El Camino Hospital Mountain View, CA

CASE STUDY
El Camino Hospital
HEALTHCARE
HOSPITAL
Mountain View, CA
OPERATING COMPANY:
Marelich Mechanical Co., Inc.
CLIENT/OWNER:
El Camino Hospital Foundation
GENERAL CONTRACTOR:
Rudolph & Sletten, Inc.
ARCHITECT:
Kaplan McLaughlin Diaz (KMD)
MECHANICAL ENGINEER:
Mazzetti & Associates
SCHEDULE:
Four (4) years
VALUE DELIVERED
Expanded 22,000 sq. ft operating Central Utility Plant to accommodate new and existing
hospitals. All equipment was removed and replaced while maintaining service, without
interruption, to the existing hospital while the replacement hospital was being built. CLIENT OBJECTIVES
Renovate and expand the existing central plant providing new energy efficient equipment
for existing buildings and the new replacement hospital.
SCOPE OF WORK:
Remove and replace three 400 horse power boilers, deaerator, flue gas economizers, two
1000 ton chillers, nine pumps, medical gas and vacuum systems, water softener system, and
associated piping and equipment.
TECHNICAL SOLUTIONS
Relationships
Quality Service
VALUE ENGINEERING
Experience
Project Schedule & Coordination
EXPERTISE
24041 Amador Street
Hayward, CA 94544-1201
T: 510.785.5500 • F: 510.783.7711
www.marelich.com
Design/Build
Bid Build
New Construction
Retrofit/Renovation
Electrical Construction
Mechanical Construction
Facilities Services
Consulting Services
El Camino Hospital
Mountain View, CA
SOLUTIONS
Marelich Mechanical was instrumental in the planning, sequencing, tie ins and
execution of the removal of the old equipment and replacement with new energy
efficient equipment and piping systems while maintaining continuous service
to the existing buildings and hospital while the replacement hospital was being
built.
BACKGROUND:
A new hospital was needed to comply with the latest codes and standards. A five
story 450,000 square foot facility with 241 patient beds, an expanded emergency
department, conference center and a complete central plant expansion with a
budget of $480 million.
This document contains confidential and proprietary information and is intended solely for the internal business use of EMCOR Group, Inc. and its subsidiaries
(“EMCOR”). The download, reproduction, or use of this document (in whole or in part) by anyone other than an EMCOR employee is not permitted and the
distribution or display of this document (in whole or in part) to anyone other than an EMCOR employee is not permitted without the prior written consent of the
Marketing and Communications Department of EMCOR Group, Inc. This document should be returned to EMCOR immediately upon request.
Copyright 2011, EMCOR Group, Inc., All Rights Reserved
24041 Amador Street
Hayward, CA 94544-1201
T: 510.785.5500 • F: 510.783.7711
www.marelich.com