Drain sump boundary Hot Air Weld Field membrane cut to lay flat in sump area Hi-Pro PVC Cut Edge Sealant Hi-Pro PVC Membrane Hi-Pro PVC underneath Min. 4 cm (1 /1")2 wide hot air weld Insulation Drain clamping ring Hi-Pro PVC Membrane Min. 4 cm (1 /1")2 wide hot air weld Min. 8 cm (3") Continous field membrane Lexcan Universal Single Ply Sealant Notes: 1. All drain bolts or clamps must be in place to provide compression on Water Cut-Off 2. Cut membrane so it extends a minimum of 13mm (1/2”) from attachment points of the clamping ring. 3. Cut edge sealant is required on cut edges of Hi-Pro PVC membrane. 4. Seam overlap direction to be reversed if main field membrane is Hi-Pro Fleece-Backed Membrane. Drains with Tapered Sumps greater than 3:12 Scale: Not to scale Roofing System Detail Detail No.: P-S-323 Date: August, 2016