American Water Resources Association 2016 SPRING SPECIALTY CONFERENCE Water – Energy ‐ Environment April 25‐27, 2016 Anchorage, AK Tuesday, April 26 3:30 PM – 5:00 PM SESSION 12: Water Supply & Energy Management I ‐ Water Resources and Infrastructure Ship Creek Heat Exchanger Project: Recovering Waste Heat from Power Generation in a Potable Water System ‐ Todd Carroll, Anchorage Water and Wastewater Utility, Anchorage, AK The Municipality of Anchorage, Anchorage Water and Wastewater Utility (AWWU) and Municipal Light and Power (ML&P), currently exchange potable water for power generation and waste heat at the Ship Creek campus located near the Glenn Highway and Muldoon Road interchange in northeast Anchorage. Upgrades are planned to both facilities. The new ML&P Plant 2a will be water cooled with an on‐site cooling tower, but will also be connected to the AWWU's Energy Recovery Station (ERS) to deliver waste cooling water heat to the AWWU water system. Currently an average of 75MBTU of energy is transferred from the ML&P Power Plant 2 power generation facility to the AWWU water transmission system. With upgrades to ML&P's power plant and AWWU's ERS, the utilities plan to increase the amount of energy recycled through construction of a new heat exchanger system. Heating cold water supplied to residential and commercial properties is very energy intensive. Exhausting waste heat from power generation facilities into the atmosphere contributes to air pollution and power plant efficiency loss. By capturing waste heat from the power generation process, AWWU helps prevent water distribution and service pipe freezing and optimize power plant efficiency while also lowering the energy used by AWWU customers to heat their potable water. This project is very unique in its scale for potable water waste heat recovery and would not be possible without a large municipal water pipeline with low water temperature adjacent to a power plant. The value to be recovered by the proposed heat exchanger system, that would otherwise escape to the atmosphere amounts to approximately $1,900,000 per year, including reduced evaporation and sewer discharge at the power plant. The majority of this savings is in lowered customer water heating costs due to warmer water entering the property. This project will sequester an average of 100 MBTU of heat that would otherwise be produced as cooling tower waste heat. There are substantial energy savings, water conservation, and environmental benefits to this innovative project. Ice accumulation in the Anchorage Bowl water reservoirs and distribution system piping is currently controlled by water cycling and adding waste heat at AWWU's Reservoirs 1 and 2 located at the Ship Creek Water Treatment Facility (SCWTF). Waste heat from the ML&P Power Plant 2 is used to heat incoming water from 43.8°F to 60°F. The bulk of the heated water is only able to be distributed to a portion of AWWU's water distribution system due to pipe configuration. The construction of the new heat exchanger will include piping upgrades to allow heated water to be distributed to a wider area of AWWU's distribution system. This oral presentation will talk about the technical aspects of the project design, the coordination of the project with the upgrades to the power plant, and the unique agreement between the utilities that is mutually beneficial. Shasta Lake Water Resources Investigation: Balancing Resource Needs Through Physical Infrastructure Solutions ‐ Thomas FitzHugh, MWH Global, Bellevue, WA (co‐authors: M. Paasch, D. Bertrand) Shasta Lake is the largest reservoir in California, and is operated as part of the Bureau of Reclamation's Central Valley Project (CVP). Operating purposes include water supply, flood control, hydropower generation, and fish and wildlife enhancement. In recent decades operations of Shasta Lake and the CVP as a whole have been challenging because of increasing demands for water supplies and growing concerns over declines in ecosystem resources in the Central Valley of California. This competition between different resource needs and the inability to resolve these issues through regulations and operational changes has led to a search for physical infrastructure solutions. This presentation will discuss one such project. In 2000, Reclamation re‐started a feasibility study on the enlargement of Shasta Dam and Reservoir, which has led to extensive analysis of different alternatives for raising the dam and adding additional storage to the reservoir. Alternatives were evaluated according to their ability to meet two primary planning objectives, anadromous fish survival and water supply reliability, and also a series of secondary objectives, which were ecosystem enhancement, flood damage reduction, hydropower generation, recreation, and downstream water quality conditions. The major differences between alternatives were the raise size and the operational focus on prioritizing agricultural vs urban water supply and water supply vs fish needs. One of the primary operational considerations for fish is the effect that the dam has on downstream temperatures. Alternatives differed in terms of the allocation of storage to cold‐water pool which could be used reduce downstream temperatures in drought years when the effect on fish is most severe. In order to compare alternatives, a tiered modeling approach was used that started with the CalSim II operations planning model, and then used CalSim II results as inputs to water temperature, fish production, economic, hydropower, and hydrodynamic models. Model results were used to quantify project benefits and impacts in a Federal Feasibility Report and Environmental Impact Statement released in 2015. The results of these reports will be discussed, focusing on analytical approaches for assessing trade‐offs between different resources needs and the role that additional storage can play in resolving water resources management issues in California. Dry Cooling Technologies in the 'Water‐rich' Susquehanna River Basin ‐ Michael College, Susquehanna River Basin Commission, Harrisburg, PA Managing water supplies to meet immediate and future water needs of the people of the Susquehanna River Basin for domestic uses, agriculture, industry, energy production and recreation calls for a comprehensive and balanced approach. How do regulations and policy accommodate demand, while minimizing direct and cumulative impacts from consumptive water uses? Can managers use water availability and conservation measures to achieve balanced policy and regulation? The Susquehanna River Basin Commission has adapted its regulations, programs, and policies to assure sustainable use and development of the water resources of the basin ‐‐most recently, to efficiently manage the growing demands associated with electric power generation. In the Susquehanna River basin, reported consumptive use for power generation at 11 major thermoelectric plants is 93 million gallons per day. Power generation currently uses almost 3 gallons of water for every 1 gallon of water used by every other industry combined. Primarily as an off‐ shoot of the natural gas development in‐basin applicants have demonstrated significant interest in permitting new, expanded and re‐powered thermoelectric plants since 2013. This activity prompted the Commission to evaluate various cooling options for combined cycle gas turbines related to efficiency of water use, and resulted in a resolution promoting dry cooling technology based on its greatly reduce water need. Although the Commission does not mandate dry cooling, its approach to determine the most appropriate cooling technology given the water availability within a particular hydrologic setting is science‐based and conservative in its protection of the basin's vital water resources and aquatic ecosystems. Applicants willing to modify their proposals gain prioritized reviews and may enjoy additional incentives. This presentation reviews (1) consumptive water use patterns in the Susquehanna River basin; (2) the challenges related to the development of new policy; and (3) implementation of Resolution No. 2015‐02 encouraging the use of dry cooling, adopted on March 5, 2015, through case studies.
© Copyright 2026 Paperzz