Northern Western Jutland, Denmark Low population density, 43.000 customers/meters High wind turbine density Installing intelligent meters, 3 years Installing optic fiber network, 7- 9 years Power production peaks Eastern Jutland, Denmark High population density 140.000 customers Biomass, low wind turbine density Going to install intelligent meters Installing optic fiber network 7- 9 years Power demand peaks Political requirements: • Energy savings • RES technologies Configuration: • One major CHP Plant • Several minor power plants and some wind turbines Challenges for the power utility: • Energy savings at end-users based on intelligent meters • Even the power demand peaks 366 wind turbines produce 80% of the electricity demand yearly Consequences during strong wind: • Overflow of power • Decrease of power price • Turbines taken out of operation • Poor incentives for further investment in wind power Challenges for the power utility: • Even the power production peaks • Establish a strong power net FP 7 Smart Energy Network - project For both power utilities: • Mapping controllable demands in order to provide increased possibilities for balancing the production and the demand • Identify options for smart grid concepts • Identify barriers • Demonstrate concepts We are looking for partners, please contact: Mr Kaj Leonhart Petersen Energy Consulting Network [email protected] www.ecnetwork.dk, +45 8613 8056 Mr Jens Brusgaard Vestergaard BVEngineering [email protected] www.bvengineering.dk; +45 4160 4241
© Copyright 2026 Paperzz