chalk line 2 chalk line 1 chalk line 3

ASHLAR
2
3
chalk line 3
chalk line 1
8
5
1
4
7
6
chalk line 2
INSTALLATION DIRECTIONS:
Begin the installation by following Shaw’s Installation Guidelines for Site Conditions and proper Floor Preparation.
The starting point in a modular installation must be as near to the center of the room as possible
and must be positioned to utilize the largest perimeter cut module size.
Snap a chalk line parallel to one major wall bisecting the starting point. It may be necessary to
offset the center chalk line to assure perimeter modules will be at least half size.
A second chalk line must be snapped from the starting point at 90° to the first line and a third
chalk line must be snapped at 18" apart from the first chalk line.
Test a dry-install of one section for pattern layout and placement.
Starting in one quadrant, place tiles in the ashlar pattern illustrated by the numbers above.
Flow into the opposite quadrant, continuing the ashlar pattern.
Directional arrows are featured on the back of the tile. Numbers within the arrows are for
manufacturing purposes and are not related to installation.
For more information on installing 18X36 including an instructional video visit shawcontractgroup.com or call 877.502.SHAW
BRICK
8
4
6
2
3
9
1
7
5
chalk line 1
chalk line 2
chalk line 3
INSTALLATION DIRECTIONS:
Begin the installation by following Shaw’s Installation Guidelines for Site Conditions and proper Floor Preparation.
➊ The starting point in a modular installation must be as near to the center of the room as possible
and must be positioned to utilize the largest perimeter cut module size.
➋S
nap a chalk line parallel to one major wall bisecting the starting point. It may be necessary to
offset the center chalk line to assure perimeter modules will be at least half size.
➌A
second chalk line must be snapped from the starting point at 90° to the first line and a third
chalk line must be snapped at 18" apart from the second chalk line.
➍T
est a dry-install of one section for pattern layout and placement.
➎ Starting in one quadrant, stagger tiles in the brick pattern illustrated by the numbers above.
➏ Flow into the adjacent quadrants, keeping arrows facing each other in pairs.
Directional arrows are featured on the back of the tile. Numbers within the
arrows are for manufacturing purposes and are not related to installation.
For more information on installing 18X36 including an instructional video visit shawcontractgroup.com or call 877.502.SHAW
BOXED IN
18X36
BOXED IN
5
6
3
1
8
4
2
7
chalk line 1
chalk line 2
INSTALLATION
DIRECTIONS:
place an additional
chalk line
chalk line 3
18” from the base chalk line
Begin the installation by following Shaw’s Installation Guidelines for Site Conditions and proper Floor Preparation.
➊ Tdry
he starting
in a modular
installation
must be as
near
to the center
the room
install point
a portion
of 18x36
to understand
the
pattern
layoutofprior
to as possible
and must be positioned to utilize the largest perimeter cut module size.
installation
➋ Snap a chalk line parallel to one major wall bisecting the starting point. It may be necessary to
offset the center chalk line to assure perimeter modules will be at least half size.
in line
onemust
quadrant
placing
in the
boxed
asand a third
➌ Abeginning
second chalk
be snapped
fromthe
thetiles
starting
point
at 90° in
to method
the first line
chalk
line must
snapped
at 18"
apart from the second chalk line.
illustrated
bybethe
numbers
above
➍ Test a dry-install of one section for pattern layout and placement.
➎ Starting
in one
quadrant,
box-in
tiles as illustrated
by the—numbers
above.column
continue
to form
boxes
constructing
a column
every other
➏ Cshould
ontinue be
to form
boxes, constructing
columnsabove
and staggering every other column 18"
staggered
18” as illustrated
as in diagram.
directional arrows are featured on the back of the tile - the number featured within
Directional
are featured
on theand
back
tile.toNumbers
the arrow arrows
are for manufacturing
purposes
areof
notthe
related
installationwithin the
arrows are for manufacturing purposes and are not related to installation.
For more information on installing 18X36 including an instructional video visit shawcontractgroup.com or call 877.502.SHAW
BASKETWEAVE
18X36
SKETWEAVE
5
8
6
2
1
7
chalk line 1
3
4
chalk line 2
chalk line 3
place an additional chalk line 18” from the base chalk line
INSTALLATION DIRECTIONS:
Begin the installation by following Shaw’s Installation Guidelines for Site Conditions and proper Floor Preparation.
➊ The starting point in a modular installation must be as near to the center of the room as possible
and must be positioned to utilize the largest perimeter cut module size.
dry install
a portion of 18x36 to understand the pattern layout
➋ Snap a chalk line parallel to one major wall bisecting the starting point. It may be necessary to
offset the center chalk line to assure perimeter modules will be at least half size.
prior to installation
➌ A second chalk line must be snapped from the starting point at 90° to the first line and a third
chalk line must be snapped at 18" apart from the second chalk line.
➍ Test
dry-install
of one section
for pattern
beginning
inaone
quadrant
placing
thelayout
tilesandinplacement.
the basketweave
Starting in one quadrant, place tiles in the basketweave pattern quarter turning in pairs of two
method➎quarter
turning in pairs of two
as illustrated by the numbers above.
➏ The paired tile directions should oppose each other as shown in diagram.
the pairDirectional
tile directions
should be opposing each other as illustrated
arrows are featured on the back of the tile. Numbers within the
above arrows are for manufacturing purposes and are not related to installation.
directional arrows are featured on the back of the tile - the number featured within
the arrow are for manufacturing purposes and are not related to installation
For more information on installing 18X36 including an instructional video visit shawcontractgroup.com or call 877.502.SHAW
HALF BASKETWEAVE18X36
HALF BASKETWEAVE
4
1
5
2
6
3
chalk line 1
chalk line 2
chalk line 3
place an additional chalk line 18” from the base chalk line
INSTALLATION DIRECTIONS:
Begin the installation by following Shaw’s Installation Guidelines for Site Conditions and proper Floor Preparation.
dry install a portion of 18x36 to understand the pattern layout
➊ The prior
starting
in a modular installation must be as near to the center of the room as possible
topoint
installation
and must be positioned to utilize the largest perimeter cut module size.
➋ Snap a chalk line parallel to one major wall bisecting the starting point. It may be necessary to
beginning
oneline
quadrant
the
tiles inwillthebehalf
basketweave
offset
the center in
chalk
to assureplacing
perimeter
modules
at least
half size.
method
asline
illustrated
by the numbers
abovepoint at 90° to the first line and a third
➌ A second
chalk
must be snapped
from the starting
chalk line must be snapped at 18" apart from the second chalk line.
➍ Test continue
a dry-install
one section
for pattern layout
and placement.
toofinstall
tiles constructing
columns
for ease
of installation
➎ Starting in one quadrant, place tiles in the half basketweave pattern illustrated by the
numbers above.
➏ Continue
to place
constructing
fortile
ease
installation.
directional
arrowstiles,
are featured
on thecolumns
back of the
- theofnumber
featured within
the arrow are for manufacturing purposes and are not related to installation
Directional arrows are featured on the back of the tile. Numbers within the
arrows are for manufacturing purposes and are not related to installation.
For more information on installing 18X36 including an instructional video visit shawcontractgroup.com or call 877.502.SHAW
HERRINGBONE
18X36
HERRINGBONE
5
2
6
1
7
chalk line 1
4
9
8
3
chalk line 3
chalk line 2
INSTALLATION DIRECTIONS:
place an additional chalk line 18” from the base chalk line
Begin the installation by following Shaw’s Installation Guidelines for Site Conditions and proper Floor Preparation.
➊ The starting point in a modular installation must be as near to the center of the room as possible
and must
be positioned
to utilize
the largest
cut module
size.
dry install
a portion
of 18x36
to perimeter
understand
the pattern
layout
➋ Snap a chalk line parallel to one major wall bisecting the starting point. It may be necessary to
prior to installation
offset the center chalk line to assure perimeter modules will be at least half size.
➌ A second chalk line must be snapped from the starting point at 90° to the first line and a third
chalkbeginning
line must bein
snapped
at 18" apartplacing
from thethe
second
line. herringbone
one quadrant
tileschalk
in the
➍ Test method
a dry-install
one section for
layout andabove
placement.
asofillustrated
bypattern
the numbers
➎ Starting in one quadrant, place tiles in the herringbone pattern illustrated by the numbers above.
➏ Flow into the opposite quadrant, continuing the herringbone pattern.
flow into the opposite quadrant continuing the herringbone pattern
Directional arrows are featured on the back of the tile. Numbers within the
arrows are for manufacturing purposes and are not related to installation.
directional arrows are featured on the back of the tile - the number featured within
the arrow are for manufacturing purposes and are not related to installation
For more information on installing 18X36 including an instructional video visit shawcontractgroup.com or call 877.502.SHAW