Heartland Area Redwater Project (HARP) – Phase 2 Project type Project proponent CO2 storage type Project timeframe Project location Funding Government of Canada Provincial government Private sector Total project cost Storage site characterization ARC Resources Ltd. Saline formation 2008 to 2010 1, 2 Fort Saskatchewan–Heartland–Redwater area, northeast of Edmonton, Alberta, Canada $0.8 million $0.4 million $2.2 million $3.4 million Project description This project was designed to demonstrate the feasibility of safe CO2 storage in the Redwater Leduc Reef located near the Alberta Industrial Heartland region, northeast of Edmonton. This storage site is close to several existing and planned large industrial sources of greenhouse gas (GHG) emissions, including chemical and fertilizer plants and several oil sands upgraders. Preliminary work estimated the total storage capacity of the saline aquifer portion of the reef to be one gigatonne of CO2. Expected outcomes The short-term outcome of the project was to complete storage site characterization studies and to confirm the geological formation’s characteristics, capacity and suitability as a long-term storage site. In subsequent phases, the work could be extended to include pilot injection and scaling pilot injection to a commercial demonstration project. Over the long term, possible outcomes include demonstrating carbon capture and storage on a commercial scale (several megatonnes per year) and contributing to significant reductions in GHG emissions. Proponent profile ARC Resources Ltd., headquartered in Calgary, Alberta, is a sound and conservative oil and gas company, with operations across western Canada. An industry leader, socially responsible operator and key contributor to the communities in which it works, ARC has consistently delivered top performance and measureable results since inception in 1996. Proponent Web site www.arcresources.com 1 2 Phase 1 of the project (preliminary site characterization) started in April 2008 and ended in June 2009. Phase 2 of the project (detailed site characterization and well drilling) started in April 2009 and was suspended in October 2010. For information regarding reproduction rights, contact Public Works and Government Services Canada (PWGSC) at 613-996-6886 or at [email protected]. © Her Majesty the Queen in Right of Canada, 2013 Revised March 2013 Aussi disponible en français sous le titre : Projet Redwater de la région de Heartland – phase 2
© Copyright 2026 Paperzz