“Building for you” TABLE OF CONTENTS page 1 OUR ACTIVITIES page 2 AWARD-WINNING PROJECTS page 3 INTRODUCTION pages 4 to 5 MOTORWAY BRIDGES pages 6 to 7 ROAD BRIDGES pages 8 to 9 RAILWAY BRIDGES pages 10 to 11 STEEL STRUCTURES page 12 REINSTATING CONCRETE STRUCTURES page 13 SPECIAL TECHNOLOGIES page 14 UTILITY LINES AND SEWAGE TREATMENT PLANTS page 15 NOISE BARRIERS page 16 RAILWAY SUBSTRUCTURE AND SUPERSTRUCTURE page 17 CONSTRUCTION AND RECONSTRUCTION OF ROADS AND PAVED AREAS page 18 HEAVY-OBJECT HANDLING, SYNCHRONOUS LIFTING AND LOWERING page 19 TEMPORARY BRIDGES AND FALSEWORK page 20 INSULATION WITH BITUMINOUS STRIPS, TARCO ELASTIC BRIDGE JOINTS page 21 DIRECTLY DRIVEN OR WALKED SPRAYED INSULATION page 22 STRUCTURE PRESTRESSING AND STRENGTHENING page 23 CIVIL ENGINEERING AND INDUSTRIAL PROJECTS page 24 TRANSPORT AND MECHANISATION page 25 WHERE TO FIND US OUR ACTIVITIES We work for your satisfaction from the start of the project to the final realisation. FIRESTA-Fiser, rekonstrukce, stavby a.s. has been operating in the Czech construction market since 1991. Currently the company employs more than 450 fully qualified employees. Our company headquarters is located in Brno; branches are located in Ostrava, Prague, Pilsen and Bratislava (the Slovak Republic). We have been operating in the Romanian and Polish construction markets since 2007. We use a quality system based on CSN EN ISO 9001 and we have implemented systems for environmental management based on CSN EN ISO 14001 and the management of safety and protection at work based on OHSAS 18001. The Company was granted the „National Prize of the Czech Republic for Quality“ in 2002. We carry out the following: • New constructions, reconstructions and repairing of road and railway bridges. • Civil engineering and industrial projects. • Manufacturing of steel construction and bridges, including working drawings • Structure prestressing and strengthening with a ETA approved post tensioning system • Synchronous heavy lifting and lowering of bridges, heavy –object handling, bridge installation using the longitudinal launch method. • Insertion and removal of temporary road and railway bridges. • Design and installation of support structures. • Concrete repair and maintenance • Cement and chemical resin grouting, vacuum grouting. • Construction of railway substructure and superstructure, renewal of switch frogs and switch rails including by overlaying welding, in –situ installation of glued, insulated rail joints, etc. • Waterproofing with asphalt paper, sprayed polyurethane membranes waterproofing and TARCO QUBIK drivable insulation • TARCO elastic bridge joints. • Utility lines and sewage treatment plants. • Reconstruction and construction of roads, pavements, railway platforms and railway crossings. • Rental of earthmoving machinery. Stawiamy na Państwa zadowolenie od projektu aż do realizacji! FIRESTA - Fišer, reconstruction, stavby a.s. prowadzi swoją działalność na czeskim rynku budowlanym od 1991 roku. Firma zatrudnia obecnie ponad 450 wykwalifikowanych pracowników. Siedziba firmy jest w Brnie (oddziały firmy w Ostrawie, Pradze, Pilźnie i Bratysławie (Republika Słowacka)). Od 2007 roku prowadzimy działalność w Rumunii i Polsce. Stosujemy system jakości według ČSN EN ISO 9001, a równocześnie mamy wdrożone systemy zarządzania środowiskiem według ČSN EN ISO 14001 oraz zarządzania bezpieczeństwem i higieną pracy według OHSAS 18001. W 2002 roku firma otrzymała „Nagrodę Państwową Republiki Czeskiej za Jakość“. Wykonujemy: • Budowy, przebudowy i naprawy bridgeów drogowych i kolejowych. • Budowle lądowe i przemysłowe. • Produkcję konstrukcji stalowych i bridgeów włącznie z dokumentacją produkcyjną. • Statyczne sprężanie i wzmacnianie budynków certyfikowanym systemem obciążenia wstępnego. • Synchroniczne podnoszenia i opuszczania bridgeów, obsługa ciężkich ładunków, montaż bridgeów przez wysunięcie. • Wstawianie i usuwanie tymczasowych bridgeów drogowych i kolejowych. • Konstrukcje nośne włącznie z opracowaniem projektu • Odnowa konstrukcji betonowych. • Spoinowania chemiczne i próżniowe. • Budowa nawierzchni i podtorza, regeneracja krzyżownic i iglic zwrotnic przez przyspawanie, montaż ambulatoryjnych LIS itp. • Taśmy hydroizolacyjne, poliuretanowe aplikowane przez natrysk oraz cienkowarstwowa nawierzchnia z żywicy epoksydowej – TARCO QUBIK. • Elastyczne bridgeowe przekrycia dylatacyjne TARCO. • Sieci inżynieryjne i oczyszczalnie ścieków. • Remont i budowa dróg i powierzchni. • Wynajem maszyn i mechanizacji do prac ziemnych. Ne bazăm pe mulţumirea dumneavoastră de la proiectare până la execuţie! FIRESTA-Fiser, reconstruction, stavby a.s. este activă pe piaţa de construcţie cehă din anul 1991. Firma în prezent are mai mult de 450 de angajaţi calificaţi. Sediul central al firmei este în Brno, sucursale are în Ostrala, Praga, Plzen, şi Bratislava (Slovacia). Din anul 2007 ne desfăşurăm activitatea pe piaţa din România şi Polonia Aplicăm sistemul de management al calităţii ISO 9001 şi, în acelaşi timp, am implementat sisteme de management de mediu conform standardelor ČSN EN ISO 14001 si sisteme de management de sănătate şi securitate în muncă conform OHSAS 18001 În anul 2002 firma a obţinut „Premiul Naţional al Republicii Cehe pentru calitate”. Efectuăm: • Construcţii noi, reconstrucţii şi reparaţii de poduri rutiere şi cale ferată. • Construcţii civile şi industriale. • Fabricarea de construcţii de oţel şi podurilor inclusiv documentaţia de producţie. • Pretensionarea şi consolidarea statică a obiectelor cu ajutorul sistemului de pretensionare certificat • Ridicare şi coborâre sincron a podurilor, manipularea sarcinilor grele, montarea podurilor ejectate. • Introducerea şi scoaterea podurilor rutiere şi cale ferată provizorii. • Construcţii de susţinere inclusiv elaborarea proiectului. • Asanarea construcţiilor de beton. • Injectări chimice şi de vid. • Construirea suprastructurii şi infrastructurii de cale ferată, regenerare de inimă şi aci de macaz prin sudare, montare LIS ambulatorie, etc. • Hidroizolaţii de bandă, poliuretan aplicate prin spray şi rulare directă - TARCO QUBIK. • Bariere de pod elastice TARCO. • Reţele utilitare şi staţiile de epurare a apelor. • Reconstrucţii şi construcţii de drumuri şi suprafeţe. • Închiriere de maşini şi utilaje pentru lucrări de terasament. AWARD-WINNING PROJECTS THE INFRASTRUCTURE PROJECT OF 2009; THE SOUTH-MORAVIAN PROJECT OF 2009 "Znojemský Viadukt" railway bridge at km 99.297 on the Šatov – Znojmo route THE BRIDGE OF 2007; EUROPEAN AWARD FOR STEEL STRUCTURES 2007 Footbridge over the D8 motorway at km 83.344 THE BRIDGE OF THE YEAR 2006 D8 motorway border bridge between the Czech Rep. and Germany THE BRIDGE OF THE YEAR 2006 Railway bridge over the Dyje River on Břeclav to CZ/SK state border route THE BRIDGE OF THE YEAR 2005 Railway bridge at km 27.340 on Zábřeh – Krasíkov line THE BRIDGE OF THE YEAR 2005 Road bridge over the Vranovská Přehrada lake at Vysočany THE BRIDGE OF THE YEAR 2004 Road and railway bridge over the Lužnice River in Bechyně THE BRIDGE OF THE YEAR 2004 Railway bridge at km 24.539 on Krasíkov – Česká Třebová linee THE BRIDGE OF THE YEAR 2004 Railway bridge at km 25.885 on Krasíkov – Česká Třebová linee THE BRIDGE OF 2003; THE SOUTH-MORAVIAN PROJECT OF 2003 Foot and bicycle bridge over Brněnská Přehrada lake at Veveří castle THE BRIDGE OF THE YEAR 2003 Railway bridge in Brno-Chrlice on Brno – Přerov line 2 Ladies and gentleman, Welcome to FlRESTA-Fiser, reconstruction, stavby a.s. company. Since its modest beginning in 1991, when we employed 10 people, the company has constantly been developed, increasing both its turnover and profit, which has always been reinvested in further business development. The company currently employs more than 450 qualified employees. Our headquarters is located in Brno and we have branches in Ostrava, Prague, Pilsen, and Bratislava (the Slovak Republic). Since 2007, we have been active in the Polish and Romanian markets. We apply a quality control system based on ČSN EN ISO 9001, have introduced an environmental management systems based on ČSN EN ISO 14001 and an industrial safety and health protection management system in accordance with ČSN OHSAS18001. The Czech Republic´s National Prize for Quality was awarded to our company in 2002. Our company´s creed is reliability and effort for first-class quality. That is why we encourage all of our staff to: - apply a high level of professionalism, - devote themselves to lifelong learning in professional and language skills, - require and provide the highest achievable work quality, - properly represent the company through good conduct, - maintain and encourage positive in-house relationships, - and, last but not least, be proud of the company they work for. The quality of our work is documented by numerous awards which we are proud of. We would like to express our sincere gratitude to all of our customers, contractors and business partners; and at the same time, take the opportunity to thank our staff for their dedication, diligence, involvement and efforts in achieving common goals. We will continue to focus all our efforts on further increasing the trust and confidence that you have in FIRESTA-Fiser, rekonstrukce, stavby a.s. Yours truly Ing. Vladimír Fišer Chairman of the Board of Directors 3 MOTORWAY BRIDGES 1 2 3 MOTORWAY BRIDGES After a ten-year experience with constructing both road and railway bridges throughout the country, we entered the market of the greatest investor: The Road and Motorway Directorate of the Czech Republic (RMD) in 2001. 4 In 2003, we extended our business with construction of new motorway bridges and fly-over crossings. 5 6 7 4 Legend 5 Bridge at km 45.161 on the D11 1 D3 motorway, 0306/I Mezno – Chotoviny project, SO 210-I motorway motorway bridge over multi-regional bio-corridor - Investor: RMD CR, Prague branch at km 64.480 - Realised in: 2004 - 2006 - Investor: RMD CR, Prague branch - one of the largest bridges on the D11 - Realised in: 2005 - 2007 motorway, highly angular, with 51m-wide - this bridge is part of the 0306/I Mezno in-situ cast abutment extended by a Chotoviny project on the D3 motorway, its 25m-long wing wall purpose is to get the D3 motorway across 6 the K120 multi-regional bio-corridor Flyover crossing at km 0.300 in Dražkovice D4704 SO 203 at Lipník n/Bečvou - Investor: RMD CR, Pardubice office 2 - Realised in: 2005 - 2006 3 - Investor: RMD CR, Brno branch - Realised in: 2008 - 2009 - new flyover crossing (four-spans, two- new single-span bridges on the D47 girders, prestressed) over rerouted I/37 motorway road in front of a crossing with fan-shaped ramps 7 1/43 road, skyway over Hapalova Street, III/32723 rerouted road crossing over Brno, bridges reg. Nos. 43-20051, 4 the D11 motorway at km 64.154 43-20052 - Investor: RMD CR, Prague branch - Investor: RMD CR, Brno office - Realised in: 2005 - 2006 - Realised in: 2003 - 2004 - prestressed single-truss bridge featuring both - comprehensive repair incl. prestressing, horizontal and vertical curves, over the newly grouting, reinstating, insulating and addition opened of a new noise barrier on both motorway-type bridges D11 Prague - Hradec Králové motorway 8 Flyover crossing No. 2, structure No. 9 206, part of R4 project, I/20 road, Nová Hospoda crossing - Investor: RMD CR, České Budějovice office - Realised in: 2006 - 2007 - five-span bridge over road, perpendicular, solid, single-girder, in-situ cast, posttensioned 10 SO 203, flyover crossing over D3 motorway at 74.009 Chotoviny Stoklasná Lhota - Investor: RMD CR, Prague branch - Realised in: 2003 - newly constructed road bridge over the D3 motorway, four-spans, prestressed reinforced concrete 11 Bridge on D47 road at km 160.52 over Antošovická street, Ostrava - Investor: RMD CR, Ostrava office - Realised in: 2005 - 2007 - new construction of two parallel threespan motorway bridges MOTORWAYBRIDGES BRIDGES MOTORWAY 8 9 10 11 Border Bridge on D8 A combined structure consisting of a steel tunnel and a reinforced concrete slab was selected for bridging the valley. Each direction of traffic runs on a separate construction. The six bridge spans are 58.4 + 4×73.0 + 58.4 m long. The bridge is perpendicular, following a radius of 1750 m, its longitudinal gradient is partly 0.5% and partly in a trough shape. The structure's height in the centre is 3.7 m. The longitudinal steelwork launch by means of a 30-m-long temporary cantilever was applied due to the great height of the superstructure above the terrain. Both constructions were erected in parallel to speed up the process. The border bridge at the meeting point of the D8 and A17 motorways has become one of the vista points on the Prague - Dresden route and the second highest (56.4 m) motorway bridge in the Czech Republic Thanks to positive investor-designer-contractor cooperation, this technically demanding project has been realised quickly and with high quality. The project was implemented in an extremely short time. The construction commenced on 31/3/2005 and the entire motorway section was officially opened on 22/12/2006. Technical data: - bridge length: 430.00m - main structure length: 411.80m - usable bridge width: 2×12.5m - bridge width: 30.70m - main structure width: 2×14.50m - bridge height above the terrain: 56.37m - structure height: 4.02m 5 ROAD BRIDGES 1 2 3 ROAD BRIDGES 4 We have been building road bridges since the establishment of the company. Currently we implement bridge projects for municipalities, regional offices, road administration companies and RMD (Road and Motorway Directorate) We complete the majority of building projects (both new constructions and reconstructions) using our own resources. Completeness of projects can be guaranteed thanks to FIRESTA's specialised departments: 5 - Insulation Department installs water-proof sealing strips, elastic bridge joints and directly drivable TARCO insulation. 6 Legend 1 Flyover crossing, city ring road, Brno 3 Modernisation of Olomouc - Červenka 5 M2 bridge, Černovické terasy railway line, road overpass at km - Hlinky - Investor: city of Brno 75.045 - Štěpánov - Realised in: 2004 Award-winning bridge over the Svratka River - Investor: RIA (Railway Infrastructure - new six-span bridge made of 30-m-long at Kamenný Mlýn Administration), Olomouc prestressed girders - Investor: RMD CR and statutory city of - Realised in: 2004 Brno - bridge over railway line, prestressed, - Realised in: 2004 6 Bridge reg. No. 19-079, I/49 road, Žďár in-situ cast reinforced concrete structure nad Sázavou - the bridge consists of a steel arch and a - Investor: RMD CR, Jihlava office half-sunk, crosswise prestressed deck; it is 4 The Bridge of the Year 2005 - Realised in: 2006 supported by hinge bearings at ends - single-span, open-shaped, postBridge reg. No. 40813 – 4 over tensioned concrete girder Vranovská Přehrada lake near 2 Construction of new bridge reg. No. 3629 – 5, Loucký Dvůr Vysočany - Investor: RMM, South Moravian Region - Investor: RMM, South Moravian Region - Realised in: 2003 - Realised in: 2004 - massive in-situ cast reinforced concrete - steelwork reinforcement, anti-corrosion bridge on a pile foundation treatment and superstructure replacement 6 - Steelwork Department manufactures and installs steel constructions and their accessories. - Heavy Load Handling Department provides computer-controlled synchronous lifting, handling, transportation, longitudinal launching of bridges, and installation of temporary bridges. - Structure Tensioning and Strengthening Department prestresses structures, provides low and highpressure grouting and repairs of concrete structures. ROAD BRIDGES 7 9 8 10 11 12 13 14 16 15 17 Legend 7 III/40813 Bítov, bridge reg. No. 40813-3 10 on III/40813 road - Investor: RMM (Road Maintenance and Management), South Moravian Region - Realised in: 2006 - broadening of the three-span steel bridge incl. drivable TARCO insulation 11 8 The Bridge of the Year 2004 Reconstruction of bridge reg. No. 122-008 Bechyně - Investor: South Bohemian Region - Realised in: 2003 – 2004 - complete rehabilitation, road and railway reconstruction 9 II/421 Zaječí, bridge reg. No. 421-010 - Investor: RMM, South Moravian Region - Realised in: 2009 - new bridge construction, composite steelwork-concrete main structure I/47 road, Lipník nad Bečvou bypass II/2 13 Žďár nad Sázavou, bridge reg. 16 No. 19-075 - Investor: RMD CR, Olomouc office - Investor: RMD CR, Jihlava office - Realised in: 2004 - 2006 - Realised in: 2007 - reinforced concrete bridge, main structure - new bridge construction, prestressed of prestressed trusses in-situ cast reinforced concrete structure Hradiště u Znojma, bridge reg. No. 40819-1 14 Reconstruction of II/416-022 bridge over Jihlava River in Pohořelice - Investor: RMM, South Moravian Region - Investor: RMD CR, Olomouc office - Realised in: 2009 17 - Realised in: 2004 - 2007 - construction of new arched polotmu?? incl. - in-situ cast, reinforced concrete bridge stone facing, gabion walls and adjacent with post-tensioned deck-shaped structure communications 12 Ring road, Dobrovského St., bridge on 15 Bridge in Mikulovice, SO 207 - Investor: RMD CR, Prague branch Korejská St., Brno - Realised in: 2006 - Investor: RMD CR, Brno office - single-span bridge, reinforced concrete deck - Realised in: 2008 - new bridge construction, T-shaped prestressed in-situ cast structure, incl. ramp connections to the tunnel Construction of new bridge reg. No. 369-005 over the Branná creek near Ostružná - Investor: RMM, Olomouc Region - Realised in: 2004 - construction of new reinforced concrete bridge with stone facing III/49030 road, Uherský Brod, bridge reg. No. 49030-2 - Investor: Road Directorate of the Zlín Region - Realised in: 2006 - bridge reconstruction using the synchronous lifting technique 7 RAILWAY BRIDGES 1 RAILWAY BRIDGES We build new railway bridges and repair/ reconstruct old ones and prepare our own project documentation. We perform all work using our own resources: installation of waterproofing, steelwork production, falsework and track superstructure installation and reinstatement of bridges. 2 We can guarantee meeting all agreed terms and conditions as well as short deadlines thanks to our technology, highly qualified staff, use of up-to-date and modern techniques and experience from previous projects. Since 1997, we have acted as builders of railway corridors. 3 Legend 4 5 8 6 1 DOPRAVNÍ STAVBA ROKU 2009 2 The South Moravian Structure of the Year 2009 Electrification of the Šatov - Znojmo line section incl. PEM, SO 04-19-01, bridge at km 99.297 - Investor: RIA, Olomouc office - Realised in: 2008 - 2009 - the viaduct in Znojmo carries the Šatov - Znojmo single-track line across the Dyje River valley; it is a historically valuable structure built in 1871, which, however, was in a state of disrepair and had to be replaced by a temporary structure in 1992. The temporary bridge was dismantled and replaced by a new continuous steelwork construction as part of the "Electrification of the Šatov - Znojmo railway line" project. 3 THE BRIDGE OF THE YEAR 2006 ČD, DDC - optimisation of Břeclav - CZ/SK state border, SO 02-19-02, bridge at km 1.634 - Investor: RIA, Olomouc office - Realised in: 2006 - two steel bridges over the Dyje River 5 Construction of a new passenger tunnel in Olomouc - Investor: city of Olomouc - in-situ cast concrete frame, built-in shops, installation of escalators 6 Modernisation of the Veselí n. Lužnicí Tábor line, Doubí - Tábor section, SO 59-20-02, 4 THE BRIDGE OF THE YEAR 2003 passenger tunnel at km 81.835 ČD, DDC - reconstruction of a bridge on - Investor: RIA, Prague office Brno - Přerov line section at km 8.172 - Realised in: 2008 - Chrlice - passenger tunnel at Tábor railway station - Investor: RIA, Olomouc office - Realised in: 2003 - reconstruction of a four-arched stone bridge 7 14 8 RAILWAY BRIDGES 13 9 15 11 10 12 Legend 7 Modernisation of Veselí n. Lužnicí Tábor line, Doubí - Tábor section, SO 58-26-02 footbridge at km 80.530 - Investor: RIA, Prague office - Realised in: 2007 - steelwork-concrete composite structure with in-situ cast concrete ramps 12 The Bridge of the Year 2005 16 ČD, DDC - optimisation of Zábřeh na Moravě – Krasíkov line section, SO 44-19-07 Hoštejn – Krasíkov, bridge at km 27.340 - Investor: RIA, Olomouc office - Realised in: 2004 - 2006 - reinforced concrete arches 8 Bridge reconstruction at km 5.929 on Kunovice - Staré Město u UH line - Investor: RIA, Olomouc office - Realised in: 2009 - highly angular semi-frame of reinforced concrete 13 Modernisation of Červenka - Zábřeh na Moravě railway section, SO 33-19-01, bridge at km 56.589 - Investor: RIA, Olomouc office - Realised in: 2007 - steel bridge over the Morava River 9 Optimisation of Prague Stránčice Hostivař line, SO 03-20-02, railway bridge at km 164.665 14 - Investor: RIA, Prague office - Realised in: 2007 – 2008 - passenger tunnel at Říčany station incl. tunnel exit structure and platforms 10 Optimisation of Benešov - Stránčice line, railway bridge at km 144.234 - Investor: RIA, Prague office - Realised in: 2009 - 2010 - six-span steel-concrete composite bridge 11 ČD, DDC - optimisation of Zábřeh - Krasíkov line section, SO 42-19-10, bridge at km 34.281 - Hněvkov II - Investor: RIA, Olomouc office - Realised in: 2004 - 2006 - three-span steel-concrete composite bridge Modernisation of Veselí n. Lužnicí Tábor line, Doubí - Tábor section, SO 58-20-08, bridge at km 79.915 - Investor: RIA, Prague office - Realised in: 2007 - steel bridge over the I/3 road 15 Reconstruction of the railway bridge over the II/418 road at km 13.611, Sokolnice - Investor: RIA, Olomouc office - Realised in: 2007 - steel bridge over the II/418 road 16 17 The Bridge of the Year 2004 ČD, DDC - optimisation of Krasíkov Česká Třebová line, SO 51-19-02, bridge at km 25.885 - Krasíkov II - Investor: RIA, Olomouc office - Realised in: 2003 - 2004 - five-span steel-concrete composite bridge 17 ČD, DDC - optimisation of Zábřeh Krasíkov line section, SO 42-19-09, bridge at km 34.707 - Hněvkov I - Investor: RIA, Olomouc office - Realised in: 2004 - 2006 - three-span steel-concrete composite bridge 18 The Bridge of the Year 2004 18 ČD, DDC - optimisation of Krasíkov - Česká Třebová line section, SO 51-1901, bridge at km 24.539 - Krasíkov I - Investor: RIA, Olomouc office - Realised in: 2003 - 2004 - five-span steel-concrete composite bridge 19 Electrification of PEM Šatov - Znojmo line section, SO 04-19-02, bridge at km 99.660 - Investor: RIA, Olomouc office - Realised in: 2009 - steel-concrete composite bridge over Vídeňská St., Znojmo 19 9 STEELWORKS 1 2 3 4 STEELWORKS The steelwork department has been part of the company since 2000. 5 6 Our team of experienced staff and available technology qualify us to: - produce structural steelwork incl. production documentation - install steel bridges - repair and strengthen bridge steelwork incl. anti-corrosion treatment - make riveted and friction-type joints - produce bridge bearings - produce portals and cantilever beams 7 CONTACT Steelwork Department Křižíkova 68, areál KSB 660 90 Brno, Czech Republic Phone +420 532 041 038 +420 532 041 039 e-mail [email protected] Legend 8 9 10 11 10 1 Electrification of the Šatov - Znojmo 5 Flyover crossing, Brno - Hlinky ring 9 ČD DCC, modernisation of the Červenka - Zábřeh railway section, SO road 2 railway section incl. PEM (pre33-19-01, bridge at km 56.589 electrification modifications), Award-winning bridge over the Svratka - Realised in: 2008 SO 04-19-01, bridge at km 99.297 River at Kamenný Mlýn - bridge over the Morava River, steelwork - Realised in: 2009 - Realised in: 2004 length: 103.5 m, width: 12 m, weight: - bridge over the Dyje River and over a bank - production and installation of steelwork 588 t road and railing; the bridge consists of steel arches and a half-sunk, transverse prestressed 10 Construction of the Brno - Lesná THE BRIDGE OF THE YEAR 2003 railway stop deck; THE SOUTH MORAVIAN STRUCTURE OF Footbridge staircase at Sládkova supported by end hinge bearings, THE YEAR 2003 3 Bridge over the Brněnská Přehrada Street steelwork length: 44 m - Realised in: 2006 lake at Veveří Castle 6 ČD DDC, Zábřeh - Krasíkov railway - the main structure consists of two trusses - Realised in: 2003 interconnected by - steelwork production, production 7 section an orthotropic deck and by coiled Bridge at km 34.707 and installation of bridge railing; members - Realised in: 2004 - 2005 the main truss is suspended on the arches completing a closed section; staircase - production of steelwork; 3-span bridge by means of six pairs of tubular tie lengths: with a top deck and a parabolic lower members, and supported by a box19.7 m and 18 m cord, length: 72 m shaped joist; the orthotropic steel deck features both longitudinal and transverse stiffeners; bridge length: 101 m 8 ČD Brno - part 1 of the storage sidings, 11 Electrification of the Šatov – Znojmo Hrušovany - Brno line, SO 01-19-02, railway section incl. PEM (prebridge at km 152.402 electrification modifications), SO 04-19-02, 4 Steel roller bearings - Realised in: 2008 bridge at km 99.690 designed in accordance with TNŽ 736277, - steelwork, 'Langer truss' - Realised in: 2009 2VS-3 and 2PV-3 types - steel-concrete composite bridge over the Vídeňská St., Znojmo; bridge length 36.3 m, width: 7.3 m, steelwork length 29.2 m, weight: 57.7 t STEELWORKS 12 13 15 14 16 17 18 19 20 Legend 12 Optimisation of Břeclav - CZ/SK state 16 II/421 Zaječí, bridge reg. No. 421-010 21 II/418 Újezd u Brna, bridge reg. No. border 418-005 over ČD railway track railway section, SO 02-19-02, railway - Realised in: 2008 - Realised in: 2009 bridge - bridge over the Litava River - production and installation of steelwork over the Dyje River and a sunk deck, steelwork length: 31 m, - Realised in: 2006 bridge width: 11 m, weight: 65 t 22 THE BRIDGE OF THE YEAR 2005 - production and installation of two separate Vysočany bridge reg. No. 40813-4 structures; 'Langer truss', i.e. a truss over Vranovská Přehrada lake Zábřeh Hoštejn SO 42-19-10 17 - Realised in: 2004 reinforced with an arch as been applied as - Realised in: 2004 - 2005 - main structure strengthening and antithe main structural element. - steel-concrete composite structure corrosion treatment, bridge length: 160 m The steel orthotropic deck is 69 m long. Modernisation of Veselí nad Lužnicí 18 THE BRIDGE OF THE YEAR 2006 - Tábor 23 Modernisation of the Veselí nad Lužnicí - Tábor line D8 motorway border bridge between line. Part 1, Doubí u Tábora - Tábor 13 CZ and D?? - Tábor, part 1, Doubí u Tábora section, - Realised in: 2005 - 2006 SO 58-26-02, bridge at km 80.530 - Tábor section, SO 58-20-08, railway - continuous box-shaped steel-concrete (footbridge) bridge at km 79.915 composite truss, six spans, length: 412 m, - Realised in: 2008 - Realised in: 2008 steelwork height: 4 m, weight: 2×1735 t, - footbridge over the railway line - production and installation of steelwork; height above terrain: 56.4 m length: 57 m, width: 12 m, weight: 480 t Optimisation of the Ostrava Petrovice line, 19 THE BRIDGE OF THE YEAR 2007 traffic light cantilever truss at km 277.469, Bohumín station 14 Footbridge over the D8 motorway at km 83.344; Chlumec - cantilever length: 9.0 m, column height: - Realised in: 2006 7.5 m, weight: 6.65 t - all-welded steelwork of 2 main girders and an orthotropic deck (Vierendeel Girder); 20 D1 motorway at km 145.530, SO105, length: 96.1 m sign board structure Optimisation of the Krasíkov-Česká - Realised in: 2009 15 Třebová line, SO 54-19-08, traffic light - two half-portals, cantilever length: 6.25 m, column heights: 5.3 m and 7,3 m, weight: portal at km 13.829, Rudoltice station 2.23 and 2.0 t - lattice girder length: 27 m, column height: 7.5 m, weight: 11.9 t 21 22 23 11 REINSTATEMENT OF CONCRETE STRUCTURES 2 1 3 5 6 7 4 8 REINSTATEMENT OF CONCRETE STRUCTURES 9 We reinstate concrete structures using a broad spectrum of work types and/or techniques. Our main activities include: - preparation of concrete surfaces through mechanical cleaning and wet sand blasting (TORBO machine) - re-shaping plain concrete and reinforced concrete structures – by manual application, wet or dry spraying - treatment of existing steel reinforcement in concrete structures with corrosion inhibitors and applying special coatings as replacements of reinforcement cover, inhibiting the concrete carbonisation, water and salt penetration - making sprayed concrete structures - formwork erection and concreting - painting steel and concrete structures 10 Legend 1 Reconstruction of bridge at km 5.872, 5 Reconstruction of bridge reg. No. 9 Český Těšín - Ostrava Kunčice line 6 03811-1 over a railway track in Havlíčkův Brod - Realised in: 2009 - Realised in: 2010 - view of the reinstated structure - cleaning the steel reinforcement - spraying protective and sealing coating 10 I/52 road Brno Rajhrad, bridge 2 reg. No.52-019 on III/15280 road - Realised in: 2009 7 Reconstruction of the Břeclav railway hub, project 1. Bridge at km 82.467 - view of the reinstated structure - Realised in: 2009 11 - view of stonework cleaning by wet sand 3 I/27 road, bridge at Plasy - reg. No. blasting 27-060 over a railway line 8 REINSTATMENT PROJECT OF THE YEAR - Realised in: 2009 - cleaning the structure with 2004 12 a high-pressure waterjet I/43 road, skyway above Hapalova St., reg. No. 43-005 - Realised in: 2003 - 2004 4 I/42 road Brno - Žabovřesky, bridges reg. Nos. 42- complete reconstruction of prestressed 002.1,2 and 42-002A.1,2 C217 structure underpass at Luční St. incl. post-tensioning; complete - Realised in: 2009 substructure reinstating, fixing of cavities - concrete spraying on the underpass ceiling in trusses; complete bridge superstructure and a new noise barrier 12 I/52 road Brno - Rajhrad, bridge reg. No.52-011 on III/15275 road - Realised in: 2009 - view of the reinstated structure Bridge reg. No. 122-008, Bechyně - Realised in: 2004 - view of the structure under repair II/602 Helenín - bridge reconstruction, reg. No. 602-042 - Realised in: 2008 - view of the reinstated structure Repair of bridge reg. No.35-114 in Mohelnice - view of the reinstated structure 11 12 SPECIAL TECHNIQUES 1 4 2 5 6 3 7 8 SPECIAL TECHNIQUES We apply a broad range of special techniques for reinstatement work. Thanks to newly developed materials, grouting is becoming an ever more popular technique for structure reinstatement, the purpose of which can be strengthening, stabilization or stopping water seepage and thus preventing further structural degradation. Types of work we offer: - grouting with activated cement-based suspensions (grouting of cable conduits in post-tensioned concrete, caverns, nests or cracks in concrete structures, grouting porous stone or brick masonry) - vacuum re-injecting with activated cement suspensions (applied predominantly in reinstating of non-grouted cable conduits and/or anchors, if incomplete grouting of cable conduits or other structural parts detected) - grouting with epoxy, polyester or acrylic resins (filling in caverns, fixing cracks in concrete structures or masonry using high-pressure grouting of low-viscosity, high-strength and high adhesion-to-base materials) - application of plastic-mortar into confined spaces using the injecting method (filling in caverns, applying layers of plastic-mortar under bridge bearings) - grouting with elastic polyurethane resins and acrylic gels (to stop water seepage into the structure or if active (i.e. moving) joints need to be grouted) - structural fault diagnostics, diagnostic surveys using an endoscope - designs 9 10 11 12 13 Legend Telč - bridge reg. No. 40610-2 - Realised in: 2006 1 - concrete application using the dry-spray method - bridge before and after adding a thin shell 2 of 3 sprayed concrete, grouting with metacrylate gel and painting with insulation crystallisation-based material 15 14 4 Project 0807/II, border bridge, D8 motorway Prague - Ústí nad Labem - Realised in: 2005 - 2006 - the bearing after bottom-grouting with plastic-mortar 16 5 I/48 road, Nový Jičín - Estakáda reg. No. 48 – 016 - Realised in: 2005 - 2007 - blasting the structure underside with wet sand 11 6 I/43 road, skyway over 7 Hapalova Street, Brno, reg. No. 43-005 - Realised in: 2003 - 2004 - exposing anchors of the original tensioning 8 system, 9 diagnosing the anchor areas and prestressing wires with an endoscope 12 - vacuum re-grouting of the original cables 13 with activated cement mortar 10 I/35 road, Olomouc, bridge reg. No. 35-145-3 - Realised in: 2010 - view of an exposed non-grouted longitudinal prestressing cable Reconstruction of the Břeclav railway hub, project 1. Bridge at km 82.467 - Realised in: 2009 - 2010 - view of grouting hoses installed in a bearing block construction joint THE BRIDGE OF THE YEAR 2003 Chrlice, bridge at km 8.172 on the Brno - Přerov line - Realised in: 2003 - grouting the stonework substructure with activated cement mortar 14 Bridge reg. No. 122-008, Bechyně 15 - Realised in: 2004 16 - chemical grouting of cracks and pockets with epoxy resin, view of a test-drill core drilled out after grouting 13 UTILITY LINES AND SEWER TREATMENT PLANTS 1 2 3 4 5 UTILITY LINES AND SEWER TREATMENT PLANTS 6 7 The Utility Line Department established in 2001 further developed the activities previously performed in the area of water engineering and utility lines. It specialised predominantly in building water supply systems and tanks, sewer systems, sewage treatment plants, pipe tunnels, etc. We can install all utility lines using either the traditional trenching or modern trenchless technique. The portfolio of our activities covers everything from repairs and reconstructions of utility lines in urban agglomerations, reconstructions of pavements and organic landscaping to specialised infrastructure projects – constructions of pipe tunnels, etc. 8 11 Legend 9 14 10 10 6 ČD Brno – part 1 of storage sidings, 1 Sewer and WWTP in Březolupy 7 phase I – SO 01-27-07 Sokolova – sewer 2 - Realised in: 2008 – 2009 8 - Realised in: 2008-2009 3 - construction of a sanitary sewer in - construction of a sanitary sewer, DN 600, Březolupy, total length: approx. 1.5 km incl. length: approx. 220 m, depth: up to 7 m, a house connectors and 8 sewer section under the trackage done overflow chambers using the tunnelling method - sewage treatment plant construction and - installation of a pumped storage tank incl. technology installation its technology at a depth of 12 m 4 Reconstruction of Husova and Pekařská 11 5 streets, Brno 9 I/55 road Veselí nad Moravou - Petrov, - Realised in: 2008-2009 Rohatec - Lužice, the Veselí n.M. - Petrov - lining the existing sewer with SKL NC part 680/1050 (length: 455 m) and 600/900 - Realizace : 2008 (length: 192.5 m) - construction of a sanitary sewer in Petrov, total length: approx. 0.5 km, incl. installation of 22 inspection manholes and construction of house connectors Dyje River catchment protection, partial project C – Šlapanicko region Construction No. 10B, sewer in Podolí - Realised in: 2005 - 2006 - construction of a sanitary sewer in Podolí u Brna, total length: approx.. 4.5km, construction of house connectors, restoration of roads and pavements I/42 road Brno, flyover crossing on ring road at Hlinky, water line undercrossing - Realised in: 2004 - 2006 - construction of a reinforced concrete pipe tunnel for a DN 500 water line in an open trench stabilised by jet grouting NOISE BARRIERS 2 1 4 5 3 6 NOISE BARRIERS Noise barriers have become an integral part of the landscape as an element limiting the effects of noise pollution generated predominantly by road and rail traffic. We have been building all types of noise barrier systems - whether noise absorbing or noise reflecting - for many years. 7 8 9 10 11 12 15 Legend 1 Noise barrier on the D1 motorway at 2 km 146.711 next to bridge reg. No. D1-181 - Realised in: 2009 - new reflective noise barrier, a separate 3D steel latticework of 3 bays glazed with tinted PPMA fixed in aluminium frames, height: 4.0 m, length: 61.5 m, weight: 15.9 t 3 Noise barrier on the bridge over the Bečva River near the Přerov power plant - Realised in: 2007 - transparent reflective noise barrier on the "U ELEKTRÁRNY" bridge, HEA 160 posts, glazed with 15-mm-thick tinted PMMA, length: 90.6 m 6 Noise barrier on the D1 motorway, 7 Troubsko, km 186.060 at the D1-223 bridge - Realised in: 2007 - production of posts and latticework, length: 42.5 m, weight: 8.6 t, area: 217 m2 12 Noise barrier on Novoměstská St., Brno - Realised in: 2007 - new noise barrier combining an absorbing lower section and a reflecting upper section. The lower section is consists of noise-absorbing panels made of recycled DSH plastic. 8 Noise barrier on the bridge at km 152.402 of the Hrušovany - Brno line, part 1, Brno13 Horní Heršpice storage sidings - Realised in: 2009 - production and installation of posts, wall length: 56.27 m, height: 2.2 m, weight of posts: 2.5 t Noise barrier on the bridge at km 24.539, Krasíkov I, Krasíkov - Česká Třebová line - Realised in: 2004 - noise barrier production and installation, length: 2 × 150 m, height: 2.61 and 2.31 m, weight: 23.7 t, steel 9 Noise barrier on both sides of the D1 14 motorway at km 188.234-189.102, Noise barrier on bridge reg. No. 35-182, Bosonohy, Troubsko Valašské Meziříčí - Realised in: 2010 - Realised in: 2006 4 Noise barrier on Hapalova Street, Brno - new noise barrier, height: 3.5-4.5 m, HEA - noise barrier production and installation, - Realised in: 2004 160 posts, panels of recycled INP plastic left side 442 m, right side 512 m, Plexiglas - noise barrier production and installation, 1952 m2, Replast walls 263 m2, weight: the left bridge. Length: 244 m, height: 3 m, 10 Noise barrier on the bridge at km 52.4 t, steel Replast posts, Plexiglas glazing 34.707 of the Zábřeh - Krasíkov line - Realised in: 2005 Noise barrier on the CZ/D border bridge 15 - production and installation of noise barrier on D8 5 Noise barrier on I/48 road, Nový Jičín, bridge reg. No. 48-016 posts and railing - Realised in: 2006 - Realised in: 2007 - noise barrier length: 2 × 455 m, height: - length: 751 m, Replast walls 364 m2, Noise barrier on the D47 motorway 4.2 m, material: Plexiglas, 20 mm thick 11 2 Plexiglas 2141 m , weight: 45,6 t, steel - Realised in: 2008 - new reflective noise barrier, height: 4.0 m, reinforced concrete posts and panels, panels featuring an absorber of engrained Liapor lacunar concrete 13 14 15 RAILWAY SUBSTRUCTURE AND SUPERSTRUCTURE 1 2 3 4 RAILWAY SUBSTRUCTURE AND SUPERSTRUCTURE 5 6 7 8 Firesta provides a wide range of activities concerning railway substructure and superstructure for the Railway Infrastructure Administration (RIA), the Czech Railways (ČD), public transport companies in different municipalities, and private investors. These activities include: - reconstruction and rehabilitation of tracks and rail switches - medium and large repairs of tracks and rail switches - track and rail switch maintenance - reinstatement of marshy areas - drainage systems for tracks and stations - groundwork incl. environmental damage remediation - abutment and retaining walls - railway crossing structures of all types - platforms - installation of temporary railway bridges of all types - renewal of switch frogs and tongues with an electric arc - in-situ installation of glued, insulated rail joints - manual welding of rails with an electric arc (Innershield method) - various types of metalwork 10 9 Legend 7 Optimisation of České Velenice - Veselí 10 5 Electrification of Zábřeh - Šumperk line 8 nad Lužnicí line, project 1 SO 01-33-11, platform next to the SO 03-16-02, platform and paved station building??, České Velenice areas, Bludov station SO 01-33-12 ŽST island platform, České - Investor: RIA, Olomouc office Velenice - Realised in: 2009 2 Veveří - Šumavská crossing, Brno - Investor: RIA, Pilsen office - Investor: Dopravní podnik města Brna, a.s. - construction of a new island and external - Realised in: 2008 - 2010 - Realised in: 2009 L-type platform without corbel slabs - construction of new island platforms and - track reconstruction on DZP prefab an external L-type platform without sections, incl. the substructure and Modernisation of Červenka Zábřeh 6 corbel slabs bituminous surface railway section SO 35-17-11, pedestrian crossings, Mohelnice station 3 Modernisation of Červenka - Zábřeh na 9 reconstruction of switches Nos. 56, 57 at Brno-Maloměřice station, St.6?? - Investor: RIA, Olomouc office 4 Moravě railway section - Investor: RIA, Olomouc office SO 33-16-02 platform No. 1, Moravičany - Realised in: 2006 station - construction of new pedestrian crossings - Realised in: 2006 SO 33-16-04 platform No. 2, Moravičany to platforms - original switches were replaced by new station UIC60-shaped switches on concrete sleepers - Investor: RIA, Olomouc office - Realised in: 2008 1 Hradecká - Purkyňova, Brno, flyover crossing, tram line extension - Investor: Brněnské komunikace a.s. - Realised in: 2007 - 2008 16 reconstruction of bridge at km 5.872, Český Těšín - Ostrava Kunčice line SO 01, track rehabilitation - Investor: RIA, Olomouc office - realizace: 2009 - track modifications required by the bridge reconstruction 2 3 4 CONSTRUCTION AND RECONSTRUCTION OF ROADS AND PAVED AREAS Construction and reconstruction of roads and streets represent an important part of our activities. We construct roads and their accessories in both urban and rural areas. CONSTRUCTION AND RECONSTRUCTION 1 The portfolio of our activities includes reconstruction and construction of new city roads, footwalks, access roads, parking sites and paved areas. 5 8 6 Legend 1 Reconstruction of Husova and Pekařská 2 streets, Brno - Realised in: 2008-2009 - comprehensive reconstruction of the sewer, tram track, road, footwalks and parking areas 3 Road on Mučednická St., Brno - Realised in: 2006 - reconstruction of road with a total area of approx. 2500 m2, drainage, reconstruction of footwalks and street lighting 4 I/55 road, Veselí n.M. - Petrov, Rohatec – Lužice - Realised in: 2007-2008 - newly constructed I/55 clearway through the village of Petrov incl. subbase rehabilitation and construction of all structural layers 7 Bus stops in the South Moravian 5 Reconstruction of underbridge in Region, interchange terminal stop, Skrchov Modřice, phase II - Realised in: 2006 - Realised in: 2006 - increased headroom by 1 m, construction - construction of interchange terminals in of adjacent paved areas incl. membrane Brno-Modřice for the integrated transport waterproofing and re-routing of utility lines system, construction of parking bays and footwalks, repositioning of utility lines, 6 Construction of Brno-Lesná railway street lighting reconstruction stop - Realised in: 2006 - new platforms for both tracks, total 8 Set of structures at Černovická terasa, phase V, connection to the Řipská length of 170 m, new staircase to the Street existing footbridge, platform lighting, - Realised in: 2004 - 2005 repositioning of - construction of a new bridge, length: utility lines, communication technology 151.20 m, new 843-m-long road, re-routing of optic and low voltage cables 7 17 HEAVY LOAD HANDLING 2 1 3 4 5 6 HEAVY LOAD HANDLING SYNCHRONOUS LIFTING AND LOWERING 7 In 2000, Firesta became the first firm in the Czech Republic to acquire an ENERPAC computer-controlled synchronous lifting system developed specifically for uniform and controlled lifting and lowering of heavy objects. The synchronisation is provided automatically by the computer based on monitored data on the stroke and the load distribution to different hydraulic cylinders. Significant handling time savings and high lifting accuracy (tolerance down to 1 mm) can be achieved with this system. No unwanted stress is introduced in the structures being lifted and the handling process is considerably safer. The raising (lowering) process generates a report that records data on structure's vertical travel (stroke) and on the pressure force in cylinders; the data is recorded in selected intervals. In 2005, the hydraulic technology was supplemented by an ENERPAC hydraulic bar pushing system?? designed for bridge launching. At the beginning of 2010, we extended our technology even further with a new synchronous system and a bar?? pushing system for bridge launching. 8 Legend 9 SUITABLE AREAS FOR THE SYNCHRONOUS SYSTEM APPLICATION lifting (lowering) of bridges including continuous ones, positioning on bearings lifting of buildings and industrial halls lifting and levelling of platforms and crane runways horizontal moving of heavy objects lifting (lowering) of heavy machinery 18 10 1 INFRASTRUCTURE PROJECT OF THE YEAR 4 Reconstruction of railway bridge in Nymburk 8 Reconstruction of bridge at km 5.872, Český 2009 - Investor: Waterway Directorate of the CR Těšín - Ostrava Kunčice line, SO 02 2 Electrification of Šatov - Znojmo railway - Realised in: 2007 - 2008 - Investor: RIA, Olomouc office section incl. PEM (pre-electrification - lifting the steelwork of a railway bridge over - Realised in: 2009 modifications), SO 04-19-01, bridge at km the Labe River. Synchronous lifting a - synchronous raising and lowering of the 99.297 - "Znojemský Viadukt" continuous steelwork (4 spans, length: 4 × main structure consisting of 5-spans of - Investor: RIA, Olomouc office 42 m) by 1.09 m and handling it during the prestressed trusses; weight of each span: - Realised in: 2008 - 2009 bearing replacement. Lifted structure weight: 400 tons. Even bays were lifted and lowered - bridge structure replacement that included 780 tons. by 2.0 m, odd ones by 0.3 m. dismounting the temporary ŽM16 M bridge (four spans, length: 58.5 m, 5 Layout of Enerpac synchronous system 9 ČD Brno - storage sidings, part 1, phase total weight: 710 tons) by longitudinal and its components I, SO 01-19-02, bridge at km 152. 402 un-launching, longitudinal launching the Hrušovany - Brno line new lattice structure (weight: over 920 tons, 6 III/04720 Přerov, U Elektrárny bridge, reg. - Investor: RIA, Olomouc office spans: 50 + 2 × 60 + 50 m) and seating No. 4720, SO - C 201 and C 202 - Realised in: 2008 on the bearings by lowering it by 1.70 m. - Investor: Olomouc Region - longitudinal launch of new steelwork for a - Realised in: 2007 railway bridge over the Břeclav - Brno line D8 motorway, 0807 project , section II, synchronous lowering of a new prestressed and synchronous lowering onto bearings by 3 Knínice - border bridge, structure 217 continuous deck (C 201) of five spans over 1.65 m, respectively by 1.30 m; length: Border Bridge the Bečva River by 0.49 m and its tilting 58.3 m, weight: 290 tons - Investor: Road and Motorway Directorate of into a transverse gradient of 2.50 %. Main the CR structure weight: 2,945 tons, total span: 10 ČD DDC, modernisation of the Červenka - Zábřeh - Realised in: 2005-2006 89.90 m. Synchronous lifting of the existing railway section, SO 33-19-01, bridge at km 56.589 - separate longitudinal launching of the continuous concrete structure (C 202) of five - Investor: RIA, Olomouc office 430-m-long left and right steelwork parts spans and a weight of 1,965 tons by 0.255 m. - Realised in: 2008 into a horizontal curve and a longitudinal - longitudinal launch of two single-track gradient; launched steelwork weight: 1800 7 Optimisation Břeclav - CZ/SK state border continuous steel structures of five spans over tons each, spans: 58.4 + 4 × 73.0 + 58.4 m; railway section, SO 02-19-02, bridge at the Morava River incl. transverse shifting and once longitudinally launched, the steelwork km 1.634 lowering onto bearings by 2.20 m; steelwork was lifted from the supports for removing - Investor: RIA, Olomouc office length: 104.90 m, weight: 2 × 300 tons - Realised in: 2006 the sliding blocks and for seating on bearings. - longitudinal launch of two single-track steel bridges over the Dyje River incl. transverse shifting and lowering onto bearings; steelwork weight: 560 tons each 2 3 4 TEMPORARY BRIDGES AND SUPPORT STRUCTURES Heavy skruž??. ŽBM 30 elements, PIŽMO pier Temporary bridges The formwork structure needs to be supported by a ?? when forming in-situ cast decks of concrete bridges. Firesta owns components of a ŽBM 30 dismountable railway bridge and of dismountable PIŽMO piers. We can cover the whole process from designing working drawings to the installation of heavy skruže?? . These components provide for building bridge trusses up to a span of 30 m without intermediate supports; this is why they are so widely used. Firesta is equipped with MS and TMS-type temporary bridges for provisional bridging of general road traffic or for providing access to the building site over obstacles (water streams, roads, railways, underground projects under construction, etc.). 5 TEMPORARY BRIDGES AND SUPPORT STRUCTURES 1 6 Legend - support structure made of the Pižmo pier 6 III/40819 Znojmo - Hradiště, bridge 1 II/421 Zaječí, bridge reg. No. 421-010 system components enabling transverse reg. No. 40819-1 over a railway track shifting of the original steelwork and of - Investor: South Moravian Region - Investor: RMM, South Moravian Region the new composite steel-concrete bridge - Realised in: 2008 - Realised in: 2009 structure. - temporary 27-m-long MS bridge - support structure made of the Pižmo pier positioned above a new bridge element system components and of custom-type being built elements for longitudinal launching of the 4 Electrification of the Šatov - Znojmo railway section incl. PEM, SO 04-19-01, bridge steelwork including a 7 ČD DDC, modernisation of the bridge at km 99.297 - Znojemský steel-concrete composite deck 8 Červenka - Zábřeh railway section, SO Viadukt - Investor: RIA, Olomouc office 33-19-01, bridge at km 56.589 2 ČD Brno - storage sidings, part 1, - Realised in: 2008 - 2009 - Investor: RIA, Olomouc office phase I, SO 01-19-02, bridge at km - temporary MS bridge over the Dyje River; - Realised in: 2008 152.402 Hrušovany - Brno line - temporary MS bridge over the Morava - Investor: RIA, Olomouc office two spans: 21 + 24 m, intermediate Pižmo River, four spans: 21 + 3 × 15 m, - Realised in: 2008 pier supported by the Pižmo pier system - support structure made of the Pižmo pier system components, of IP beams and 5 III/04720 Přerov, C 201, U Elektrárny of custom-type elements for longitudinal bridge reg. No. 4720 launching of the bridge structure - Investor: Olomouc Region - Realised in: 2006 - 2007 Optimisation of Stříbro Planá - support skruž?? of ŽBM 30 components 3 u Mariánských Lázní line, SO 60-38-04, and a Pižmo pier for concreting the bridge railway bridge at km 405.932 main structure - Investor: RIA, Pilsen office - Realised in: 2009 7 8 19 INSULATION WITH BITUMINOUS STRIPS, TARCO ELASTIC BRIDGE JOINTS 2 4 6 7 8 9 INSULATION WITH BITUMINOUS STRIPS, TARCO ELASTIC BRIDGE JOINTS INSULATION WITH BITUMINOUS STRIPS We have been installing sealing-strip insulations in infrastructure projects since 1997. Our company features an expert team of insulation installers among our own staff. We use only those water-proofing systems for railway bridges or passenger tunnels that hold a Certificate of Compliance with the terms and conditions of Czech Railways (ČD). Waterproofing of railway bridges is performed in accordance with TNŽ 73 6280. We apply only those water-proofing systems for road bridges that have been approved by the Czech Ministry of Transport. Bituminous sealing strips are melted onto a concrete deck previously treated with sealing coating, fixing/ impregnation coating or penetration/adhesive coating. We insulate road bridges in accordance with the requirements of ČSN 73 6242 and TKP Legend 20 3 5 10 1 D1 motorway Mořice - Kojetín, SO206, motorway bridge over Vlčidolka Creek - Realised in: 2009 - waterproof insulation with PARAPLAST MPV S55-15 LA bituminous strips on a Mastertop P605 sealing coat; insulated area: 2,400 m2 1 9 I/69 bridge reg. No. 69-007 over the 4 Tarco elastic bridge joint Sirákovka Creek in Liptál 5 - detail of the inserted anti-adhesion tape; - detail of filling, first layer - Realised in: 2007 - Tarco elastic bridge joint 6 D47motorway, structure 4704, Lipník 7 nad Bečvou, SO 203, bridge at km 91.854 10 Rerouting of the I/6 road Prague Pavlov, SO 201, 202, 204, 208, 209, 213 - Realised in: 2008 - Realised in: 2006-2008 - waterproof insulation with Elastbridge - waterproof insulation with PARAPLAST 50 Universal bituminous strips applied 2 Bridge reg. No. 399-002 over Dalešická MPV S55-15 LA bituminous strips applied on Mastertop P605 sealing coating; total Přehrada lake 2 on Mastertop P605 sealing coating; insulated area: 1,000 m - Realised in: 2009 insulated area: 8,900 m2 - waterproof insulation with PARAPLAST MPV S55-15 LA bituminous strips applied 8 Říčany railway station, SO 03-20-02 on Mastertop P605 sealing coating; passenger tunnel at km 164.665 insulated area: 2,700 m2 - Realised in: 2008 - waterproof insulation withTeranap 431TP + Parafor Solo bituminous strips applied 3 SO 42-19-09, Zábřeh - Hoštejn, railway on Siplast Primer penetration coating; bridge at km 34.707 insulated area: 1,000 m2 - Realised in: 2004 - 2006 - waterproof insulation with MISTRAL C melted bituminous strips – chapter 21 - waterproofing. TARCO ELASTIC BRIDGE JOINTS Firesta has been installing TARCO elastic bridge joints since 1994. The elastic bridge joint (hereinafter EBJ) is a joint in the form of an elastic material strip (TARCO binding agent and aggregates) adhesively connected to the adjacent road layers and to the base and forming the road surface at the same time. Thanks to its deformation characteristics, EBJ is capable of absorbing movements of the bridge structure. EBJs are used to absorb horizontal expansion movements of up to 50 mm, and in some exceptions to 70 mm. They are used for new as well as reconstructed bridges. 1a 4 DIRECTLY DRIVEN OR WALKED SPRAYED INSULATION 1 3 2 5 6 DIRECTLY DRIVEN OR WALKED SPRAYED INSULATION POLYURETHANE INSULATIONS We have been applying sprayed polyurethane insulations since 2002. The waterproof layer is formed by a sprayed polyurethane-based seamless insulation membrane. The membrane is hot-sprayed by a machine on a previously applied fixing/impregnation coating of epoxy resin and spreading. Firesta owns the necessary spraying equipment for the insulation membrane forming. The two polyurethane components are hot-mixed in the nozzle. The insulation membrane hardens within 15-25 seconds and is then walkable. This insulation system features higher resistance to mechanical damage, higher dilatability, higher capacity of crack bridging and adhesion to the base material than traditional systems using melted bituminous strips. Other benefits include easy application in complicated detailed shapes, single-piece membrane with no visible joints and chemical resistance. The system is approved for use on both road and railway bridges. If used for Czech Railway bridges, it features the added benefit of direct pouring the railway bedding without any protective layer on the membrane. DIRECTLY DRIVABLE AND WALKABLE INSULATION Firesta has been applying TARCO QUBIK NTF drivable (walkable) insulation since 1994. This epoxy-based material has been developed in the laboratories of TARCO VEJ A/S, Denmark as a waterproof insulator resistant to mechanical stress on the structure surface and thus capable of substituting for the road surface on bridges with class III, IV, V, or VI traffic load. 7 8 9 10 Legend 1 Vestec - Lahovice, SO 206 - bridge over the 5 Říčany railway station, SO 03-20-02 Vltava River passenger tunnel at km 164.665 - Realised in: 2008 - Realised in: 2009-2010 - walkable insulation applied using the - insulation sprayed with the Sikalastic 2 Conipur M800 system; 821LV system; insulated area: 8,450 m insulated area: 360 m2 detail of drain inlet insulation 1a 9 D1 Mořice - Kojetín, SO206, motorway bridge over the Vlčidolka Creek, drainage channels - Realised in: 2009 - treatment of drainage channels with Tarco Qubik NTF; insulated area: 200 m2 2 THE INFRASTRUCTURE PROJECT OF 3 THE YEAR 2009 Šatov - Znojmo, SO 04-19-01, bridge at km 99.297 - Realised in: 2009 - insulation applied using the Conipur M800 system; insulated area: 2,044 m2 10 BRIDGE OF THE YEAR 2003 Bridge over Brněnská Přehrada lake at Veveří Castle - Realised in: 2003 - Tarco Qubik NTF walkable insulation; insulated area: 400 m2 4 Letohrad – Lichkov, SO 02-19-17, bridge at km 97.018 – tubosider - Realised in: 2008 - insulation applied using the Conipur M800 system; insulated area: 215 m2 6 Brno storage sidings, SO 01-19-02, 7 bridge at km 152.402 - Realised in: 2008 - insulation applied using the Conipur M800 system; insulated area: 415 m2 8 Reconstruction of footbridge at the Krakow-Prokocim railway station, Poland - Realised in: 2008 - walkable insulation of the Sikalastic 821LV system: total insulated area: 450 m2 21 STRUCTURE PRESTRESSING AND STRENGTHENING 1a 1b 1 2a 2b 3 4 5 6 7 8 STRUCTURE PRESTRESSING AND STRENGTHENING 9 10 11 12 Firesta has been prestressing and strengthening building structures since 1997. In co-operation with Germany's BBV Vorspanntechnik GmbH, we introduced the globally recognised BBV prestressing cable system to the Czech market in 2008. This system holds the ETA – 05 / 0202 European technical approval issued by Deutsches Institut für Bautechnik in conformance with ETAG 013 "Post Tensioning Kits for prestressing of Structures" guideline. We offer: - a certified system approved in accordance with ETAG 13 - prestressing of bridge structures with or without the mechanical bond - possibility of using usměrněného?? cables - possibility of increasing the stress to the system in the future - possibility of metering the prestressing forces with sensors positioned at any point of the cable length - strengthening bridge structures with unbonded cables - securing and reinforcing structures by introducing pre-stress with Monostrand cables (reinforcing of bridges, foundation strips, structural securing of brick or other masonry in civil engineering or infrastructure projects) - structural securing and strengthening of construction with carbon-fibre lamellae and fabrics - drilling and cutting with diamond-blade tools (high-accuracy pound-free drilling of concrete, stone or bricks, diameter up to 300 mm, length up to 10 m) - structural diagnostics, designing, stress analysis calculations Legend 13 14 22 - Realised in: 2008 3 I/42 road, Brno, bridge on Korejská 1 I/48 road Nový Jičín - Estakáda - structural strengthening with Monostrand reg. No. 48 - 016 4 Street over the city ring road cables led on the structure - Realised in: 2005 - 2007 - Realised in: 2008 - 2009 underside - structure post-tensioning - strengthening the structure with external cables running freely in bridge tunnels; the 13 - installation of cable sleeves Monostrand cables have been anchored with a - anchor prestressing, BBV L 7 and L 19 anchors 9 I/21 Nová Hospoda - Kočov system enabling later increases in prestress used 10 - Realised in: 2009 - 2010 - structure post-tensioning . The newly introduced forces were - view of the structure metered with EM sensors. 5 Bridge reg. No. 4468-4 in Štěpánov - the prestressing process - Realised in: 2008 1a - computer animation and description of - structure post-tensioning the repair scope BBV L12 anchors tunnel and cable sleeves 1b 11 Town hall tower in Vyškov - Realised in: 2000 - structural securing of the leaning tower 2 Reconstruction of bridge at km 5.872, 6 I/42 road, Brno, city ring road, by bracing with Monstrand cables Český Těšín - Ostrava Kunčice 7 Dobrovského St., bridge on H3 and H4 ramps over a roundabout - Realised in: 2009 - Realised in: 2009 - view of the strengthened structure, 12 I/56 Ostrava, bridge on Místecká St. - structure post-tensioning the strengthening Monostrands are 13 over Ostramo - view of cable prestressing process hidden under 14 - Realised in: 2009 - structure post-tensioning - view of cable channels prior to concreting an envelope of sprayed concrete 2a - view of Monostrand installation - view of prestressing cables being moved 2b - angular drilling in gaps between trusses inside the formwork 8 II/602 Helenín - reconstruction of - view of the bridge front face bridge reg. No. 602-042 2 CIVIL ENGINEERING AND INDUSTRIAL PROJECTS 1 2 3 4 5 CIVIL ENGINEERING AND INDUSTRIAL PROJECTS Since 2007, we have been building halls and other industrial buildings and constructing/ reconstructing special concrete structures such as dynamically stressed foundations for rotary machines. We also build community buildings and reconstruct historical buildings in both the Czech Republic and abroad. 6 7 8 11 9 Legend 1 Heightening and reconstruction of an 2 office building on Mlýnská St., Brno - Realised in: 2007 - addition of the 10th floor featuring a glazed conference hall and office rooms; reconstruction of the whole building consisting of new façade cladding, new lifts, new sanitary facilities and new airconditioning 3 New 660MW power source in the Ledvice power plant, OB06, gas control station - Realised in: 2008 - all structural work on the control station 4 Strapa Mix office and service building 5 - Realised in: 2008 - 2009 - construction of a in-situ cast frame, masonry, plastering, utility service lines, central heating, HVAC, I&C, window cladding incl. finishing work 6 Arboreum apartment building in Žilina, Slovakia - Realised in: 2007 – 2008 - two seven-floor buildings (92 flats) interconnected with single-floor garages 10 FIRESTA hall in Modřice - Realizace: 2007 - 36 × 60 m steel warehouse, rack system with a storing capacity of 400 pallets and 1500 linear metres of shelves 7 Comprehensive renovation of the Tušimice 11 reconstruction of the Šatov railway station building 8 II power plant, OB5 construction part - Realised in: 2007 - 2010 - Realised in: 2009 - 2010 - demolition of the original foundations for rotary machines and construction of new ones, disassembling old steelwork, installation of new steelwork, replacement of anchor bolts, reconstruction of hot-water piping for the city of Kadaň 10 9 KRAMPE CZ hall, Ostrovačice - Realised in: 2008 - main structure, specialised crafts and finishing work, external areas and paved surfaces 23 TRANSPORT AND MECHANISATION 3 1 5 2 4 6 TRANSPORT AND MECHANISATION 7 8 9 Our logistic centre is located in Modřice and includes the Transport and Mechanisation Department and warehousing facilities. The Transport and Mechanisation Department was established in 1994. The reason for its establishment was the company's dynamic growth requiring equipment for specific types of work and transport. The original number of vehicles has more than doubled since the centre's founding. The Department is supplemented with additional vehicles, machines and specialised technology every year. It provides its services both internally for Firesta and for external customers in the event of free capacity. The Transport and Mechanisation Department's staff has many years of experience with railway construction projects. They can handle commitments during lockouts, under extreme conditions, at night, etc. The Department's staff are regularly retrained and given physicals for their work - as required by regulations. 10 Legend The Department participated in construction/ reconstruction of road bridges on Vídeňská St. in Brno, in Židlochovice, on Dobrovského St. within the city of Brno ring road, and on numerous railway projects such as the construction of the Brno storage sidings, railway corridors in Tábor, Břeclav, Votice u Benešova and others. Our machinery has been used for constructions of utility lines in Podolí u Brna, Hlinky St. and Sokolova St. in Brno, for the construction of a STP and a sewer in Březolupy and Šumvald. Our special-purpose machines have worked on water management projects, ameliorations and cleaning/improvements of rivers. Since 2003, our Department provides winter road maintenance for the South Moravian Road Maintenance and Management (RMM) office. We are equipped with all the necessary technology for these types of activities. The warehouse provides centralised stocking of building materials, small machinery, construction components and standardised formwork. All of our teams are equipped with all applicable hand-held tools, compressors, Diesel power generators, compactors and other technology thanks to which we are able to guarantee a smooth workflow. We have the following vehicles and machines available: 1 Slope dressing with a Menzimuck walking digger 6 Telescopic manipulator applicable in both warehouse and construction projects TRUCK CRANES capacity: 20 t, reach: 28 m Locust L 752 skid-steered loader - shovel, pallet fork Demag AC 40-2 capacity: 40 t, reach: 46 m Takeuchi TB35 mini-digger - shovel: 30-80 cm, demolishing hammer capacity: 4 t, reach: 30 m CAT 428 tractor digger - shovel: 40-80 cm, pallet fork Liebherr 312C wheel digger - shovel: 80-125 cm, slope grader Liebherr 314C wheel digger - shovel: 60-125 cm, slope grader, claw: 600 mm Liebherr 900C wheel digger - shovel: 80-125 cm, slope grader, Atlas demolishing hammer (weight: 1 t) Menzimuck A71 walking digger - shovel: 60-80 cm, slope grader Atlas 1604 railroader digger - shovel:60 cm, slope grader, claw Atlas 1404 railroader digger - shovel:60 cm, slope grader, claw The Transport and Mechanisation 2 Department site 7 Salt/grit sprayers for road maintenance Bridge construction on a railway 3 corridor 8 Reconstruction of a bridge over the Hapalova St., Brno Liebherr 32TT 9 Construction of a bridge destroyed by a flood, Šťáhlavice u Plzně Tatra 815 S3 4 Liebherr 32TT tower crane Bridge construction on D11 motorway, 5 Libice nad Cidlinou 10 Demag truck crane TOWER CRANES TIPPER TRUCKS 24 Phone: Fax: e-mail +420 547 357 049-50 +420 547 357 050 [email protected] capacity: 12 - 16 t PLATFORM TRUCKS MAN 12.180 capacity: 5 t; hydraulic loader - capacity: 1.5 t, reach: 6 m Liaz 18.29 capacity: 8 t (tandem 21 t), hydr. loader - capacity: 2.5 t, reach: 6 m Tatra 815 capacity: 12 t (tandem 24 t), hydr. loader - capacity: 4 t, reach: 12 m MAN 26.460 capacity: 13 t (tandem 25 t), hydr. loader - capacity: 4.5 t, reach: 12 m CONTACTS Transport and Mechanisation Department Brněnská 681 664 42 Modřice DIGGERS Tatra AD 20 WHERE TO FIND US WHERE TO FIND US Sídlo firmy Odštěpné závody a střediska PRAHA BRATISLAVA SVITAVY K Bohemia branch Prague centre Weilova 2e, 102 23 Praha 10 Phone: +420 267 215 931 Fax: +420 267 215 931 e-mail [email protected] Bohemia branch Pilsen centre Uhelná 541, 330 03 Chrást u Plzně Phone: +420 377 945 487 Fax: +420 377 945 487 e-mail [email protected] Organisational unit for Slovakia V záhradách 17, 811 02 Bratislava Phone: +421 650 400 610 Fax: +421 254 415 033 e-mail hejtmanek@ firesta.sk Phone: Steelwork Department Křižíkova 68, areál KSB, 660 90 Brno Transport and Mechanisation Department Brněnská 681, 664 42 Modřice D R V 37 3 Svitava 374 3 PŘÍZŘENICE EXIT 3 CHRLICE 370 E5 2 43 2 Moravany DOLNÍ HERŠPICE Pod 1 Bedřichovice EXIT 196 BRNO-JIH BRNĚNSKÉ 38 IVANOVICE 0 2 Tuřany LKTB HOLÁSKY 6 OLOMOUC, OSTRAVA 373 EXIT 203 BRNO-VÝCHOD SLATINA 5 2 Nebovidy Nebovid 374 2 642 41 PRAGUE 23 4 EXIT 194 BRNO-CENTRUM ý potok T 4 430 EXIT 201 BRNO-SLATINA HORNÍ HERŠPICE Šlapanice Brno Tuřany Dvorska Kobylnice 4 Hajany Želešice 3 [email protected] Bobrava BOHUNICE 7 e-mail ce 50 ČERNOVICE Ořechov BOBRAVA CHRLICE Modřice Sokolnice Bobrava Popovice VIENNA 5 3 +420 596 136 165 řelice KOMÁROV 0 38 +420 596 136 057 Fax: Ostopovice 2 TRNITÁ 8 Phone: STARÝ LÍSKOVEC LÍŠEŇ ŽIDENICE ŠTÝŘICE 602 1 EXIT 190 BRNO-ZÁPAD VINOHRADY 3 42 D2 3 Ostrava branch Palackého 105, areál ČD 702 00 Ostrava Company headquarters at Mlýnská 68, Brno oubsko Brno - Příkop Špilberk 3 E461 DIRECT CONTACTS ky 8 ro ub sk www.firesta.cz STRÁNICE PISÁRKY NOVÝ LÍSKOVEC H 424 642 ZÁBRDOVICE VEVEŘÍ Bosonohy MALOMĚŘICE Hády Černé Pole 42 http//: ČERNÁ 642 POLEBrno - 1 [email protected] ŽABOVŘESKY Svitava e-mail HUSOVICE 5 2 +420 543 532 232 JUNDROV 1 BRNO Žebětín LESNÁ 42 1 tka 3 fax 640 KOMÍN Svra Vrbovec 640 +420 - 543 532 231, 233 Bílovice nad Svitavou5 6 OBŘANY 1 Phone to secretary's office SADOVÁ KRÁLOVO POLE Říčka V 384 4 BYSTRC FIRESTA-Fišer, rekonstrukce, stavby a.s. Mlýnská 68 602 00 Brno, Czech Republic 5 MEDLÁNKY Medlánky 383 Řícmanice LKCM KNÍNIČKY COMPANY HEADQUARTERS Soběšice Pon ávka ŘEČKOVICE R RADKA A 3 9 Vodní nádrž Brno BŘECLAV, BRATISLAVA +420 532 041 038, 039 e-mail [email protected] Phone: +420 547 357 049, 050 Fax: +420 547 357 050 e-mail [email protected] 25 FIRESTA-Fišer, rekonstrukce, stavby a.s. Mlýnská 68, 602 00 Brno, Czech Republic Phone: +420 - 543 532 231, 233 Fax: +420 - 543 532 232 E-mail: [email protected] www.firesta.cz
© Copyright 2026 Paperzz