Wall-Cote E

Application Specification
Wall-Cote E
Purpose and Scope
Instructions for the mixing and application of DexO-Tex Wallcote E epoxy wall finish.
masonry unit walls) either add additional C
Bondcoat with thickener powder or Dex-O-Tex
Cove Base Gel as required for block filling
CAUTION: When applying Wallcote E in light
colors over a dark subsurface, the application may
require three coats to "hide".
Thickness ....................... 15 mils (Two Coats)
21 mils (Three Coats)
Colors
Materials/Packaging
Select from Dex-O-Tex Wall Coatings Color Chart.
Dex-O-Tex Wallcote E is a 100% solids epoxy wall
surfacing which is available in two-component
units. A Unit Four (4 gallon unit) or 5 Gallon Bulk
(20 gallon unit). The mixing ratio of Wallcote E
Component A and Component B is 3A:1B.
NOTE: Where White and other light colors are
used, Flex Glaze Top Coat is recommended as the
final finish to protect against extensive exposure to
ultra-violet and other intensive lighting systems
Surface Preparation
Approximate Quantity of Materials
Required
To Cover ONE HUNDRED SQ. FT (9.3 sq.
Meters)
Unit One Packaging
Amount
Require
Spread Rate/
Mixed Gallon
C Bondcoat (Unit 3)
Comp. A (Two gal. can) ............ 0.148 units .................. 225 sq. ft
Comp. B (One gal. can)
per gal /per coat
Or
C Bondcoat (5 Gal Bulk)
Comp. A (5 gal) ....................... 0.06 pails
Comp. B (5 gal) ....................... 0.03 pails
2 COAT SYSTEM
Wallcote E (Unit 4)
Comp A (3 gal. pail) ...............0.21 units ....................... 225 sq ft
Comp B (1 gal. can)
per gal/per coat
Or
Wallcote E (5 Gal Bulk)
Comp A (5 gal. pail) ................0.135 units
Comp B (5 gal. pail) ................0.045 units
3 COAT SYSTEM
Wallcote E( Unit 4)
Comp A (3 gal. pail) ...............0.315 units ..................... 225 sq ft
Comp B (1 gal. can)
per gal/per coat
Or
Wallcote E (5 Gal Bulk)
Comp A (5 gal. pail) ................0.203 units
Comp B (5 gal. pail) ................0.068 units
NOTE:
Above does not include Dex-O-Tex
materials for Block Filling (for use over concrete
Dex-O-Tex Application Specification
S-521 Rev. 02/13
A. Gypsum Wall Board
All seams, joints and corners should be taped,
sanded smooth, wiped free of dust and
otherwise prepared as for painting.
All
smoothing must be accomplished with an
acrylic compound or epoxy based grout.
B. Cement Board
All seams, joints and corners should be taped,
sanded smooth, and wiped free of dust and a
smoothing coat of Thickened epoxy applied to
provide a smooth even surface. Apply Wallcote
E to the open cement side of cement board. All
projections on the cement board should be
sanded smooth and rough spots patched with
epoxy patching compound prior to application
of the Wallcote E.
C. Cement Plaster
All surfaces should be thoroughly cured, crackfree and dry. Check moisture content with
meter. Lightly sand surface to improve bond.
Fill any voids, holes, etc. with suitable epoxy
patching mix or other approved filler.
D. Concrete Block
Surface must be clean and free of projections.
Parge the block to fill all voids and provide a
smooth even surface. Use Dex-O-Tex C
Bondcoat with thickener powder or Dex-O-Tex
Cove Base Gel as required to accomplish block
filling. Block surfaces must be dry. Check
Page 1 of 4
Wall-Cote E
Application Specification
Wall-Cote E
moisture content with meter. Prepare to the
requirements of SSPC SP 13/NACE No.6.
CAUTION: In some cases additional coat(s) of
Block filler may be required. Thoroughly
inspect
surface
to
determine
project
requirements before preparing job cost.
*Apply VaporControl Primer 100 at the
specified
thickness required as per
Application Specification S-972 for the
level of MVER or in-situ relative humidity
percentage of the substrate.
B. Inspect Substrate to verify proper preparation
and soundness of substrate before applying any
materials.
E. Glazed Block, Tile, Metal
Lightly abrade the surface to remove any
glazing and provide an open surface as a
substrate for application of the Wallcote E
system. (Consult Crossfield Products Corp.)
Job Site Survey
A. Perform moisture testing in accordance with
one of the following methods:
ASTM F1869 Standard Test Method for
Measuring Moisture Vapor Emission
Rate of Concrete Subfloor Using
Anhydrous Calcium Chloride. Verify
and document the results in accordance
with the specification. If MVER
exceeds 3 lbs./24 hrs./1000 sq. ft. and is
under 10 lbs./24 hrs./1000 sq. ft., apply
Dex-O-Tex VaporControl Primer 200 as
per Application Specification S-970. If
MVER exceeds 10 lbs./24 hrs./1000 sq.
ft. and under 15–22* lbs./24 hrs./1000
sq. ft., apply VaporControl Primer 100
as per application specification S-972.
C. Measure and record ambient temperature and
humidity, surface temperature and the
temperature of the material being used; Do not
proceed with the application if the conditions
are outside the recommended parameters.
Inspect materials to be used. Verify material is
the proper material and all components and
sizes are correct. Inspect all containers and
verify a proper factory seal with no signs of
damage or leakage. Premix Liquid materials
into a smooth homogenous blend before using.
D. Joints and Cracks – Expansion joints, and
Control Joints should be continued through the
system and sealed with an elastomeric sealant.
The sealant may then be top coated with the
final finish coat of the system.
Environmental Conditions
ASTM F2170 Determining Relative
Humidity in Concrete Floor Slabs Using
in situ Probes. Verify and document the
results in accordance with the
specification. If the in-situ relative
humidity (rh) of the substrate is greater
than 75% and less than 84%, apply
Dex-O-Tex VaporControl Primer 200 as
per Application Specification S-970. If
the in-situ relative humidity (rh) is
greater than 84%, and less than 89–
99%*, apply VaporControl Primer 100
as per Application Specification S-972.
All materials are mixed, applied and cured at
the job site. Minimum environmental conditions
are required to facilitate proper curing and
Performance of the Products. Ensure conditions
are in accordance with the following
requirements.
Ambient
Temperature
Relative Humidity
Wind
Min
45OF
20% rh
NA
Max
100OF
85% rh
30 mph
Substrate
Temperature
Relative Humidity
MVER
55OF
NA
NA
90OF
78%
3 lbs*
Materials
Temperature
63OF
83OF
* 3 lbs of MVT, per 1000 sq. ft., during a 24
hr., period as measured by ASTM F1869.
Dex-O-Tex Application Specification
S-521 Rev. 02/13
Page 2 of 4
Wall-Cote E
Application Specification
Wall-Cote E
Materials should be delivered in original
packages and containers with seals unbroken
and bearing manufacturer's labels containing
brand name and directions for storage and
mixing with other components. Check materials
immediately upon receipt, verify all the correct
materials in the correct packaging are accounted
for in good condition. Sort the materials and
store them in a tempered storage area.
12 fluid oz of Thickener powder per mixed
gallon of C Bondcoat
Measure out the required amount of Component
A and Component B and pour into a clean
mixing container, scraping the sides and bottom
of cans to insure all materials are used. Mix
with a low speed electrical mixer for
approximately three minutes to a homogenous
blend. Then slowly blend in 12 fluid oz per
gallon of Thickener powder. Cover mixing
vessel during mixing to contain thickener
powder during mixing. Take care to insure
smooth homogenous blend is free from dry
clumps.
STEP ONE – Bond Coat
C Bondcoat
Mix Ratio: 2A:1B
Cure Time: 6 hrs
Coverage: 225 s.f.
Pot Life: 35 min
Recoat Time: 6 – 48 hrs
DFT: 7 mils
A. Mix together the following materials:
C Bondcoat Comp A ........... (2 Parts by Volume)
C Bondcoat Comp B ............. (1 Part by Volume)
Measure out the required amount of Component
A and Component B and pour into a clean
mixing container, scraping the sides and bottom
of cans to insure all materials are used. Mix
with a low speed electrical mixer for
approximately three minutes to a homogenous
blend.
OPTION: Dex-O-Tex Cove Base Gel is a factory
pre-thickened resin that may be used in lieu of
the thickened C Bondcoat material. Cove Base
Gel does not usually require adding any
thickener powder at the job site.
B. If only minor patching is required, apply the
epoxy patch material with a broad knife and
smooth off. Minor sanding may be required.
If the entire surface needs to be parged, apply
the Thickened epoxy material with a grout
trowel or squeegee. Pull the material tightly
across the surface being care to not to leave any
ridges or trowel marks. Examine the surface as
you go to inspect for any signs of sagging or
running. If the material does sag or run then it
either needs to be applied thinner or the
material need to have more thickener powder
added. The exact amount of thickener will be
effected by job site conditions, substrate and
application technique.
B. Apply a thin coat of C Bondcoat using a trowel,
squeegee, or roller over the area to be coated.
Do not allow primer to sag or be applied too
thick. A three gallon (2 gal A: 1 gal B) mixture
should cover approximately 675 square feet
(225 sq. ft. / mixed gallon) over smooth surface.
If surface is very porous, two coats may be
required. Allow to cure as described below
before proceeding with the application.
C. Once cured, lightly sand the entire surface with
palm sander or pole sanding techniques.
Remove all imperfections from the surface.
Inspect surface for acceptability before
proceeding to the next step. Allow to cure a
minimum of 6 hours @ 70OF.
STEP TWO – Detailing
C Bondcoat
Mix Ratio: 2A:1B
Cure Time: 6 hrs
Coverage: 160 s.f.
Pot Life: 35 min
Recoat Time: 6 – 48 hrs
DFT: 6 -12 mils
A. Mix together the following materials:
C Bondcoat Comp A ........... (2 Parts by Volume)
C Bondcoat Comp B ............. (1 Part by Volume)
Dex-O-Tex Application Specification
S-521 Rev. 02/13
CAUTION: Never use gypsum based products with
smooth or filling. Only use epoxy or other
acceptable approved materials in wet areas or areas
that will be subject to high humidity.
Page 3 of 4
Wall-Cote E
Application Specification
Wall-Cote E
STEP THREE- Wallcote E (1st Coat)
Wallcote E
Mix Ratio: 3A:1B
Cure Time: 6 hrs
Coverage: 250s.f.
allowing regular serve, 96 hours for full
chemical resistance, and physical properties.
Pot Life: 25 min
Recoat Time: 6 – 48 hrs
DFT: 6.5 mils
A. Mix together the following materials:
Wallcote E Comp A............. (3 Parts by Volume)
Wallcote E Comp B .............. (1 Part by Volume)
Cautions
Measure out the required amount of Component
A and Component B and pour into a clean
mixing container, scraping the sides and bottom
of cans to insure all materials are used. Mix
with a low speed electrical mixer for
approximately three minutes to a homogenous
blend.
B. Wallcote E is applied in two or three coats as
required. If applied in light color over dark
substrates, three coats maybe required to
provide adequate "hiding” of the substrate.
C. Apply Wallcote E using a shed-resistant roller
of suitable nap length. Apply smoothly and
evenly. Cross-roll the surface to insure even
material distribution. First coat coverage for
Unit Three package will be approximately 675
sq. ft. per unit (225 sq ft per gal). Check
application thickness during installation with a
wet mil gauge to insure proper application
thickness. Pot life is approximately 25 minutes
@ 700F. Pot life can be extended by placing the
material in a roller pan or other wide receptacle.
D. Allow to set to hardness (approx. 6 hours at
70ºF) before recoating.
OPTION: Third coat of Wallcote E or other final
finish – a third coat of Wallcote E or other final
finish coat may be applied if desired or
required. Apply final finish coat as described
above in Step Four or as described in the
appropriate
Crossfield
Products
Corp.
Application Specification.
1. During application epoxy materials may cause
dermatitis in sensitive people. Protective hand
creams and rubber gloves should be used. Face
protectors should be used while working
components. If contact with the eye is made,
flush with water and consult a physician
immediately. If contact with the skin is made,
remove with hot, soapy water wash. After
curing, the product is non-toxic.
2. Apply only when surface temperature and
ambient temperatures are between 65ºF - 85ºF
(18ºC - 26ºC). Surface thermometers should be
used to determine surface temperatures.
3. Materials should be stored in an area where the
temperatures will be 65ºF - 85ºF (18ºC - 26ºC)
for at least twenty-four (24) hours prior to use
so the blends will be of proper viscosity for best
application.
4. Be sure to drain all the resin and curing agent
from the containers. Scraping the cans will be
necessary.
5. Obtain, read and observe Material Safety Data
Sheets for this material.
6. Read and follow Crossfield Application Spec.
S-900.
STEP FOUR - Wallcote E (2nd Coat)
DEX-O-TEX PRODUCT LINE
Crossfield Products Corp.
A. Examine surface. Remove any projections or
imperfections in surface by light sanding or
hand-stoning.
West Coast Office
3000 E. Harcourt Street
Rancho Dominguez, CA
90221
310-886-9100
310-886-9119 fax
B. Mix and apply second coat as described above.
Coverage will be approximately 250 sq. ft. per
unit.
C. Allow to set to hardness (approx. 6 hours at
70ºF) before recoating, or 24 hours before
Dex-O-Tex Application Specification
S-521 Rev. 02/13