ASHLAR 2 3 chalk line 3 chalk line 1 8 5 1 4 7 6 chalk line 2 INSTALLATION DIRECTIONS: Begin the installation by following Shaw’s Installation Guidelines for Site Conditions and proper Floor Preparation. The starting point in a modular installation must be as near to the center of the room as possible and must be positioned to utilize the largest perimeter cut module size. Snap a chalk line parallel to one major wall bisecting the starting point. It may be necessary to offset the center chalk line to assure perimeter modules will be at least half size. A second chalk line must be snapped from the starting point at 90° to the first line and a third chalk line must be snapped at 18" apart from the first chalk line. Test a dry-install of one section for pattern layout and placement. Starting in one quadrant, place tiles in the ashlar pattern illustrated by the numbers above. Flow into the opposite quadrant, continuing the ashlar pattern. Directional arrows are featured on the back of the tile. Numbers within the arrows are for manufacturing purposes and are not related to installation. For more information on installing 18X36 including an instructional video visit shawcontractgroup.com or call 877.502.SHAW BRICK 8 4 6 2 3 9 1 7 5 chalk line 1 chalk line 2 chalk line 3 INSTALLATION DIRECTIONS: Begin the installation by following Shaw’s Installation Guidelines for Site Conditions and proper Floor Preparation. ➊ The starting point in a modular installation must be as near to the center of the room as possible and must be positioned to utilize the largest perimeter cut module size. ➋S nap a chalk line parallel to one major wall bisecting the starting point. It may be necessary to offset the center chalk line to assure perimeter modules will be at least half size. ➌A second chalk line must be snapped from the starting point at 90° to the first line and a third chalk line must be snapped at 18" apart from the second chalk line. ➍T est a dry-install of one section for pattern layout and placement. ➎ Starting in one quadrant, stagger tiles in the brick pattern illustrated by the numbers above. ➏ Flow into the adjacent quadrants, keeping arrows facing each other in pairs. Directional arrows are featured on the back of the tile. Numbers within the arrows are for manufacturing purposes and are not related to installation. For more information on installing 18X36 including an instructional video visit shawcontractgroup.com or call 877.502.SHAW BOXED IN 18X36 BOXED IN 5 6 3 1 8 4 2 7 chalk line 1 chalk line 2 INSTALLATION DIRECTIONS: place an additional chalk line chalk line 3 18” from the base chalk line Begin the installation by following Shaw’s Installation Guidelines for Site Conditions and proper Floor Preparation. ➊ Tdry he starting in a modular installation must be as near to the center the room install point a portion of 18x36 to understand the pattern layoutofprior to as possible and must be positioned to utilize the largest perimeter cut module size. installation ➋ Snap a chalk line parallel to one major wall bisecting the starting point. It may be necessary to offset the center chalk line to assure perimeter modules will be at least half size. in line onemust quadrant placing in the boxed asand a third ➌ Abeginning second chalk be snapped fromthe thetiles starting point at 90° in to method the first line chalk line must snapped at 18" apart from the second chalk line. illustrated bybethe numbers above ➍ Test a dry-install of one section for pattern layout and placement. ➎ Starting in one quadrant, box-in tiles as illustrated by the—numbers above.column continue to form boxes constructing a column every other ➏ Cshould ontinue be to form boxes, constructing columnsabove and staggering every other column 18" staggered 18” as illustrated as in diagram. directional arrows are featured on the back of the tile - the number featured within Directional are featured on theand back tile.toNumbers the arrow arrows are for manufacturing purposes areof notthe related installationwithin the arrows are for manufacturing purposes and are not related to installation. For more information on installing 18X36 including an instructional video visit shawcontractgroup.com or call 877.502.SHAW BASKETWEAVE 18X36 SKETWEAVE 5 8 6 2 1 7 chalk line 1 3 4 chalk line 2 chalk line 3 place an additional chalk line 18” from the base chalk line INSTALLATION DIRECTIONS: Begin the installation by following Shaw’s Installation Guidelines for Site Conditions and proper Floor Preparation. ➊ The starting point in a modular installation must be as near to the center of the room as possible and must be positioned to utilize the largest perimeter cut module size. dry install a portion of 18x36 to understand the pattern layout ➋ Snap a chalk line parallel to one major wall bisecting the starting point. It may be necessary to offset the center chalk line to assure perimeter modules will be at least half size. prior to installation ➌ A second chalk line must be snapped from the starting point at 90° to the first line and a third chalk line must be snapped at 18" apart from the second chalk line. ➍ Test dry-install of one section for pattern beginning inaone quadrant placing thelayout tilesandinplacement. the basketweave Starting in one quadrant, place tiles in the basketweave pattern quarter turning in pairs of two method➎quarter turning in pairs of two as illustrated by the numbers above. ➏ The paired tile directions should oppose each other as shown in diagram. the pairDirectional tile directions should be opposing each other as illustrated arrows are featured on the back of the tile. Numbers within the above arrows are for manufacturing purposes and are not related to installation. directional arrows are featured on the back of the tile - the number featured within the arrow are for manufacturing purposes and are not related to installation For more information on installing 18X36 including an instructional video visit shawcontractgroup.com or call 877.502.SHAW HALF BASKETWEAVE18X36 HALF BASKETWEAVE 4 1 5 2 6 3 chalk line 1 chalk line 2 chalk line 3 place an additional chalk line 18” from the base chalk line INSTALLATION DIRECTIONS: Begin the installation by following Shaw’s Installation Guidelines for Site Conditions and proper Floor Preparation. dry install a portion of 18x36 to understand the pattern layout ➊ The prior starting in a modular installation must be as near to the center of the room as possible topoint installation and must be positioned to utilize the largest perimeter cut module size. ➋ Snap a chalk line parallel to one major wall bisecting the starting point. It may be necessary to beginning oneline quadrant the tiles inwillthebehalf basketweave offset the center in chalk to assureplacing perimeter modules at least half size. method asline illustrated by the numbers abovepoint at 90° to the first line and a third ➌ A second chalk must be snapped from the starting chalk line must be snapped at 18" apart from the second chalk line. ➍ Test continue a dry-install one section for pattern layout and placement. toofinstall tiles constructing columns for ease of installation ➎ Starting in one quadrant, place tiles in the half basketweave pattern illustrated by the numbers above. ➏ Continue to place constructing fortile ease installation. directional arrowstiles, are featured on thecolumns back of the - theofnumber featured within the arrow are for manufacturing purposes and are not related to installation Directional arrows are featured on the back of the tile. Numbers within the arrows are for manufacturing purposes and are not related to installation. For more information on installing 18X36 including an instructional video visit shawcontractgroup.com or call 877.502.SHAW HERRINGBONE 18X36 HERRINGBONE 5 2 6 1 7 chalk line 1 4 9 8 3 chalk line 3 chalk line 2 INSTALLATION DIRECTIONS: place an additional chalk line 18” from the base chalk line Begin the installation by following Shaw’s Installation Guidelines for Site Conditions and proper Floor Preparation. ➊ The starting point in a modular installation must be as near to the center of the room as possible and must be positioned to utilize the largest cut module size. dry install a portion of 18x36 to perimeter understand the pattern layout ➋ Snap a chalk line parallel to one major wall bisecting the starting point. It may be necessary to prior to installation offset the center chalk line to assure perimeter modules will be at least half size. ➌ A second chalk line must be snapped from the starting point at 90° to the first line and a third chalkbeginning line must bein snapped at 18" apartplacing from thethe second line. herringbone one quadrant tileschalk in the ➍ Test method a dry-install one section for layout andabove placement. asofillustrated bypattern the numbers ➎ Starting in one quadrant, place tiles in the herringbone pattern illustrated by the numbers above. ➏ Flow into the opposite quadrant, continuing the herringbone pattern. flow into the opposite quadrant continuing the herringbone pattern Directional arrows are featured on the back of the tile. Numbers within the arrows are for manufacturing purposes and are not related to installation. directional arrows are featured on the back of the tile - the number featured within the arrow are for manufacturing purposes and are not related to installation For more information on installing 18X36 including an instructional video visit shawcontractgroup.com or call 877.502.SHAW
© Copyright 2026 Paperzz