NOTES: 1. The flashing arrow board shall be used when the posted speed limit is 45 mph or greater. 2. The Lane Drop symbol sign and the Merge with arrow sign may be omitted when the posted speed limit is 40 mph or less. 3. Use the appropriate traffic control devices for a right lane closure. Temporary Traffic Control Distance Charts Posted Speed Limit Prior to Work Starting (mph) 0 - 30 35 - 40 45 - 50 55 60 - 65 70 - 75 100 feet 3 3 Typical Shoulder Taper (A) (D) (L) (L/2) (L/3) feet 250 325 feet 550 700 feet 200 325 feet 100 175 feet 75 125 600 750 1000 1200 900 1200 1400 1600 600 700 800 900 300 350 400 450 200 250 275 300 G = 25 ft G = 50 ft Shadow Vehicle Following Distance (mph) (B) (F) feet 200 305 feet 250 - 550 325 - 700 feet 100 100 feet 100 100 425 500 650 820 600 - 900 750 - 1200 1000 - 1400 1200 - 1600 175 175 225 225 125 125 175 175 G = 25 ft G = 50 ft Protection Vehicle Roll-Ahead Buffer Distance (with or without TMA) Moving (R) (15 mph max) Stopped TYPE A CHANNELIZERS: 4 inch Diameter Minimum 2 3 2 or Shifting Taper Type A channelizing devices are typically used in attended temporary traffic control zones.* or 3 Taper Length (12 ft lane) Buffer Space 45 - 50 55 60 - 65 70 - 75 1 Decision Sight Distance Posted Speed Limit Prior to Work Starting 0 - 30 35 - 40 3 Advance Warning Sign Spacing 3 daytime low speed only 36 inch Minimum daytime low speed only 18 inch Minimum 3 18 inch Minimum TUBULAR MARKERS 3 42 inch Minimum 28 - 36 inch Minimum CONES WEIGHTED CHANNELIZER Type B channelizing devices shall be used if the temporary traffic control zone will be installed for more than 12 hours or if it is left unattended. * variable TYPE B CHANNELIZERS: 270 square inch minimum of retroreflective sheeting surface OPTIONAL 36 inches LANE CLOSURE VERTICAL PANEL MULTI-LANE DIVIDED ROAD 3 DAYS or LESS 24 inches LAYOUT 53 36 inches minimum 36 inches minimum TYPE I BARRICADE TYPE II BARRICADE DIRECTION INDICATOR BARRICADE DRUM * See the MN MUTCD, Part 6F for more details on application restrictions. Temporary Traffic Control Distance Charts Posted Speed Limit Prior to Work Starting (mph) 0 - 30 35 - 40 45 - 50 55 60 - 65 70 - 75 Advance Warning Sign Spacing Decision Sight Distance Taper Length (12 ft lane) Shifting Taper Typical Shoulder Taper (A) (D) (L) (L/2) (L/3) feet 250 325 feet 550 700 feet 200 325 feet 100 175 feet 75 125 600 750 1000 1200 900 1200 1400 1600 600 700 800 900 300 350 400 450 200 250 275 300 G = 25 ft G = 50 ft Posted Speed Limit Prior to Work Starting Buffer Space Shadow Vehicle Following Distance (mph) (B) (F) feet 200 305 feet 250 - 550 325 - 700 feet 100 100 feet 100 100 425 500 650 820 600 - 900 750 - 1200 1000 - 1400 1200 - 1600 175 175 225 225 125 125 175 175 0 - 30 35 - 40 45 - 50 55 60 - 65 70 - 75 G = 25 ft G = 50 ft NOTES: 1. Use the appropriate advance warning sign spacing for the speed on the cross road. 2. The flashing arrow board shall be used when the posted speed limit is 45 mph or greater. 3. The Lane Drop symbol sign and the MERGE with Arrow sign may be omitted when the posted speed limit is 40 mph or less. 100 feet G Protection Vehicle Roll-Ahead Buffer Distance (with or without TMA) Moving (R) (15 mph max) Stopped 25 feet 25 feet 200 feet Type A channelizing devices are typically used in attended temporary traffic control zones.* 200 feet TYPE A CHANNELIZERS: L 4 inch Diameter Minimum daytime low speed only 36 inch Minimum daytime low speed only 18 inch Minimum 18 inch Minimum TUBULAR MARKERS G 42 inch Minimum 28 - 36 inch Minimum 2 3 CONES or G 3 WEIGHTED CHANNELIZER 3 or Type B channelizing devices shall be used if the temporary traffic control zone will be installed for more than 12 hours or if it is left unattended. * TYPE B CHANNELIZERS: TURN LA N E variable 270 square inch minimum of retroreflective sheeting surface OPTIONAL 36 inches 24 inches VERTICAL PANEL 36 inches minimum 36 inches minimum TYPE I BARRICADE TYPE II BARRICADE DIRECTION INDICATOR BARRICADE DRUM * See the MN MUTCD, Part 6F for more details on application restrictions. RIGHT LANE CLOSURE WORK SPACE BEYOND INTERSECTION MULTI-LANE DIVIDED ROAD 3 DAYS or LESS LAYOUT 56 NOTES: 1. Use the appropriate advance warning sign spacing for the speed on the cross road. 2. The flashing arrow board shall be used when the posted speed limit is 45 or greater. 3. The Lane Drop symbol sign and the MERGE with Arrow sign may be omitted when the posted speed limit is 40 mph or less. Temporary Traffic Control Distance Charts Posted Speed Limit Prior to Work Starting (mph) 0 - 30 35 - 40 45 - 50 55 60 - 65 70 - 75 100 feet G TURN LA N E Taper Length (12 ft lane) Shifting Taper Typical Shoulder Taper (A) (D) (L) (L/2) (L/3) feet 250 325 feet 550 700 feet 200 325 feet 100 175 feet 75 125 600 750 1000 1200 900 1200 1400 1600 600 700 800 900 300 350 400 450 200 250 275 300 G = 25 ft G = 50 ft Buffer Space Shadow Vehicle Following Distance (mph) (B) (F) feet 200 305 feet 250 - 550 325 - 700 feet 100 100 feet 100 100 425 500 650 820 600 - 900 750 - 1200 1000 - 1400 1200 - 1600 175 175 225 225 125 125 175 175 45 - 50 55 60 - 65 70 - 75 G = 25 ft G = 50 ft Protection Vehicle Roll-Ahead Buffer Distance (with or without TMA) Moving (R) (15 mph max) Stopped 200 feet 25 feet Type A channelizing devices are typically used in attended temporary traffic control zones.* 200 feet TYPE A CHANNELIZERS: G 4 inch Diameter Minimum L 2 Decision Sight Distance Posted Speed Limit Prior to Work Starting 0 - 30 35 - 40 25 feet Advance Warning Sign Spacing daytime low speed only 36 inch Minimum G or 3 3 daytime low speed only 18 inch Minimum 18 inch Minimum TUBULAR MARKERS or 42 inch Minimum 28 - 36 inch Minimum CONES WEIGHTED CHANNELIZER Type B channelizing devices shall be used if the temporary traffic control zone will be installed for more than 12 hours or if it is left unattended. * variable TYPE B CHANNELIZERS: OPTIONAL LEFT LANE CLOSURE WORK SPACE BEYOND INTERSECTION 24 inches VERTICAL PANEL MULTI-LANE DIVIDED ROAD 3 DAYS or LESS 36 inches LAYOUT 55 270 square inch minimum of retroreflective sheeting surface 36 inches minimum 36 inches minimum TYPE I BARRICADE TYPE II BARRICADE DIRECTION INDICATOR BARRICADE DRUM * See the MN MUTCD, Part 6F for more details on application restrictions. Temporary Traffic Control Distance Charts Posted Speed Limit Prior to Work Starting (mph) 0 - 30 35 - 40 45 - 50 55 60 - 65 70 - 75 Advance Warning Sign Spacing Decision Sight Distance Taper Length (12 ft lane) Shifting Taper Typical Shoulder Taper (A) (D) (L) (L/2) (L/3) feet 250 325 feet 550 700 feet 200 325 feet 100 175 feet 75 125 600 750 1000 1200 900 1200 1400 1600 600 700 800 900 300 350 400 450 200 250 275 300 G = 25 ft G = 50 ft Posted Speed Limit Prior to Work Starting Buffer Space Shadow Vehicle Following Distance (mph) (B) (F) feet 200 305 feet 250 - 550 325 - 700 feet 100 100 feet 100 100 425 500 650 820 600 - 900 750 - 1200 1000 - 1400 1200 - 1600 175 175 225 225 125 125 175 175 0 - 30 35 - 40 45 - 50 55 60 - 65 70 - 75 G = 25 ft G = 50 ft Protection Vehicle Roll-Ahead Buffer Distance (with or without TMA) Moving (R) (15 mph max) NOTES: 1. This layout should be used on high speed roadways where traffic queues may extend at least 0.5 mile upstream of the taper. If little or no queuing is anticipated, use the typical lane closure Layout 52. 2. Use the appropriate traffic control devices for a left lane closure. 3. A PCMS may be used in place of a pair of USE BOTH LANES DURING BACKUPS signs. 4. Distance plaques are recommended when the distance is 2 miles or more. 2 2 Stopped Type A channelizing devices are typically used in attended temporary traffic control zones.* 2 A A TA K E TURNS 2 2 BEGIN MERGE TA K E TURNS L E FT LA N E CLOSED A H EA D L E FT LA N E CLOSED A H EA D 2 TA K E T U R N S AT M E R G E TA K E T U R N S AT M E R G E TYPE A CHANNELIZERS: 4 inch Diameter Minimum daytime low speed only 36 inch Minimum 1 mile daytime low speed only 18 inch Minimum 18 inch Minimum TUBULAR MARKERS 42 inch Minimum 28 - 36 inch Minimum 3 USE BOTH LA N E S DURING BACKUPS CONES 3 WEIGHTED CHANNELIZER USE BOTH LA N E S DURING BACKUPS 3 Type B channelizing devices shall be used if the temporary traffic control zone will be installed for more than 12 hours or if it is left unattended. * TYPE B CHANNELIZERS: 36 inches 24 inches VERTICAL PANEL 1 to 2 mile spacing Continue spacing for the estimated maximum queue distance BACKUPS 3 BACKUPS USE BOTH LA N E S DURING 3 BACKUPS USE BOTH LA N E S DURING 3 BACKUPS A 270 square inch minimum of retroreflective sheeting surface 4 36 inches minimum 36 inches minimum TYPE I BARRICADE USE BOTH LA N E S DURING USE BOTH LA N E S DURING TYPE II BARRICADE DIRECTION INDICATOR BARRICADE XX MILES 4 LANE CLOSURE WITH LATE MERGE DRUM * See the MN MUTCD, Part 6F for more details on application restrictions. XX MILES MULTI-LANE DIVIDED ROAD 3 DAYS or LESS LAYOUT 54
© Copyright 2026 Paperzz