Hamaoka Nuclear Power Station Replacement Plan, etc. December 2008 Table of Contents The Plans Overview (1) ・・・・・・・・ (1) The Plans Overview (2) ・・・・・・・・ (2) Outline of Construction of Reactor No. 6 ・・・・・・・・ (3) The Shutdown of Reactors No. 1 and No. 2 ・・・・・・・・ (4) Outline of Construction of Spent Fuel Dry Storage Facility ・・・・・・・・ (5) Nuclear Power Generation Ratio in Composition of Power Supply ・・・・・・・・ (6) Outline of the Revised Forecast of Results ・・・・・・・・ Note: The Company's fiscal year (FY) is from April 1 to March 31of the following year - FY2008 represents the fiscal year began in April 1, 2008, and ends in March 31, 2009. © 2008 Chubu Electric Power Co., Inc. All rights reserved. (7) The Plans Overview (1) Operation Operation of of Reactors Reactors No. No. 11 and and No. No. 22 to to be be terminated, terminated, Reactor Reactor No. No. 66 to to be be built built in in their their replacement replacement A A spent spent fuel fuel dry dry storage storage facility facility to to be be built built on on the the site site Spent fuel dry storage facility Reactor No. 1 Stack for Reactor Nos.1&2 Stack for Reactor No. 6 Reactor No.6 Reactor No. 2 Pond for Reactor No.2 Reactor No.3 Reactor No. 4 Pond for Reactor No. 6 Pond for Reactor No. 1 Reactor No. 5 Sea water outlet for Reactor Nos. 1 & 2 Sea water intake tower for Reactor No. 1 Sea water outlet for Reactor No.6 Sea water intake tower for Reactor No.2 Sea water intake tower for Reactor No.6 © 2008 Chubu Electric Power Co., Inc. All rights reserved. (3) The Plans Overview (2) December 2008 Construction of Reactor No. 6 2018 ◆Construction ◆Operation to start to begin 2018 and thereafter within 2015 (plan) several years (target) Termination of operations at Reactors Nos. 1 & 2 ◆Planning for decommission procedures Construction of spent fuel dry storage facility ◆Geological ◆Construction ◆Usage start survey to begin FY 2016 (target) © 2008 Chubu Electric Power Co., Inc. All rights reserved. (2) Outline of Construction of Reactor No. 6 Reactor Reactor No. No. 66 will will be be aa 1,400MW-class 1,400MW-class Advanced Advanced Boiling Boiling Water Water Reactor Reactor (ABWR) (ABWR) similar similar to to Reactor Reactor No.5 No.5 The The construction construction will will be be on on the the east east side side of of Reactor Reactor No. No. 5. 5. The The company company will will acquire acquire land land needed needed to to build build the the reactor. reactor. Under Under the the plan, plan, cooling cooling water water will will be be drawn drawn in in through through an an intake intake tower tower and and seafloor seafloor tunnel tunnel that that isis to to be be built, built, the the same same as as that that of of the the arrangement arrangement used used in in other other reactors. reactors. Spent fuel dry storage facility Reactor No. 1 Stack for Reactor Nos.1&2 Stack for Reactor No. 6 Reactor No.6 Reactor No. 2 Pond for Reactor No.2 Reactor No.3 Reactor No. 4 Pond for Reactor No. 6 Pond for Reactor No. 1 Reactor No. 5 Sea water outlet for Reactor Nos. 1 & 2 Sea water intake tower for Reactor No. 1 Sea water outlet for Reactor No.6 Sea water intake tower for Reactor No.2 Sea water intake tower for Reactor No.6 © 2008 Chubu Electric Power Co., Inc. All rights reserved. (3) The Shutdown of Reactors No. 1 and No. 2 Their operation are to be terminated, based on judgments which concluded that it would not be economical to perform needed work to restart them, as such will take considerable expense and time to achieve targeted seismic resistance (approx. 1,000 gal). For the time being, the company will remove fuel from them, while planning for decommission procedures. ◆Process of decommission Removal of fuel Initial decontamination Long term safe- storage Dismantle & removal of structures The company will make plans in detailed procedures and time frame. Disposal of waste © 2008 Chubu Electric Power Co., Inc. All rights reserved. (4) Outline of Construction of Spent Fuel Dry Storage Facility Based on necessity to remove spent fuels from fuel pool in Reactors Nos. 1 and 2 which are to be shutdown, Chubu Electric has adopted a plan to build a new dry storage facility inside the power station site for spent fuel from all Hamaoka reactors as part of the current power generation facilities. Storage capacity: approx. 700 tU (equivalent to approx. 4,000 fuel assemblies)The construction site will be north of Reactor No. 4, where is a land belongs to the power station. For the time being, the company will conduct geological survey. ◆Spent fuel dry storage facility Metal cask At the spent fuel dry storage facility, spent fuel will be stored in special metal casks until it is removed to a reprocessing facility. ■Drawing of the facility Approx. dimension 60m×50m×(height)25m © 2008 Chubu Electric Power Co., Inc. All rights reserved. (5) Nuclear Power Generation Ratio in Composition of Power Supply (Based on Supply Plan for FY 2008) Composition of generated electricity Composition of generating facilities 20% 35% 32% 30% 17% 27% 25% 14% 12% 20% 15% 10% 16% 26% 18% 19% 8% 15% 15% 20% 14% 11% 4% 5% 0% 0% 2007 (H19) 2008 (H20) 2012 (H24) 2017 (H29) 2007 (H19) 2008 (H20) 2012 (H24) Previous plan ※ Reactor No. 6 does not affect above figures, as its commencement of operation will be FY 2017 and thereafter © 2008 Chubu Electric Power Co., Inc. All rights reserved. 2017 (H29) (6) Outline of the Revised Forecast of Results An extraordinary loss of approximately 155 billion yen to be recorded in conjunction with shutdown of Reactors Nos. 1 and 2. Principal figures on which outlooks are based are unchanged from previous announcement in October, 2008. Although the company expects extremely severe outlook for incomes, the company plans to maintain year end dividends of 30 yen per share (60 yen per share for annual basis). [ Forcast of result for FY 2008] (Billion yen) Change [ Current forecast] [Previous forecast in October] (A) (A)-(B) (B) Non-Consolidated Non-Consolidated Consolidated Consolidated Non-Consolidated Consolidated Operating revenue 2,600 2,420 2,600 2,420 Operating income 63 45 63 45 35 10 35 10 Ordinary income Extraordinary loss 155 155 155 155 -78 -94 22 6 -100 -100 Net income (Rounded down to billion yen) [ Principal fugures on which outlooks are based] [ Current Forecast] (A) Electric energy sales (TWh) approx. 137.2 CIF price: crude oil ($/b) approx. 110 FX rate (yen/$) approx. 106 Nuclear power utilization rate approx. 63 (%) [Previous forecast in October] (B) approx. 137.2 approx. 110 approx. 106 approx. 63 © 2008 Chubu Electric Power Co., Inc. All rights reserved. (7) DISCLAIMER This presentation contains forward-looking statements with respect to the financial conditions, results of operations, and business of the company. These assumptions and forward-looking statements involve certain risks and uncertainties resulting from changes in the managerial environment. Though great care is exercised in the preparation of such literature, Chubu Electric Power Co.,Inc. shall not be liable in any manner for any loss whatever incurred as a result of erroneous information contained therein or in this presentation.
© Copyright 2026 Paperzz