UPGRADATION OF I.T.I. GHOGHA Welcom THROUGH PUBLIC PRIVATE PARTNERSHIP To WITH Pipavav PIPAVAV SHIPYARD LTD. Shipya INSTITUTE DEVELOPMENT PLAN Institute Development Plan 1|Page ANNEXURE SR NO 1 2 3 4 5 6 7 8 DESCRIPTION PAGE NO INFORMATION ABOUT IMC OF ITI EXECUTIVE SUMMARY OF THE DETAILS OF THE EXISTING ITI SUMMARY OF THE FUTURE PLAN FOR UPGRADATIUON OF ITI DESCRIPTION OF THE MEASURES FOR IMPROVING THE PERFORMANCE OF THE INSTITUTE ACTION PLAN FOR UPGRADATION YEARWISE BREAKUP OF RESOURCES REQUIRED MISCLLANEOUS DETAILS OF THE INSTRUCTIONAL STAFF IN THE INSTITUTE 3-4 5-6 7-10 11-12 13-14 15-16 17 18 Institute Development Plan 2|Page 1 SECTION-A: INFORMATION ABOUT IMC OF ITI Gujarat STATE/UT 2 ITI(Name/ Address) 3 Name of Principal: Contact details- Phone: Industrial Training Institute, Ghogha, Panchayat Quarter, GHOGHA, PIN 364110 Di: Bhavnagar Shri B. M. Chauhan 0278-2424316, Mo. 09428108844 Fax: 0278-2424316 Email: [email protected] Industry Partner (Name/ Address) 4 5 6 7 8 Taluka Pipavav Defence and Offshore Engineering Company Ltd. –Pipavav At:Ucchaiya Ta:Rajula Di:Amreli. PIN:365 560 Details of Nodal officer (Name/Address) Mr. Debashish Bir Pipavav Defence and Offshore Engineering Company Ltd. Designation in parent org.: COO (production) Contact detailsPhone: 9727777003 Fax: Email: [email protected] IMC Chairman (Name/ Address) Mr. Debashish Bir Pipavav Shipyard Ltd. –Pipavav Designation in parent org.: COO (production) Contact detailsPhone: 9727777003 Fax: Email: [email protected] Affiliation of Industry Partner Details of Contact Person of above Mr. Mayank Pandya Industry body at: Local level 9727777115 State level National level Details of Bank Account of IMC UNDER PROCESS Society- Account No: Bank & Branch: Institute Development Plan 3|Page Composition of Institute Management Committee (IMC) Name of member SrNo Additional info about the member Chairman of the IMC Mr Debashish Bir 1 C.O.O. Pipavav Shipyard Ltd. Ucchaiya Members nominated by Ind. Partner Member 1 2 Mr. Buddhadeb VicePresident–HR Sen gupta Pipavav Shipyard Ltd. Ucchaiya Member 2 Mr. Naranbhai vaja 3 GM-yard service Pipavav Shipyard Ltd. Ucchaiya 4 Member 3 Mr.Jaybhai P.Deliwala Prop. Elite Chemical, Bhavnagar Member 4 Mr. Nirajbhai Joshu. 5 Dy. GM(Engg.) Excel Crop Care Ltd, Bhavnagar. Members nominated by State Govt. Mr. B. M. Chauhan Principal, ITI, Bhavnagar & Mahuva 8 9 Member 3 Member 4 Mr. P. B. Thakar Office of the Assistant Asst. DirectorSEmp) Director(Emp.) Mr.Mahavirsinh Gohil Principal,Ghogha English School, 10 Member 5 Mr. J.K.Kanabi ITI Ghogha Foreman 11 Member 6 Mr.J.B.Dangodara ITI Ghogha S.I.(ET) 11 Member 6 Mr. Nitesh Boricha, ITI Ghogha Institute Development Plan 4|Page Trainee. Institute Development Plan 5|Page SECTION-B: EXECUTIVE SUMMARY OF THE DETAILS OF THE EXISTING ITI: 1. Year of Establishment: 2. Affiliation Number given by DGE&T 3. Building/ Premises : (Owned/ Rented) 4. Total land Area (in Sq. m) 5. Total Constructed area: (in sq.mts) 01/10/1990, in rent building ET :- DGET12/1/2001 –TC WM:-DGET12/2/1997/TC FT :-DGET/12/1/1998-TC MD:-DGET/12/1/1998-TC Under Construction 256 Sq.m. Office: 129 Sq.m. Workshop:127 Sq.m. Hostel: Nil 6. Types of industries available in the region: MECHANICAL, ELECTRICAL & MARINE. 7. Whether Placement cell available in ITI--------------------------------------- NO 8. Percentage of passed out trainees employed/self employed during last two years: 80% 9. Trades having high employment potential in the region: Mechanical, Electrical & Chemical (Dehydration), Welding, Welding cum Fabrication. 10. Trades having low employment potential in the region: ...............NA........ 11. Total yearly fees collected from trainees (average of last two years) Rs: 45675/12. Revenue generated during last two years through other sources/ activities (Pl specify)-----Rs. ……… (Year______) Rs. (Year______) : Nil 13. Trainees Details (Trainees as on date ) Total Number 60 Males Females 60 -- Scheduled Caste Males Females 22 -- Scheduled Tribe Males Females 02 -- OBC Males Females 32 -- Institute Development Plan 6|Page 14. Trade details: Trades available in ITIs No. of trainees Instructors Availability Training (out of filled posts) Trained untrained Ist year 2nd year 3rd year Sancti oned Filled vacant Total NCVT 1 Wiremen -- 30 -- 02 02 00 02 02 -- 2. Electrician -- 17 -- 01 01 -- 01 01 -- Others: Maths cum Drg. -- -- -- 01 -- 01 01 -- -- SCVT 1. Welder cum Fabri. 13 -- -- 02 01 01 02 01 -- 15. Expenditure details: (Rs in Lakh) Expenditure of last two years Exp for the Year 2009-10 Recurring 24.19 Lakh Non recurring Expenditure incurred by DET H.O. Gandhinagar Exp for the Year 2010-11 Recurring 25.01 Lakh Non recurring Expenditure incurred by DET H.O. Gandhinagar Institute Development Plan 7|Page SECTION C: SUMMARY OF THE FUTURE PLAN FOR UPGRADATIUON OF ITI: (I) Skill requirements of the region a. How the skill needs of the region has been determined (i) Though study/survey of Local Industries--------------------------------Yes (ii) Data collected from Apprentice branch & other local sources------- Yes b. Estimate of the yearly skill requirement (in terms of number of workers) Skill For the region For outside the region which can requirement be met by the ITI Short term 800 100 Medium term 500 Long term 1000 150 280 (II) Proposed changes in training program: (a) Upgrade the ITI into a Centre of Excellence in (Fabrication : Fitting & Welding) trade sector. (b) Upgrade the following trades. List of Trades No. of units o Wireman o Electrician o Welder cum Fabrication (c) Add the following new trades. List of Trades o o o o COPA Fitter Marine Diesel Dress Making 01 01 01 No. of units 01 01 01 01 Institute Development Plan 8|Page (III) Details of the additional resources required and the total loan amount sought by the IMC society under this scheme: 1. Total interest free loan amount sought : Rs ______(lakhs) 2. Seed money to be used as a corpus : Rs _____ (Lakhs) 3. Manner in which the remaining amount is proposed to be used: Item Civil works Equipment furniture learning material etc. Recurring expenditure Total For CoE Nil Nil For upgradation 15 30 For new trades 15 40 (Rs in lakhs) Total 30 70 Nil 15 10 25 Nil 60 65 125 4. Additional Manpower requirement: S No 1. 2. 3. 4. Trade All Maths/Drg. All Trades All trades Instructors Other staff Principal Craft Instructor-01 Asst.Store keeper01 Clerk-01 Placement Cell Consultant-1 Accountant-1 Security Guards-2 Web Designer-1 Institute Development Plan 9|Page (IV) Details of any revenue generating facilities proposed to be set up in the ITI: (1). Whether any Business Plan to generate revenue has been prepared?. Yes. (2). If yes, please give the details interalia indicating the year when the facilities for the same is envisaged to be developed, funds requirement & how the expenditure is likely to be met, etc. in a separate Annexure. • Enrolment Fees and Monthly fees can be increased. • Allowing industrial workers for training at institute on payment basis. • Allowing special skill production job work at institute with charges. • Maintenance contract for special equipments wiring with nearby industries, N.G.O. and Govt. / Semi Govt. organizations. • Starting some special short term courses with tution fees. • Providing Placement services. • Providing institute's equipments to industries on rental basis at institute campus for production work during un utilization period. Detailed Business Plan Business Plan Increase in Enrolment Fees and Monthly Fees Placement Cell Evening Computer Course to people in area Vehicle Service Station Total Year-wise Revenue Generation ( Rs. in Lacs) 1st 2 nd 3rd 4th 5th Total 0 0 0.5 0.5 0.5 1.5 0 0 0.4 0.4 0.4 1.2 0 0.2 0.2 0.2 0.2 0.8 0 0 0.5 0.7 0.5 1.8 0.5 1.8 0.5 1.8 2.0 5.5 Institute Development Plan 10 | P a g e (V) Key Performance Indicators(KPIs) The details to the Key Performance Indicators set as targets under this scheme during next five years are as follows: Sl. No. 1. 2. 3. 4. 5. 6. Key Performance Base line in Indicators the year of for the release of year next loan to loan release year % of applications 146% 150% as compared to no. of seats % of enrolments as 80% 85% compared to no. of seats % of dropout as 10% 8% compared to no. of enrolments % of students 80% 85% passed out compared to enroll students % of passed out 50% 60% students employed/ self employed within one year of pass out Average monthly 2000/2500/income of the employed/self employed students. Target for 2nd for 3rd for 4th for year year year year 175% 175% 175% 175% 90% 90% 95% 100% 6% 5% 4% 2% 87% 90% 95% 98% 65% 70% 80% 90% 3500/- 4000/- 5000/- 6000/- 5th Institute Development Plan 11 | P a g e SECTION D: DESCRIPTION OF THE MEASURES FOR IMPROVING THE PERFORMANCE OF THE INSTITUTE (a)What changes would you like to introduce for better management of the ITI? i. ii. Functional Autonomy and De-centralization of power for IMC. Salary package would be offered for a prescribed training to guest lecturer and contractual staff to fulfill the shortage of staff. iii. No transfer of CoE staff for at least five years. iv. Industrial Partnership in the form if IMC. v. Staff, trainees and industrial feedback for better management. vi. Staff training in different aspects. vii. Guest lecturer for better knowledge impartment. viii. PAB Establishment (b) What sort of training do teaching and non-teaching staff of the ITI require? i. ii. iii. iv. i. ii. iii. iv. Training for operating and maintenance of newer Machinery & Equipments. Training regarding the recent development and modernization in teaching methodology. Industrial training where latest machineries are available. EMF Trg. For non-teaching staff; Training of Administration and Automation in record keeping. Training of Computer Operations like MIS, Financial Accounting etc. Motivation, behavior, self discipline and industrial survey. EMF Trg. (c) What improvements in teaching and learning resources does the ITI require? i. ii. iii. Multimedia Class Rooms, Workshops, Cut models, Machineries equipments and full furnished library. Advanced machineries and equipments for newly introduced courses. G-Sat facility is required. Learning Resources; i. ii. iii. Standard Instructional material in English as well as in Gujarati. Latest Audio Visual Aids. Presentation CDs, latest technological books, internet connection. Institute Development Plan 12 | P a g e (d)Can you improve the number of female students in ITI courses? How would this be done? i. ii. iii. iv. v. We will arrange the campaign at girl's school. IMC will help to give employment to female students. Modular Employable pattern courses will be introduced. Free training and training materials will be offered. Short term course will conducted by ITI only for Girls. (e) Can you improve the number of students from disadvantaged background in the ITI courses? How would this be done? i. ii. iii. Campaign at school level as well as in the slum and rural area to motivate the disadvantaged backgrounds students. IMC will help to give employment to these students. Importance of Short Term Courses and Modular Employable Scheme will be explain to these group and motivate them to join these scheme freely. (f) How can you improve your linkages with the local labour market? Do you need to improve your linkages with labour markets outside your locality and if yes, how could you go about it? i. Seminar of all Industrialists of the district will help to improve linkage. ii. Campus interviews will helpful to improve the linkage. iii. Continuous feed back from industries which absorbed our trainees. iv. Interchanging faculties from Institute to industries and from Industries to Institute. v. Job work possible to do at Institute will be done at Institute. vi. Old machinery exposed by industries may be utilized for demonstration purpose at institute. vii. Workshop with Industry experts from H.R. department can help trainees for performance development in personnel interviews. viii. Big industries can be invited for M.O.U., which are stated outside the district, but their market is in the district also. ix. Placement Advisory bureau will help to meet the requirement of labour market. Institute Development Plan 13 | P a g e SECTION E: ACTION PLAN FOR UPGRADATION (a) Do you intend to establish a Centre of Excellence? Yes If Yes: Which trade sector do you prefer? Fabrication : Fitting & Welding Why did you choose this sector? We have chosen this sector due to the recent development of Sea shore and Port. Vast job opportunities are observed in these fields. Related skills like, fitting, machining, sheet metal works also needed in co-relation with these fields. (b) In addition to above or otherwise Which trades would you prefer to upgrade? 1 Wireman 2 Welder cum Fabricator 3 Electrician These trades are co-related with above Sector. IMC has also suggested developing these trades for better performance in CoE. (c) What resources do you need to upgrade your institution as a COE or to upgrade selected trades? (i) Civil works – describe and justify any civil works you want to undertake. i. ii. iii. iv. Construction of three workshops for Basic Modules of Centre of Excellence. Construction of two class rooms on reserved land for basic module. Sanitation facilities with drainage link for good house keeping. Workshop floorings, windows, shutters, Air conditioners etc. for modifications in up gradation of related trades, v. Construction of Conference hall, English Communication lab to improve training facilities. vi. Overhead tank for water requirement. vii. One Hostel building. Institute Development Plan 14 | P a g e (ii)Equipment, Tools & other items– describe and justify all goods you want to procure. (a) Equipment (b) Furniture Equipments required for Trades as per syllabus. Furniture for Class rooms and Workshop is required as per norms. Old furniture is required to be replaced by newer ones (c) Books, Learning Resources and Software: i. Books and software published by NIMI and some popular publications are required time to time as per development of curriculum and for new sector. ii. MIS software required. iii. Multimedia resources, software and internet connection is necessary. (d) Training of Staff – describe and justify the training needed by your staff and indicate how this could be implemented. ( Please fill-up the Annexure to IDP) (i) Training of Teaching Staff i. Entry Level training to inexperienced instructors. ii. Advanced / Refresher training to experienced Instructors. iii. Special training for latest equipment at industries or at manufacturing industries who supply the equipments. iv. Training is essential since it should be organized periodically and this process should be a continuous one. (ii) Training of Non-Teaching Staff i. Administrative staff requires Asset Management, Financial Management, Resource Management, Human Resource Management and Record Keeping. ii. E-governance and MIS software training will be help full. (e) Additional Staff - describe and justify any additional staff you need. i. ii. iii. iv. v. vi. Six Instructor staff is required for Basic Module. One Principal is required. One Full time librarian is required. One Supervisor cum store keeper is required. One Workshop attendant, One Peon, Three Watchman and One Sweeper are required. One clerk required for office work. (f) Consumables and Training Materials – describe and justify the consumables and any maintenance you need. For practical training, consumable material is required. According to syllabus, periodical maintenance required, just like electrical maintenance, machinery maintenance, etc. - Electrical materials just like types of wire, switches etc. - Hardware material like Iron Round bar, Iron flats, etc. - Welding material like electrodes, welding rod, Gases etc. - Computer material like stationeries, CDs etc. - Electronics material like diode, triodes, etc. Institute Development Plan 15 | P a g e SECTION F: YEARWISE BREAKUP OF RESOURCES REQUIRED (I) What finances do you need to procure the resources you described in the previous section? (a) for CoE: (figures in lakh of Rupees) Year 1 Year 2 Year 3 Year 4 Year 5 Total Non-recurring costs 1 Civil Works 2 Equipment 3 Furniture 4 Books, Learning Resources and Software etc Sub Total(1+2+3+4) 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Recurring Costs 6 Additional manpower 0 0 0 0 0 0 7 0 0 0 0 0 0 8 Consumables, Maintenance and Training Materials Misc Exp.(Pl specify) 9 Sub Total (6+7+8) 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL(5+9) 0 0 0 0 0 0 Year 1 Year 2 Year 3 Year 4 Year 5 Total 15 (b) for Upgradation of trades: Non-recurring costs 1 Civil Works 2 Equipment 3 Furniture 4 Books, Learning Resources and Software etc Sub Total(1+2+3+4) 5 -05 3 10 10 3 05 02 1 -02 1 -01 -- 20 08 0.5 0.5 0.3 0.3 0.4 02 8.5 23.5 8.3 3.3 1.4 45 Recurring Costs 6 Additional manpower 7 8 Consumables, Maintenance and Training Materials Misc Exp. (Pl specify) 9 1.5 1.5 1.5 1.5 1.5 7.5 1.0 1.0 0.8 1.0 1.0 4.8 0.5 3.0 0.5 3.0 0.5 2.8 0.7 3.2 0.5 3.0 2.7 Sub Total (6+7+8) TOTAL(5+9) 11.5 26.5 11.1 6.5 4.4 60 15 Institute Development Plan 16 | P a g e (c) for new trades : Year 1 Year 2 Year 3 Year 4 Year 5 Total 15 Non-recurring costs 1 Civil Works 2 Equipment 3 Furniture 4 Books, Learning Resources and Software etc Sub Total(1+2+3+4) 5 --1.0 10 10 04 05 10 01 -05 01 -05 01 30 08 0.5 1.0 0.3 0.1 0.1 02 1.5 25 16.3 6.1 6.1 55 Recurring Costs 6 Additional manpower 7 8 Consumables, Maintenance and Training Materials Misc Exp. (Pl specify) 9 -- 1.5 1.5 1.8 1.7 6.5 0.5 0.5 0.5 0.5 0.5 2.5 0.2 2.2 0.2 2.2 0.2 2.5 0.2 2.4 01 Sub Total (6+7+8) 0.2 0.7 10 TOTAL(5+9) 2.2 27.2 18.5 8.6 8.5 65 Year 3 Year 4 Year 5 Total 30 TOTAL requirement of funds (a)+ (b)+(c) Year Year 2 1 Non-recurring costs 1 Civil Works 2 Equipment 3 Furniture 4 Books, Learning Resources and Software etc Sub Total(1+2+3+4) 5 -05 04 20 20 07 10 12 02 -07 02 -06 01 50 16 01 1.5 0.6 0.4 0.5 4 10 48.5 24.6 9.4 7.5 100 Recurring Costs 6 Additional manpower 7 8 Consumables, Maintenance and Training Materials Misc Exp. (Pl specify) 9 1.5 03 03 3.3 3.2 14 1.5 1.5 1.3 1.5 1.5 7.3 0.7 5.2 0.7 05 0.9 5.7 0.7 5.4 3.7 Sub Total (6+7+8) 0.7 3.7 TOTAL(5+9) 18.7 53.7 22.6 16.1 13.9 125 25 Institute Development Plan 17 | P a g e SECTION G: MISCLLANEOUS a) How do you see the future of the Institute and what action would you suggest for achieving its growth and sustainability. i. ii. iii. iv. v. vi. Production and job work will be done and services will be utilized to generate revenue and make training more effective and viable. Revenue will be generated by the testing and certification charges. In plant training will develop the involvement of industries. Exchange of faculties and transfer of technology and knowledge of institute and industries through IMC. Formation of policies for extending training for informal sector and their by local employment need will be fulfilled. Donations/subsidized purchasing of equipments and machines. b) Any outstanding achievements/ success stories of the Institute? 1. From starting of this Institute, from 1990 to 2011, the result of this Institute is between 90% to 97%. 2. Passed out students got job in local Industries by the salary of Rs.5000 to 12000. and atleast 100 trainees of this Institute got job in Industries like Narmada Cement, Ultratech Cement, GPPL etc. ITI Principal(Secretary of IMC) Signature Industry Partner(IMC Chairman) Signature Institute Development Plan 18 | P a g e Annexure to IDP Details of the Instructional Staff in the Institute Sl. No . a Name of the Instructional Staff Educational /Technical Qualificatio n b Email ID Mobile No./Phone No. Instructor in which Area and how long e f g Foreman (7 yr) Welder (15 yr) Wireman (15yr) Wireman (15 yr) Electrician (10yr) peon No Yes Yes Yes Yes Yes Yes No No Yes No No c d 1 J.K.Kanabi ITI (MD) --- 9427051093 2 J.C.Parmar ITI (WD) ---- 9724333343 3 H.J.Jadav ITI (ET) --- 9426731003 4 J.K.Timaniya --- 9428079323 5 J.B.Dangodara ITI (WM) D.E.E. --- 9426966808 6 M.B.Gohel 9th pass --- 9426146305 Is the Instructor Trained in Principles of Teaching-POT (Yes/No) Is the Instructor Trained in Trade area(s) (Yes/No) Institute Development Plan 19 | P a g e
© Copyright 2025 Paperzz