an approach to urban growth and to a spatial structure that will enable Ibhayi to become more resilient and adaptive. Based on the outcomes of the Status Quo it is necessary to identify a longer term (10 to 15 Years) spatial structure for Ibhayi within which strategies, guidelines and intervention can be formulated to achieve resilience and adaptability. 2017_03_01_Proposals_FirstDraft_.docx 6 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 4 METROPOLITAN ROLE From a metropolitan perspective Ibhayi also needs to fulfil its identified role within the Metro. Ibhayi should not be dealt with in isolation i.e. as a separate town within a town, this inhibit integration ROLE NATIONAL (What role does the area play with respect to the growth and development of South Africa) PROVINCIAL/REGIONAL (What role does the area play for the Provincial, Metropolitan and surrounding communities and business) ENVIRONMENT SOCIAL ECONOMIC National Heritage significance National Industrial Node Catchment Management (Swartkops Estuary) Coastal and Marine Management (Coastline) Catchment Management Water Quality Management Biodiversity Linkages Transportation Hub Regional Social Services Node Regional Tertiary Education Facilities - Node Regional Sports and Recreation Centre Regional Business and Industrial Node Regional Tourism Node Tourism and Events Rates generator Office development node Employment area. Transportation Node Local Civic Node Local Sport Hub Affordable Residential District Religious Hub – Prevalence of Churches Social Facilities Redevelopment area (Restructuring) Local Business Centres Employment Node Residential Node Industrial Node LOCAL (What role does the area play for local people and communities) Biodiversity Conservation and Management Flood Management Mitigation against air pollution 2017_03_01_Proposals_FirstDraft_.docx Well located affordable housing for low income residents 7 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 5 OBJECTIVES/BUILDING BLOCKS This section puts forward Key Objectives, divided into three broad themes, that are considered to be the spatial building blocks or objectives that will enable a more resilient and adaptable Ibhayi. Taken together these cover all of the economic, social and physical components that will contribute to the achievement of the long-term vision for Ibhayi. 2017_03_01_Proposals_FirstDraft_.docx 8 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 5.1 THEME 1: COMPLETE AND INTEGRATED COMMUNITIES Many Ibhayi residents have moved to other parts of the Metro or use facilities, particular schools and retail outlets outside the area. This indicates that the move to integration has not matched some of the residents’ desired quality of life. Through this ‘one-way integration’ the townships continuously lose the impetus for improvement. Transformation of Ibhayi, which functioned in the past as a dormitory settlement, into a complete, integrated and sustainable human settlement will require a greater mix of land uses, a wider and more effective range of amenities and housing opportunities as well as improved and affordable internal and external mobility. To this end, the reinforcement of existing public facilities clusters with supporting land uses and amenities, as well as better access to public recreational amenities, is of vital importance. Furthermore, it remains important to eliminate redundant/under-utilized facilities space (vacant school grounds, neglected or non-functional public open space, etc.) by means of shared/multi-functional space between public facilities. The building blocks contained under this theme are geared towards addressing the following shortcomings of the current urban structure: Dispersed and restricted movement within the township Low-density built form and overcrowding Lack of range and quality of social facilities and public places Limited range of economic infrastructure and services Limited range of residential choice Insecure or unsafe spaces Lack of identity and ‘sense of place’ 2017_03_01_Proposals_FirstDraft_.docx 9 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 5.2 THEME 2: URBAN MANAGEMENT Up to the 1970s all aspects of life in townships were strictly controlled, but after 1976 the apartheid state focused on oppressing political resistance and the application of lesser controls broke down. Since 1994, much of the focus has been on capital investment to address the backlogs in service infrastructure and housing, while urban management as a whole has been neglected. This is also evident in Ibhayi where the enforcement of regulations e.g. by-laws and town planning schemes have been ineffectual. The objectives of urban management range across the following: the maintenance of public capital investments enforcement of basic rules of public life the contribution an improved quality of life may bring to residents and other users of urban space under effective management. A prerequisite for effective urban management is the allocation of affective and adequate resources, both staff and budget. Effective Urban Management enables the NMBMM to meet the objectives of COGTA’s Back to Basics Programme 2017_03_01_Proposals_FirstDraft_.docx 10 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 5.3 THEME 4: RESTRUCTURING The purpose of restructuring in Ibhayi is to meet the goals of integration and equity as well as making better use of economic assets. Ibhayi does not form an independent or isolated settlement area but forms an integral part of the greater urban settlement of the Nelson Mandela Metro. To this end the NMBMM SDF has set out restructuring proposals which will enable Ibhayi to fulfil its role. In addition to these the Status Quo Report has identified a number of local spatial inadequacies that need to be addressed in the longer term spatial structure. 2017_03_01_Proposals_FirstDraft_.docx 11 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 6 SPATIAL FRAMEWORK The vision, roles and objectives for Ibhayi have been articulated in concept diagrams for the following spatial components: Gateways Nodes/Destination Places Linkages Biodiversity and Open Space, and Activity Corridors The integration of these spatial concepts enabled the formulation of the conceptual development framework for Ibhayi. Gateways Nodes/Destination Places Linkages Biodiversity and Open Space Urban Function Activity Corridors 2017_03_01_Proposals_FirstDraft_.docx 12 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 6.1 GATEWAYS Gateways represent areas of opportunity to strengthen and improve the urban character and spatial definition of Ibhayi. These gateways are to be high quality urban areas, which provide ease of access and opportunities for integration into and from the broader Metropolitan area. 6.2 NODES/DESTINATION PLACES Nodes and destination places provide the focal points for the delivery of community facilities, commercial activity and provide structure. These nodes have been classified into those of metropolitan significance and those which play a role at a community or neighbourhood level. 6.2.1 At a metropolitan level the primary nodes and their associated functions are: Kenako/Vista -Commercial and Community Njoli – Community, Commercial and Heritage Daku – Community and Commercial Mavuso – Community Red Location – Heritage. NODAL CLUSTERS/HUBS When taken together the nodes form a southern cluster (Embreni, Kwaford and Sheya khulati) and a northern Cluster made up of the Njoli, Kenako/Vista, Mavuso and Daku Nodes. These nodes are then supported by the sports and recreation nodes of Wolfson and Chris Hani as well as by the Red Location heritage node. At a neighbourhood level: Wolfson – Regional Sports and Recreation Chris Hani – Regional Sports and Recreation Kwaford - Community Embreni – Community and Commercial Sheya Khulati – Commercial 2017_03_01_Proposals_FirstDraft_.docx 13 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 6.3 LINKAGES The movement linkages are: 6.3.1 PRIMARY LINKAGES Spondo Struanway Norongo Njoli Tshangana Avenue A Ntsekisa Ferguson Seyisi John Talant Matomela Grahamstown Sheya Kulati 6.3.2 SECONDARY LINKAGES Stofile Salamntu Avenue C/Singhapi/Mahambehlala Avenue A Ntintili/Pendla Jolobe 6.3.3 NMT LINKAGES Significant pedestrian linkages have been identified between Algoa Park and Struandale/Ibhayi as well as between the Red Location area, across the New Brighton Station into Deal Party. 6.4 ACTIVITY CORRIDORS 6.4.1 6.4.2 METROPOLITAN ACTIVITY CORRIDORS Spondo Struanway (Partial) Norongo Njoli Ntsekisa Ferguson Sheya Kulati 2017_03_01_Proposals_FirstDraft_.docx NEIGHBOURHOOD CORRIDORS Struanway Njoli Tshangana Avenue A Ntsekisa Seyisi Matomela Ntsekisa (Southern Section) 14 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 6.5 URBAN FUNCTION 6.5.1 RESIDENTIAL 6.5.2 Good quality residential neighbourhoods Protect against gentrification. EMPLOYMENT Preserve the employment generating land uses. Infill residential 6.6 BIODIVERSITY AND OPEN SPACE 6.6.1 BIODIVERSITY Swartkops Estuary Coastline Paapenkuils Canal – Restoration of ecological functioning. 6.6.2 OPEN SPACE 6.6.3 SPORTS AND RECREATION Two regional recreation and sports nodes Wolfson Chris Hani/new Brighton Oval A network of fully functional open spaces/parks (Active Open Spaces) within the urban fabric. FIGURE 1: BIODIVERSITY AND OPEN SPACE CONCEPT 2017_03_01_Proposals_FirstDraft_.docx 15 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 6.7 CONCEPTUAL FRAMEWORK The various spatial concepts are synthesised into a Conceptual Framework which: Provides the overall strategic direction for future planning and management of development. Articulates the role that Ibhayi and its sub-precincts play in the greater NMBMM area, in order to give effect to the Conceptual Development Framework the following preliminary catalytic interventions have been identified FIGURE 2: CONCEPTUAL FRAMEWORK 2017_03_01_Proposals_FirstDraft_.docx 16 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 7 CATALYTIC INTERVENTIONS o Vehicular Linkages from the N2 (Coastal) o Pedestrian Linkages across Uitenhage Road o Accommodation Informal Settlement Residents within Ibhayi (Close Proximity) – Particularly of the Chris Hani Residents Identified Catalytic Interventions o Development of good quality Open Spaces (Parks) o Njoli Square Redevelopment o The introduction of good quality middle income housing. o Address the isolation of Red Location o Good quality Environment/Environmental Upgrading o Create good quality retail experiences o Non-motorized Transport – Pedestrian focus for public spaces o Mixed Use development on PPC Land (Along Sheya Khulati Link Road)2017_03_01_Proposals_FirstDraft_.docx Mixed Uses – not only industrial 17 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 8 TARGETED LAND PARCELS The vacant or underutilised land parcels which are targeted for spatial change make up approximately 10% (303ha) of the entire study area. (Many of these land parcels are also not ideal for development due to environmental constraints and past land use practices). FIGURE 3: TARGETED LAND PARCELS 2017_03_01_Proposals_FirstDraft_.docx 18 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 9 SPATIAL PROPOSALS The spatial objectives and goals have been synthesised into spatial proposals which address: Social Infrastructure Residential Infrastructure Basic Infrastructure Sustainable Development Heading toward resilience. Getting the basics right now Setting the base for future residents Correcting the spatial legacy 2017_03_01_Proposals_FirstDraft_.docx 19 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 9.1 SOCIAL INFRASTRUCTURE Development of good quality Open Spaces (Parks) 9.1.1 PARKS P ROPOSALS There is 26ha of what is classified as existing developed open space. Approximately 98ha are identified for the development of new parks across the study area. Proposed Parks: – 18Ha (Smaller and Pocket Parks) Proposed Parks: Other – 30ha (Inclusive of areas serving as stormwater detention ponds and other unusable or inaccessible areas) The Chis Hani Site is identified as a new District level park and makes up an additional 50ha. Due to the existing shortage of developed parks no land which is identified for the development of a park may be utilised for any other purpose including other municipal purposes. In terms of the CSIR Guidelines 34ha are required for the community and neighbourhood parks - 42 ha are provided, while 23 ha are required for district parks – 50 ha is provided for this purpose (Chris Hani site). Most of these parks are small and will be intensively utilised the design and materials need to ensure longevity and reduce the need for maintenance and constant upgrading. Vacant and derelict land is often associated with urban blight Develop Pocket Parks Good quality Environment FIGURE 4: PARKS 2017_03_01_Proposals_FirstDraft_.docx 20 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 9.1.1.1 (Image from - http://www.discoverdesign.org) Users should not have to travel more than 10 minutes to it. Since parking is normally not provided the parks need to be accessible on foot or by bike. Parks should serve a resident population of between 500 and 1000 residents. Parks should strive to accommodate as many different users as possible, prioritising the needs of the surrounding residents. P OCKET P ARKS (NRPA, 2016) What is a pocket Park? - A pocket park is a small outdoor space, usually no more than 0.4ha, only a few residential erven in size or smaller, most often located in an urban area surrounded by commercial buildings or houses on small erven with few places for people to gather. relax, or to enjoy the outdoors. They are also called vest pocket parks, a term first used in the 1960's. Pocket parks are urban open spaces on a small-scale and provide a safe and inviting environment for surrounding community members. They also meet a variety of needs and functions, including: event space, play areas for children, spaces for relaxing or meeting friends, taking lunch breaks, etc. Successful "pocket parks" have four key qualities; they are accessible; allow people to engage in activities; are comfortable spaces and have a good image; and finally are sociable places: one where people meet each other and take people to when they come to visit. How do they work and what are the benefits? - It is important to note that pocket parks are not Intended to service an entire city in the same way as a neighbourhood or city park. Each should be created with the specific interests and needs of the contiguous community in mind —that is, the nearby individuals and families for whose use it was originally intended. (Image from - http://www.discoverdesign.org) Community gardens are a popular choice for pocket parks. These parks typically provide the land and resources necessary to grow food for local sale or consumption. (Image from https:/ /landscapeislapinski.wordpress.com) 2017_03_01_Proposals_FirstDraft_.docx 21 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 An Indicative Plan for Creating a Pocket Park (NRPA, 2016) 1. Secure the Community's commitment - The more inclusive the decision-making, the more successful the park will be. Start talking to as many neighbours as possible and secure them to help you throughout the process. 2. Convene a steering committee - You will need local leadership for the project _ One of the best ways to 9.1.1.2 C REATING A P OCKET P ARK In organising pocket parks, designers must often work out a delicate balancing act so that all groups can use the space in peaceful coexistence. accomplish this is to create a committee with divided responsibilities in terms of planning and working on the project. 3. Choose a Site - Think about how the Site will be used. What kinds of improvements are needed? Keep in mind how much the neighborhood can realistically take on to address Issues such as the creation and maintenance of the plan and make sure the space suits all expectations, 4. Plan - Determine a site plan either with the help of a landscape architect. Begin to strategize how the landscaping will be installed, how it will be funded, and how the neighborhood will maintain it in the long run. 5. Identify and secure potential partners - partners should be local businesses, non-profits and other There are no set designs for pocket parks; each is dependent on the size and use of the space. Because space is restricted and user needs are diverse conflicts can arise between groups. The Municipality can assist by undertaking the design, identify the usage trade-offs (Resulting from size limitations) and the development of an implementation strategy. This should focus initially on small-scale, doable improvements that can bring immediate benefits to the surrounding residents. organizations available in the City. Identify the roles of each partner and secure a written understanding if possible 6. Secure long-term and short-term funding - Begin to at various for funding in the form of grants, in-kind materials and money from business. Consider corporate sponsorships and be sure to think long-term about funding and saving money for maintenance and repairs in the future or to cover other necessary items including liability insurance coverage. 7. Partnership between the surrounding community and the municipality and other role-players Schedule work days in advance - Assign a project manager and plan out what activities need to occur in what order. Can everything be done in one day, or will it take multiple work days? 8. Plan a big work day 'dedication/celebration event - This is a very important part of the process to the neighborhood and to the partners. This is a chance to possibly garner media attention, as well as involve as many people as 9. Implement a maintenance plan - Before any plants go in the ground, the neighborhood should agree to a maintenance plan and document it in writing 10. Pursue consistent engagement - Just as maintenance is a never-ending job, so is everything else involved. Ongoing communication with the neighborhood especially should keep them interested and involved in your project. 2017_03_01_Proposals_FirstDraft_.docx 22 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 9.1.2 PLACE OF WORSHIP There is no need to provide additional land for place of worship sites. The current ratio of public worship sites to households is 1 facility per 500 households (CSIR = 1/6000 Households). The CSIR Guidelines require 19 sites – There are 76 sites! 9.1.2.1 R E - UTILISATION OF U NDERUTILISED S ITES There are many religious organisations who have managed over the years to gain ownership of larger sites in the study area. Many of these have not succeeded in fully utilizing the site. These underutilized sites need to be accessed in order to provide the necessary community facilities and the alternative housing opportunities required to meet the diverse needs of the community. It would be possible to offset the cost of acquiring the land from the church against the possible sale price of the land if it is sold for private development. 9.1.2.2 P ROPOSED P OLICY A formal policy needs to be prepared to address the demand for additional public worship sites. This policy needs to: Prevent the loss of existing housing stock. Promote the combined use of residential sites for smaller churches in a similar fashion to a home occupation provided that the residential character of the erf is not lost and the amenity of the surrounding area is not negatively affected by `the noise and demand for parking. 9.1.3 LIBRARIES New libraries are proposed at Wolfson Stadium (A relocated facility) and within the proposed Njoli Square development. There is no need to provide additional library sites. The specific facility at the current library sites is invariably too small to meet the changing demands on such facilities. Particular attention needs to be given to the creation of afterschool study areas within the libraries. An audit needs to be undertaken to determine the needs at each facility and whether the current facility can adequately address these. FIGURE 5: PLACE OF PUBLIC WORSHIP SITES 2017_03_01_Proposals_FirstDraft_.docx 23 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 9.1.4 SCHOOLS Provision of good quality schooling 9.1.4.1 R E - UTILISATION OF UNDERUTILISED SCHOOL SITES The sites of the former, now closed ?????????Newell High School and erf 50571 (Lwandlekazi Secondary School) have been provisionally identified as opportunities where private education organizations can utilise existing land within Ibhayi to provide good quality and affordable private education 9.1.4.2 E NHANCEMENT OF THE CURRENT FACILITIES This needs to be undertaken through the appropriate maintenance of the current facilities as well as the upgrading of the current facilities, including playing fields etc. In addition, adjoining underutilised land needs to be either developed by the Municipality as a multifunctional sports area that can be utilised by the school or formally allocated to the school for additional development. The cooperation of the Department of Education needs to be established to ensure that the quality of education and education facilities are improved. 9.1.4.3 FIGURE 6 :EDUCATION/SCHOOLS PROPOSALS N EW E DUCATION O PPORTUNITIES A new private school is proposed to the south of the study area and will be located within an unutilized portion of the Eveready facility. 2017_03_01_Proposals_FirstDraft_.docx 24 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 9.2 RESIDENTIAL INFRASTRUCTURE Accommodation of the Chris Hani Residents (Informal Settlement Residents) within Ibhayi (Close Proximity) The total demand for housing in Ibhayi is ????????? dwellings, most of these are made up of the Chris Hani settlement residents. 9.2.1 INFORMAL FORMALISATION Where possible undertake in-situ upgrading or relocation within the Ibhayi area. The maximum erf size for these developments should be capped at 120m². Mk Silvertown, Qaqawuli, Ekhuphumleni, Endulini, Raymond Mhlaba, Mandela Village, Singaphi Street and Red Location are planned to deliver 1531 formal subsidy units. 9.2.2 RELOCATION AREAS Due to stormwater or geotechnical conditions the residents of Silvertown (Swartkops), Endulini, Endongweni (E and W) and the majority of the Chris Hani Tip settlement will need to be relocated. The housing department has identified areas outside the study area as the reception areas for these residents. A number of these resident’s area showing resistance to the proposed relocations and despite being informed that the areas will not be formalized have refused to vacate the sites. Land within or in close proximity to Ibhayi needs to be sought to facilitate the intended relocation FIGURE 7: RESIDENTIAL INFRASTRUCTURE 2017_03_01_Proposals_FirstDraft_.docx 25 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 9.2.3 BACK YARD DWELLINGS There are approximately 1000 backyard dwellings in Ibhayi Given the fact that it is unlikely that the phenomenon of backyard accommodation will be eliminated within Ibhayi in the foreseeable future (At least 10 years) these structures and their inhabitants have been taken into account as part of the residential population of the study area. The community facilities provision has taken this into account. The backyard dwellings currently perform both a livelihood (rental income) and shelter function. The shelter function is a combination of both rental income drivers addressing the demand for well-located affordable shelter and the need to accommodate members of extended family units (Often the elderly) Policy: The NMBMM needs to adopt a policy which can adequately address the complex social and physical) issues associated with back yard dwellings. 9.2.4 FORMAL HOUSING The current housing stock needs to be protected against gentrification and loss through the conversion to other uses. Create residential precincts/neighbourhoods that need to be protected due to their function of providing affordable housing in close proximity to the urban centre and employment opportunities Backyard dwellings are here to stay - for a while at least. FIGURE 8: BACKYARD DWELLINGS 2017_03_01_Proposals_FirstDraft_.docx 26 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 9.2.5 9.2.5.1 Accommodation of the Chris Hani Residents (Informal Settlement Residents) within Ibhayi (Close Proximity) CONVERSION OF UNDERUTILISED LAND G AP T AP S ITES ( RESIDENTIAL ) 25 GAP-Tap sites have been identified for residential development. These can potentially accommodate 8 dwellings each if a multi-storey structure is utilised. These can therefore accommodate approximately 200 dwelling units. 9.2.5.2 R ESIDENTIAL I NFILL A total of 58 ha has been identified for proposed residential development. Of these the most significant sites are: On either side of the intersection of Daku and Struanway – These properties should be developed for social and higher density housing. The requirement would be that the existing light industrial uses be relocated to the disused industrial buildings nearby building. West and south of Chris Hani – The area needs to be developed in a manner which will enable the accommodation of a significant portion of the Chris Hani residents. Development at least 50 units per hectare will have to considered here. The railway flats sites at the intersection of Fergusson and Avenue E – This area should be developed for higher density housing around the existing sports fields. On Struanway opposite Sokuta Street in Kwaford – This land has the potential to accommodate social housing. 9.2.6 The introduction of good quality middle income housing MIDDLE INCOME HOUSING Although the priority within the study area is the accommodation of the informal residents the smaller infill areas within the heart of the area should be utilised for the accommodation of middle income residents. FIGURE 9: RESIDENTIAL INFILL 2017_03_01_Proposals_FirstDraft_.docx 27 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 9.3 BASIC INFRASTRUCTURE 9.3.1 WATER The existing bulk water network can accommodate the proposals. Network upgrades will be required in the proximity of the proposals. 9.3.2 SANITATION The existing bulk water network can accommodate the proposals. Network upgrades will be required in the proximity of the proposals. 9.3.3 STORMWATER The existing bulk water network can accommodate the proposals. Network upgrades will be required in the proximity of the proposals. 9.3.4 ELECTRICITY The existing bulk water network can accommodate the proposals. Network upgrades will be required in the proximity of the proposals. 9.3.5 9.3.5.1 SOLID WASTE W ASTE T RANSFER S ITES Waste Transfer stations are proposed – Recently supplied by Solid Waste to be assessed. 9.3.5.2 W ASTE TO ENERGY FACILITY A waste to energy facility is proposed for the land to the west of PPC. FIGURE 10: BASIC INFRA. – WATER, SANITATION, STORMWATER 2017_03_01_Proposals_FirstDraft_.docx 28 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 9.3.6 ROAD NETWORK 9.3.6.1 9.3.6.1.1 N EW LINKAGES L INK THROUGH W ETLAND NORTH OF F ISHWATER F LATS This link is not viable and should be removed from the NMBMM’s transportation network due to its intended route across the Swartkops estuary. 9.3.6.1.2 J OHN T ALLANT The dual lane extension of John Tallant Road into the study area is currently constrained by its passage across wetland areas and the proposed formalisation of the Qaqawuli settlement layout. The social and economic benefits of this integration focused linkage should take precedence to ensure the future sustainability/resilience of the residents of Ibhayi. 9.3.6.1.3 B RAMLIN -M ARKMAN L INKAGE This linkage section of the Bramlin Markman Arterial will enable a more direct connection between Uitenhage Road and Njoli Square via Daku Road. As no formal feasibility has been undertaken, land usage within the Study Area must take cognisance of this possible alignment. This is particularly relevant to land usage at the intersection of Daku and Struanway. Should this direct linkage not be feasible and alternative intersection (Daku and Struanway) configuration could be considered? 9.3.6.1.4 N2 TO G RAHAMSTOWN R OAD This proposed off-ramp will enable direct access to Grahamstown road. Feasibility studies need to be undertaken to ensure the viability of this route. FIGURE 11: BASIC INFRA. - ROAD NETWORK 2017_03_01_Proposals_FirstDraft_.docx 29 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 9.4 SUSTAINABLE DEVELOPMENT Metropolitan Activity Corridors 9.4.1 Spondo Struanway (Partial) Norongo Njoli Ntsekisa Ferguson Sheya Kulati 9.4.1.1 INTEGRATED TRANSPORTATION AND LAND U SE B US R APID T RANSPORT The proposed long, medium and short term BRT routes are accommodated. 9.4.1.2 A LGOA B US The Algoa Bus Service currently provides an effective service with the vast majority of residents within 500m of a bus stop. An additional stop will be required within the Red Location Node once this facility begins to operate optimally 9.4.1.3 Nodes and destination places provide the focal points for the delivery of community facilities, commercial activity and provide structure. Neighbourhood Corridors N ODES /D ESTINATION P LACES 9.4.1.4 Struanway Njoli Tshangana Avenue A Ntsekisa Seyisi Matomela Ntsekisa (Southern Section) C ORRIDORS The corridors have been aligned with Public Transport Routes and become the focus for investment FIGURE 12: INTEGRATED TRANSPORTATION AND LAND USE 2017_03_01_Proposals_FirstDraft_.docx 30 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 9.4.2 DEVELOPMENT FOCUS Development and investment in Ibhayi needs to be focused within the nodes and the identified corridors which are aligned with a public transport routes. . FIGURE 13: DEVELOPMENT FOCUS 2017_03_01_Proposals_FirstDraft_.docx 31 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 9.4.2.1 R ESIDENTIAL D ENSIFICATION Normally these corridors would form the focus of densification and intensification proposals. However, as the average density within the Ibhayi Corridors is about 51.33 households per hectare and in some cases reaches above 200 there is no immediate need for residential densification. Development is focussed on the underutilised sites along the corridors FIGURE 14: CORRIDOR - RESIDENTIAL DENSITY 2017_03_01_Proposals_FirstDraft_.docx 32 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 9.4.2.2 9.4.2.3 I NTENSIFICATION The current cadastral layout of the erven along the transportation routes within the corridors constrains incremental intensification. The conversion of the narrow erven to a higher intensity use would create undesirable multiple individual vehicle access points along a primary transportation route. The small erven and associated footprint of the structures on the site also do not enable the provision of off- street parking. Even if the requirement for parking on-site is relaxed the resultant on-street parking will create undesirable circumstances in front of the sites. Intensification along these routes will need to be accompanied by land assembly, with the adjoining parallel roads forming part of the primary access design. As an interim guideline, half of the street block should be seen as the minimum land assembly before intensification can be considered. Alternative - Look at retaining the route as a single carriageway and then provide on-street municipal parking. It should also be noted that the relaxation of the requirement to provide parking on the site merely transfers the parking onto and into the road reserve. This essentially transfers the parking provision responsibility from the private sector to public sector. FIGURE 15:CONSTRAINING CADASTRAL LAYOUT 2017_03_01_Proposals_FirstDraft_.docx 33 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 NON-MOTORISED TRANSPORTATION Pedestrian Linkages – Linking Residents to Opportunities 9.4.2.3.1 P EDESTRIAN M OVEMENT B ARRIER What needs to be kept in mind is that many of the transport routes within the Metropolitan Transport Corridors are planned carry high volumes of traffic and to eventually become dual lanes in either direction, with median separation. These routes could eventually become barriers to pedestrian and lower order vehicular movement unless the appropriate planning and urban design strategies are implemented. 9.4.2.3.2 P EDESTRIAN L INKS The primary pedestrian linkages that need to be formalised are: To Algoa Park across Uitenhage Road – SANRAL are planning the upgrading of Uitenhage Road and are aware of the need to accommodate pedestrian links. To North End Across the N2 – SANRAL are aware of the need to accommodate pedestrian movement across the N2. This linkage needs to cross the rail lines and the Papenkuils Canal to enable adequate access to Ibhayi. To Deal Party across the Railway Lines – Safe pedestrian access to Deal Party needs to be created to the north of Fergusson Road in addition to the old walkway adjacent to the New Brighton Station. A connection from Qaquwuli to John Tallant Road as well as directly to Deal Party should be developed. This route will also enable access to the recreational facilities at Brighton Beach. To the Swartkops Station – A safe pedestrian linkage to the Swartkops Station may increase the usage of the station. Linkages through the Swartkops Power Station need to be introduced into its proposed redevelopment initiatives. FIGURE 16: NON-MOTORISED TRANSPORTATION 2017_03_01_Proposals_FirstDraft_.docx 34 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 LIVELIHOODS AND EMPLOYMENT 9.4.2.4 E XISTING LAND ZONED FOR B USINESS Most of the land currently zoned for business (retails and associated uses) is retained as is. A small number have been identified for the development of 9.4.2.5 C OMMERCIAL AND F ORMAL E MPLOYMENT A total of 60 hectares of land has been set aside for land uses which will create larger scale formal employment. These are anticipated to take the form of industrial infill and associated development. The land between PPC and Mati/Ntshekisa Roads is the most significant of these and has been earmarked for the development of a waste to energy facility. This facility is currently in the planning phase and is expected to accommodate up and downstream industries. Its location in close proximity to PPC is a strategic advantage none of the other alternative sites could offer. The primary advantage for Ibhayi will be the creation of additional employment opportunities. An overriding consideration in the planning of this facility and the associated industries will be that there is no negative impact on the surrounding residential land uses. This includes the potential negative impact additional heavy vehicle traffic may have on the surrounding routes, including Fergusson and Mati/Ntshekisa Roads. 9.4.2.6 I NFORMAL T RADING Is focussed within the identified nodes and along the primary public transport routes, which are located within the corridors. The NMBMM needs to prepare a detailed policy plan to address the development of informal trading. As informal trading follows the activity and transportation intensity, the policy should allow for flexibility in the design of and infrastructure within the road reserves so that informal trading can be accommodated when the need arises. FIGURE 17: SUSTAINABLE DEVELOPMENT 2017_03_01_Proposals_FirstDraft_.docx 35 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 9.4.3 THE FARM-A-LOT PROGRAM Location: Detroit Michigan Description: Detroit has more than 28,000 vacant parcels owned by the City *almost half of then residential plots – that no significant tax revenue and cost more to maintain than the city can afford. Finding new uses for this land has become one of the most pressing challenges for a City that lost a quarter of its population in the past decade. There are groups and individuals around the City who have begun to use vacant some privately owned some cityowned — as personal gardens and even full scale farming operations. Challenges: While Gardens are widespread they are small in scale and comprise only a fraction of the total number of vacant lots. Inadequate city resources are an obstacle to conscientious land use and effective community management of open space. In addition, gardeners are faced with a lack of long term security and the issues of liability and insurance are not addressed. 9.4.3.1 FOOD SECURITY F OOD G ARDENS There are numerous food gardens that have been developed on the underutilised areas of some erven. These uses are encouraged and additional land should be allocated for this purpose, particularly below the powerlines were no formal development or structures are permitted. Unfortunately, some of these facilities have been developed on strategically placed land, which in the future needs to be utilised more intensively. Where possible these food gardens need to be accommodated within the new proposed development or relocated within close proximity. In order to make maximum use of the available rainfall food gardens should be located around the proposed and developed stormwater detention ponds or along runoff areas. It is not possible to allocate the former refuse disposal sites for food gardens due to the potential for toxins in the soil. Until a formal investigation is undertaken both the Chris Hani and Silvertown Swartkops areas cannot be allocated for this use. The example of the Farm-a-Lot programme in Detroit Michigan could be used to enable the effective use of some of the Gap-Tap sites – Pocket Parks as Urban Gardens. 9.4.3.2 L IVESTOCK Due to the shortage of land to address human settlement needs no land has been formally allocated for the use of stock pens. The keeping of stock within the study area is currently managed in terms of municipal bylaws. FIGURE 18: FOOD SECURITY Outcomes: The City created and manages the Farm-a-Lot program whose goal it is to facilitate the reuse of vacant city owned lots for agriculture. Farm-A-Lots provides soil tilling services and free seeds to residents interested in using vacant lots in their neighbourhoods for growing vegetables. Once the program was launched a number of the city’s green organisations became involved and added their partnerships to the program. Lessons Learned: Urban Agriculture programs like Farm-A-Lot help the city by reducing urban blight, provide education opportunities and improve access to fresh produce. Annual costs for maintaining the city park space are much higher than the cost of maintaining an active food garden. At the moment the stock is accommodated within the surrounding flood prone areas. Due to the potential of contaminants and toxins the former refuse disposal sites cannot be allocated as formal grazing or stockholding areas. A detailed investigation should be undertaken to determine the need for the stockpens in the area and to determine whether an appropriate area can be identified for the location of formalized stock pens. (NRPA, 2016) 2017_03_01_Proposals_FirstDraft_.docx 36 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 9.4.4 9.4.4.1 REPURPOSING BUILDINGS P OWER S TATION The Power Station site and its redevelopment are key to the redefining of Ibhayi as a good quality suburb. It forms the northern gateway to the suburb and sets the ‘tone’ for this part of the suburb. It is proposed that the NMBMM set up a development team that can oversee the preparation of a project brief to call for development teams to prepare redevelopment proposals (Urban Re-development) as part of a competition. In a similar fashion to the development proposals associated with the Red Location Museum development. (Image from: www.heraldlive.co.za) 9.4.4.2 V OLPES The disused Volpes factory has been earmarked for the relocation of the business hives located at the intersection of Struanway and Daku Roads. This relocation will enable the more intensive usage of land at this strategic intersection. 9.4.4.3 T RANSNET The underutilised Transnet land particularly around the intersection of Fergusson and Grahamstown Roads have been identified for development into industrial hives or similar developments. Should the need arise these areas can also be targeted for higher density housing developments. FIGURE 19: REPURPOSING BUILDINGS 2017_03_01_Proposals_FirstDraft_.docx 37 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 9.4.5 Existing infrastructure (electrical), residential & cemetery potential inundation risk Swartkops Village, Transnet, Fishwater Flats CLIMATE CHANGE Within the 2016 to 2055 period the SA Weather Service has identified the following climatic changes for the NMBMM area: (SAWeatherService, 2015) Temperature increase remains below 2°C above the mean annual maximum. Increase in the frequency of heat waves Cold spells are expected to reduce significantly. Decrease in total rainfall Increase in the severity of droughts A slight increase in the intensity of floods Increase in onshore wind anomalies Increase in wind speed. Increase in the probability of coastal storms, with unprecedented storms becoming probable. Sea level rise will only become significant post 2080. The most significant spatial planning implication for Ibhayi will be the possibility of stormwater inundation resulting from the concurrent occurrence of a combination of climatic conditions i.e.: wind, rain and storm at sea during a full moon period. The unpredictability and rapid weather changes occurring make this possibility probable. No specific studies have been undertaken to quantify the areas which may be affected by this potential occurrence. The 5m contour has been suggested as an interim precautionary indication of areas which may be prone to potential inundation. Development within this zone and surrounding stormwater systems need to take the possibility of inundation into account. Note that although the ‘inundation’ zone is broadly aligned with the 1:100-year flood in the North Eastern part of the study area there are pockets of infrastructure (electrical and components of Fishwater Flats WWTW, Transnet Infrastructure and a component of the N2 – Settlersway Interchange), existing residential (Entire Swartkops Village) as well as a cemetery which are at risk. Large areas of Deal Party are at potentially at risk. To mitigate the effect of droughts rainwater capturing practices need to be encouraged. Section of N2 & part of Settlersway Interchange FIGURE 20: POTENTIAL INUNDATION AREAS 2017_03_01_Proposals_FirstDraft_.docx 38 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 NATURAL ASSETS AND SYSTEMS 9.4.5.1 R EHABILITATION OF WETLANDS /P ONDS The numerous wetlands and ponding areas need to be rehabilitated to ensure that their natural functioning is ensured while also providing a natural stormwater management system. Additionally, these wetlands can provide a pollution prevention mechanism to limit the amount of pollution entering the Estuary. 9.4.5.2 S WARTKOPS E STUARY (Integrated Management Plan Swartkops Estuary and Swartkops Valley and Aloes Nature Reserves, 2011) The Management Plan’s key land usage recommendations need to be implemented. These include: The establishment of a no-ski zone on the sea side of the N2 Bridge. A designation of a critical biodiversity area, which accommodates the surrounding areas of the estuary. The designation of a protected area in the centre of the estuary. The creation of a multi-use management area on the water body FIGURE 21: NATURAL ASSETS AND SYSTEMS 2017_03_01_Proposals_FirstDraft_.docx 39 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 10 INTEGRATED SPATIAL PROPOSALS FIGURE 22:INTEGRATED SPATIAL PLAN 2017_03_01_Proposals_FirstDraft_.docx 40 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 10.1 WARD PROPOSALS 10.1.1 WARD 14 (2016) 10.1.1.1 N EEDS Ward 14 (2011) and Ward 25 (2011) now Ward 14 (2016) 2017_03_01_Proposals_FirstDraft_.docx 41 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 2017_03_01_Proposals_FirstDraft_.docx 42 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 10.1.1.2 PROPOSALS FIGURE 235: WARD 14 PROPOSALS 2017_03_01_Proposals_FirstDraft_.docx 43 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 Ward No. Ward No. BEPP Category 2011 2016 Objec t ID Info Info Summary 25 14 Community Infrastructure 1 Proposed site for Sports Required Sportsfield Upgrade/New field Sportsfield Develop new sportsfield 14 14 Basic Infrastructure 47 Illegal Dumping Site Illegal Dumping Site Proposed site for improved waste management 14 14 Basic Infrastructure 48 Illegal Dumping Site Illegal Dumping Site Proposed site for improved waste management 14 14 Community Infrastructure 49 Convert to Arts Centre General Community Building Renovation/New Building Redevelop into Arts Centre 25 14 Community Infrastructure 52 CCTV Camera Installed to be CCTV Needed/Not Working/New CCTV Update progress of cameras that are currently being installed 25 14 Community Infrastructure 53 CCTV Camera Installed to be CCTV Needed/Not Working/New CCTV Update progress of cameras that are currently being installed 25 14 Community Infrastructure 72 Upgrade New Brighton Stadium Upgrade Oval Upgrade Stadium 14 14 Community Infrastructure 76 CCTV Camera Required CCTV Needed/Not Working/New CCTV Install new CCTV cameras 25 14 Basic Infrastructure 93 Crime Hotspot Crime Hotspot Increase overall security measures in the area due to high crime rate 25 14 Basic Infrastructure 94 Crime Hotspot Crime Hotspot Increase overall security measures in the area due to high crime rate 14 14 Basic Infrastructure 103 Crime Hotspot Crime Hotspot Increase overall security measures in the area due to high crime rate 14 14 Basic Infrastructure 104 Crime Hotspot Crime Hotspot Increase overall security measures in the area due to high crime rate 14 14 Basic Infrastructure 105 Street Lights Faulty Basic Road Infrastructure Repair existing street lights 2017_03_01_Proposals_FirstDraft_.docx Proposals 44 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 14 14 Residential Infrastructure 106 Convert to Multi-Storey Residential Upgrades Rental units Redevelop into multi-storey rental units 14 14 Basic Infrastructure 120 Paving Required Basic Road Infrastructure Build paved sidewalk 14 14 Basic Infrastructure 122 Speed Humps Required Basic Road Infrastructure Proposal for speed humps to be installed 14 14 Basic Infrastructure 123 Speed Humps Required Basic Road Infrastructure Proposal for speed humps to be installed 14 14 Basic Infrastructure 127 Tarring Required Basic Road Infrastructure Upgrade Road 14 14 Basic Infrastructure 128 Lighting Required Basic Road & Electrical/Lighting Infrastructure Install new street lights 14 14 Basic Infrastructure 129 Lighting Required Basic Road & Electrical/Lighting Infrastructure Install new street lights 14 14 Basic Infrastructure 130 Drains Required Basic Road Infrastructure Install drains 14 14 Basic Infrastructure 159 Speed Humps Required Basic Road Infrastructure Proposal for speed humps to be installed 14 14 Basic Infrastructure 160 Drains and Speed Hump Basic Road Infrastructure Required Install speed humps and drains 25 14 Sustainable Development 170 Vacant Proposed Commercial Employment 25 14 Sustainable Development 171 Proposed Commercial Employment 25 14 Sustainable Development 172 Proposed Commercial Employment 25 14 Sustainable Development 173 Proposed Commercial Employment 25 14 Sustainable Development 175 Proposed Commercial Employment 2017_03_01_Proposals_FirstDraft_.docx 45 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 25 14 Sustainable Development 176 Proposed Commercial Employment 25 14 Sustainable Development 179 Vacant Proposed Commercial Employment 14 14 Sustainable Development 182 Vacant Proposed Commercial Employment 25 14 Sustainable Development 187 25 14 Sustainable Development 191 Vacant 25 14 Community Infrastructure 308 Vacant Allocated to the school as additional land Proposed Park 25 14 Community Infrastructure 313 Vacant Proposed Park 25 14 Community Infrastructure 315 Vacant 14 14 Residential Infrastructure 335 Vacant Proposed Housing 14 14 Residential Infrastructure 347 Vacant Proposed Housing 14 14 Residential Infrastructure 348 Vacant Proposed Housing 14 14 Residential Infrastructure 415 Vacant Proposed Housing 25 14 Residential Infrastructure 439 Vacant Proposed Housing 25 14 Residential Infrastructure 440 Vacant Proposed Housing 14 14 Residential Infrastructure 441 Vacant Proposed Housing Proposed Commercial Employment Proposed Industrial Allocated to the school as additional land Proposed Park Allocated to the school as additional land 2017_03_01_Proposals_FirstDraft_.docx 46 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 14 14 Residential Infrastructure 442 Proposed Housing 14 14 Residential Infrastructure 443 Vacant Proposed Housing 25 14 Residential Infrastructure 450 Vacant Proposed Housing 2017_03_01_Proposals_FirstDraft_.docx 47 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 10.1.2 WARD 15 (2016) 10.1.2.1 N EEDS Ward 15 (2011) and Ward 60 (2011) now Ward 15 (2016) 2017_03_01_Proposals_FirstDraft_.docx 48 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 10.1.2.2 PROPOSALS FIGURE 246: WARD 15 PROPOSALS 2017_03_01_Proposals_FirstDraft_.docx 49 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 Ward 2011 No. Ward 2016 No. BEPP Category Object ID Info Info Summary Proposals 15 15 Residential Infrastructure 73 Site for Destitute Families Site for Destitute Families 15 15 Community Infrastructure 74 Closed School Due to Numbers School Closed 15 15 Community Infrastructure 75 Classrooms Delapidated School Upgrade Required Upgrade School 15 15 Basic Infrastructure 113 Loose Electrical Cables and Water Pipes Exposed Basic Water & Electrical Infrastructure Repair electrical cables and water pipes in area that are exposed 15 15 Basic Infrastructure 118 Speed Humps Required Basic Road Infrastructure Proposal for speed humps to be installed 15 15 Basic Infrastructure 166 Stormwater Issues Stormwater Issues fix stormwater issues 60 15 Sustainable Development 174 Proposed Commercial Employment 60 15 Sustainable Development 180 Proposed Commercial Employment 60 15 Sustainable Development 183 Vacant Proposed Commercial Employment 60 15 Sustainable Development 184 Vacant Proposed Commercial Employment 60 15 Sustainable Development 186 Vacant Proposed Commercial Employment 60 15 Sustainable Development 317 Vacant Proposed Repurposed Buildings 15 15 Residential Infrastructure 350 Vacant Proposed Housing 2017_03_01_Proposals_FirstDraft_.docx 50 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 15 15 Residential Infrastructure 367 Vacant Proposed Housing 15 15 Residential Infrastructure 406 Vacant Proposed Housing 15 15 Residential Infrastructure 444 Vacant Proposed Housing 15 15 Residential Infrastructure 445 Vacant Proposed Housing 15 15 Residential Infrastructure 446 Vacant Proposed Housing 15 15 Residential Infrastructure 447 Vacant Proposed Housing 2017_03_01_Proposals_FirstDraft_.docx 51 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 10.1.3 WARD 16 (2016) 10.1.3.1 N EEDS Ward 14 (2011), Ward 15 (2011) and Ward 60 (2011) now Ward 16 (2016) 2017_03_01_Proposals_FirstDraft_.docx 52 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 2017_03_01_Proposals_FirstDraft_.docx 53 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 10.1.3.2 PROPOSALS FIGURE 27: WARD 16 PROPOSALS 2017_03_01_Proposals_FirstDraft_.docx 54 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 Ward 2011 No. Ward 2016 No. BEPP Category Object ID Info Info Summary Proposals 16 16 Community Infrastructure 66 Proposed Pre-School Site Proposed Pre-School Site Proposed site for pre-school 16 16 Community Infrastructure 67 Revitalise Existing Park Required Park Maintenance/New Park Redevelop Park 16 16 Community Infrastructure 68 Revitalise Existing Park Required Park Maintenance/New Park Redevelop Park 16 16 Community Infrastructure 69 Grass and Ablutions for Sports Field Required Sportsfield Upgrade/New Sportsfield Upgrade Sportsfield 16 16 Community Infrastructure 70 Sports Field Renovation Required Sportsfield Upgrade/New Sportsfield Upgrade Sportsfield 16 16 Residential Infrastructure 110 Pre 1994 Housing Residential Upgrades Upgrade pre 1994 Housing 16 16 Basic Infrastructure 111 Crime Hotspot Crime Hotspot Increase overall security measures in the area due to high crime rate 15 16 Basic Infrastructure 165 Stormwater Issues Stormwater Issues fix stormwater issues 15 16 Community Infrastructure 269 Vacant Small Open Space Site Proposed Park 60 16 Community Infrastructure 293 Vacant Stormwater Proposed Park 2017_03_01_Proposals_FirstDraft_.docx 55 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 60 16 Community Infrastructure 294 Vacant Stormwater Proposed Park 60 16 Community Infrastructure 295 Vacant (edit) Small Open Space Site Proposed Park 60 16 Community Infrastructure 296 Vacant (edit) Proposed Park 16 16 Community Infrastructure 302 Vacant Proposed Park 16 16 Community Infrastructure 305 Vacant Proposed Park 16 16 Community Infrastructure 306 Vacant Proposed Park 60 16 Sustainable Development 318 Vacant 16 16 Residential Infrastructure 326 Vacant Proposed Housing 16 16 Residential Infrastructure 327 Vacant Proposed Housing 16 16 Residential Infrastructure 329 Vacant Proposed Housing 16 16 Residential Infrastructure 330 Vacant Proposed Housing 16 16 Residential Infrastructure 331 Vacant Proposed Housing Power Station 2017_03_01_Proposals_FirstDraft_.docx Proposed Repurposed Buildings 56 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 15 16 Residential Infrastructure 344 Vacant Proposed Housing 15 16 Residential Infrastructure 345 Vacant Proposed Housing 15 16 Residential Infrastructure 346 Vacant Proposed Housing 16 16 Residential Infrastructure 352 Vacant Proposed Housing 16 16 Residential Infrastructure 353 Vacant Proposed Housing 60 16 Residential Infrastructure 407 Vacant (edit) Proposed Housing 60 16 Residential Infrastructure 408 Vacant (edit) Proposed Housing 60 16 Residential Infrastructure 409 Vacant (edit) Proposed Housing 60 16 Residential Infrastructure 410 Vacant (edit) Proposed Housing 60 16 Residential Infrastructure 419 Vacant (edit) Proposed Housing 60 16 Residential Infrastructure 420 Vacant (edit) Proposed Housing 15 16 Residential Infrastructure 433 Vacant Proposed Housing 2017_03_01_Proposals_FirstDraft_.docx 57 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 15 16 Residential Infrastructure 434 Vacant Proposed Housing 16 16 Residential Infrastructure 435 Vacant Proposed Housing 16 16 Residential Infrastructure 436 Vacant Proposed Housing TABLE 3: WARD 16 PROPOSALS 2017_03_01_Proposals_FirstDraft_.docx 58 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 10.1.4 WARD 17 (2016) 10.1.4.1 N EEDS Ward 17 (2011) now Ward 17 (2016) 2017_03_01_Proposals_FirstDraft_.docx 59 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 10.1.4.2 PROPOSALS FIGURE 28: WARD 17 PROPOSALS 2017_03_01_Proposals_FirstDraft_.docx 60 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 Ward No. Ward No. BEPP Category 2011 2016 Objec t ID Info Info Summary Proposals 17 17 Basic Infrastructure 37 High Masts in Area all out High Mast Needed/Not Working/New High Mast Erect new high mast light 17 17 Basic Infrastructure 38 Illegal Dumping Site Illegal Dumping Site Proposed site for improved waste management 17 17 Community Infrastructure 39 Closed School (Convert to MP Sports Centre) School Closed 17 17 Community Infrastructure 40 Revitalise Existing Park Required Park Maintenance/New Park Redevelop Park 17 17 Community Infrastructure 41 Revitalise Existing Park Required Park Maintenance/New Park Redevelop Park 17 17 Community Infrastructure 42 Revitalise Existing Park Required Park Maintenance/New Park Redevelop Park 17 17 Community Infrastructure 43 Revitalise Existing Park Required Park Maintenance/New Park Redevelop Park 17 17 Community Infrastructure 44 Revitalise Existing Park Required Park Maintenance/New Park Redevelop Park 17 17 Basic Infrastructure 45 High Masts Not Working High Mast Needed/Not Working/New High Mast Erect new high mast light 2017_03_01_Proposals_FirstDraft_.docx 61 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 17 17 Community Infrastructure 46 CCTV Camera Required CCTV Needed/Not Working/New CCTV Install new CCTV cameras 17 17 Community Infrastructure 87 Park to be converted to outdoor gym Other Development of an outdoor gym 17 17 Community Infrastructure 88 Convert Open Space to Park Required Park Maintenance/New Park Develop Park 17 17 Community Infrastructure 89 Convert Open Space to Park Required Park Maintenance/New Park Develop Park 17 17 Community Infrastructure 90 Revitalise Existing Park Required Park Maintenance/New Park Redevelop Park 17 17 Basic Infrastructure 91 Illegal Dumping Site Illegal Dumping Site Proposed site for improved waste management 17 17 Basic Infrastructure 92 Illegal Dumping Site Illegal Dumping Site Proposed site for improved waste management 17 17 Basic Infrastructure 121 Tarring Required Basic Road Infrastructure Upgrade Road 17 17 Basic Infrastructure 124 Tarring Required Basic Road Infrastructure Upgrade Road 17 17 Basic Infrastructure 125 Tarring Required Basic Road Infrastructure Upgrade Road 17 17 Basic Infrastructure 126 Tarring Required Basic Road Infrastructure Upgrade Road 17 17 Basic Infrastructure 143 Tarring Required Basic Road Infrastructure Upgrade Road 17 17 Basic Infrastructure 145 Tarring Required Basic Road Infrastructure Upgrade Road 17 17 Basic Infrastructure 146 Tarring Required Basic Road Infrastructure Upgrade Road 2017_03_01_Proposals_FirstDraft_.docx 62 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 17 17 Basic Infrastructure 151 Tarring Required Basic Road Infrastructure Upgrade Road 17 17 Basic Infrastructure 152 Tarring Required Basic Road Infrastructure Upgrade Road 17 17 Basic Infrastructure 155 Tarring Required Basic Road Infrastructure Upgrade Road 17 17 Basic Infrastructure 156 Tarring Required Basic Road Infrastructure Upgrade Road 17 17 Basic Infrastructure 157 Tarring Required Basic Road Infrastructure Upgrade Road 17 17 Basic Infrastructure 158 Tarring Required Basic Road Infrastructure Upgrade Road 17 17 Community Infrastructure 256 Vacant Proposed Park 17 17 Residential Infrastructure 337 Vacant Proposed Housing 17 17 Residential Infrastructure 338 Vacant Proposed Housing 17 17 Residential Infrastructure 412 Proposed Housing TABLE 4: WARD 17 PROPOSALS 2017_03_01_Proposals_FirstDraft_.docx 63 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 10.1.5 WARD 18 (2016) 10.1.5.1 N EEDS Ward 18 (2011) now Ward 18 (2016) 2017_03_01_Proposals_FirstDraft_.docx 64 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 10.1.5.2 PROPOSALS FIGURE 29: WARD 18 PROPOSALS 2017_03_01_Proposals_FirstDraft_.docx 65 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 Ward No. Ward No. BEPP Category 2011 2016 Object ID Info Info Summary Proposals 18 18 Basic Infrastructure 34 Illegal Dumping Site Illegal Dumping Site Proposed site for improved waste management 18 18 Community Infrastructure 56 Library Required for School School Upgrade Required Upgrade school to make space for a library 18 18 Basic Infrastructure 108 Crime Hotspot Crime Hotspot Increase overall security measures in the area due to high crime rate 18 18 Basic Infrastructure 117 Stormwater Issues Stormwater Issues fix stormwater issues 18 18 Basic Infrastructure 119 Stormwater Issues Stormwater Issues fix stormwater issues 18 18 Basic Infrastructure 153 Tarring Required Basic Road Infrastructure Upgrade Road 18 18 Basic Infrastructure 154 Tarring Required Basic Road Infrastructure Upgrade Road 18 18 Basic Infrastructure 163 Stormwater Issues Stormwater Issues fix stormwater issues 18 18 Sustainable Development 181 Vacant Power Lines Proposed Commercial Employment 18 18 Community Infrastructure 255 Vacant 18 18 Community Infrastructure 264 Vacant Gap Tap Site - Park Proposed Park 18 18 Community Infrastructure 268 Vacant Gap Tap Site - Park Proposed Park Proposed Park 2017_03_01_Proposals_FirstDraft_.docx 66 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 18 18 Community Infrastructure 270 Vacant 18 18 Community Infrastructure 278 Vacant Gap Tap Site - Park Proposed Park 18 18 Community Infrastructure 279 Vacant Small Open Space Site Proposed Park 18 18 Community Infrastructure 291 Vacant Proposed Park 18 18 Community Infrastructure 309 Vacant Proposed Park 18 18 Community Infrastructure 310 Vacant Proposed Park 18 18 Community Infrastructure 311 Vacant Proposed Park 18 18 Community Infrastructure 312 Vacant Proposed Park 18 18 Residential Infrastructure 319 Vacant Proposed Housing 18 18 Residential Infrastructure 320 Vacant Proposed Housing 18 18 Residential Infrastructure 332 Vacant Proposed Housing 18 18 Residential Infrastructure 333 Vacant Proposed Housing Proposed Park 2017_03_01_Proposals_FirstDraft_.docx 67 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 18 18 Residential Infrastructure 334 Vacant Proposed Housing 18 18 Residential Infrastructure 336 Vacant Proposed Housing 18 18 Residential Infrastructure 339 Vacant Proposed Housing 18 18 Residential Infrastructure 341 Vacant Gap Tap Site Residential Proposed Housing 18 18 Residential Infrastructure 342 Vacant Gap Tap Site Residential Proposed Housing 18 18 Residential Infrastructure 343 Vacant Proposed Housing 18 18 Residential Infrastructure 349 Vacant Proposed Housing 18 18 Residential Infrastructure 351 Vacant Proposed Housing 18 18 Residential Infrastructure 372 Vacant Proposed Housing 18 18 Residential Infrastructure 373 Vacant Proposed Housing 18 18 Residential Infrastructure 374 Vacant Proposed Housing 18 18 Residential Infrastructure 375 Vacant Proposed Housing 2017_03_01_Proposals_FirstDraft_.docx 68 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 18 18 Residential Infrastructure 376 Vacant Proposed Housing 18 18 Residential Infrastructure 377 Vacant Proposed Housing 18 18 Residential Infrastructure 378 Vacant Proposed Housing 18 18 Residential Infrastructure 379 Vacant Proposed Housing 18 18 Residential Infrastructure 380 Vacant Proposed Housing 18 18 Residential Infrastructure 381 Vacant Proposed Housing 18 18 Residential Infrastructure 382 Vacant Proposed Housing 18 18 Residential Infrastructure 383 Vacant Proposed Housing 18 18 Residential Infrastructure 384 Vacant Proposed Housing 18 18 Residential Infrastructure 385 Vacant Proposed Housing 18 18 Residential Infrastructure 386 Vacant Proposed Housing 18 18 Residential Infrastructure 387 Vacant Proposed Housing 2017_03_01_Proposals_FirstDraft_.docx 69 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 18 18 Residential Infrastructure 388 Vacant Proposed Housing 18 18 Residential Infrastructure 389 Vacant Proposed Housing 18 18 Residential Infrastructure 390 Vacant Proposed Housing 18 18 Residential Infrastructure 391 Vacant Proposed Housing 18 18 Residential Infrastructure 392 Vacant Proposed Housing 18 18 Residential Infrastructure 393 Vacant Proposed Housing 18 18 Residential Infrastructure 394 Vacant Proposed Housing 18 18 Residential Infrastructure 395 Vacant Proposed Housing 18 18 Residential Infrastructure 396 Vacant Proposed Housing 18 18 Residential Infrastructure 413 18 18 Residential Infrastructure 414 Vacant Proposed Housing 18 18 Residential Infrastructure 416 Vacant Proposed Housing Proposed Housing 2017_03_01_Proposals_FirstDraft_.docx 70 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 18 18 Residential Infrastructure 431 Vacant Proposed Housing 18 18 Residential Infrastructure 432 Vacant Proposed Housing 18 18 Residential Infrastructure 449 Cadastral and Open Space Revisions Proposed Housing TABLE 5: WARD 18 PROPOSALS 2017_03_01_Proposals_FirstDraft_.docx 71 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 10.1.6 WARD 19 (2016) 10.1.6.1 N EEDS Ward 16 (2011) and Ward 19 (2011) now Ward 19 (2016) 2017_03_01_Proposals_FirstDraft_.docx 72 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 2017_03_01_Proposals_FirstDraft_.docx 73 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 10.1.6.2 PROPOSALS FIGURE 30: WARD 19 PROPOSALS 2017_03_01_Proposals_FirstDraft_.docx 74 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 Ward No. 2011 Ward No. 2016 BEPP Category Object Info ID Info Summary Proposals 19 19 Community Infrastructure 50 CCTV Camera to be Installed CCTV Needed/Not Working/New CCTV Update progress of cameras that are currently being installed 19 19 Community Infrastructure 51 Sports Field (Zokwana Sports Development) Required Sportsfield Upgrade/New Sportsfield Upgrade Sportsfield 16 19 Community Infrastructure 54 Existing CCTV CCTV Needed/Not Working/New CCTV Replace existing CCTV 19 19 Community Infrastructure 55 Vegetable Garden Other Create a vegetable garden 19 19 Community Infrastructure 57 Youth and Aged Resource Centre General Community Building Renovation/New Building Upgrade Building 16 19 Basic Infrastructure 58 Stormwater Pond Stormwater 16 19 Community Infrastructure 59 Revitalise Existing Park Required Park Maintenance/New Park Redevelop Park 16 19 Community Infrastructure 60 Revitalise Existing Park Required Park Maintenance/New Park Redevelop Park 16 19 Community Infrastructure 61 Revitalise Existing Park Required Park Maintenance/New Park Redevelop Park 16 19 Community Infrastructure 62 Community Hall needs to be made Bigger Community Hall Upgrade Increase size of community hall 16 19 Community Infrastructure 63 Sports Field Renovation Required Sportsfield Upgrade/New Sportsfield Upgrade Sportsfield 2017_03_01_Proposals_FirstDraft_.docx 75 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 16 19 Community Infrastructure 64 Matomela Bottle Store General Community Building Renovation/New Building Renovate building 16 19 Community Infrastructure 65 Revitalise Existing Park Required Park Maintenance/New Park Redevelop Park 16 19 Community Infrastructure 71 School too small for Capacity School Upgrade Required Upgrade school to increase learner capacity 19 19 Community Infrastructure 77 Second Field Requires Upgrading Required Sportsfield Upgrade/New Sportsfield Upgrade Sportsfield 19 19 Community Infrastructure 78 Revitalise Existing Park Required Park Maintenance/New Park Redevelop Park 19 19 Community Infrastructure 79 Revitalise Existing Park Required Park Maintenance/New Park Redevelop Park 19 19 Community Infrastructure 80 Revitalise Existing Park Required Park Maintenance/New Park Redevelop Park 19 19 Community Infrastructure 81 Revitalise Existing Park Required Park Maintenance/New Park Redevelop Park 19 19 Community Infrastructure 82 Revitalise Existing Park Required Park Maintenance/New Park Redevelop Park 19 19 Community Infrastructure 83 Revitalise Existing Park Required Park Maintenance/New Park Redevelop Park 19 19 Community Infrastructure 84 Revitalise Existing Park Required Park Maintenance/New Park Redevelop Park 19 19 Community Infrastructure 85 Revitalise Existing Park Required Park Maintenance/New Park Redevelop Park 2017_03_01_Proposals_FirstDraft_.docx 76 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 19 19 Community Infrastructure 86 Revitalise Existing Park Required Park Maintenance/New Park Redevelop Park 18 18 Basic Infrastructure 108 Crime Hotspot Crime Hotspot Increase overall security measures in the area due to high crime rate 16 19 Basic Infrastructure 109 Tarring Required Basic Road Infrastructure Upgrade Road 16 19 Basic Infrastructure 112 Crime Hotspot Crime Hotspot Increase overall security measures in the area due to high crime rate 19 19 Basic Infrastructure 115 Crime Hotspot Crime Hotspot Increase overall security measures in the area due to high crime rate 19 19 Basic Infrastructure 116 Crime Hotspot Crime Hotspot Increase overall security measures in the area due to high crime rate 19 19 Basic Infrastructure 135 Lights need to be Connected to Electricity Basic Road & Electrical/Lighting Infrastructure Ensure all lights in the area are connected to the electrical grid 19 19 Basic Infrastructure 137 Stormwater Drains Required Stormwater Issues Install drains 19 19 Basic Infrastructure 138 Lights need to be Connected to Electricity Basic Road & Electrical/Lighting Infrastructure Ensure all lights in the area are connected to the electrical grid 19 19 Basic Infrastructure 150 Cement Street Basic Road Infrastructure Upgrade cement road 19 19 Community Infrastructure 167 Wolfson Library Proposed Library Wolfson Library 19 19 Sustainable Development 178 Proposed Commercial Employment 2017_03_01_Proposals_FirstDraft_.docx 77 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 19 19 Community Infrastructure 257 Vacant Gap Tap Site - Park Proposed Park 16 19 Community Infrastructure 258 Vacant Gap Tap Site - Park Proposed Park 16 19 Community Infrastructure 259 Vacant Gap Tap Site - Park Proposed Park 16 19 Community Infrastructure 260 Vacant Gap Tap Site - Park Proposed Park 19 19 Community Infrastructure 265 Vacant Gap Tap Site - Park Proposed Park 19 19 Community Infrastructure 266 Vacant Gap Tap Site - Park Proposed Park 19 19 Community Infrastructure 267 Vacant Gap Tap Site - Park Proposed Park 16 19 Community Infrastructure 280 Vacant Small Open Space Site Proposed Park 19 19 Community Infrastructure 288 Proposed Park 19 19 Community Infrastructure 289 Proposed Park 19 19 Community Infrastructure 290 Proposed Park 16 19 Community Infrastructure 303 Park Stormwater 2017_03_01_Proposals_FirstDraft_.docx Proposed Park 78 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 16 19 Community Infrastructure 304 Park Stormwater Proposed Park 16 19 Community Infrastructure 307 Vacant Allocated to the school as additional land Proposed Park 16 19 Community Infrastructure 314 Vacant Allocated to the school as additional land Proposed Park Allocated to the school as additional land 16 19 Residential Infrastructure 321 Vacant Proposed Housing 16 19 Residential Infrastructure 322 Vacant Proposed Housing 16 19 Residential Infrastructure 323 Vacant Proposed Housing 16 19 Residential Infrastructure 324 Vacant Proposed Housing 16 19 Residential Infrastructure 325 Vacant Proposed Housing 16 19 Residential Infrastructure 328 Vacant Gap Tap Site Residential Proposed Housing 16 19 Residential Infrastructure 340 Vacant Gap Tap Site Residential Proposed Housing 19 19 Residential Infrastructure 397 Vacant Gap Tap Site Residential Proposed Housing 16 19 Residential Infrastructure 411 Vacant (edit) Proposed Housing 2017_03_01_Proposals_FirstDraft_.docx 79 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 19 19 Residential Infrastructure 437 Vacant Proposed Housing 16 19 Residential Infrastructure 438 Vacant Proposed Housing 19 19 Residential Infrastructure 448 Vacant Proposed Housing TABLE 6: WARD 19 PROPOSALS 2017_03_01_Proposals_FirstDraft_.docx 80 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 10.1.7 WARD 20 (2016) 10.1.7.1 N EEDS Ward 18 (2011), Ward 20 (2011) and Ward 25 (2011) now Ward 20 (2016) 2017_03_01_Proposals_FirstDraft_.docx 81 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 2017_03_01_Proposals_FirstDraft_.docx 82 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 2017_03_01_Proposals_FirstDraft_.docx 83 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 10.1.7.2 PROPOSALS FIGURE 31: WARD 20 PROPOSALS 2017_03_01_Proposals_FirstDraft_.docx 84 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 Ward No. Ward No. BEPP Category 2011 2016 Objec t ID Info Info Summary Proposals 20 20 Community Infrastructure 32 Sports Field Upgrade Required Sportsfield Upgrade/New Sportsfield Upgrade Sportsfield 18 20 Basic Infrastructure 33 Illegal Dumping Site Illegal Dumping Site Proposed site for improved waste management 20 20 Basic Infrastructure 35 Speed Hump Required Basic Road Infrastructure Install Speed Hump 20 20 Basic Infrastructure 36 High Masts in Area all out High Mast Needed/Not Working/New High Mast Erect new high mast light 20 20 Basic Infrastructure 101 Stormwater/Sanitation Stormwater Issues fix stormwater issues 20 20 Basic Infrastructure 102 Sanitation Sanitation Issues Improve sanitation for area 20 20 Community Infrastructure 114 Structures need to be Revamped (No Budget) General Community Building Renovation/New Building Upgrade community building structures 20 20 Basic Infrastructure 133 Lighting Required Basic Road & Electrical/Lighting Infrastructure Install new street lights 20 20 Basic Infrastructure 140 Speed Humps Required Basic Road Infrastructure Proposal for speed humps to be installed 20 20 Community Infrastructure 284 Vacant Gap Tap Site - Park Proposed Park 20 20 Community Infrastructure 285 Vacant Gap Tap Site - Park Proposed Park 2017_03_01_Proposals_FirstDraft_.docx 85 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 20 20 Community Infrastructure 292 Vacant Gap Tap Site - Park Proposed Park 20 20 Residential Infrastructure 370 Vacant Gap Tap Site Residential Proposed Housing 20 20 Residential Infrastructure 371 Vacant Gap Tap Site Residential Proposed Housing 20 20 Residential Infrastructure 401 Vacant Gap Tap Site Residential Proposed Housing 20 20 Residential Infrastructure 402 Vacant Gap Tap Site Residential Proposed Housing 20 20 Residential Infrastructure 403 Vacant Gap Tap Site Residential Proposed Housing 20 20 Residential Infrastructure 404 Vacant Gap Tap Site Residential Proposed Housing 20 20 Residential Infrastructure 405 Vacant Gap Tap Site Residential Proposed Housing 18 20 Residential Infrastructure 417 Vacant Proposed Housing TABLE 7: WARD 20 PROPOSALS 2017_03_01_Proposals_FirstDraft_.docx 86 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 10.1.8 WARD 21 (2016) 10.1.8.1 N EEDS Ward 21 (2011) now Ward 21 (2016) 2017_03_01_Proposals_FirstDraft_.docx 87 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 10.1.8.2 PROPOSALS FIGURE 32: WARD 21 PROPOSAL 2017_03_01_Proposals_FirstDraft_.docx 88 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 Ward No. Ward No. BEPP Category 2011 2016 Object Info ID Info Summary Proposals 21 21 Basic Infrastructure 8 Traffic lights needed Basic Road Infrastructure Propose installation of traffic lights 21 21 Basic Infrastructure 23 High Mast Needed High Mast Needed/Not Working/New High Mast Erect new high mast light 21 21 Community Infrastructure 24 Revitalise Existing Park Required Park Maintenance/New Park Redevelop Park 21 21 Community Infrastructure 25 Proposed Library Proposed Library Proposed site for library 21 21 Basic Infrastructure 26 High Mast Taken Down High Mast Needed/Not Working/New High Mast Erect new high mast light 21 21 Residential Infrastructure 27 Transfer Site Residential Upgrades 21 21 Residential Infrastructure 28 Relocate (Kyamnandi) Relocation 21 21 Community Infrastructure 29 Closed School (Convert to Youth Resource Centre) School Closed 21 21 Sustainable Development 30 Rejuvenate Wetland Area (Tourism) Rehabilitate Area Revitalise environmental features 21 21 Community Infrastructure 31 Open Area to Multi Purpose Sports Ground Required Sportsfield Upgrade/New Sportsfield Develop open space for a multipurpose sports ground 2017_03_01_Proposals_FirstDraft_.docx 89 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 21 21 Community Infrastructure 96 Rehabilitate Area Rehabilitate Area Revitalise environmental features 21 21 Basic Infrastructure 97 Storm Water Drain Issues (Only 1 Drain) Stormwater Issues Install drains 21 21 Basic Infrastructure 98 Stormwater Stormwater Issues fix stormwater issues 21 21 Basic Infrastructure 99 Stormwater Stormwater Issues fix stormwater issues 21 21 Community Infrastructure 100 Building Upgrade General Community Building Renovation/New Building Upgrade Building 21 21 Basic Infrastructure 141 Speed Humps Required Basic Road Infrastructure Proposal for speed humps to be installed 21 21 Basic Infrastructure 142 Speed Humps Required Basic Road Infrastructure Proposal for speed humps to be installed 21 21 Basic Infrastructure 144 Lighting and Speed Hump Required Basic Road & Electrical/Lighting Infrastructure Proposal for new street lights and a speed hump 21 21 Basic Infrastructure 147 Speed Humps Required Basic Road Infrastructure Proposal for speed humps to be installed 21 21 Sustainable Development 177 Vacant 21 21 Community Infrastructure 188 Closed School Convert to Youth Resource Centre Proposed Community Facility 21 21 Community Infrastructure 253 Vacant Gap Tap Site - Park Proposed Park Proposed Commercial Employment 2017_03_01_Proposals_FirstDraft_.docx 90 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 21 21 Community Infrastructure 254 Vacant Sportsfield Proposed Park 21 21 Community Infrastructure 261 Vacant Gap Tap Site - Park Proposed Park 21 21 Community Infrastructure 262 Vacant Gap Tap Site - Park Proposed Park 21 21 Community Infrastructure 263 Vacant Gap Tap Site - Park Proposed Park 21 21 Community Infrastructure 271 Vacant Gap Tap Site - Park Proposed Park 21 21 Community Infrastructure 272 Vacant Gap Tap Site - Park Proposed Park 21 21 Community Infrastructure 273 Vacant Gap Tap Site - Park Proposed Park 21 21 Community Infrastructure 274 Vacant Gap Tap Site - Park Proposed Park 21 21 Community Infrastructure 275 Vacant Gap Tap Site - Park Proposed Park 21 21 Community Infrastructure 276 Vacant Gap Tap Site - Park Proposed Park 21 21 Community Infrastructure 277 Vacant Gap Tap Site - Park Proposed Park 21 21 Community Infrastructure 281 Vacant Small Open Space Site Proposed Park 2017_03_01_Proposals_FirstDraft_.docx 91 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 21 21 Community Infrastructure 299 Vacant 21 21 Community Infrastructure 300 Vacant Proposed Park 21 21 Community Infrastructure 301 Vacant Proposed Park 21 21 Residential Infrastructure 354 Vacant Gap Tap Site Residential Proposed Housing 21 21 Residential Infrastructure 355 Vacant Gap Tap Site Residential Proposed Housing 21 21 Residential Infrastructure 356 Vacant Proposed Housing 21 21 Residential Infrastructure 357 Vacant Proposed Housing 21 21 Residential Infrastructure 358 Vacant Proposed Housing 21 21 Residential Infrastructure 359 Vacant 21 21 Residential Infrastructure 360 Vacant 21 21 Residential Infrastructure 361 Vacant Gap Tap Site Residential Proposed Housing 21 21 Residential Infrastructure 362 Vacant Gap Tap Site Residential Proposed Housing Small Open Space Site Gap Tap Site Residential Proposed Park Proposed Housing Proposed Housing 2017_03_01_Proposals_FirstDraft_.docx 92 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 21 21 Residential Infrastructure 363 Vacant Gap Tap Site Residential Proposed Housing 21 21 Residential Infrastructure 364 Vacant Gap Tap Site Residential Proposed Housing 21 21 Residential Infrastructure 365 Vacant Gap Tap Site Residential Proposed Housing 21 21 Residential Infrastructure 366 Vacant Proposed Housing 21 21 Residential Infrastructure 368 Vacant Proposed Housing 21 21 Residential Infrastructure 421 Vacant Proposed Housing 21 21 Residential Infrastructure 422 Vacant Proposed Housing 21 21 Residential Infrastructure 423 Vacant Proposed Housing 21 21 Residential Infrastructure 424 Vacant Proposed Housing 21 21 Residential Infrastructure 425 Vacant Proposed Housing 21 21 Residential Infrastructure 426 Vacant Proposed Housing 21 21 Residential Infrastructure 427 Vacant Proposed Housing 2017_03_01_Proposals_FirstDraft_.docx 93 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 21 21 Residential Infrastructure 428 Vacant Proposed Housing 21 21 Residential Infrastructure 429 Vacant Proposed Housing 21 21 Residential Infrastructure 430 Vacant Proposed Housing TABLE 8: WARD 21 PROPOSALS 2017_03_01_Proposals_FirstDraft_.docx 94 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 10.1.9 WARD 22 (2016) 10.1.9.1 N EEDS Ward 22 (2011), Ward 25 (2011) and Ward 26 (2011) now Ward 22 (2016) 2017_03_01_Proposals_FirstDraft_.docx 95 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 2017_03_01_Proposals_FirstDraft_.docx 96 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 10.1.9.2 PROPOSALS FIGURE 33: WARD 22 PROPOSALS 2017_03_01_Proposals_FirstDraft_.docx 97 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 Ward No. 2011 Ward No. 2016 BEPP Category Object ID Info Info Summary Proposals 22 22 Community Infrastructure 3 Revitalise Existing Park Required Park Maintenance/New Park Redevelop Park 22 22 Basic Infrastructure 4 Illegal Dumping Site Illegal Dumping Site Proposed site for improved waste management 22 22 Community Infrastructure 5 Convert Open Space to Park Required Park Maintenance/New Park Develop Park 22 22 Community Infrastructure 6 Convert Open Space to Park Required Park Maintenance/New Park Develop Park 22 22 Community Infrastructure 7 Revitalise Existing Park Required Park Maintenance/New Park Redevelop Park 22 22 Basic Infrastructure 9 Traffic Lights Needed Basic Road Infrastructure Propose installation of traffic lights 22 22 Basic Infrastructure 10 High Mast Needed High Mast Needed/Not Working/New High Mast Erect new high mast light 22 22 Basic Infrastructure 11 High Mast Needed High Mast Needed/Not Working/New High Mast Erect new high mast light 22 22 Basic Infrastructure 13 Illegal Dumping Site Illegal Dumping Site Proposed site for improved waste management 22 22 Community Infrastructure 14 Revitalise Existing Park Required Park Maintenance/New Park Redevelop Park 22 22 Community Infrastructure 15 Closed Run Down Hospital Closed Health Facility 22 22 Basic Infrastructure 16 Illegal Dumping Site (Pest Infestation) Illegal Dumping Site Proposed site for improved waste management 22 22 Community Infrastructure 17 Revitalise Existing Park Required Park Maintenance/New Park Redevelop Park 22 22 Community Infrastructure 18 Convert Open Space to Park Required Park Maintenance/New Park Develop Park 2017_03_01_Proposals_FirstDraft_.docx 98 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 22 22 Community Infrastructure 19 Convert Open Space to Park Required Park Maintenance/New Park Develop Park 22 22 Basic Infrastructure 21 Illegal Dumping Site Illegal Dumping Site Proposed site for improved waste management 22 22 Basic Infrastructure 95 Crime Hotspot Crime Hotspot Increase overall security measures in the area due to high crime rate 22 22 Basic Infrastructure 107 Crime Hotspot Crime Hotspot Increase overall security measures in the area due to high crime rate 22 22 Basic Infrastructure 132 Street Lights Needed Basic Road Infrastructure Proposal for new street lights 22 22 Basic Infrastructure 134 Paving And Speed Hump Required Basic Road Infrastructure Install speed humps as well as a paved sidewalk 22 22 Basic Infrastructure 139 Potholes Need Filling Basic Road Infrastructure Repair potholes 22 22 Basic Infrastructure 148 Speed Humps Required Basic Road Infrastructure Proposal for speed humps to be installed 22 22 Basic Infrastructure 149 Speed Humps Required Basic Road Infrastructure Proposal for speed humps to be installed 22 22 Basic Infrastructure 164 Speed Humps Required Basic Road Infrastructure Proposal for speed humps to be installed 22 22 Community Infrastructure 168 Njoli Library Proposed Library Njoli Library 22 22 Sustainable Development 169 22 22 Community Infrastructure 282 Vacant Gap Tap Site - Park Proposed Park 22 22 Community Infrastructure 283 Vacant Gap Tap Site - Park Proposed Park 22 22 Residential Infrastructure 369 Vacant Gap Tap Site Residential Proposed Housing 22 22 Residential Infrastructure 398 Vacant Gap Tap Site Residential Proposed Housing Taxi Rank 2017_03_01_Proposals_FirstDraft_.docx 99 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 22 22 Residential Infrastructure 399 Vacant Gap Tap Site Residential Proposed Housing 22 22 Residential Infrastructure 400 Vacant Gap Tap Site Residential Proposed Housing TABLE 9: WARD 22 PROPOSALS 2017_03_01_Proposals_FirstDraft_.docx 100 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 10.1.10 WARD 25 (2016) 10.1.10.1 N EEDS Ward 25 (2011) and Ward 31 (2011) now Ward 25 (2016) 2017_03_01_Proposals_FirstDraft_.docx 101 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 2017_03_01_Proposals_FirstDraft_.docx 102 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 10.1.10.2 PROPOSALS FIGURE 34: WARD 25 PROPOSALS 2017_03_01_Proposals_FirstDraft_.docx 103 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 Ward 2011 No. Ward 2016 No. BEPP Category Object ID Info Info Summary Proposals 25 25 Basic Infrastructure 2 Illegal Dumping Site Illegal Dumping Site Proposed site for improved waste management 25 25 Basic Infrastructure 131 Road Upgrade Basic Road Infrastructure Upgrade Road 25 25 Community Infrastructure 161 Greening Beautification Beautification of Area Revitalise environmental features 25 25 Basic Infrastructure 162 Paving to be Finished Basic Road Infrastructure Finish paved sidewalk 25 25 Sustainable Development 185 Vacant 25 25 Community Infrastructure 286 25 25 Sustainable Development 316 Vacant Proposed Repurposed Buildings 25 25 Residential Infrastructure 418 Vacant Proposed Housing Proposed Commercial Employment Proposed Park TABLE 10: WARD 25 PROPOSALS 2017_03_01_Proposals_FirstDraft_.docx 104 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 11 URBAN MANAGEMENT 11.1 NEIGHBOURHOOD PLANNING The road and associated corridor network create a series of distinct residential neighbourhoods. Each of these will require the formulation of detailed spatial planning, infrastructure and land use management initiatives. FIGURE 25: NEIGHBOURHOOD PLANNING 2017_03_01_Proposals_FirstDraft_.docx 105 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 11.2 LAND USE MANAGEMENT GUIDELINES 11.2.1 PRECINCT PLANNING Precinct planning needs to be for the nodes. When taken together these precincts form a southern cluster (Embreni, Kwaford and Sheya khulati) and a northern Cluster made up of the Njoli, Kenako/Vista, Mavuso and Daku Nodes. FIGURE 26: NODES-PRECINCT PLAN FOCUS 2017_03_01_Proposals_FirstDraft_.docx 10 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 11.2.2 METRO CORRIDOR 11.2.2.1 P OLICY G UIDELINES These guidelines will apply to properties within the Metro Corridor Boundary (Aligned with the primary BRT Routes). The boundary reflected on the plan is merely indicative and detailed precinct planning will need to be undertaken to delineate the most appropriate properties for application of the guidelines. Business uses including retail, offices, service and light industrial uses should be encouraged to locate directly adjacent to the primary transportation route. Residential uses in support of the public transport routes can either be provided above or to the rear of the business uses to ensure genuine mix of land uses. Height restrictions to be relaxed (up to 3 storeys or more – Where detailed precinct planning proposals permit) to encourage more intensive utilization of land close to the corridor Introduce land use and development parameters and incentives to promote mixed land uses by way of introducing relaxations of FSI, parking provision that will have the effect of ensuring maximum utilization of land should be set. It will be necessary to prepare a detailed policy plan(s) that will become a Substitution for the Khulani Corridor or portions thereof. Land banking and consolidation of erven to create larger and significant development nodes including road closures are to be encouraged. Introduce incentives, e.g. by way of waiving payment for levies for rezoning to achieve the precinct planning vision. Revise restrictions on access, building lines, etc along the corridor to ensure better utilization of land and achieve an effective transportation movement system. Relax house business rules to enable operation of a business from home by other persons other than the occupier/owner of the house, consider eliminating insistence on, or revise restrictions on the number of employees per house shop, enable a structure to be built either attached to or detached from the house for operating a house shop even by an entrepreneur who does not necessarily reside in the main dwelling. Precinct plans need to be prepared in order to guide development within the corridor. 11.2.2.2 B UILT F ORM The land uses along the public transport routes should have a strong commercial, which is then supported by a residential component above and behind. Single use high density residential uses should not be encouraged. The preferred development should comprise higher density, multi-level buildings, where upper floor uses support ground/lower floor uses (up to and where appropriate above 3 storeys). Development should be focused around the Njoli Street and Daku Street busy public transport route on the one side and pedestrian friendly streets with emphasis on maintaining a clear definition of public vs. private realms, on the other. It shall promote horizontal and vertical mix of uses along the main public transport routes as well as contiguous buildings and attractive frontages to replace the current detached and ad hoc urban form of one house per site. 2017_03_01_Proposals_FirstDraft_.docx 10 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 11.2.2.3 D EVELOPMENT P ARAMETERS Within the short term the intension of this zone will be to increase the permitted density to accommodate residents in backyard shacks and members of the extended family system already living on properties along the corridor. These higher densities will support businesses and public transport facilities along the corridor. Metro -Corridor Development parameters Zoning: Special Purposes (Mixed Use Retail, Commercial, Residential), comprising a commercial strip fronting onto the BRT Routes and other main roads with back portions and/or land above street level being used for residential purposes. FSI A maximum of 2.0 or higher where the detailed precinct planning has found it desirable. Coverage: 100% for business/mixed use with residential; 75% for residential only Height: At most 3 storeys or higher where the detailed precinct planning has found it desirable. Building Lines: Street – 1m The zone will be characterized by: Predominantly residential development, preferably multi-storey and attached housing. Supported by business uses will constitute a small proportion of uses in this zone and attempts should be made to provide business in Zone B before this can be extended to Zone C. business in Zone C will consist largely of spaza shops that occupy one-third or less of the total floor of the house, and not to exceed 25m 2 30m2 in gross floor area. Back – Nil Side - Nil Permitted Uses: Business, Offices, Residential, Medical and Pharmaceutical Buildings, Hardware Stores, Fast Food Outlets, Convenience, Retail, Entertainment and Restaurants, Hotels, Guest Houses, Service Stations, Car Show Rooms, SMME Workshops, Informal Trading, etc., General Residential Buildings, Townhouses, Flats, etc. and community facilities Consent Uses: Shebeens and Taverns, Service Trades, light and service industries, Informal Trading 11.2.3 NEIGHBOURHOOD CORRIDOR 11.2.3.1 P OLICY G UIDELINES These guidelines will apply to properties within the Neighbourhood Corridor Boundary (Aligned with public transport routes which support the BRT Routes). The boundary reflected on the plan is merely indicative and detailed precinct planning will need to be undertaken to delineate the most appropriate properties for application of the guidelines. 2017_03_01_Proposals_FirstDraft_.docx 10 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 11.2.3.2 R ESIDENTIAL FOCUS Permitted Uses: Business, Offices, Residential, Medical and Pharmaceutical Buildings, Hardware Stores, Fast Food Outlets, Convenience, Retail, Entertainment and Restaurants, Hotels, Guest Houses, Service Stations, Car Show Rooms, SMME Workshops, Informal Trading, etc., General Residential Buildings, Townhouses, Flats, etc. Consent Uses: Shebeens and Taverns, Service Trades The policy principles are: Increase in threshold population living closer to the public transport routes and facilities along neighborhood corridors. Protect existing residential enclaves against ad hoc encroachment by non-residential uses that are not compatible with a residential location. Retain and improve amenity value of the areas for residential use, reverse blight associated with the ageing housing stock and create enclaves with high visual quality, low noise levels, limited through traffic and high quality open spaces. Promote in-situ upgrading of informal housing areas on developable land, Develop and upgrade under-developed school sites, undeveloped open spaces and undeveloped community facility sites. The provision of social and community facilities needs to be prioritised in this area The appropriate open space (recreation and sports fields) need to be provided. 11.2.3.2.1 D EVELOPMENT P ARAMETERS : Neighbourhood Corridor Development Parameters Zoning: Special Purposes (Mixed Use Retail, Commercial, Residential), comprising of business sites fronting public Transport Routes and other main roads with back portions and/or land above street level being used for residential purposes and community facilities FSI: At most 1.5 Coverage: 100% for business/mixed use with residential; 75% for residential only Height: At most 3 storeys Building Lines: Street – 1m Back – Nil Side - Nil 2017_03_01_Proposals_FirstDraft_.docx 109 IBHAYI LOCAL SPATIAL DEVELOPMENT FRAMEWORK 2015 - 2020 12 BIBLIOGRAPHY Anon., 2014. The Workplace Consortium Environmental Upgrading of Singaphi Street, New Brighton. s.l.:Mandela Bay Development Agency. Presentation: Municipal Solid Waste Diversion and Beneficiation Opportunities at NMBMM, 2014. Municipal Solid Waste Diversion and Beneficiation Opportunities at NMBMM. s.l.:s.n. SANBI, n.d. East Cape Biodiversity Conservation Plan, s.l.: s.n. CES, C. a. E. S., 2011. CHDM Climate Change Response Framework Specialist Report: Water Resources, s.l.: CHDM. SAWeatherService, 2015. Climate Scenarios for the Nelson Mandela Bay Municipality, s.l.: SA Weather Service. Coastal Managment Program for NMBM - 2015, 2015. s.l.:s.n. South African Council for Planners, 2014. Feedback on SPLUMA. SACPLAN Bullietin, March, p. 9. CSIR, 2011. CHDM Climate Change Response Strategy Spaeialist Report: Biodiversity, s.l.: CHDM. STATSSA, 2012. Census 2011 Statistical Release - P0301.4/Sensus South Africa, Pretoria: Statistics South Africa. CSIR, 2012. CSIR Guidelines for the Provision of Social Facilities in South African Settlements, s.l.: CSIR. DRDLR, 2013. Guidelines for the Development of Municipal Spatial Development Frameworks, s.l.: s.n. ECDEDEA, The Eastern Cape Department of Economic Development, Environmental Affairs and Tourism, 2014. Eastern Cape Sustainable Energy. [Online] Available at: http://greenenergy-ec.co.za [Accessed 05 August 2014]. Engineer, P. E. C. C., 1999. Khulani Development Corridor, Port Elizabeth: s.n. Integrated Management Plan Swartkops Estuary and Swartkops Valley and Aloes Nature Reserves, 2011. s.l.:NMBMM. Nelson Mandela Metropolitan Municipality, 2006. Water Master Plan 2005 - 2020, s.l.: s.n. Nelson Mandela Metropolitan Municipality, 2006. Water Services Development Plan Update, s.l.: s.n. NMBMM, 2015. Metropolitan Spatial Development Framework, s.l.: s.n. NRPA, N. R. a. P. A., 2016. National Recreation and Park Association. [Online] Available at: www.nrpa.org [Accessed 25 June 2016 2016]. One World Sustainable Investments, ?. CHDM Climate Change Response Framework Specialist Report: Agriculture (Commercialand Subsistance), rural Livelihoods and Food Security, s.l.: CHDM. 2017_03_01_Proposals_FirstDraft_.docx 110
© Copyright 2026 Paperzz