XAGA 550 I N S T A L L A T I O N I N S T R U C T I O N Joint closure system for telephone distribution networks XAGA-550 Kit Contents • • • • • • • • • • • • XAGA and encapsulant Installation procedure Shield (screen) continuity wire assembly Encapsulant mastic Encapsulant containment sheet Metal canister (2 half shells) Self adhering aluminium closing strips Mittens, PE pair Cleaning tissues Abrasive strip Aluminium foil Heat shrinkable reinforced sleeve Flexible channels (+ under clip) Note for branched joints The standard XAGA-550 kit is designed for maximum 1 cable entry at each end. Note: Branched joints (more than 1 cable at an end) require the use of one additional branching kit (BOKT-5S or 5M) per added cable. Up to 4 cables, each end may be accommodated. Safety Rules - - Check manhole for presence of gas and follow locally prescribed precautions. When working with open flame, use standard safety equipment such as gloves, safety glasses etc... as required by local practices. Recommended torches Telstra approved soft Flame burner, S414/130 or S414/107 Selection chart (dimensions in mm) Telstra Serial/item Description S513/00145 S513/00146 S513/00147 Branching kit S513/00022 XAGA-550-43/8-100 XAGA-550-43/8-200 XAGA-550-75/15-250 S513/00148 Branching kit S513/00097 XAGA-550-122/30-500 BOKT-5S BOKT-5M Max. Joint bundle diameter Min cable diameter (O.D.) Nominal sheath opening (L) 43 43 75 8 8 15 100 200 250 for use with S513/00145, S513/00146 & S513/00147 122 30 500 Note For joints with 2, 3 or 4 cables in one end the overall cable diameter must be determined. Add 10 mm for every branch clip. The total diameter must not exceed the joint bundle diameter. See below. 20mm 15mm 15mm for use with S513/00148 Effective diameter 70mm BOKT Kit Content • • • • • • Branch off clip Shield (screen) continuity clip + connector Cleaning tissue Aluminium foil Cable tie Abrasive strip Use kit S513/00147 with 2 x S513/00022 1 Remove cable sheath to the required dimension (L), following locally prescribed practices. Maximum 4 cables at each end. Where applicable, remove sacrificial and nylon oversheath(s). Using the kitted bond line gauge, starting at the sheath cut, mark the length of oversheath to be removed. Remove the oversheath taking care not to damage the cable sheath. 2 Where appropriate, install screen continuity. Use tool to cut the cable sheath over a length of 20 mm and a width of 10 mm. 3 Put cotton or PVC tape underneath the cable sheath strip. 4 Install screen continuity clip with standard pair of pliers. 5 For joints with three or more cables, install continuity wire on screen continuity wire assembly using crimp connector. Make the joint according to normal practice. 6 Encapsulate joint in accordance with attached TE Connectivity instruction. 7 Wrap the encapsulated joint with two layers of craft paper, (S094/00002) with 50% overlap. Craft paper should NOT extend beyond the encapsulant mastic. 8 Centre and fit metal canister over the joint, and secure with tape. Seal canister seam(s) with self adhering aluminium strip(s). Smooth strip(s) with a blunt tool. 9 Tape the crowns, starting from 10 mm onto the canister body down to the cable(s) with 50% overlap, use PVC or heat resistant tape. If applicable, use a branch clip temporarily as an aid, to spread cables prior to tape installation. DO NOT over tension tape. Remove branch clip for later installation. 10 Tape maximum 5 mm onto the cable(s). Where applicable, re-check sacrificial and nylon oversheath removal following instruction 13. Remove additional oversheath taking care not to damage the cable sheath. 11 Protect hands with mittens. Using the cleaning tissue from the kit, clean the cables over a distance of approximately 150 mm. 12 Using the abrasive strip from the kit, abrade the cables circumferentially over the cleaned length. Note: Where applicable, install SCOP (S433/00311) to lead-in, earth & non-moisture barrier cables following Telstra approved practices. 13 Use measuring strip (at bottom of installation instruction) from the end of canister and mark bondline length on each cable. 14 Apply the aluminium foil to the cables, positioning the blue line at the mark on the cable and smooth foil with a blunt tool. 15 Flame brush the cable area between the indicated arrows. Flame brush PE cable for 5 seconds, moisture barrier (MB) 10 seconds. Preheat lead cable over the bond line area for 5-10 seconds. 16 Wear protective gloves. Wrap the sleeve around the canister. Place the underclip over the rails at the centre of the sleeve. 17 Pull flexible channels over the sleeve rails until they butt on top of the underclip. Centre the sleeve over the joint, such that the sleeve length matches the blue lines on the aluminium foils. 18 For branch joints, position the wraparound sleeve such that the adhesive flap and sleeve rails are over the largest cable, see drawing. Avoid pinching the adhesive flap between sleeve rails. 20 Notes for heating 21 Start heating in the centre of the sleeve 180 degrees from the channel. Continuously heat circumferentially (heating equally on both sides) until arrival at the channel area. Recovery in the channel area should take place towards the end of heating. Continue heating until all the thermochromic paint has changed colour from green to black. BOKT-5L 160/42-200/50 19 Insert the branch off clip(s) fully between cables. Proportion the sleeve on each side of the branch off clip(s) according to the cable size. Secure the cables together with the cable tie from the branching kit. Regulate flame to a total length of approximately 350mm with a yellow tip of approximately 150mm • During shrinkage, move flame continuously to avoid local overheating • Apply heat until the thermochromic paint has changed colour completely with the exception of the immediate vicinity of the clips and channels where a green area of about 2 mm may remain. 23 Press the channel gently down with a blunt tool to give the channel the shape of the canister transition. Note for branched joints • Pull branched cables together by tightening the cable tie from the branch off kit. Repeat operations 21 and 22, starting in the centre. Note for lead cable • On completion of sleeve recovery, apply additional heat over the bond line for 5-10 seconds, moving the torch at all times. Leave the closure undisturbed until cool to the touch. 24 When all thermochromic paint has changed colour two separate lines should be visible in the slots of the channel. If the lines are not visible within 2-3 minutes of completion of shrinking, apply more heat around the sleeve at that point to re-flow the adhesive. Take care not to overheat the sleeve. Check if the clip adhesive is seen to flow. If not apply additional heat all around the clip area until the clip adhesive appears at the sleeve end. Leave the closure undisturbed until cool to the touch. BOKT-5S 43/8-75/15 22 Progressively move towards the end of the sleeve converting all paint. A green area of about 2 mm may remain in the immediate vicinity of the clips and channels. BOKT-5M 92/25-125/30 XAGA-550 Re-entry Safety rules When working with open flame, use standard safety equipment such as gloves, safety glasses etc… as required by local practices. 1 Use pliers and a hacksaw or locally approved tool to lift the channel and cut it from the sleeve while cold. Avoid damaging the cable(s). 2 Ring cut the heat shrink sleeve material onto the metal canister shoulder at both ends. 3 Heat the sleeve circumference at one end from the ring cut to sleeve end, including branch off clips if present, as shown. 4 While the adhesive is still hot, remove the clip with a pair of pliers. 5 Remove the sleeve end with a pair of pliers by pulling the sleeve gently off the cables. Apply more heat if necessary. 6 Remove the aluminium flap of the sleeve with a pair of pliers. 7 Remove the PVC tape from the crown of the canister. 8 While the adhesive is still hot, separate the cables with an appropriate tool to assist clip insertion when reclosing. 9 Repeat steps 3 through 8 on the opposite end. Locate one of the canister seams. Make a cut through the sleeve along the seam and separate the canister. Remove the canister and re-work the joint. Re-closing Use a new XAGA-550 kit and repeat the installation procedure. The remaining adhesive does not have to be removed from the cables. Ensure any remaining adhesive is clean and free of grease or dirt before re-closing. Tyco Electronics Raychem bvba Diestsesteenweg 692 3010 Kessel-Lo, Belgium Tel.: 32-16 351 011 Fax: 32-16 351 697 www.te.com www.telecomnetworks.com XAGA, TE (logo) and TE Connectivity are trademarks of the TE Connectivity group of companies and its licensors. TC 205/SIP/AU/4 01/00
© Copyright 2025 Paperzz