1. ROC Detailed References concerning specific experience, methodologies and evaluations used, ICT technology projects, web based technologies, data bases, experience in the region and key experts skills relevant to the project of technical assistance, road safety, vehicle technologies, incident and accident analysis, cooperation with police/administrations, consulting for road safety agency, traffic data collection and analysis, project management and safety consultancy: Assignment name: Approx. value of the contract (Euro): CITRA International R&D Project 600.000€ Country: Duration of assignment (months): Germany/Italy/Austria 36 Name of Client: Total N of staff-months of the assignment: European Commission 24 Address: Approx. value of the services provided by your firm under the contract (in Euro): o Brussels, Belgium 250.000€ Start date (month/year): 01/1993 o Completion date (month/year): 12/1995 N of professional staff-months associated Consultants: provided by Name of associated Consultants, if any: Name of senior professional staff of your firm involved Rigobert Opitz Technical Coordinator Narrative description of Project: International R&D project in cooperation with the police, with Siemens and different road administrations for traffic safety, incident detection and dynamic incident monitoring, including a database system with real time data input and monitoring • Heavy Traffic control and weight control stations • Dangerous goods transport monitoring • Graphical monitoring and statistic workstations • Digital maps and GPS interfacing Description of actual services provided by your staff within the assignment: Development of a DTC 500 Dynamic traffic control and monitoring workstation for traffic data collection, communication, monitoring with data base and GIS with digital maps and real time monitoring of traffic events by satellite for Munich /Brunntal Dreieck for the German Autobahn Directorate in Bavaria South. • Interactive HMI, high resolution digital monitoring station with database • Alarm and Rescue Management • Dangerous goods control and weight control stations • Graphical monitoring and statistic workstations • Digital maps and GPS interfacing Assignment name: Approx. value of the contract (in Euro): PORTICO International R&D Project 900.000€ Country: Duration of assignment (months): Portugal 36 Name of Client: European Commission Total N of staff-months of the assignment: 36 Address: Approx. value of the services provided by your firm under the contract (in current US$ or Euro): Brussels, Belgium o 350.000 € Start date (month/year): 06/1993 o Completion date (month/year): 06/1995 N of professional staff-months associated Consultants: provided by Name of associated Consultants, if any: Name of senior professional staff of your firm involved Rigobert Opitz Technical coordinator and expert Achim Gayer IT & Software Engineer Narrative description of Project: International R&D project in cooperation with the police and road administration for traffic incident detection and driver violation analysis including a real time system installation in Portugal in cooperation with the road authorities JAE Junta Autonoma dEestradas • High resolution incident detection system • AID accident and incident analysis algorithms • Real-time data collection, database and HMI • Evaluation and reporting system Description of actual services provided by your staff within the assignment: Project management (technical integration). Development and integration of a DTC 500 Dynamic traffic control and monitoring station with data base and GIS with digital maps and real time monitoring real of traffic events, violations and incidents. Development of an Interactive HMI. Software design and data collection. Development of a High resolution incident detection computer system including AID accident and incident analysis algorithms. Test of real-time data collection, database and HMI. Evaluation and reporting system Assignment name: Approx. value of the contract (in current US$ or Euro): TOPTRIAL International R&D Project 900.000€ Country: Germany Duration of assignment (months): 24 Name of Client: European Commission Total N of staff-months of the assignment: 30 Address: Approx. value of the services provided by your firm under the contract (in Euro): 191.000 € Brussels, Belgium Start date (month/year): 10/2000 o o Completion date (month/year): 08/2002 N of professional staff-months associated Consultants provided Name of associated Consultants, if any: Name of senior professional staff of your firm involved Rigobert Opitz Technical coordinator safety expert Achim Gayer Software engineer by Narrative description of Project: International project for controlling heavy goods transports on roads and construction of a semi automatic control station in cooperation with the police. • Multi array sensor networks development and investigation • Software Algorithms development and performance investigations • System development Automated Truck Overload Control and Enforcement • Real-time database , data collection and analysis • Elaboration of the monitoring and reporting for the police operators • Technical Coordination and Project Management Description of actual services provided by your staff within the assignment: System analysis, design, implementation for controlling heavy goods transports on roads and construction of a semi automatic traffic measurement and control station in cooperation with the police: Technical Project Coordinator for Police Headquarter Munich / EU Commission project “TOP TRIAL” • Elaboration of technical and operative requirements • system concept design and specification • tendering of subsystems and acceptance test of the control station for overload control, • design of a real-time traffic data base system and operation centre • In depth traffic and WIM data monitoring, analysis and evaluation Cost benefits analysis of different violation and overload enforcement schemes and its efficiency Assignment name: Approx. value of the contract (in US$): PPP Project ETC General Consultant Taiwan 2.100.000 total Country: Taiwan Duration of assignment (months): 36 o Name of Client: TANFB Taiwan Area National Total N of staff-months of the assignment: Freeway Bureau/Dornier/MAA&TNS Taipei 14 Address: Approx. value of the services provided by your firm under the contract (in Euro): 170.000€ Taiwan, Taipei Start date (month/year): 02/2003 Completion date (month/year): 07/2006 Name of associated Consultants, if any: Dornier and MAA consultants o N of professional staff-months associated Consultants: provided by Name of senior professional staff Rigobert Opitz Main technical advisor and Senior Consultant Narrative description of Project: International consultancy project for the definition and implementation of an ETC electronic tolling PPP Project, Electronic Tolling System Taiwan as General Consultant, including analysis of system requirements concept analysis and definition, Main technical advisor and auditor; • Analysis and definition of Technical, functional and operational requirements; Cost benefit analysis, • State of the Art and Technology Study • ETC Tenders and Case Studies • Requirements definition and adjustment • Technical and Operational Requirements • for the PPP Project • Costs & System Validation • ETC System Cost Analysis • Validation and Supervision Concept • Bid Analysis & Evaluation • Testing Concept • Supervision & Auditing • Testing of systems and performance analysis and auditing Support for the TANFB Administration, award for an excellent project and support Description of actual services provided by your staff within the assignment: Main technical advisor and Senior Technical Consultant, description of services see above. Assignment name: FAIR Fully Automatic Integrated Approx. value of the contract (in Euro): Road control (Study) 500.000 € Country: Germany Duration of assignment (months): 18 o Name of Client: European Commission DG TREN Total N of staff-months of the assignment: directorate for transport and energy 12 Address: Brussels, Belgium Start date (month/year): Approx. value of the services provided by your firm (in Euro): 151.000 € 01/2005 o Completion date (month/year): 07/2006 N of professional staff-months associated Consultants: provided Name of associated Consultants, if any: Name of senior professional staff of your firm involved Rigobert Opitz Technical Project Coordinator Achim Gayer IT Engineer Narrative description of Project: FAIR Fully Automatic Integrated Road control for innovative concepts and automation on road traffic control, safety improvement and accident prevention: • Multi Violation Enforcement and Road Safety Systems • Fully Automated Integrated Road control • Technical Coordination and Project Management by Cooperation with different police administrations and the police academy in Münster/ Germany. Description of actual services provided by your staff within the assignment: Technical Project Coordinator for the EC DG TREN project “FAIR” Fully Automatic Integrated Road control”; Fully automated integrated road control and safety systems for: Overload, speed, gap, driving behavior, tolling violation etc. Tasks and performances: • State of the art traffic measurement technologies study • System architecture design, methodology and application study • Test site concept and planning, • Test site cost estimator • Chairman of the international workshop in Budapest on enforcement and road safety • Developing Training Programs with the German Police Academy in Muenster Assignment name: Approx. value of the contract (in current US$ or Euro): European Commission Directorates General: DG 100.000 € INFSO Information Society, DG TREN Transport and Energy, DG RTD Research and Development Country: Belgium Duration of assignment (months): 6 Years ongoing Name of Client: Total N of staff-months of the assignment: o Directorates General: DG INFSO Information >10 Society, DG TREN Transport and Energy, DG RTD Research and Development Address: Brussels, Belgium Approx. value of the services provided by your firm under the contract (Euro): 100.000€ Start date (month/year): 01/2001 Completion date (month/year): ongoing N of professional staff-months associated Consultants: Name of associated Consultants, if any: Name of senior professional staff of your firm involved o provided by Rigobert Opitz Consultant Independent Expert; Project Reviewer and Evaluator of Proposals Narrative description of Project: 02/2001 – ongoing, Independent Expert for the European Commission, Project Reviewer and Evaluator of Proposals, Evaluation of R&D Proposals and Review of Projects in ITS Intelligent Traffic Systems, Traffic safety and Control, Automotive and ADAS (Advanced Driver assistance systems), Intelligent cars and infrastructure. Over 70 project auditing/proposal evaluation in 2001 to 2012, European Commission DG INFO, DG RTD, DG Move; Ref.: Thomas Haub and Ludger Rogge; Phone: +32 (-2) 2998797, +32 2 298 86 09, Mail: [email protected] Description of actual services provided by your staff within the assignment: Independent Expert for the European Commission, Evaluation of R&D Proposals and Review of Projects including Tests (over 60 times in the years 2001 to 2009 employed as expert in ITS; ADAS , ATMS and Safety) for DG INFOS and DG RTD and COST actions. Find a list of reviews and evaluation of projects for the European Commission as follows: 2003 European Commission „Evaluation of proposals 1st Call in the 6th Framework of Information Society Technologies” EUROPEAN COMMISSION 05/2003 Proposal ESCOP, EASIS, SPARC, ACTIVE, EMC Safety, PREVENT „Hearing of proposals 1st Call in the 6th Framework of Information Society Technologies” EUROPEAN COMMISSION 06/2003 Proposal AIDE, EASIS, MUSIKA GST, EMC Safety, PREVENT „ Review of Transport Projects” Project CHAUFFEUR II EUROPEAN COMMISSION 06/2003 Promote-Chauffer II (Follower Project of Chauffeur I Tow Bar function) Assistant „ Review of Transport Projects” EUROPEAN COMMISSION 06/2003 Project APOLLO Intelligent Tires for Accident-free Traffic „Annual Project Review of Transport Projects” from the Transport Sector” EUROPEAN COMMISSION 10/2003 Projects: FAMS Flexible Agency for collective responsive Mobility Services (Take-Up action/trials) SAVE-U Sensors and system architecture for vulnerable road users EDEL Enhanced drivers perception in poor visibilities PEIT Power train equipped with intelligent technologies COMPOSE Composition of Mobile Pre-Trip, On-trip Services CYBERCARS Cybernetic Cars for a New Transportation System in Cities „ Review of Transport Projects” Project EUROPEAN COMMISSION 12/2003 VESA Vehicle e-Safety Architectures 2004 European Commission „ Review of Transport Projects” Project FAMS Flexible Agency for collective responsive Mobility Services (Take-Up action/trials) „ Review of Transport Projects” Project EDEL EUROPEAN COMMISSION 16/02/2004 EUROPEAN COMMISSION 31/03/2004 Enhanced Drivers perception in poor visibilities „ Review of Transport Projects” EUROPEAN COMMISSION 22/04/2004 Project SAVE-U Sensors and system architecture for vulnerable road users „ Review and Demonstration of Transport Projects ”EUROPEAN COMMISSION 10/06/2004 Project CYBERCARS Cybernetic Cars for a New Transportation System in Cities „ Review of Transport Projects” Project CarTALK 2000 EUROPEAN COMMISSION 14/07/2004 Safe and comfortable driving based upon inter-vehicle communication „ Review and Demonstration of Transport Projects” EUROPEAN COMMISSION 14/07/2004 Project ADASE II Advanced Driver Assistance Systems in Europe, Roadmap on ADAS projects „ Review of Transport Projects” EUROPEAN COMMISSION 10/09/2004 Project APOLLO Intelligent Tires for Accident-free Traffic „Review and Demonstration of Transport Projects” EUROPEAN COMMISSION 29/09/2004 Project AWAKE Driver Monitoring and Warning Concepts (driver fatigue prevention - hypo vigilance) „ Review of Transport Projects” Project COMPOSE EUROPEAN COMMISSION 25/11/2004 Composition of mobile Pre-Trip, On-Trip Services EUROPEAN COMMISSION 07/12/2004 Project CYBER CARS Cybernetic Cars for a New Transportation System in Cities 2005 European Commission „ Review of Transport Projects” Project EASIS EUROPEAN COMMISSION 16/02/2004 Electronic Architecture and System Engineering for Integrated Safety Systems Review of Transport Projects” EUROPEAN COMMISSION 16/02/2004 Project SPARC Secure Propulsion using Advanced Redundant Control „Evaluation of proposals 4h Call in the 6th Framework of Information Society Technologies”” EUROPEAN COMMISSION 04/2005 Proposals Cybercars 2, E Safety Support, SPARC, LVS, Watch Over, Friction, Sprint „ Review of Transport Projects” Project PREVENT EUROPEAN COMMISSION 05/2005 Preventive and Active Safety Applications (integrated Project) „ Review of Transport Projects” EUROPEAN COMMISSION 05/2005 Project APOLLO Intelligent Tires for Accident-free Traffic „Project Review of Transport Projects” Project EDEL EUROPEAN COMMISSION 07/2005 Enhanced Drivers perception in poor visibilities 2006 European Commission „ Review of Transport Projects” EUROPEAN COMMISSION 04/04/2006 Project SPARC Secure Propulsion using Advanced Redundant Control 2007 European Commission „ Review of Transport Projects” Project EASIS EUROPEAN COMMISSION 02/03/2007 Electronic Architecture and System Engineering for Integrated Safety Systems „ Review of Transport Projects” Project PREVENT (IP) UROPEAN COMMISSION 26/02/2007 Integrated project (<50.000.000 €), Preventive and Active Safety Applications http://www.prevent-ip.org/ „ Review of Transport Projects” EUROPEAN COMMISSION 22/03/2007 Project CVIS (IP) Integrated project, Communication Vehicle Infrastructure Systems http://www.cvisproject.org „ Review of Transport Projects” EUROPEAN COMMISSION 23/03/2007 Project FRICTION On-board Measurement of Friction and Road Slipperiness to Enhance the Performance of Integrated and Cooperative Safety Systems http://friction.vtt.fi/ „ Review of Transport Projects” Project CYBERCARS 2 EUROPEAN COMMISSION 23/03/2007 Cybernetic cars 2 http://www-c.inria.fr:9098/cybercars2 „Evaluation of proposals 1h Call in the 7th Framework of Information Society Technologies” EUROPEAN COMMISSION 06/2007 Different proposals ADAS, Safety, Automatic driving „ Review of Transport Projects” EUROPEAN COMMISSION 16/07/2007 Project SPARC Secure Propulsion using Advanced Redundant Control 2008 European Commission Review of Transport Projects” EUROPEAN COMMISSION 02/03/2008 Project FRICTION „ Review of Transport Projects” Project CYBERCARS II EUROPEAN COMMISSION 04/03/2008 Cybernetic cars 2 http://www-c.inria.fr:9098/cybercars2 Review of Transport Projects” Project PREVENT EUROPEAN COMMISSION 10/03/2008 Preventive and Active Safety Applications (integrated Project) Review of Transport Projects” Project CVIS EUROPEAN COMMISSION 15/04/2008 Cooperative Vehicle Infrastructure Systems (Integrated Project) www.civisproject.org „Evaluation of proposals 1h Call in the 7th Framework for DG RTD” „Remote Evaluation FP7-SST-2008-RTD-1 Proposals” EUROPEAN COMMISSION June /2008 Proposal 10 Proposals including 2 IPs Call FP7 SST RTD-1 Integrated Solutions for Road Safety Review of Transport Projects” EUROPEAN COMMISSION 17/06/2008 Project R&D Content CYBERCARS II Cybernetic cars 2 http://www-c.inria.fr:9098/cybercars2 „Final Project Review of Transport Projects” EUROPEAN COMMISSION 04/12/2008 Project FRICTION On-Board measurement of friction and road slipperiness to enhance the performance of integrated and cooperative safety systems (Milano) 2009 European Commission „Final Project Review of Transport Projects” Project CYBERCARS II EUROPEAN COMMISSION 11/02/2009 Cybernetic cars 2 http://www-c.inria.fr:9098/cybercars2 „Final Project Review of Transport Projects” EUROPEAN COMMISSION 12/03/2009 Project COST action 352 In vehicle information systems and driver behavior Review of Transport Projects” EUROPEAN COMMISSION 22/04/2009 Project HAVEIT HaveIT Highly Automated Vehicles (Integrated Project) http://wwwhaveit-eu.org Review of Transport Projects” Project CVIS EUROPEAN COMMISSION 11/05/2009 Cooperative Vehicle Infrastructure Systems (Integrated Project) www.civisproject.org Assignment name: Approx. value of the contract (in Euro): Traffic Safety improvement program Cyprus 26.000 € Country: Cyprus Duration of assignment (months): 2 Name of Client: EC CYPRUS Total N of staff-months of the assignment: 2 Address: Cyprus Approx. value of the services provided by your firm under the contract (in Euro): 6.000 € Start date (month/year): o 03/ 2008 o Completion date (month/year): 05/2008 N of professional staff-months associated Consultants: provided by Name of associated Consultants, if any: Name of senior professional staff of your firm involved Dr. Heiko Gross Rigobert Opitz Senior Engineer Expert for Transport Narrative description of Project: “Traffic Safety improvement program” Senior Engineer Expert for Transport, Control, Traffic and Communication in EC Technical Assistance project for the road and traffic ministry in Cyprus Description of actual services provided by your staff within the assignment: • Road Safety Agency: Analyzing, improving and reorganization of the administrative structure and definition of subcommittees in Cyprus for traffic safety, accident analysis and avoidance. • Data analysis of accidents and statistics with the police and ministries • Presentations, workshops with administrations, police and stakeholders • Presentation of integrated approaches and interactions for an administrative set up of a road safety agency Assignment name: Approx. value of the contract (in Euro): EVALUATION KABUL HIGHWAY 40.000 € Country: Afghanistan Duration of assignment (months): 2 o Name of Client: European Commission in Afghanistan Total N of staff-months of the assignment: 2 Address: Kabul, Afghanistan Start date (month/year): Approx. value of the services provided by your firm under the contract (in Euro): 15.000 € 06/2009 N o of professional staff-months provided by Completion date (month/year): 10/2009 associated Consultants Name of associated Consultants, if any: Name of senior professional staff of your firm involved Rigobert Opitz Senior technical expert Dr. Heiko Gross Narrative description of Project: Senior Engineer Expert in the EC TA project Europe Aid/119860/C/ SV/multi – Lot 2 ““Evaluation of the Reconstruction of the Kabul-Jalalabad Highway in Afghanistan”: Description of actual services provided by your staff within the assignment: Design analysis of truck safety control stations, Inspection tour, effectiveness analysis, Questionnaires for operators and evaluation, Analysis and recommendations of measures, Workshop with stakeholders, socio economic impact analysis, operators questionnaire and Different training presentations Assignment name: Approx. value of the contract (in Euro): CONSULTANCY SERVICES FOR PREPARATION OF 260.000 € GUIDELINES FOR CONVEYANCE OF ABNORMAL LOADS, IMPROVE TRANSPORTATION EFFICIENCY ON TRANSPORT FACILITIES Country: Tanzania Duration of assignment (months): 12 Name of Client: MOID Total N of staff-months of the assignment: Address: Dar es Salaam Tanzania Approx. value of the services provided by your firm under the contract (in Euro): 260.000 € Start date (month/year): N of professional staff-months associated Consultants 15 o 07/2009 Completion date (month/year): 05/2010 Name of associated Consultants, if any: Godwin Msechu System Engineer Manfred Hügel Police officer Prof. Eugene Obrien o provided by Name of senior professional staff of your firm involved and functions performed (indicate most significant profiles such as Project Director/Coordinator, Team Leader): Rigobert Opitz Technical Project Manager for MOID Ministry of Infrastructure Development; Volker Sigmund Technical and Vehicle Engineer Narrative description of Project: “Consultancy Services for preparation of guidelines for conveyance of abnormal loads, improve transportation efficiency on transport facilities” incl. proposals of models for WIM, training of MOID staff and study tours CONSULTANCY SERVICES FOR PREPARATION OF GUIDELINES FOR CONVEYANCE OF ABNORMAL LOADS, IMPROVE TRANSPORTATION EFFICIENCY ON TRANSPORT FACILITIES a) Carryout situation analysis for the attributes of overload damage factors including evaluation and prediction software. b) Propose measure which will enhance transport safety and efficiency and ways to reduce transport delays congestions and corruption in this assignment provision of software for modelling transport and safety is essential. c) Propose investment and models for weigh in motions. Full analytical solution of WIM is essential. d) Prepare guidelines for conveyance of abnormal load e) Prepare guidelines for Transport facility damage evaluation f) Evaluation of Interlink trailers on safety and damage of transport facilities. g) Train MOID staff on the above issues. h) Establish and formulate a relevant software application for the above i) Conduct study tours to peer countries Assignment name: Approx. value of the contract (in current US$ or Euro): CONSULTANCY SERVICES FOR THE PREPARATION OF 69.000 € NATIONAL ROAD SAFETY STRATEGY 2010 to 2015 Country: Tanzania Duration of assignment (months): 12 Name of Client: MIOD Total N of staff-months of the assignment: 5 Address: Approx. value of the services provided by your firm under the contract (in current US$ or Euro): Dar es Salaam Tanzania Start date (month/year): 07/2009 – Completion date (month/year): 05/2010 Name of associated Consultants, if any: Godwin Msechu System Engineer Prof. Eugene Obrien, Dr. Heiko Gross o o N of professional staff-months associated Consultants: provided by Name of senior professional staff of your firm: Rigobert Opitz General Project Manager for Ministry of Infrastructure Development and Volker Sigmund Narrative description of Project: Development of a Road Safety Strategy 2010 - 2015 to improve road safety transportation efficiency on transport facilities” incl. training of MOID staff and study tours Description of actual services provided by your staff within the assignment: • To define the institutional, regulatory and financial aspects of the National Road Safety Strategy 2010/2011 – 2015/2016 which aims to reduce the loss of life, physical suffering and economic costs associated with traffic / road accidents. • To formulate a five-year National Road Safety Strategy for 2010/2011 – 2015/2016 to implement the National Road Safety Policy – 2009 including an approach to institutional capacity building; and • To Assist the Ministry of Infrastructure Development in collaboration with the Ministry of Home Affairs in launching the National Road Safety Strategy for 2010/2011 – 2015/2016. Task 1: Identify and analysis of the existing status and elements and concerning traffic safety. Generate a basic structure and status report with comments. Task 2: Compare data of relevant nations with comparable traffic scenarios, review it’s comparability to Tanzania’s situation, trends, measures and development. Task 3: Recommend the local structures and resources to execute the necessary steps, appoint the supervision activities, to receive accurate data. Task 4: Generate a Strategy implementation and activity plan for the future development of the Tanzanian National road safety in consideration of the growing national and international volume of traffic. Task 5: Derive from said general plan the proposed road safety strategy measures, including the commercial aspects, arrange the workshop and come to an in depth discussion with all involved parties and stakeholders. Task 6: Adapt the first proposal of measures, concepts and activities and enhance the Road Safety Strategy concerning the key points with the results of the precedent workshop. Task 7: Generate the derived processes and structures including the commercial activities. Prepare the Draft Final Report and present it at the workshop. Task 8: Prepare the Final Reports, Processes, and Milestones and present the results to the initiators of the study and furnish the authorities with the agreed promotional material. Assignment name: Approx. value of the contract (in current US$ or Euro): WORKSHOPS ACCIDENT DATABASE SYSTEMS Investment ROC Country: Germany/Austria Duration of assignment (months): 2 Name of Client: ROC Invest Total N of staff-months of the assignment: 2 Address: Graz Austria Approx. value of the services provided by your firm under the contract (in current US$ or Euro): Start date (month/year): 06/2011 N of professional staff-months associated Consultants: Completion date (month/year): 06/2012 Name of associated Consultants, if any: Prof Fellendorf Traffi Engineer Uni Graz Prof. Wotawa Software design Uni Graz o o provided by Name of senior professional staff of your firm Rigobert Opitz Project Leader Martin Hamker Telematic Engineer Narrative description of Project: Preparation and Analysis ACCIDENT Information systems Description of actual services provided by your staff within the assignment: Workshop regarding accident data collection and management between the Police and ROC system and software experts. • General analysis of the current accident recording, analysis and reporting process • Accident data registration on site • Accident reporting forms and clustered hierarchies • Pre-prepared classification and information schemes • Database system • Evaluation and reporting system Police Bavaria Rosenheim/ROC and Statistic Admin in Vienna / Austria 2011 Knowledge transfer regarding data collection, accident reporting and documentation, data import, data retrieval, geographical based information systems, Assignment name: Approx. value of the contract (in Euro): TRAFFIC AND VIOLATION DATA ANALYSIS 30.000 € Country: Germany Duration of assignment (months): 12 o Name of Client: EU Project ASSET, Police Head Total N of staff-months of the assignment: 5 Quarter Address: Brussels Belgium, Rosenheim Germany Approx. value of the services provided by your firm under the contract (in Euro): 30.000 € Start date (month/year):12/2010 N of professional staff-months associated Consultants: Completion date (month/year): 12/2011 Name of associated Consultants, if any: Narrative description of Project: Traffic Data and Violation Management System o provided by Name of senior professional staff of your firm involved and functions performed (indicate most significant profiles such as Project Director/Coordinator, Team Leader): Rigobert Opitz Project Manager and Martin Hamker Telematic Engineer Used Technologies MySQL Databases, Java, Swing Description of actual services provided by your staff within the assignment: Results A real time traffic data analysis software and linked generic relational database system for analysing collected traffic data on highways, detection of violations and for estimating trends and future problems. Assignment name: Approx. value of the contract (in Euro): Web Based Configuration Tool 25.000 € Country: Austria Duration of assignment (months): 4 Name of Client: Vinzenz Harrer GmbH Graz Total No of staff-months of the assignment: 4 Address: Graz Austria Approx. value of the services provided by your firm under the contract (in Euro): 25.000 € Start date (month/year): 09/2011 No of professional staff-months associated Consultants: Completion date (month/year): 12/2011 Name of associated Consultants, if any: provided by Name of senior professional staff of your firm involved a): Martin Hamker software designer Narrative description of Project: On line web based configuration Tools Description of actual services provided by your staff within the assignment: Used Technologies DHTML, Javascript, CSS Results Interactive online multi-channel r tool for online system configuration and data entry for any type of devices like browsers, smart phones and tablets. Assignment name: R&D Proposal Web Based Approx. value of the contract (in current Euro): Simulation and Analysis Tool 25.000 € Duration of assignment (months): 4 Name of Client: Vinzenz Harrer GmbH Graz Total No of staff-months of the assignment: 3 Address: Graz Austria Approx. value of the services provided by your firm under the contract (in Euro): 25.000 € Start date (month/year): 10 2011 No of professional staff-months associated Consultants: Completion date (month/year): 02 2012 Name of associated Consultants, if any: provided by Name of senior professional staff of your firm involved): Martin Hamker software designer Narrative description of Project: On line web based configuration, simulation and calculation Tools Description of actual services provided by your staff within the assignment: Used Technologies DHTML, Javascript, CSS Results Interactive online multi-channel retailing tool for online U value calculation for any type of devices like browsers, smart phones and tablets. Assignment name: ASSET ” Advanced Safety and Driver Support for Essential Road Transport Country: EU, Germany, Austria Name of Client: EU Commission Address: Brussels Belgium Start date (month/year): 7.2008 to 12.2011 Narrative description of Project: Advanced Safety and Driver Support in Efficient Road Transport as integrated multinational R&D project with th 19 partners including 2 partners from Tanzania during the 7 research framework program Description of actual services provided by your staff within the assignment: Technical Project Coordinator for the EC DG RTD project “ASSET Roads” Advanced Safety and Driver Support for Essential Road Transport; International R&D project for intelligent road safety, design and built of Integrated control stations and transport capacity improvements (8.12 million € in cooperation with 18 international project partners). www.project-asset.com; Responsible for: • Coordination with ministries, police and Federal Road Transport Agency • System concepts, design and preparation of integrated traffic control stations, driver behavior analysis, dangerous situation agent systems, enforcement technologies, concepts for integration and networks, • GIS Study - Geographical Information Systems in Tanzania with UTBM • Vehicle weight Measurement Systems (HS WIM and LS WIM) on motorways and preselection in soft and hardware for axle and gross weight control. • Cost benefit analysis of systems and control measures and systems • Development of integrated weight control systems (IWDC) and technical equipment for overload, dimensions, technical status checks integration (thermal cameras), tire profile measurement, RFID and dynamic tire pressure check • Preparation and implementation of training police officers in Tanzania • Planning and Coordination of Study visits in EC for administrations • Dissemination, awareness campaigns, international seminars • Preparation of the website www.project-asset.com ; • and Multilanguage brochures • Dissemination and Exploitation • Many TV sessions • 2 International Conferences in India and Tanzania Assignment name: Approx. value of the contract (in Euro): TRAFFIC DATA MONITORING TOOL 50.000€ Country: Germany/Austria Duration of assignment (months): 24 Name of Client: Investment Total N of staff-months of the assignment: 5 Address: Approx. value of the services provided by your firm under the contract (in current US$ or Euro): ROC Graz Start date (month/year): 01/2009 Completion date (month/year):12/2012 Name of associated Consultants, if any: o o N of professional staff-months associated Consultants: 5 provided by Name of senior professional staff of your firm involved and functions performed (indicate most significant profiles such as Project Director/Coordinator, Team Leader): Rigobert Opitz Project Manager and Martin Hamker Software designer Narrative description of Project: Weigh-in-Motion Vehicle and Traffic Data capturing and WIM sensor system Description of actual services provided by your staff within the assignment: Product Development for ROC System Engineering GmbH MySQL Databases, Java, Swing, Java3D, Microcontroller C First version of a high-tech weigh-in-motion system for detecting vehicle types, their speed and overweight and their technical problems including a sophisticated manipulation detection. Firms Name: ROC Systemtechnik GmbH Graz, Austria 4th of April 2012
© Copyright 2026 Paperzz