Roof pitch at 25 degrees decra roofing 150x50mm thick trussed ra

Roof pitch at 25 degrees
decra roofing les on 50x38mm baens at 450mm c/c
150x50mm thick trussed raers on
150x50 mm thick wall plate all to S.E's detail
1000mm high Parapet wall with 50mm coping
stone to detail.
Guter
1,000
17700
kitchen
yard
2,400
LOBBY
250
dsq
11800
4TH FLOOR
300
kitchen
yard
LIFT
2,400
300 250
2,400
dsq
8850
3RD FLOOR
LIFT
LOBBY
5900
2ND FLOOR
kitchen
yard
2,400
300
kitchen
yard
dsq
sliding door to detail
LOBBY
250
kitchen
yard
LIFT
dsq
LIFT
LOBBY
kitchen
yard
dsq
2950
First floor
40mm thick floor finish 150mm
r.c. slab
on 1000 gauge dpm on
50mm blinding & antermite treatment
600x200mm thick rc strip foundaon
and columns to structural engineer's details,
depth to be decided on site.
LIFT
LOBBY
1,200
2950
First floor
14750
5TH FLOOR
250
5900
2ND FLOOR
LIFT
300
8850
3RD FLOOR
LOBBY
2,400
11800
4TH FLOOR
dsq
550
14750
5TH FLOOR
2,425
475
250
17700
250mm R.C slab to S.E's specificaons
150
50
90 x 85mm moulded
hardwood handrail
2,600
16
17
18
300
150
50
300
150
50
300
150
50
300
150
300
50
1,960
200
200
50
50
200
50
15
14
13
UP
12
11
10
9
8
7
6
5
4
3
200 200 200
2
1
200 200 200
grano finished treads
and risers to details
Treads= 278mm
Risers= 164mm
LANDING
DOUBLE WALL FOOTING
5,000
STAIRCASE
NAME:
MUTINDA SAMUEL
REG NO;
B76/0504/2008
STRUCTURAL WORKS
GENERAL NOTES
1.All black cotton soil to be removed from all the building plinth. All building to
1.All dimensions are to checked on site before commencement of any Work
be clear of black cotton soil to a distance of 3M.
2.All dimensions are in millimeters unless otherwise specified.
MBITHI CIVIL WORKS
2.All basement columns to be provided with angle iron protection 150mm high.
1.All soils under the slabs and around external foundation are to be treated for termite control. 3.All paved surfaces to be clear of black cotton soil to a distance of 500mm
2.All soils on cut embarkments to be stabilized. slope not to exceed the natural angle of repose. outside the edge of the surfaces.
4.Refer to structural engineer's details for all R.C works.
3.All slabs at ground level to be poured over 1000gauge polythene sheeting on 50mm blinding
5.Foundation depth to be determined on site to S.E approval.
on hardcore.
50 x50mm decorative
moulded hardwood balusters
at 150mm centres
150mm thick suspended
slab to S.E's details
150mm wide waist
plastered and painted
to approval
STAIR DETAIL
Revisions
Date Description sign PROJECT TITLE:
Apartment development
DRAWING TITLE:
Section details
SITE;
NGARA.
CHECKED BY;..............................
DATE:
30TH MAY, 2012
SCALE:
1:100
UNITS:
MM
DRAWING NO.