Long Term Operation for U.S. Nuclear Power Plants Garry G. Young Director, License Renewal Entergy Services, Inc. IAEA – Technical Working Group, Life Management of Nuclear Power Plants Vienna, Austria 25-27 February 2015 1 Entergy Nuclear One of the Largest Nuclear Owner/Operators in the U.S. Entergy Nuclear Operations/Services Business 6 non-utility units at 5 sites (4,998 MW) 1 plant managed (800 MW) Utility • 5 electric utilities (5 regulators) • 4 contiguous states – Arkansas, Louisiana, Mississippi, Texas • 22,000 MW of generating capacity - 87 generation units - 5 nuclear units= 5120 MW - 5 coal units = 2233 MW • 15,000 miles of transmission lines 2 Entergy Nuclear One of the Largest Nuclear Owner/Operators in the U.S. Entergy Nuclear 7 units with Renewed Licenses 3 units in NRC review for Renewal ANO Unit 1 - 850 MWe B&W PWR Unit 2 - 1032 MWe CE PWR Riverbend Indian Point Unit 2 - 1035 MWe W PWR Unit 3 - 1048 MWe W PWR Fitzpatrick 816 MWe GE BWR Pilgrim 690 MWe GE BWR 967 MWe GE BWR Grand Gulf Vermont Yankee SHUTDOWN - 617 MWe GE BWR 1279 MWe GE BWR Palisades Waterford 3 1173 MWe CE PWR 805 MWe CE PWR Cooper 815 MWe GE BWR 3 U.S. Operating Nuclear Power Plants (99) (26) (75*) * Vermont Yankee’s license was renewed before the plant ceased operations on December 29, 2014. 4 U.S. NPPs – Years of Operation 5 NRC Regulations for LTO - Timeline 2015 ? 2018 ? 6 Future Plans – Second License Renewal 2029 Renewed licenses expire for oldest nuclear plants 2024 5-year minimum to submit SLR for continued operation per timely renewal SLR license issued 9 years before expiration of oldest renewed license 2020 NRC issues first SLR license 2 years for NRC review of SLR application 2018 Licensee submits first SLR application to NRC 2 years for SLR application preparation 2016 Licensee begins first SLR application preparation Revise SRP, GALL, and NEI 95-10 for SLR MDM and EMDA updated by EPRI and NRC Current Date NRC issues SRM on SLR (addressing SECY on SLR) NRC completes AMP audits EPRI completes AMP review and provides input to NRC NRC completes public meetings on SLR 2009 Oldest LR plants enter the period of extended operation (i.e., > 40 years) 7 U.S. Industry Groups – LTO • NEI LR and SLR Task Force – Regular industry meetings • Quarterly industry meetings • Quarterly NRC mgmt. meetings • SRP & GALL revision recommendations – NEI 95-10 industry guidance – Industry peer reviews of LRAs Goal – continuous improvement of aging management based on lessons learned and operating experience • NEI License Renewal Working Groups – Mechanical Working Group • EPRI Mechanical Tools Doc. Upkeep – Electrical Working Group • EPRI Electrical Tools Doc. Upkeep – Civil/Structural Working Group • EPRI Structural Tools Doc. Upkeep – Implementation Working Group • NRC IP71003, Industry Guidance – Subsequent LR Working Group • LTO R&D and Licensing Guidance • NEI SLR Executive Working Group [new] • ASME Special Working Group – Nuclear Plant Aging Management 8 Challenges to LTO in the U.S. Entergy announces plans to close Vermont Yankee Aug 27, 2013 9 U.S. Industry Initiatives for LTO 10 U.S. Department of Energy LTO Activities 11 Long Term Operation for U.S. Nuclear Power Plants IAEA – Technical Working Group Life Management of Nuclear Power Plants 12
© Copyright 2026 Paperzz