CHINA LAO PEOPLE'S DEMOCRATIC REPUBLIC NAM THEUN 2 HYDROELECTRIC PROJECT VILLAGES TO BE RESETTLED POWER PLANT SELECTED CITIES PROTECTED WILDLIFE CORRIDORS 500 kV TRANSMISSION LINE QUARRY MAJOR ROADS PROTECTED AREAS 115 kV TRANSMISSION LINE UNDER CONSTRUCTION HEADRACE CHANNEL RIVERS HEADRACE TUNNEL PROVINCE BOUNDARIES BRIDGE INTERNATIONAL BOUNDARIES 12 INTAKE STRUCTURE ROADS TO BE UPGRADED UNDER THE PROJECT Gulf of Tonkin LAO PEOPLE’S DEM. REP. IMPACT ZONES (SEE LIST*) DOWNSTREAM CHANNEL TUNNEL VIETNAM MYANMAR IMPACT ZONES AND KEY FEATURES (as of March 9, 2006) DOWNSTREAM CHANNEL CHINA Vientiane Area of Map THAILAND ROADS TO BE RE-ROUTED UNDER THE PROJECT P R O V I N C E Na m 4B Gulf of Thailand Gn o u a ng Lak Sao (Khamkeut) n 4C Phou Phako quarry (Phou Pha Penh limestone rock outcrop) N A Access Road to Nakai Dam Site Phou Hin Poun Nakai Nam Theun Corridor T Ph ao 4A I E Nam Theun Hinboun Hydropower Facility (operational) V Na m h T eu CAMBODIA Andaman Sea B O L I K H A M S AY M Existing Access Road to Nakai Dam Site n o Nakai Dam 2A Nakai Nam Theun National Protected Area eu Th am PROTECTED AREA 2A oy Na m N NATIONAL N Na m t Xo M n PHU HIN POUN m Na Ban Thalang Bridge Thalang Na m Th Nong Boua eu Kham n Sop Phene Hat Khamphane Nakai Tai Nakai Neua Saddle Dam 12B 1A Oudomsouk (Nakai) 5 Intake Structure Me gR ive r Done 3A 1B 500 kV & 115 kV Substations Ka Oy Nakai Nam TheunHin Nam Nor Corridor Headrace Tunnel Y Khone Khen Na Downstream Channel Gnommalat Regulating Pond and Dam Na m K m On th a A g an T H Nam Theun 2 Power Station kon Headrace Channel Sop Ma Keng Gnao Nong Boua Phonesavang Boua Ma Sop On an g Rerouted 8B Na m 8B I L A X e B ang Na Fai hit D 3B 3C 8B mP N Downstream Channel Tunnel 12 IMPACT ZONES: 3H HIN NAMNO NATIONAL PROTECTED AREA Mahaxai 1 - PLATEAU IMPACT ZONE 1A - INNUNDATION AREA 1B - RESETTLEMENT AREA Thakek Thakek 115/22 kV Substation (future) 2 - NAMTHEUN WATERSHED 2A - PROTECTED AREAS 5 3D 3 - DOWNSTREAM OF POWERHOUSE 3A - POWER STATION 3B - DOWNSTREAM CHANNEL 3C - NAM KATHANG 3D - UPPER XE BANG FAI 3E - MIDDLE XE BANG FAI 3F - LOWER XE BANG FAI 3G - TRANSMISSION LINES 3H - ROAD TO THAKHEK Xe Ban g Fai P R O V I N C E 3E 3F 5 Mekong River 4 - DOWNSTREAM OF DAM 4A - NAMTHEUN DOWNSTREAM TO THEUN HINBOUN HYDROPOWER PROJECT 4B - DOWNSTREAM OF THEUN HINBOUN HYDROPOWER PROJECT 4C - LAK SAO ROAD K H A M M O U A N E 5 - MEKONG RIVER S AVA N N A K H E T 3G 0 5 10 15 20 25 P R O V I N C E KILOMETERS MARCH 2006 500 kV Mekong Crossing Savannakhet 500 kV Substation (future) IBRD 34163R This map was produced by the Map Design Unit of The World Bank. The boundaries, colors, denominations and any other information shown on this map do not imply, on the part of The World Bank Group, any judgment on the legal status of any territory, or any endorsement or acceptance of such boundaries.
© Copyright 2025 Paperzz