CASE STUDY El Camino Hospital HEALTHCARE HOSPITAL Mountain View, CA OPERATING COMPANY: Marelich Mechanical Co., Inc. CLIENT/OWNER: El Camino Hospital Foundation GENERAL CONTRACTOR: Rudolph & Sletten, Inc. ARCHITECT: Kaplan McLaughlin Diaz (KMD) MECHANICAL ENGINEER: Mazzetti & Associates SCHEDULE: Four (4) years VALUE DELIVERED Expanded 22,000 sq. ft operating Central Utility Plant to accommodate new and existing hospitals. All equipment was removed and replaced while maintaining service, without interruption, to the existing hospital while the replacement hospital was being built. CLIENT OBJECTIVES Renovate and expand the existing central plant providing new energy efficient equipment for existing buildings and the new replacement hospital. SCOPE OF WORK: Remove and replace three 400 horse power boilers, deaerator, flue gas economizers, two 1000 ton chillers, nine pumps, medical gas and vacuum systems, water softener system, and associated piping and equipment. TECHNICAL SOLUTIONS Relationships Quality Service VALUE ENGINEERING Experience Project Schedule & Coordination EXPERTISE 24041 Amador Street Hayward, CA 94544-1201 T: 510.785.5500 • F: 510.783.7711 www.marelich.com Design/Build Bid Build New Construction Retrofit/Renovation Electrical Construction Mechanical Construction Facilities Services Consulting Services El Camino Hospital Mountain View, CA SOLUTIONS Marelich Mechanical was instrumental in the planning, sequencing, tie ins and execution of the removal of the old equipment and replacement with new energy efficient equipment and piping systems while maintaining continuous service to the existing buildings and hospital while the replacement hospital was being built. BACKGROUND: A new hospital was needed to comply with the latest codes and standards. A five story 450,000 square foot facility with 241 patient beds, an expanded emergency department, conference center and a complete central plant expansion with a budget of $480 million. This document contains confidential and proprietary information and is intended solely for the internal business use of EMCOR Group, Inc. and its subsidiaries (“EMCOR”). The download, reproduction, or use of this document (in whole or in part) by anyone other than an EMCOR employee is not permitted and the distribution or display of this document (in whole or in part) to anyone other than an EMCOR employee is not permitted without the prior written consent of the Marketing and Communications Department of EMCOR Group, Inc. This document should be returned to EMCOR immediately upon request. Copyright 2011, EMCOR Group, Inc., All Rights Reserved 24041 Amador Street Hayward, CA 94544-1201 T: 510.785.5500 • F: 510.783.7711 www.marelich.com
© Copyright 2026 Paperzz