WESTSIDE OPENCUT MINE EPL No. 4033 August 2014 Monthly Monitoring Data Air Quality Table 1: Depositional Dust Monitoring Sampling Method: AM-19 EPL Sampling Frequency: Monthly Sampling Received Date Site Date 21/8/14 4/9/14 21/8/14 4/9/14 21/8/14 4/9/14 21/8/14 4/9/14 21/8/14 4/9/14 21/8/14 4/9/14 21/8/14 4/9/14 NS - no sample D5 D10 D11B D13A D18 D20 D21 EPA Point Depositied matter (µg/m3) 7 8 9 10 11 12 17 0.6 1.1 0.5 0.6 0.6 0.3 0.3 Annual Average (g/m2) 0.8 1.1 0.6 0.8 1.0 0.5 0.5 Ash (g/m2) 0.4 0.8 0.4 0.4 0.3 0.1 0.1 Table 2: EPA Point 13 Total Suspended Particles (TSP) Monitoring Sampling Method: AM-15 EPL Sampling Frequency: Quarterly Sampling Received TSP TSP Limit Publishing Date Date (µg/m³) (µg/m³) Date 15/6/14 18/7/14 13.0 90.0 10/9/14 Table 3: EPA Point 18 PM10 Dust Monitoring Sampling Method: AM-18 HVAS EPL Sampling Frequency: Every 6 days 24-hour Annual Annual Publishing Sampling Received PM10 PM10 Limit Average PM10 YTDAverage PM10 Limit Date Date Date (µg/m3) (µg/m3) (µg/m3) (µg/m3) 9.5 2/8/14 3/9/14 8.0 50.0 30.0 10/9/14 9.4 8/8/14 3/9/14 8.9 50.0 30.0 10/9/14 9.6 14/8/14 3/9/14 11.1 50.0 30.0 10/9/14 9.9 20/8/14 3/9/14 12.2 50.0 30.0 10/9/14 26/8/14 3/9/14 30.0 10/9/14 9.6 6.4 50.0 Publishing Date 10/9/14 10/9/14 10/9/14 10/9/14 10/9/14 10/9/14 10/9/14 Water Quality Table 4: Surface water monitoring results for all EPA discharge points Sampling Methods Used: Grab Sample, Special Method 1, Special Method 2 EPL Sampling Frequency: Monthly Parameter EPA point 4 EPA Point 14 pH Conductivity (µs/cm) Total Suspended Solids (mg/L) Aluminium (Dissolved) (µg/l) Aluminium (Total) (µg/l) Arsenic (Dissolved) (µg/l) Arsenic (Total) (µg/l) Beryllium (Dissolved) (µg/l) Beryllium (Total) (µg/l) Cadmium (Dissolved) (µg/l) Cadmium (Total) (µg/l) Chromium (Dissolved) (µg/l) Chromium (Total) (µg/l) Cobalt (Dissolved) (µg/l) Cobalt (Total) (µg/l) Copper (Dissolved) (µg/l) Copper (Total) (µg/l) Lead (Dissolved) (µg/l) Lead (Total) (µg/l) Mercury (Dissolved) (mg/l) Mercury (Total) (mg/l) 8.3 5200 1.0 50.0 50.0 5.0 5.0 1.0 1.0 0.2 0.2 1.0 1.0 32.0 32.0 1.0 1.0 1.0 1.0 0.0001 0.0001 5.9 72 23 2700 2700 1.0 1.0 1.0 1.0 0.2 0.2 1.0 1.0 1.0 1.0 1.0 4.0 1.0 2.0 0.0001 0.0001 Molybdenum (Dissolved) (µg/l) Molybdenum (Total) (µg/l) Nickel (Dissolved) (µg/l) Nickel (Total) (µg/l) Selenium (Dissolved) (µg/l) Selenium (Total) (µg/l) Silver (Dissolved) (µg/l) Silver (Total) (µg/l) Vanadium (Dissolved) (µg/l) Vanadium (Total) (µg/l) Zinc (Dissolved) (µg/l) Zinc (Total) (µg/l) Ammonia (mg/l) Table 5 EPA Sample Dates EPA Point 4 14 15 16 EPA Point 15 EPA Point 16 6.0 130 19.0 2700 2700 1.0 1.0 1.0 1.0 0.2 0.2 1.0 1.0 1.0 1.0 1.0 1.0 1.0 2.0 0.0001 0.0001 8.3 5200 1.0 50 50.0 5.0 5.0 1.0 1.0 0.2 0.2 1.0 1.0 32.0 32.0 1.0 1.0 1.0 1.0 0.0001 0.0001 5.0 5.0 1.0 1.0 1.0 1.0 5.0 5.0 5.0 5.0 16.0 20.0 0.03 35.0 40.0 44.0 44.0 1.0 1.0 5.0 5.0 5.0 5.0 10.0 11.0 0.94 35.0 5.0 40.0 5.0 44.0 1.0 44.0 1.0 1.0 1.0 1.0 1.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 10.0 10.0 11.0 20.0 0.94 0.02 *: Below detection limits Sampled Date Received Date Published Date 28/8/14 28/8/14 28/8/14 28/8/14 9/9/14 9/9/14 9/9/14 9/9/14 10/9/14 10/9/14 28/9/14 28/9/14 Surface Water Tables 6-10: Surface water monitoring results for EPA discharge points 2, 3, 4, 6 and 16 Sampling Methods used: Grab Sample, Special Method 1, Special Method 2 EPL Sampling Frequency: Daily during discharge Table 6 EPA Point 2 Week Received pH TSS Result (mg/L) Ending - Conductivity (µs/cm) Published - 10/9/14 *Week Ending Date, Received Date & Published Date is the same for EPA Points 2,3,4,5,6 & 16. Results are listed in order as per Table 5 above NT - Not Triggered Table 7 EPA Point 3 Week Ending Received - pH - TSS Result - Conductivity (µs/cm) - Published 10/9/14 Table 8 EPA Point 4 Week Received Ending 4/8/14 5/8/14 18/08/14 19/08/14 25/08/14 26/08/14 pH 8.0 8.1 7.9 TSS Result (mg/L) 2.0 2.0 1.0 Conductivity (µs/cm) 4960.0 4720.0 4680.0 Published 10/9/14 10/9/14 10/9/14 pH - TSS Result (mg/L) - Conductivity (µs/cm) - Published 10/9/14 pH 8.0 8.1 7.9 TSS Result (mg/L) 2.0 2.0 1.0 Conductivity (µs/cm) 4960.0 4720.0 4680.0 Published 10/9/14 10/9/14 10/9/14 Table 9 EPA Point 6 Week Ending - Received - Table 10 EPA Point 16 Week Ending Received 4/8/14 5/8/14 18/08/14 19/08/14 25/08/14 26/08/14 Table 11 EPA Point Limits and EPA Point 16 YTD Result pH limit 6.0-8.5 TSS Limit (mg/L) 50.0 Conductivity Limit (µs/cm) 10000 TSS Annual Mass Limit (kg) 10000 YTD Annual Mass Result (kg) 235.6 Site: EPA Point 2 & 3 Table 12: Water discharge volume monitoring results for EPA discharge points 2 and 3 Sampling Method: Flow meter EPL Sampling Frequency: Daily during discharge Date 1/08/2014 2/08/2014 3/08/2014 4/08/2014 5/08/2014 6/08/2014 7/08/2014 8/08/2014 9/08/2014 10/08/2014 11/08/2014 12/08/2014 13/08/2014 14/08/2014 15/08/2014 16/08/2014 17/08/2014 18/08/2014 EPA POINT 2 EPA POINT 3 kL Discharged Discharge Limit (kL) kL Discharged Discharge Limit (kL) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 19/08/2014 0 20/08/2014 0 21/08/2014 0 22/08/2014 0 23/08/2014 0 24/08/2014 0 25/08/2014 0 26/08/2014 0 27/08/2014 0 28/08/2014 0 29/08/2014 0 30/08/2014 630 31/08/2014 600 *Combined limit for EPA Point 16 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 0 0 0 0 0 0 0 0 0 0 1540 1390 1050 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* Site: EPA Point 4 & 5 Table 13: Water discharge volume monitoring results for EPA discharge points 4 & 5 Sampling Method: By calculation (volume flow rate multiplied by operating time) EPL Sampling Frequency: Daily during discharge Date 1/08/2014 2/08/2014 3/08/2014 4/08/2014 5/08/2014 6/08/2014 7/08/2014 8/08/2014 9/08/2014 10/08/2014 11/08/2014 12/08/2014 13/08/2014 14/08/2014 15/08/2014 16/08/2014 17/08/2014 18/08/2014 EPA POINT 4 EPA POINT 5 kL Discharged Discharge Limit (kL) kL Discharged Discharge Limit (kL) 4700 5000 5000 5700 0 0 0 0 0 0 0 0 5800 5500 5700 5800 5600 5800 19/08/2014 6000 20/08/2014 2200 21/08/2014 0 22/08/2014 0 23/08/2014 0 24/08/2014 0 25/08/2014 0 26/08/2014 0 27/08/2014 0 28/08/2014 0 29/08/2014 5800 30/08/2014 5800 31/08/2014 5800 *Combined limit for EPA Point 16 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* No longer discharging 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 Site: EPA Point 6 & 16 Table 14: Water discharge volume monitoring results for EPA discharge points 6 and 16 Sampling Method Point 6: By calculation (volume flow rate multiplied by operating time) Sampling Method Point 16: Caculation of measured discharge volumes from points 2,3,4 & 6 EPL Sampling Frequency: Daily during discharge EPA POINT 6 Date 1/08/2014 2/08/2014 3/08/2014 4/08/2014 5/08/2014 6/08/2014 7/08/2014 8/08/2014 9/08/2014 10/08/2014 11/08/2014 12/08/2014 13/08/2014 14/08/2014 15/08/2014 16/08/2014 17/08/2014 kL Discharged 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 18/08/2014 0 19/08/2014 0 20/08/2014 0 21/08/2014 0 22/08/2014 0 23/08/2014 0 24/08/2014 0 25/08/2014 0 26/08/2014 0 27/08/2014 0 28/08/2014 0 29/08/2014 6190 30/08/2014 1220 31/08/2014 0 *Combined limit for EPA Point 16 EPA POINT 16 Discharge Limit (kL) kL Discharged Discharge Limit (kL) 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 4700 5000 5000 5700 0 0 0 0 0 0 0 0 5800 5500 5700 5800 5600 14000 14000 14000 14000 14000 14000 14000 14000 14000 14000 14000 14000 14000 14000 14000 14000 14000 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 14000* 5800 6000 2200 0 0 0 0 0 0 0 0 5800 5800 5800 14000 14000 14000 14000 14000 14000 14000 14000 14000 14000 14000 14000 14000 14000 Contact Details For further details or any other concerns in relation to Westside Colliery operations please contact Westside Collieries Environment and Community Manager Wade Covey on: (02) 49 412163.
© Copyright 2026 Paperzz