R Carbon Fiber Composite Cable Bridge Cables 橋梁用ケーブル Herning Footbridge (Denmark) In Denmark a large amount of money is spent to prevent the corrosion of steel reinforcing caused by de-icing salts in winter. In addition, Denmark is also a country that possesses the technical skills to design and construct world-class long, large-sized bridges. This PC cable-stayed bridge was built in the city of Herning, which is located in about the center of the Jutland Peninsula in Denmark. CFCC was used in all stay cables of the PC cable-stayed bridge, tendons and reinforcing bars in order to reduce the life-cycle costs of this bridge, and with a view to adopting CFRP stay cables for long-span cable-stayed bridges in the future. Of all the new material cables from around the world, the high quality and extensive experience of CFCC from Japan is widely recognized and used. Client The Danish Road Directorate, Danish Ministry of Transport Location Herning (Jutland Peninsula, Denmark) Dimension 2 span continuous PC cable-stayed bridge Bridge length: 80 m Width: 5.2 m (Span: 40 m) Material CFCC 1x37 40.0 CFCC 1x7 12.5, 10.5, 7.5 Application Stay cables Post-tensioned tendon and reinforcing bar of PC main girder Completed September 1999 CFCC reinforcing bar Courtesy of the Danish Road Directorate Schematic drawing of structure Stay cable CFCC 1×37 φ40 Cross section of grinder Side view CFCC 1×7 φ7.5∼φ12.5(Reinforcing bar) 675 CFCC 1×7 φ12.5(Post-tensioning tendon) 5400 39550 39550 <From the ACC Club Catalog> TOKYO ROPE MFG. CO., LTD TCT Division (Total Cable Technology) Nihonbashi Front Bldg. 6-2 Nihonbashi 3-chome Chuo-ku Tokyo TEL:+81-3-6366-7731 FAX:+81-3-3278-6870
© Copyright 2026 Paperzz