Status of CO2 Cooling tests at CERN f Pi for Pixell phase h 1 AO,HP / 28 January 2009 1 Main news • Manpower: João Noite, started on a CERN p ((Jan-Dec 2009). ) technical studentship • EEquipment: i All material i l available. il bl A Assembly bl work started. AO,HP / 28 January 2009 2 AO,HP / 28 January 2009 3 Planning Year Pixel upgrade CO2 cooling R&D 2008 Oct-Dec: Definition of the CO2 study project, write requirements, collect existing documentations into project database. TASK NOT FULLY COMPLETED! 2009 Jan: Project start Pixel upgrade project Sep: Provisional results of the CO2 studies available Upgrade to long feed pipes pipes, closed circuit, circuit etc etc.?? 2010 Jan: CO2 study results ready for deciding on the pipe dimensions and manifolding in the Pixel phase 1 Jan onwards: Detail design of Phase 1 pixel upgrade July: Start of component procurements 2011 Dec: All components ready 2012 Jan: Final integration work start Nov: Pixel detector ready for installation 2013 Jan: Pixel installation