T E C H N I CA L DATA S H E E T Neptune E ~ Z L I F T R E E L SYS T E M R E E L SYSTE M OV E R V I E W The ClydeUnion S&N Pumps E~Z Lift Neptune is a fully automated, safe, overboard deployed seawater lift system. Each system is specifically designed for harsh offshore conditions and features: • Custom engineered roller deployment system that intuitively maintains the radius bend of the hose throughout deployment and retraction • Dual heavy duty, non-collapsible 10 cm to 15 cm (4” to 6”) hose in 380 cm to 510 cm (150’ to 200’) lengths • Each system is designed with a wire rope inside each hose, and will support the entire weight of the pumps, shroud and full water columns eliminating hose stretch and extending hose life • The E~Z Lift Neptune can handle from 450 m³/hr (2,000 USgpm) to 1,136 m³/hr (5,000 USgpm) depending on hose size • 2 year warranty on the motor, gearbox and control panel TYPI CA L A P PL I CAT I ON S • Pre-fill/ballast T E C H N I CAL DATA Capacity: up to 5,000 USgpm / 1,135 m³/hr Delivery head: up to 20-30 ft / 6-9 m • Deluge/water curtain • Cooling water • Fire water TYPI CA L M A R K ETS • Wind turbine installation vessel • Production platform • Jack-up rig • Semi-submersible Flange drilling: ANSI Hose rating: ABS - GL - DNV fire retardant FEATU R E S + B E N E FI TS 1 Perforated plastic shield Adds to increased worker safety during retraction and deployment of the hose & pumps 2 Reel system control panel NEMA 4X enclosure with up/down toggle & emergency stop. 316 stainless steel hardware 3 Gear drive & motor 14.9 kW (20 hp) motor that is rated for marine use. Electric fail safe brake 4 381 cm to 508 cm (150’ to 200’) non-collapsible hose Heavy duty non-collapsible 10 cm, 12.5 cm, 15 cm (4”, 5”, & 6”) hose ABS, DNV, GL fire rated 5 6 7 1 3 2 4 Deployment rollers Designed specifically to maintain the correct radius bend of the hose during all stages of deployment and retraction 5 Swivel roller Hinged & pin locked to the skid. Designed to open during servicing of the pump. Protects the hoses from getting outside of the skid during use 6 Electric submersible pump Pumps can be provided by ClydeUnion S&N Pumps or existing pumps can plug and play 7 P OWE R CAB LE PR OT E CTI ON • Each system is fitted with our custom engineered cable saddles • The power cable runs through the saddles and rests between the hose • Cable banding runs through the saddles and around the hoses and prevents unwanted sagging in the power cable and provides protection from external contact P: +44 (0)141 637 7141 F: +44 (0)141 633 2399 E: [email protected] For more information about our worldwide locations, approvals, certifications, and local representatives, please visit www.spx.com. SPX Corporation reserves the right to incorporate our latest design and material changes without notice or obligation. Design features, materials of construction and dimensional data, as described in this bulletin, are provided for your information only and should not be relied upon unless confirmed in writing. CUP-04-REELN-USA-02 COPYRIGHT © 2012 SPX Corporation
© Copyright 2026 Paperzz