FORM GRN 5A 2014 Los Angeles Green Building Code TIER 1 AND TIER 2 VOLUNTARY REQUIREMENTS CHECKLIST NON-RESIDENTIAL BUILDINGS (INCORPORATE THIS FORM INTO THE PLANS ALONG WITH THE MANDATORY REQUIREMENTS CHECKLIST) Permit # ___________ - ___________ - ___________ ITEM # CODE SECTION REQUIREMENT Date: ________________________ REFERENCE SHEET Sheet # or N/A COMMENTS e.g. note #, detail # or reason for N/A PLANNING AND DESIGN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 PREREQUISITES Designated parking for fuel-efficient vehicles Cool roof ELECTIVES (CHOOSE AT LEAST 1 FOR TIER 1 AND 3 FOR TIER 2) A5.103.1 Community connectivity Brownfield or greyfield site redevelopment or infill A5.103.2 area development Reduce development footprint and optimize open A5.104.1 space A5.105.1.1 Existing building structure A5.105.1.2 Existing non-structural elements A5.105.1.3 Salvage A5.106.2.1 Storm water design A5.106.3 Low impact development (LID) A5.106.4.3 Changing rooms A5.106.5.3 Electric vehicle charging A5.106.6.1 Reduce parking capacity A5.106.7.1 Exterior wall shading: Fenestration A5.106.7.2 Exterior wall shading: Opaque wall areas A5.106.11.1 Hardscape alternatives: 50 percent A5.106.11.1.1 Hardscape alternatives: 75 percent A5.106.5.1 A5.106.11.2 ENERGY EFFICIENCY PREREQUISITES 18 19 20 A5.203.1.1.1 A5.203.1.1.2 A5.203.1.2 21 22 23 24 A5.211.1 A5.211.3 A5.212.1 A5.213.1 Outdoor lighting Service water heating in restaurants Performance standard ELECTIVES On-site renewable energy Green power Elevators and escalators Steel framing WATER EFFICIENCY & CONSERVATION 25 A5.303.2.3 26 27 A5.303.2.3.3 A5.303.3 Revised 07-01-2015 PREREQUISITES Indoor Potable Water Reduction: Low-flow fixtures ELECTIVES (CHOOSE AT LEAST 1 FOR TIER 1 AND 3 FOR TIER 2) Indoor Potable Water Reduction: 40-percent savings Appliances and fixtures for commercial applications Page 1 of 2 www.ladbs.org 2014 Los Angeles Green Building Code ITEM # 28 29 30 31 32 33 34 CODE SECTION A5.303.5 A5.304.2 A5.304.6 A5.304.7 A5.304.8 A5.305.1 A5.305.2 REQUIREMENT REFERENCE SHEET Sheet # or N/A FORM GRN 5A COMMENTS e.g. note #, detail # or reason for N/A Dual plumbing Outdoor water use Restoration of areas disturbed by construction Previously developed sites Graywater irrigation system Nonpotable water systems Irrigation systems MATERIAL CONSERVATION & RESOURCE EFFICIENCY 35 36 A5.405.4 A5.408.3.1 37 38 39 40 41 42 43 44 45 46 47 A5.404.1 A5.405.1 A5.405.2 A5.405.3 A5.405.5.2 A5.405.5.3.1 A5.405.5.3.2 A5.406.1 A5.409.2 A5.409.3 A5.410.3 PREREQUISITES Recycled content Enhanced construction waste reduction ELECTIVES (CHOOSE AT LEAST 1 FOR TIER 1 AND 3 FOR TIER 2) Wood framing Regional materials Bio-based materials Reused materials Cement and concrete Additional means of compliance: Cement Additional means of compliance: Concrete Choice of materials Whole building life cycle assessment Materials and system assemblies Commissioning ENVIRONMENTAL QUALITY PREREQUISITES 48 49 A5.504.4.7 A5.504.4.8 50 51 52 53 54 55 56 57 58 59 A5.504.1 A5.504.2 A5.504.4.5.1 A5.504.4.9 A5.504.5 A5.507.1 A5.507.2 A5.507.3 A5.508.1.3 A5.508.1.4 Resilient flooring systems Thermal Insulation ELECTIVES (CHOOSE AT LEAST 1 FOR TIER 1 AND 3 FOR TIER 2) Indoor air quality (IAQ) during construction IAQ postconstruction Early compliance with formaldehyde limits Acoustical ceilings and wall panels Hazardous particulates and chemical pollutants Lighting and thermal comfort controls Daylight Views Hydrochlorofluorocarbons (HCFCs) Hydrofluorocarbons (HFCs) A5.601.2.4 A5.601.3.4 COMPLIANCE WITH ADDITIONAL ELECTIVES FROM ANY DIVISION TIER 1: COMPLY WITH 1 ADDITIONAL ELECTIVE TIER 2: COMPLY WITH 3 ADDITIONAL ELECTIVES 60 61 Revised 07-01-2015 Page 2 of 2 www.ladbs.org
© Copyright 2026 Paperzz