PE Medium Duty Alignment Pit System Pit Rack SPECIFICATIONS Site Specifications Pit Construction Refer to Forms 744-T and 429-T Minimum Concrete Spec. 6 in. (152 mm) thick, 3000 PSI (20700 kPA) rating Pre-Installation Kit Required before pouring pit. Pit Contractor Pre-Pack None Available Pit Edging Field Fabricated / Purchased Product Specification Max. Front Axle Weight Rear Axle Jack Rail 10,000 lbs. (4535 kg) T-Pit Not Recommended Work Beam 50 tons (45 Mg) Front Axle Track Width (inside and outside width) Adjustable Pedestals and Runways 48 -120 inches (1219 - 3048 mm) Pit Depth PE Pit Installation 36 inches (914 mm) ADJUSTABLE PEDESTALS AND RUNWAYS (to handle a wide range of track widths) 50 TON (45 Mg) WORK BEAM (unique PE pit feature) PE Pit Illustration MODEL COMPARISON PT PF RKHD PE P44x Heavy Duty Heavy Duty Heavy Duty Meduim Duty Light Duty Features Capacity 18,000 lbs. / axle (8165 kg) Axle Jack Rail 18,000 lbs. / axle 20,000 lbs. / axle 10,000 lbs. / axle optional T-Pit optional jack tray N/A (8165 kg) (9072 kg) (4535 kg) Work Beam N/A Pit Depth (1473 mm) (1473 mm) (610 mm or 762 mm) (914 mm) Adjustable Runways 48 in. - 120 in Adjustable Runways 48 in. - 120 in Fixed Runways 40 in. - 106 in. Adjustable Runways 48 in. - 120 in Track Width (inside - outside width) N/A 58 in. 58 in. (1219 mm - 3048 mm) (1219 mm - 3048 mm) 24 or 30 in. (1016 mm - 2692 mm) 18,000 lbs. Total (8165 kg) N/A 36 in. (1219 mm - 3048 mm) 36 in. (30 & 24 in. available) (914, 762 or 610 mm) Fixed Runways 40 in. - 85 in. (1016 mm - 2159 mm) Continued on Page 2 For lift rack information visit: www.hunter.com/rack For general inquiries visit: www.hunter.com or call 800-448-6848 For local contact visit: www.hunter.com/company/findrep.cfm Form 6943-T, 03-15a Copyright © 2015, Hunter Engineering Company PE Medium Duty Alignment Pit System Pit Rack LAY-OUT Construct pit per referenced forms. 15 ft. (4572 mm) Pit Depth PE - 36 in. (914 mm) 61 5/8 in. (1565 mm) (for Min.) 10 ft. max. (3048 mm) Minimum 12 ft. 10 in. (3911 mm) 18 in. (457 mm) The following items are to be supplied by the customer: Concrete to construct pit / Concrete reinforcement / Electrical fixtures, wiring, and power (if necessary) / Piping / Pit ventilation materials / Drainage materials / Edging (see blue prints) / Railings / lifting equipment for installation. Form 6943-T, 03-15a Copyright © 2015, Hunter Engineering Company
© Copyright 2026 Paperzz