FOSTER, JACOBS AND JOHNSON, INC. 2201 – 12th St. North, Suite E Fargo, ND 58102 ADDENDUM #6 (Re-Bid) ISSUE DATE: FEBRUARY 20, 2017 Addendum to Drawings and Specifications for the following Project: MAHNOMEN PUBLIC SCHOOLS - ISD #432 PUBLIC SCHOOL RENOVATIONS AND ADDITION MAHNOMEN, MINNESOTA The additions, revisions, omissions, corrections and clarifications contained herein shall be made to drawings and specifications for the project and shall be included in the scope of work and bids to be submitted. References made below to specifications and drawing shall be used as a general guide only. Bidders and Contractors shall determine for themselves the work affected by Addendum items. ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE SPACE PROVIDED IN THE BID FORM. FAILURE TO DO SO MAY DISQUALIFY THE BIDDER. I. CONDITIONS OF THE CONTRACT A. The Bid Opening will be located in the Auditorium at the Mahnomen Public School (same room as the Pre-Bid meeting) B. See attached Pre-Bid Conference Minutes (Re-Bid), dated February 15, 2017 C. See attached Mechanical Addendum – M01 from ONE, dated February 20, 2017 END OF ADDENDUM #6 Addendum #6 Mahnomen Public School District #432 Public School Renovations and Addition 1 of 1 February 15, 2017 PRE-BID CONFERENCE MINUTES (RE-BID PLUMBING & HEATING, VENTILATION, & TEMPERATURE CONTROLS) MAHNOMEN PUBLIC SCHOOLS – ISD #432 PUBLIC SCHOOL RENOVATIONS AND ADDITION MAHNOMEN, MINNESOTA **This Pre-Bid Conference is held for the Re-Bid of Plumbing & Heating, Ventilation, & Temperature Controls bid packages only. I. Sign in II. Introduction of the Team A. Owner – ISD #432 – Jeff Bisek, Superintendent B. Construction Program Manager – Foster Jacobs & Johnson, Inc. – Ken Anderson, Project Manager C. Construction/Project Manager – Foster Jacobs & Johnson, Inc. – Carl Clark, Project Manager D. Construction Site Superintendent – Foster, Jacobs & Johnson, Inc. – Larry Knutson E. Architect – Foss Architecture & Interiors – Steve Skoblik; Trevor Anderson F. Engineers – Civil – ONE – Steve Schilke Structural – Northland Consulting Engineers – Mark Udd Mechanical – ONE – Joel Peck Electrical – ONE – Andy Bartsch; Brian Wentland III. General Project Description A. New Classroom Addition 1. Sitework a. New Asphalt Parking Lot (east and west side) b. Bus Loop c. Concrete Walks d. Utilities e. Lighting 2. Addition a. New Classrooms with individual restrooms b. Conference Room c. Central Restrooms d. New Casework, Finishes/Etc. e. Extend Fire Suppression System f. Mech/Elec B. Existing Building Renovations 1. Asbestos Abatement (Minor Flooring – under separate contract) 2. District Office Renovations 3. Elementary & High School Office Renovations 4. Computer Lab/Collaboration Renovations 5. Restroom Renovations/Additions 6. Nurse’s Office Page 1 of 3 7. 8. 9. 10. 11. 12. 13. 14. 15. IV. V. Special Ed/Speech Renovations Basement Locker Room Finishes Replace Pool Heating Equipment Replace Ventilation Systems a. Pool areas b. Locker Rooms c. 1985 Gym d. 1965 Gym (including Dehumidification) e. Community Hall/Bandroom Steam-to-Hot Water Conversions Secure Entrance Assemblies (Exterior) New Lighting (at renovated areas with new ceilings) Electrical power/data systems at renovated areas New Service/Transformer Construction Management Format A. Prime contracts with Independent School District #432 B. Review role of Construction Manager in Article 4 of General & Supplemental Conditions of the Contract C. All bids will be Prime Contracts for all respective items of Work identified within each contract in the Summary of Work 1. No modifications or deletions shall be made to the Bid Forms or Summary of Work (ALL items must be included as part of each bid) 2. Individual Contracts a. Sitework b. Concrete c. Masonry d. General Construction e. Architectural Woodwork f. Roofing & Metal Wall Panels g. Aluminum Windows & Glazing h. Gypsum Board Assemblies i. Acoustical Ceilings j. Flooring k. Painting l. Fire Protection m. Plumbing & Heating n. Ventilation o. Testing & Balancing p. Automatic Temperature Control q. Electrical Bid Documents / Contract Documents A. Specifications 1. Prime Contract Summary of Work (Specification Section 01 11 00) B. Drawings Page 2 of 3 VI. Proposed Schedule A. Specification Section 01 02 00 1. Onsite Start of Work (Addition): May 1, 2017 or as soon as weather permits 2. Existing School Renovations: Start May 30, 2017 3. Substantial Completion: August 25, 2017 (Existing School renovations) November 30, 2017 (Classroom Addition) VII. Miscellaneous Requirements A. General Conditions – Prime Contractors (Specification Sections 00 70 00 – General Conditions, 00 80 00 – Supplementary Conditions) 1. Layout by each contractor 2. Testing, if any, will be by Owner (Specification Section 01 40 00) 3. Disposal, Clean-up (including Final Clean-up) by each contract 4. Safety (Specification Section 01 52 00) –All contractors 5. Permits – Owner/FJJ obtains and purchases general building permit and plan review. All other permits required will be by Prime Contractors. 6. Coordination with other trades 7. Temporary Facilities (Specification Section 01 50 11) 8. Submittals (Specification Section 01 33 00) B. Insurance Requirements (Specification Sections 00 80 00 – Supplementary Conditions Article 11) C. Performance & Payment Bond AIA A312, $10,000 or over VIII. Bid Form (Specification Section 00 41 00) – Bid Bonds 5% (AIA A310) – Sales Tax – Single Lump Sum Bid A. Bid Security can be in the form of certified or cashier’s check B. Unit Prices -Refer to Section 01 22 00 C. Alternates -Refer to Section 01 23 00 for descriptions IX. Addenda A. Only questions/issues resolved by addendum will be part of the contract documents (any other discussions/correspondences, not included in addendum, may NOT be considered as part of the contract documents. B. Five Addenda have been issued (one more may be forthcoming) X. Bid Due Date - Thursday, February 23, 2017 - Sealed Bids due by 1:30 P.M. at the Supt’s Office – no faxes or emails accepted. A. Bids will be opened at the Mahnomen Public School (Room will be identified by addendum) B. Get there early (there will be NO excuses) XI. Bid Award Date – Anticipated mid-March, 2017– School Board may hold a special meeting (however, bids and alternates may be awarded up to 60 days following bid date) A. Bid Award Criteria 1. Bid Amount 2. Bid Responsiveness – Alternates, Other Forms, Addenda 3. Don’t forget to include Attachment A (Responsible Contractor Affidavit) 4. Don’t forget to sign the completion and start date on the Bid Form END OF PRE-BID CONFERENCE Page 3 of 3 ADDENDUM – M01 Date Project # Project Name Project Location 02/20/17 2016300 Mahnomen Public School Renovation and Addition Mahnomen, MN NOTICE TO BIDDERS: This Addendum is prepared to supplement information presented in the Drawings and Project Manual for the above referenced project. All additions, changes, omissions and conditions listed herein shall become an integral part of the Contract Documents. DRAWINGS ITEM NO. 1 M2.14 Main & Second Floor Plan Area G – Plumbing A. For each pool heater replacement, relocate the existing pipe-mounted temperature sensors and wiring as required for reconnection of piping to new pool heater. Provide additional wiring as necessary. SPECIFICATIONS ITEM NO. 2 220400 Plumbing Systems A. Add the following section Pool Heaters 2.21: 1. Pool heaters shall be gas-fired units in sizes as scheduled on the drawings. Provide the following features: a. 2-Line, 16-Character Digital Display b. Pool & Spa Temperature Control c. Password Security d. CPVC or PVC Ready e. 3rd-Party Remote Compatible f. Sealed Combustion Chamber g. Fan-Assisted Combustion h. Built-in Combustible Floor Shield i. Direct-Spark Ignition j. Cupronickel heat exchanger k. Loch-Heat Ceramic Tile l. 24V Terminal Strip m. 120V/60HZ n. On/Off Switch o. Built-in Air & Water Pressure Switches and flow switch p. Inlet & Outlet Temperature Sensors q. Automatic Reset High Limit Safety r. Polymer Header with Built-in Bypass s. Low-NOx Emissions Meet the Most t. Flame View Port u. 3-Year Limited Warranty on Heat Exchanger v. 2-Year Limited Warranty on Parts Page 2 of 2 w. ASME Construction with ASME pressure relief valve 2. Provide powered vent cap for sidewall venting. Provide type B double wall vent. 3. Pool heater shall be Lochinvar or approved equal. PRIOR APPROVALS None END OF ADDENDUM Document1
© Copyright 2025 Paperzz