ATP Strategic Planning Workshop – May 2007 Detailed Final Report ______________________________________ Creation of an ATP Strategic Master Plan - Results of a Strategic Workshop, May 2007 ATP Confidential Page 1 Re: 8145 ATP Strategic Planning Workshop – May 2007 Detailed Final Report ______________________________________ Executive Summary On May 2nd and 3rd 2007 key members of the City of Beer-Sheva, Ben-Gurion University, the Negev Company and invited guests met at a Kibbutz in central Israel to develop the first draft of a strategic plan for the Advanced Technology Park (ATP) to be located adjacent to the train station in Beer-Sheva and very near the university. Due to the extreme importance of this park, a strategic master plan is mandatory. The draft plan contained in this report is the beginning of the strategic planning effort. We appreciate all the interaction and the sincere contributions from all participants. What was unique about this workshop was the timing. Just before the offsite, the Winograd Report had been presented in draft form to the nation of Israel. The report was critical of the lack of strategic scenarios addressed in a prior conflict. Those of us deeply involved in the ATP do not wish to have similar criticism in the future ~ hence, this workshop launched the process to truly address the strategic scenarios that will lead to consensus and ATP success. Key accomplishments from this workshop are as follows: 1. As a result of having all the right contributors at one place at one time, the Memorandum of Understanding (MoU) between the NBS and KUD was successfully developed and signed. 2. As a result of forcing participants to think “outside the box” the true scope and scale of the ATP was developed. The team concluded this is NOT just a land development effort ~ but a true opportunity to bring distinction to the desert. 3. As a result of a structured process, ten Goals for the ATP were developed in detail and an initial list of Actions Required (AR’s) linked to the Goals is presented. A major deliverable was the Goal listing. Ten Goals were detailed. The details can be found in Section 5.0 of this Executive Report on the ATP. The ten Goals are as follows: 1. Governance of the ATP and Donor Funding 2. ATP Financing 3. The KUD Operational Management Activities 4. Facility and Incubator 5. Infrastructure 6. Surroundings of the ATP 7. Tenants of the ATP 8. Brand Image of the ATP 9. Talent Availability for the ATP 10. Build the Park For each Goal a detailed description is available. This can be found in Appendix 3. But of greater value is the extraction from the Goal’s list of the Actions Required for ATP success. Section 6.0 of this report begins the capture of these A/R’s. By establishing a timely communication linkage between all participants, this A/R list will be come dynamic and real-time. The successful completion of the ATP demands it!! ATP Confidential Page 2 Re: 8145 ATP Strategic Planning Workshop – May 2007 Detailed Final Report ______________________________________ 1.0 Agenda and Table of Contents Two days were invested by very involved individuals from BGU, the city of Beer-Sheva, the Negev Company and KUD. The objective was to leave with a detailed action plan leading to the success of the ATP. The agenda was as follows: - Begin with introductions of the participants - First Exercise ~ an ice breaker allowing all the participants to capture the “Should Be” picture of the ATP. - Second Exercise ~ define the “measures of success” for the ATP. - Third Exercise ~ detail the Goals (long term – what’s) needed for ATP success. - Fourth Exercise ~ detail the Strategies (long term – how’s) and the Actions Required (AR’s) for near term launch. Much discussion was held that allowed all the participants to begin to act as one. This major accomplishment was the implicit goal of this workshop. We believe this was accomplished. A second accomplishment took advantage of having all the right people in one location at one time. This situation allowed the Memorandum of Understanding (MoU) between BGU and the city of Beer-Sheva represented by the Negev Company and KUD to reach an agreement. This document captures all the accomplishments and the AR’s. The contents are as follows: - Vision of the ATP - Mission of the ATP - Consensus Measures of Success for the ATP - Preliminary Goals for the ATP - Recommended Goals for the ATP - Detailed Recommended Goals for the ATP - Strategies and AR’s Aligned with Goals - Conclusions and Recommended Next Steps ATP Confidential Page 3 Re: 8145 ATP Strategic Planning Workshop – May 2007 Detailed Final Report ______________________________________ 2.0 Vision and Mission of the ATP Values and Vision Statement Leading Industrial Discovery and Education for the 21st Century “The Negev offers the greatest opportunity to achieve everything from the very beginning” “The past prepares us for the present, and tomorrow is intertwined with today.” “I don’t need an expert who says it’s impossible ~ I need an expert who can do it!” Quotations from David Ben Gurion We seek to be a vibrant technology park of industries, scholars and students dedicated to the development, dissemination, and application of knowledge for the benefit of society and enhancement of the quality of life in the Negev and beyond. We strive to advance the discovery of technology systems and to optimize the design and realization of technology systems recognizing the value and importance of humans, individually and collectively. By excelling in this endeavor, we seek to be an Advanced Technology Park of first choice in our state and region, with a national and international recognition for selected programs of emphasis. Mission Statement Provide an Environment Rich in Research, Education, Entrepreneurship, and Leadership Resulting in Successful Industrial Habitation, Productive Liaison with Ben-Gurion University and Technological Advancements that Benefit Society The mission of the Advanced Technology Park (ATP) is to provide a high quality, innovative environment for industrial inhabitants and university centers: • that encourage entrepreneurial and multidisciplinary advancements and growth experiences, to foster discovery by all participants; • that provides the infrastructure and the environment for a public / private consortium dedicated to the mission of being an economic engine for the Negev and beyond; • that provides an academic environment liaison supporting the best development of students, faculty and staff; • that serves as the catalyst to allow companies and research centers to turn investments and ideas into technology-based companies, jobs, products and services and • that serves as a magnet for talent coming to the Negev. ATP Confidential Page 4 Re: 8145 ATP Strategic Planning Workshop – May 2007 Detailed Final Report ______________________________________ 3.0 Consensus Measures of Success for the ATP Each team developed critical measures of success for the ATP. We used as the motivation: “If you can’t measure it, you can’t manage it!” Peter Drucker At the One Day Workshop a key measure of success was developed. This dealt with the number of jobs expected from the ATP. These numbers were generated by the team from Beer-Sheva and are shown below: Year Number of Number of Number of Employees Employee Beer-Sheva Citizens Citizens 7/2007 72,000 64,800 200,000 7/2010 75,000 (IDF) 65,100 207,110 7/2012 78,000 (Negev) 98,000 65,400 212,323 85,400 288,756 7/2015 We feel confident that the park will add at least 3,000 new employees by 2010; 6,000 total new employees by 2012 and up to 26,000 total new employees by 2015. Coupling this with the ancillary families and other jobs, this adds 88,756 new citizens to BeerSheva ~ an increase of 44% in less than 10 years just from the ATP. But we did not quit just looking at the jobs. We developed the following Balanced Scorecard Matrix. This is the foundation for our ATP Game Plan. ATP Confidential Page 5 Re: 8145 ATP Strategic Planning Workshop – May 2007 Detailed Final Report ______________________________________ Key Metrics Exercise Summary: How Can We Measure Success? Customer: Operational: Renting price per square meter Availability of manpower Availability of high level of Education Level of maintenance of the facility Access of quality affordable living for employees Partnerships with companies. Increase number of students and graduates working in ATP. Well known multi-national companies populate the ATP Increase # of students in BGU from ATP operations Quality of candidates to BGU. Increase number of students and graduates working in ATP. Increase student projects and create foundation for number of fourth year student projects. Operational costs within budget Uninterrupted infrastructure support (power, internet, water, A/C) Amount of space built within “x” years Adjunct faculty from tenants teach at BGU Financial: Knowledge / Intellectual Increasing the value of land, apartments, etc. Increase in City Taxes Increase average salary in Beer-Sheva. Rate of return on investment to City, BGU and KUD Number of jobs Increase income from research Increase income for Research from increased PhDs and Master students in ATP Number of spin offs and start ups Patents (filing and use as spin-offs, start ups, royalties to BGU) Number of spin offs and start ups Number of collaborations Number of transfer of knowledge from BGU to ATP tenants Low ratio of failures to start ups (improved chances for start-up success) Increase quality of candidate coming to BGU Improve Social / Economic / Educational Impact Increase number of students and graduates working in ATP. Increase in acquisition IP and Royalties. Increase # of graduate students Increase # of joint papers. 8 Tomorrow Begins Here! ATP Confidential Page 6 Re: 8145 ATP Strategic Planning Workshop – May 2007 Detailed Final Report ______________________________________ 4.0 Finalized List of Goals We began the effort of defining the Goals for the ATP by reviewing a draft list of Goals that Jim and Dan had crafted after 2+ years of listening to all the ATP constituents. This starting point is found in Appendix 2 of this report. After lengthy discussion, the participants combined some Goals, modified others and took ownership of the following list of ten (10) ABSOLUTELY CRITICAL “What’s” that must be accomplished for ATP success. The consensus list of goals is as follows: 1. Governance of the ATP and Donor Funding Develop the overall governance and decision making plan for the NBS. 2. ATP Financing Determine the financing needed and secure the funding. 3. The KUD Operational Management Activities Activate the selected contractor and exploit their expertise. 4. Facility and Incubator Determine overall facility plan with emphasis on an incubator allowing spin-off technology companies to succeed. 5. Infrastructure Develop the plan for the “big information pipe” and all the other support services needed for the success of the park. 6. Surroundings of the ATP Think of the entire work-life continuum for all the people involved in the park. 7. Tenants of the ATP Secure the anchor tenants and their locations 8. Brand Image of the ATP Position the ATP for the national / international reputation creation. 9. Talent Availability for the ATP Fill the pipeline of talent and develop a plan to keep the talent. 10. Build the Park Establish the overall build plan for the park, the infrastructure and the tenant buildings. ATP Confidential Page 7 Re: 8145 ATP Strategic Planning Workshop – May 2007 Detailed Final Report ______________________________________ 5.0 Initial Actions Required (AR) List After detailed discussion and analysis, the following AR List is offered for review and update. The criticality of this list can not be overlooked ~ we must get many actions going simultaneously for the successful launch of the ATP. The following overall assumptions are made as we develop the AR list: Timing (assume phases): • Phase 1 – 18 months o Phase 1a - Pre-Construction Activities – 6 Months o Phase 1b - Infrastructure Construction – 12 Months • Phase 2 – to be determined Resources Required: • Capital (NIS 40 Million initially) with another infusion of capital in Phase 1b and Phase 2. • Land Use permit for Phase 1 and Phase 2. • Planning Team in place now o Land Use / Master Planner o Engineers • Contractors selected for the Infrastructure Construction phase. Dependencies: • Lease contract with ILA • Land use plan / master plan. • Determination of Brand Image / Tenant Profile / Requirements • NIS 40 million from MOF – Phase 1 Infrastructure. • Finalize agreement with IDF Lotem. • Marketing & Leasing Logical Lead Organization: • KUD o In conjunction with Ministry of Trade (MOT) Planning Group ATP Confidential Page 8 Re: 8145 ATP Strategic Planning Workshop – May 2007 Detailed Final Report ______________________________________ Composite Listing of AR’s: Goal Actions Required and Number 1-1 Create a plan to keep all participants informed. Consider a web-site but be sure this is appropriate. 1-2 Rationalize the NBS structure, BoD, members, authority, protocols, etc. 1-3 Develop relationships with other research parks, visit these and assimilate lessons learned. 2-1 ATP Financing is solidified 2–2 5-1 5-2 5-3 5-4 5-5 5-6 5-7 Financing Package PR package is created. Secure Land from the Land Authority Create Lead Park Team and Critical Path for ATP success. Review plans being created by MoT and develop strategic scenarios: follow plans, minor modifications, major changes required, etc. Organize Planning Team and organize Israeli company. Complete Market Analysis / Tenant Profile Identify Tenant / ATP Requirements Refine Existing Master Plan to address Tenants’ Needs 5-8 5-9 Bidding / Contracting Construction 7-1 Launch ATP efforts to solidify IDF as an anchor ATP Confidential Accountable Needed By (from Now) Shlomi Immediately Avishag and David Immediately KUD Pre-construction phase – 1a. KUD with BoD Immediately KUD with BoD Immediately Uzy with KUD KUD Pre-construction phase – 1a. Immediately KUD with Uzy Immediately KUD 1 Month KUD 3 Months KUD 3 Months MOT Planning Team in coordination w/ KUD MOT Team MOT SubContractors in coordination w/ KUD NBS in the lead because of the 5 Months - Phase 1a Page 9 6 Months 18 Months - Phase 1b Immediately Re: 8145 tenant and resolve location. 7-2 7-3 Launch efforts to solidify National Inst. of BioTech as an anchor tenant Launch efforts to solidify Deutche Telecom as an anchor tenant. ATP Confidential ATP Strategic Planning Workshop – May 2007 Detailed Final Report ______________________________________ security clearances required. KUD with help from Within 3 months – 1a BGU professors KUD with help from BGU professors Page 10 Within 3 months – 1a Re: 8145 ATP Strategic Planning Workshop – May 2007 Detailed Final Report ______________________________________ Appendices of the Executive Review of an ATP Strategic Master Plan ATP Confidential Page 11 Re: 8145 ATP Strategic Planning Workshop – May 2007 Detailed Final Report ______________________________________ Appendix 1 – Detailed Metrics Results The following demonstrate the breadth and depth discussed at the workshop related to strategic measures of success. We have synthesized this into a summary and this is found in Section 2 of this report. Four categories of metrics were developed ~ consistent with the international standard developed by Kaplan and Norton in the late 1980’s called the Balanced Scorecard. These four categories are; 1. Customer 2. Operations 3. Financial 4. Knowledge and Innovation What follows are the details for each. Customer: • Renting price per square meter • Availability of manpower • Availability of high level of Education • Access to transportation • Access to recreations/culture • Access to the university • Access to medical services • Quality of the ATP neighbors (other tenants) • Aesthetic and unique appeal • Level of maintenance of the facility • Access of quality affordable living for employees • Image as a result of being in the ATP Operations: • Operational costs within budget • Uninterrupted infrastructure support (power, internet, water, A/C) • Access to facilities 24/7 • Security of facilities and the ATP for protection of equipment and people • Cleanliness • Access to amenities • Transportation Accessibility • Amount of space built within “x” years • Adjunct faculty from tenants teach at BGU ATP Confidential Page 12 • • • • • • • • • • Partnerships with companies. Increase number of students and graduates working in ATP. Increase lecturers coming from companies in ATP Research compatible with university criteria. Well known multi-national companies populate the ATP Increase # of students in BGU from ATP operations Quality of candidates to BGU. Increase number of students and graduates working in ATP. Increase student projects and create foundation for number of fourth year student projects. Manufacturing “in or out” of the park is resolved and measured. Re: 8145 ATP Strategic Planning Workshop – May 2007 Detailed Final Report ______________________________________ Financial from the City’s Perspective: • Economic contribution to the vitality of the City by company and employees • Increasing the value of land, apartments, etc. • Increase in City Taxes • Increase average salary in BeerSheva • Partnerships with companies. • Rate of return on investment to City, BGU and KUD • Number of jobs • • • Increase number of Start-Ups Increase “Hot Names”. Increase K-12 classrooms as required for new population Financial from the University’s and KUD’s Perspective: BGU KUD • Increase income from research • Earn an appropriate return on the • Increase in acquisition IP and investment while maintaining our Royalties. reputation. • Contribution to employment of • Creating opportunities in Israel for students KUD • Attraction of students, lecturers, etc. • Creating a model for high-tech park to University creates income stream that can be exported to other to BGU projects. • Industry affiliation contributes equipment, money to departments, etc. • Joint research • Incubators allow University opportunity to commercialize intellectual property. • Increase # of graduate students • Increase # of joint papers. • Retention of graduate students, faculty • Rate of return on investment to City, BGU and KUD • Increase income for Research from increased PhDs and Master students in ATP ATP Confidential Page 13 Re: 8145 ATP Strategic Planning Workshop – May 2007 Detailed Final Report ______________________________________ Innovation and Knowledge: • Patents (filing and use as spin-offs, start ups, royalties to BGU) • State of Art research and technology for mutual benefit of BGU and industry • Number of spin offs and start ups • Number of collaborations • Number of transfer of knowledge from BGU to ATP tenants • Low ratio of failures to start ups (improved chances for start-up success) ATP Confidential Page 14 • • • • • • • Increase quality of candidate coming to BGU Improve Social / Economic / Educational Impact Increase number of students and graduates working in ATP. Increase in acquisition IP and Royalties. Increase “Hot Names”. Increase student projects. Measures for Educate, Attain and Retain Re: 8145 ATP Strategic Planning Workshop – May 2007 Detailed Final Report ______________________________________ Appendix 2 – Initial List of Goals for the ATP - A Culmination of Two Years of Listening – Goals: Long Term “What’s” That Must Be Accomplished for the ATP to be Successful Later we will develop the Long Term “Hows” ~ Strategies Then Near Term “What’s” ~ Projects ~ will be defined But this list is ONLY about the Long Term What’s We Must Accomplish A preliminary Goals list was presented to the participants on the first day of the workshop. This list was created by Dan and Jim in order to stimulate conversation. These eleven (11) goals sensitized the audience to the scope and scale needed for ATP success. The preliminary list is as follows: - Governance: o Activate the Negev Company, Charter the Board of Directors and Structure the Negev Company consistent with the strategy of the ATP • Structure: o The organization roles and responsibilities. o How the organizations will interact with one another. • ATP Funding: o Create the Funding Roadmap Needed for ATP Success o Establish a Cash Flow Proforma for the ATP Development and Operation o Create a Plan to Address the Request for the State’s Financial Guarantee o Establish a Complete Financial Incentives Package for ATP Residents that Fosters Win – Win – Win - Win ( Resident – City – University - State ) o IP Income: Create a Plan to Earn Income from IP Development • KUD: o o o o • • Develop a P & L for the park with time horizons Develop internal infrastructure to assure ATP success. Develop final agreement for signature to formally begin Develop initial map of park so as to be able to start infrastructure work. Facilities: o Land Use o Allow Basic Research, Applied Research, Advanced Development AND Low Volume, Clean Production in the ATP o Provide the “Right” Facilities to Achieve Success o Provide All The Support Necessary to Spin-out Innovations and Companies R&D Advancement o Create an Environment to Advancement of Research to Applied Research to Development to Commercialization Incubator: ATP Confidential Page 15 Re: 8145 ATP Strategic Planning Workshop – May 2007 Detailed Final Report ______________________________________ o Provide Incubator Capacity to Support Idea / Business Growth, including facilities, access to strategic equipment, revolving funds, etc • Infrastructure: o Create a Complete Plan for High Quality Infrastructure Tuned to the Targeted Centers of Excellence addressing Services, Support, Management and Maintenance. • Surroundings of the ATP o Include the Area Around the ATP as the Context for Quality of Life Education System o Leverage the ATP to Improve the Education System of Beer-Sheva o Manufacturing “just down the street” ~ actually or virtually. o Validate availability of electric, water and housing to accommodate expanding population • Tenants: o Create an Environment to Attract International and Domestic Anchor Tenants to the ATP o Develop Architectural and Operational Plans to Achieve a “Green” ATP Addressing the Triple Bottom Line o Army: Attract the Army Intelligence Unit as an Anchor Tenant for the ATP o Select the Centers of Excellence that Serve as the Best Magnets for the Anchor Tenants • CEO Forum: o Create an ATP Corporate CEO Forum to define the attraction of the ATP to them. • Brand Image: o Create a National / International Brand Image for ATP, Beer Sheva and the Negev Desert o Position ATP in a historical context understanding the continuum • Talent: o Develop and Attract Top Talent to the Desert; from Ph.D.’s to MidManagers to Knowledge Workers with a plan to educate / attain / retain talent. Quality of Life. ATP Confidential Page 16 Re: 8145 ATP Strategic Planning Workshop – May 2007 Detailed Final Report ______________________________________ Appendix 3 – Detailed Goals Presentations Each team at the workshop took their assignments quite seriously. As such great detail was developed for each of the Goals assigned. We have synthesized the Goal “Long Term – What’s” in Section 3 of this report. Here we present all the details for all the Goals. This should be reviewed periodically to insure that key thinking is not overlooked. The following details and the associated A/R’s are now presented: 1. Governance of the ATP and Donor Funding a. Begin with the new MoU structure b. Activate the NBS company c. Charter the Board of Directors i. Develop a Management Committee (MC) of 3 – 4 people from the expanded BoD with the responsibility of operational decision making of the Negev company. ii. May need to expand Board up to 9 people with 5 as a logical first step. iii. The Program Manager will need to do periodic reports to the MC iv. Every contract needs to go to the MC and Board for approval d. Structure the NBS e. Define the Roles and Responsibilities i. These are written in the by-laws of the company. They must be reviewed / expanded / clarified. f. Define the Signature Authority i. All approval authorities must be defined and published. ii. Currently only two signatories iii. NBS must be an “active” company ~ not just a holding company. g. Develop the Interactions Plans with the Donors i. Some may wish to invest in the investment company. ii. Collectively, we have an obligation to work with the potential donor with City or University personnel. ATP Confidential Page 17 Re: 8145 ATP Strategic Planning Workshop – May 2007 Detailed Final Report ______________________________________ 2. ATP Financing a. Create the overall funding roadmap. i. Create the long term funding plan for the park. b. Include assimilation of multiple funding sources. i. We must develop a comprehensive, alternate-source funding plan just in case the government does not come through and fulfill all their obligations. ii. Meetings with appropriate ministers must begin now. c. Establish complete financial incentives for a “win-win-win”. i. We must develop a plan to promote the project. 1. A PR package is needed. (AR) d. Establish Intellectual Property Income Plan 3. The KUD Operational Management Activities a. KUD now has a signed MoU to launch the plans for the park. b. KUD has learned that Phase I of the ATP has a preliminary plan and layout and infrastructure definition. i. Their task is to review this plan and create comments and a game plan on how to proceed. ii. Scenarios for these alternatives c. Create Land Use Plan d. Develop initial map of park (or modify MoT map of phase 1.) 4. Facility and Incubator a. Location on Tech S Curve i. Basic, applied, adv. Develop, Low Vol, High Vol b. Where should the park be strategically positioned i. Perform a market analysis to identify the kind of potential tenants (Basic research, Advanced Development, etc..) ii. Validate analysis (to be sure that the market analysis is realistic) c. Land Use Plan d. Design of the park i. Identify the requirements of potential tenants 1. Infrastructure 2. Allocation of space and function for various needs 3. Services (child care, food, security, …) ii. Complete the detailed plan of the park based on the identified requirements. e. Spin-out Incubation Support f. Provide Incubator g. Incubator i. Define the focus of the incubator (multiple centers of excellence?, within one incubator?, several?, types) ii. Define the structure (management, services, administration) iii. Define Infrastructure and facilities ATP Confidential Page 18 Re: 8145 iv. v. vi. vii. ATP Strategic Planning Workshop – May 2007 Detailed Final Report ______________________________________ Define the relations between the university and the incubators (BGN share, etc…) Identify sources of capital (VCs, I-banking, etc…) Define a function in the incubator that will connect manure ideas to investment capital (Spin-Out support). Open immediately an incubator in the university that will be responsible for fulfilling the above goals and will start to operate some of the activities within the university campus using existing facilities, manpower and IP. 5. Infrastructure a. Create a Complete Plan for High Quality Infrastructure Tuned to the Targeted Centers of Excellence addressing Services, Support, Management and Maintenance. b. Identify the requirements of potential tenants i. Infrastructure ii. Allocation of space and function for various needs iii. Services (child care, food, security, …) iv. Expected number of employees (how many need cars, etc…) c. Identify what infrastructure and/or services should be in the park and what outside of the park. d. Compose a detailed list of all the required infrastructure i. Transportation ii. Parking iii. Electrical, Communication infr., Wastewater, iv. Space for different needs (buildings, services, landscape, etc…) e. Complete detailed plan of the park based on the identified requirements. f. Where should the park be strategically positioned i. Perform a market analysis to identify the kind of potential tenants (Basic research, Advanced Development, etc.) ii. Validate analysis (to be sure that the market analysis is realistic) g. Identify the requirements of potential tenants i. Infrastructure ii. Allocation of space and function for various needs iii. Services (child care, food, security, …) iv. Expected number of employees (how many need cars, etc…) h. Identify what infrastructure and/or services should be in the park and what outside of the park. i. Compose a detailed list of all the required infrastructure i. Transportation ii. Parking iii. Electrical, Communication infr., Wastewater, iv. Space for different needs (buildings, services, landscape, etc…) j. Complete detailed plan of the park based on the identified requirements. ATP Confidential Page 19 Re: 8145 ATP Strategic Planning Workshop – May 2007 Detailed Final Report ______________________________________ 6. Surroundings of the ATP a. Creating an environment for the likely ATP residents and workers i. Transportation, Tourism, Culture, Schools, Housing, etc. b. Tie this into the national initiatives c. Creation of a Family Support program as well i. School system, “children friendly” d. Adopting a concept of “Alliancing” i. Taking the best that all have to offer (seeing the best of each) ii. Master Plan creation that builds upon city transportation, public relations, tourism opportunities, etc. e. Creation of a brochure to attract many to the region f. Address the Bedouin perception issue ~ i. ATP will NOT solve this problem ~ ii. ATP must address issues in the future if a problem arises! g. Coordinate the proposed uses with the legal rights allowed i. Understand limitations and/or work with “powers” to make some desired changes happen. h. Central Coordinating Committee formed to coordinate all these actions. i. Answer the question: Does Beer-Sheva have the infrastructure to accommodate up to 100,000 new residents? ATP Confidential Page 20 Re: 8145 ATP Strategic Planning Workshop – May 2007 Detailed Final Report ______________________________________ 7. Tenants of the ATP a. Create an Environment to Attract International and Domestic Anchor Tenants to the ATP b. Develop Architectural and Operational Plans to Achieve a “Green” ATP Addressing the Triple Bottom Line c. Army: i. Attract the Army Intelligence Unit as an Anchor Tenant for the ATP d. Select the Centers of Excellence that Serve as the Best Magnets for the Anchor Tenants e. Light manufacturing could be attracted to the park “area” i. Think about the area around the park as well as the park itself f. Light mfg. is a logical ? extension of research. Real Opportunities i. Rapid Ramp is really for the Park! talented Hybrid B-G Low Vol 1. Maintaining Tech University Production Industry Maturity Focus Focus the high salary desires Incubator from the ATP Shared ii. Maybe “Hybrid” Facil. & Services R&D and Proto Basic Applied Advanced Rapid Production 1. Sophisticated Res. Res. Develop. Ramp . tools used by sophisticated people! iii. Selling “Tested” IP g. Consider “no emissions” h. Focus on getting the IDF into the ATP i. Absolutely critical focus ii. Treat them as a “client”! iii. Really work to secure them as a “magnet” to the ATP 1. May be more of a magnet than B-GU 2. Keep the pressure on! iv. The suppliers of the IDF are the logical “close followers” i. But look for #2 as well! i. Second major tenant is critical ~ one is NOT enough! ii. National Institute of Biotech of the Negev maybe should be lured aggressively 1. In conjunction with the hospital 2. In conjunction with a pharma! j. Maybe #3 could be D-T i. Recommend we show them the “brochure” of the ATP ii. Consider expanding the operation into the ATP 1. Exploiting : research to center to park continuum! iii. A current client is much easier to lure than a new one! k. Water may be the next scarce resource and B-G U is really on the forefront! ATP Confidential Page 21 Re: 8145 ATP Strategic Planning Workshop – May 2007 Detailed Final Report ______________________________________ 8. Brand Image of the ATP a. Make the ATP look like a high tech, stylish park b. Attract the best companies to the park c. Reduced fees for early year, anchor tenants d. Utilize / provide access to university facilities, e.g. equipment, journals, etc. e. Ability to influence / interject decision-making politicians and others into the “game” f. Special government benefits incentive package (over and above the current) g. “Success breeds Success” – Attract Type B entrepreneurs as Type A entrepreneurs enter the park. h. Provide “right of first refusal” for new BGU ip to anchor tenants i. Make space available for early-entrant targeted anchor tenants with the first 6 months of ATP existence as they transition to their own facilities in 2 – 3 years. j. Build incubator with anchor tenant paying for x% i. Start with existing facility in university and move to incubator ii. Supported by admin and clerical and office support. k. Create worldwide CEO-Conference for: i. CEO awareness of ATP ii. CEO identification of their needs l. Develop marketing collateral for SPC to distribute m. Define the sales process and specific roles and responsibilities with clear liaison for all partners. n. Exploit faculty / staff contacts with NBS team to provide visibility for their contacts to join the ATP. o. Define the manner to which companies can have BGU provide employees that frees tenants from hiring. ATP Confidential Page 22 Re: 8145 ATP Strategic Planning Workshop – May 2007 Detailed Final Report ______________________________________ 9. Talent Availability for the ATP a. Develop and Attract Top Talent to the Desert; from Ph.D.’s to MidManagers to Knowledge Workers with a plan to educate / attain / retain talent. Quality of Life: b. Increase the level of compensation for the: i. Students ii. Workers c. Address where the talent will come from AND the training needed to make them “world class!” d. Develop a detailed plan to answer the following: i. Why will they come to the desert? ii. What will keep them / let them live in the desert? 1. “Quality of Life” must be addressed! e. Attract by “Quality of Life”, “Cost of Life”, Education, Entertainment, etc. f. Housing is a critical part of the decision: i. Inexpensive land is available now ~ announce the opportunity! g. Proximity to a magnet serves as a value generator for housing, etc. i. Cost of housing is now very reasonable ii. Cost of housing WILL go up as magnet grows! h. Need to VALIDATE the real value prop that the ATP / Beer-Sheva area / B-GU offers to the talent 10. Build the Park a. Find construction contractors for spec buildings b. Work with contractors for tenant-build buildings ATP Confidential Page 23 Re: 8145
© Copyright 2026 Paperzz