FEE SCHEDULE Construction Services and Permitting CONSTRUCTION SERVICES A. BUILDING RELATED PERMIT FEES Affidavit Permit. If authorized by the POD prior to start of construction Single-family residential Commercial and all other residential If not authorized by the POD prior to start of construction (see Section 12-8 for additional permit fees when work was started without permit(s) Single-Family Residential Commercial and all other residential 100.00 500.00 250.00 750.00 Commercial Tent (separate electrical, plumbing, and mechanical permits required) 50.00 Change of Address: First address Each additional address on the same property 50.00 20.00 Demolition (additional permit(s) may be required) Demo base fee up to 5,000 square feet Over 5,000 square feet 150.00 300.00 Driveway Permit, Residential Construction of up to two driveways and/or curb cuts and construction of sidewalk. ($20 DRS, $45 C.S. & $65 Eng.) 130.00 Early Start Authorization, per request 100.00 10.00 + fee by County Filing a Notice of Commencement Flood Insurance Flood determination letter Community flood elevation certificate 60.00 100.00 House Moving: Relocating a house within the City of St Petersburg Moving a house into the City Moving a house outside the City 250.00 250.00 250.00 Construction Services and Permitting Division Planning and Economic Development Department City of St. Petersburg, Florida Revised 10/06/16 Microfilm Services: Viewing only: First 15 minutes Each additional 15 minutes or portion thereof Copies each: Half sheet Full sheet Property Card Subscription Service Unlimited requests with escrow account, per month or $5.00 per request, whichever is less expensive to the subscriber in any calendar month. Permit Extension: Commercial Residential Extension after permit expiration Extension of 2 or more permits for same parcel N.C. 12.00 5.00 10.00 50.00 75.00 50.00 250.00 350.00 Permit Fee for App. with Inspections Performed by Outside Entity (contracted by applicant): The permit fee for an application when the Building Official has approved the request of the applicant to have an outside entity, contracted by the applicant, perform the required inspections shall be: one-half of the permit fee of the proposed structure as calculated pursuant to this chapter, with a minimum $55 fee (this does not include any fees paid to the outside entity). Refunds of Permit Fee Only (not plan review or other fees) Work has not commenced and the permit is less than 6 months The amount of the permit fee paid minus 75.00 Work has commenced or the permit is over 6 months old No refund Residential: Residential property owners obtaining permits without a contractor shall be charged a surcharge for permits for work costing more than $2,000. 20.00 Service Permits: Specified single-family and duplex residential permit fees Air conditioning unit changeout (no electric) Air conditioning unit changeout (with electric) Hot water heater unit changeout (no electric) Hot water heater unit changeout (no gas) Hot water heater unit changeout (with electric) Hot water heater unit changeout (with gas) Hot water heater unit changeout (with electric & gas) Tankless hot water heater unit changeout (with plumbing) Tankless hot water heater unit changeout (with plumbing & electric) Tankless hot water heater unit changeout (with plumbing & gas) Tankless hot water heater unit changeout (with plumbing, gas & electric) 65.00 85.00 65.00 65.00 65.00 85.00 95.00 65.00 85.00 85.00 95.00 Construction Services and Permitting Division Planning and Economic Development Department City of St. Petersburg, Florida Revised 10/06/16 Special Project Fee: A fee charged for special services requiring staff research, inspections, document preparation and other assistance that is beyond the scope of services routinely provided by a department. The fee will be calculated based on actual staff time and other related costs that are incurred in order to complete the request. Minimum fee 30.00 Transportation Impact Fee: To be assessed in accordance with Pinellas County Ordinance 85-43 and its subsequent amendments except as additionally required in the Gateway Areawide Development of Regional Impact. b. BUILDING RELATED PLAN REVIEW FEES Plan Review: One- and two-family dwellings or additions thereto 30.00 Multifamily, commercial and industrial, and where plans are submitted, the plan review fee shall be 20 percent of the permit fee with the minimum fee 50.00 Plan consultation fee (preliminary building plan review), (the cost of staff shall be applied as a credit for applicable plan review fees at the time the permit application is submitted for plan review)100.00 plus the cost of staff attending the meeting Plan review fee for plans reviewed by a private entity contracted by the permit applicant, pursuant to the provisions in F.S. 553.791, The plan review fee shall be one-half of the fee calculated pursuant to this Chapter, with a minimum $45 fee (this does not include any fees paid the outside entity). Plan review fee for master plan (which is intended to be used for multiple properties) for new single-family structures: Review of a master plan 145.00 Review of an individual application building using an approved master plan 65.00 Plan Revision Review Fee: Commercial revisions review: One page Each additional page 45.00 12.00 Residential revisions review 45.00 Construction Services and Permitting Division Planning and Economic Development Department City of St. Petersburg, Florida Revised 10/06/16 Certificates and Release of Power Certificate of Occupancy (C.O.): C.O. Single-family and duplex residential C.O. Commercial C.O. Temporary Single-family residential per unit C.O. Temporary Commercial, per unit (90 days) Each additional 30 days 75.00 125.00 75.00 200.00 200.00 Certificate of Completion (C.C.) 100.00 Certificate of Use: Certificate of Use for single-family residential Certificate of Use for residential over two (2) dwelling units 50.00 100.00 Change of Use: Change of use with construction – no additional fee To the building permit fees Change of use with no construction (these changes may also be required to pay TIF fees) Early Release of Power: Early release of power commercial Early release of power residential 100.00 125.00 50.00 Specialty Contractor Registration 50.00 Special Services: Fees for specialized services are as follows: 1. Inspections: a. Reinspection fee after a failed reinspection for non-compliance with at least one of the same code deficiencies 100.00 b. New business inspection request 100.00 c. Single-family consultation and partial inspection 65.00 d. Inspection appointments per Division procedure 75.00 e. Saturday inspection with min. of three inspections (fee per inspection) 90.00 f. Commercial partial inspections unless waived by POD due to complexity of a project 65.00 2. Plan Review a. Expedited plan review (first review) b. Expedited plan review (2nd and each subsequent review of same plan) 3. Flat Fee Permits a. Photo voltaic systems b. Solar Water heater (plus electric permit if required) c. Solar Pool heating 130% of plan review fee 40% of plan review fee 385.00 250.00 150.00 Construction Services and Permitting Division Planning and Economic Development Department City of St. Petersburg, Florida Revised 10/06/16 d. e. f. g. h. i. j. k. l. m. n. o. p. q. r. s. t. u. v. w. x. y. z. aa. bb. cc. dd. ee. ff. gg. hh. ii. Pools/spas above ground (plus electric permit if required) Pools/spas inground (plus electric permit if required) Pool enclosure Antennas more than 30 feet above grade Other – Plumbing with no required plan review and one inspection Other - Electrical with no plan review and one inspection Other - Mechanical with no plan review and one inspection Hood and fire suppression separate from building or alteration Mobile Home removal Mobile home installation including foundation (MEP extra) Reroof up to 15 squares (a sq. equals 100 sq. ft.) Reroof over 15 square up to 40 squares (a sq. equals 100 sq. ft.) Reroof over 40 squares (a sq. equals 100 sq. ft.) Masonry walls or fences up to 300 LF Masonry walls or fences over 300 LF Signs Pylon, pole, billboards (plus electric permit if required) Signs walls sign (plus electric permit if required) Siding including stucco, wood or vinyl Fascia soffit Sheds Tanks Tents Electric - commercial alarm - low voltage Electric pre-power inspection Saw pole Electric service change – Residential Electric service change – Commercial Electric service recertification (service and riser only) Plumbing fixture replacement (per fixture including shower pans) Water service replacement Sewer/storm line replacement exterior only Sewer/storm line replacement interior 125.00 250.00 250.00 100.00 100.00 100.00 100.00 200.00 85.00 190.00 125.00 150.00 300.00 150.00 250.00 150.00 110.00 120.00 120.00 120.00 75.00 125.00 40.00 65.00 120.00 125.00 150.00 175.00 65.00 85.00 125.00 175.00 Other Service Fees: Amendments to a Redevelopment Plan approved by the CRA 2,000.00 Developments of regional impact Initial application Notice of proposed change Substantial deviation application Annual report 1,000.00 1,500.00 2,500.00 150.00 Appeal of denial of moving permit Codes inspection of a property 100.00 50.00 Construction Services and Permitting Division Planning and Economic Development Department City of St. Petersburg, Florida Revised 10/06/16 Code lien release requests, per property By property owner By any other entity (e.g. mortgage company) Each successive lien release request by the same entity for the same property Public Vehicle Certificate Public Vehicle Driver Background Check 50.00 100.00 100.00 200.00 90.00 Sewer and Water Services Fees: To be assessed in accordance with Chapter 27 Special Projects Fee: A fee charged for special services requiring staff research, inspections, document preparation and other assistance that is beyond the scope of services routinely provided by a department The fee will be calculated based on actual staff time and other related Costs that are incurred in order to complete the request. Minimum fee 30.00 Transportation Impact Fee: To be assessed in accordance with Pinellas County Ordinance 85-43, as amended, except as additionally required in the Gateway Areawide Development of Regional Impact. Requests for City staff to appear and speak before other agencies Hourly charge based on labor plus materials and other costs Research Fees Not related to above enumerated applications and not related to public records requests Hourly charge based on labor plus materials and other related costs Construction Services and Permitting Division Planning and Economic Development Department City of St. Petersburg, Florida Revised 10/6/16
© Copyright 2026 Paperzz