LIGHT MAINTENANCE Ordinance 1472- Light Maintenance District Expansion Light Maintenance Background Light Maintenance District Tax levied proportionally on an area basis for real property in the City that is within 300 feet of a City street light Amount $.0030 per square foot of lot or parcel/ year Cap assessments for vacant land at 5 acres District boundary shown in diagram as yellow There are 6,995 parcels currently being assessed Light Maintenance Service Includes Lights Located in City Streets and State Routes (intermittently) Alleys Parks 10 Traffic Lights Parking Areas Services performed Electricity costs ( FE flat rate lights) Electricity, operations, and maintenance costs (metered lights) Community Benefits of Lights Driver Safety: Street lights increase visibility Pedestrian Safety: Street lights make it easier to see dangers Public Safety: People tend to feel safer in lit areas. People are not as vulnerable to being victimized Increase Nighttime Business: Dark areas look deserted; a welllighted area looks cheery and inviting, so street lights might be good for business LIGHTING DISTRICT MAP North Kalispell ³ 9 8 O N M L : 9 8 O N M L : 9 8 O N M L : 1 inch = 3,000 feet 0 1,500 3,000 6,000 Feet Legend 9 8 O N M L : Traffic Lights Parks ( ! Unmetered Lights 2014 _ ^ Metered Lights 2014 Kalispell Streets MAJOR ARTERIAL US HIGHWAY HIGHWAY MINOR ARTERIAL COLLECTOR LOCAL City Limits 2014 Private Light Parcels 2014 Parcels to be Added 2014 Parcels Assessed South Kalispell 9 O N M L : 9 O8 N M L : 9 8 O 8 N M L : 9 O N M L : 9 8 O8 N M L : 9 O N M L : 9 8 O8 N M L : Level of Service Options Reduce Services to Meet Current Revenue Resources 1. No increase- reduce staff time and M & O as budget permits Maintain Current Level of Service 2. Increase assessment (10 % for two years) Reduce staff time and maintain M & O as budget permits Increase Level of Service from Current Levels 3. Increase assessment (15% for two years, 10%, 3%) Maintain staff time, M & O, new installations of 1/year, proactive replacement of decorative globes Increase Level of Service from Current Levels 4. No assessment increase Adjustment to assess all City Parcels Expansion of Light Maintenance District Assessment for Entire City Assessments Level of Service Expenditures Full time TSS salary Maintain O & M Costs Lighting Supplies Repair and Maint Service Decorative Light Rehab 6/yr Electricity Capital Outlay Machinery and equipment replacement Installation 5 new luminaires/yr TSS Replacing Hit Luminaire on Reserve Loop Cost/Per Square Ft - .003 $/sf Vacant land cap at 5 Acres 50% reduction for properties within subdivision with private street light systems Expansion Assessment Summary Level of Service requires assessment revenue of $401,000 Ensures LOS is provided beyond FY 23/24 Parcel Assessment Summary City total = 9,450 Currently assessed = 6,995 (.003$/sf) Add Non-private street light system = 1,543 (.003 $/sf) Add Private street light system = 912 (.0015 $/sf) Total estimated annual assessment including all parcels = $410,000 Expansion Assessment Review- Cost per Year Properties not paying for street lighting other than assessment -.003 $/SqFt (current assessment) Properties paying for street lighting in the ROW addition to assessments - .0015 $/SqFt Option 4: Assess all City Parcels Properties not paying for street Properties paying for private lighting street lighting in the ROW Assessment Increase % 0.003 0.0015 SqFT $/Year $/Year Typical SFR 8,632 $25.90 $12.95 Typical SFR 6,098 $18.30 $9.15 Commercial 20,000 $60.00 NA Vacant Cap at 5 Acre 217,800 $653.40 $326.70 Assessment $ /Sq FT ADDITIONAL INFORMATION FROM PAST WORK SESSION PRESENTATION Light Management 1. Non-metered Lights Luminaires, decorative lights, decorative bollards (15 different types) City owns and maintains entire light Not metered – – 2. Metered Lights Flat rate/month for each light Large luminaires – Flathead Electric Maintains the Lights – Damage, ballasts, light bulbs 1,221 lights FE performed audit and mapped lights to verify City’s account 585 City owned metered lights – – – – Lights are categorized and metered for electrical use 496 in Downtown area 47 in Reserve Loop 28 in Meridian Road 14 Hospital Area (Windward Way, Sunny Side, Heritage Way) Maintenance – Bulbs, Ballasts, Poles, Wiring Review Findings and Possible Cost Reductions for FY15 Budget 1. Re-categorized meter accounts to Municipal accounts 2. Performed audit of properties 3. Initial inventory identified $20,000 annual additions in revenue Reduced allocated staff time 4. Decreased annual electrical fee by $5,622 1 FTE to 0.5 FTE decrease Personal Service by $21,338 Reduced staff time spent preforming activities for Light Maintenance Eliminated proactive rehabilitation of downtown decorative lights Identified Parks and Recreation areas supported by Light Maintenance Fund Potential reduction in electrical of $9,419 TSS Replacing Hit Luminaire on Reserve Loop Budget FY 2015 and 5 Year Projection BEGINNING CASH ACTUAL FY12/13 Est BUDGET FY13/14 Proposed FY14/15 Projected FY15/16 Projected FY16/17 Projected FY17/18 Projected FY18/19 Projected FY19/20 $160,503 $152,664 $94,656 $70,180 $40,276 $5,397 ($34,652) ($57,828) $236,730 $236,000 $256,000 $257,280 $259,853 $262,451 $265,076 $267,727 $8,322 $108,731 $1,275 $1,900 $1,900 $1,900 $1,900 $1,900 $405,555 $497,395 $351,931 $329,360 $302,028 $269,748 $232,323 $211,799 REVENUES Maintenance Assessments Misc, Penalty, Interest TOTAL AVAILABLE EXPENDITURES Personal Services: $48,907 $76,985 $55,647 $57,253 $58,909 $60,618 $62,381 $64,201 Materials and Services: $203,837 $200,040 $203,858 $209,585 $215,476 $221,536 $227,770 $234,183 $0 Total Capital Outlay (Mach & Equip) $147 $101,275 $0 $0 $0 $0 $0 Debt Service: loan repayment $0 $24,438 $22,246 $22,246 $22,246 $22,246 $0 $0 TOTAL AVAILABLE $252,891 $402,739 $281,751 $289,085 $296,632 $304,400 $290,151 $298,383 ENDING CASH $152,664 $94,656 $70,180 $40,276 $5,397 ($34,652) ($57,828) ($86,585) Current Assessment Review: Projected 2013-2020 $320,000 $300,000 ASSESSMENT REVENUE $280,000 EXPENDITURES $260,000 $240,000 $220,000 $200,000 FY11/12 FY12/13 FY13/14 FY14/15 FY15/16 FY16/17 FY17/18 FY18/19 FY19/20 Option 4:Light Assessment for Entire City BEGINNING CASH ACTUAL FY12/13 BUDGET FY13/14 BUDGET FY14/15 Projected FY15/16 Projected FY16/17 Projected FY17/18 Projected FY18/19 Projected FY19/20 Projected FY20/21 Projected FY21/22 Projected FY22/23 Projected FY23/24 $160,503 $152,664 $94,656 $129,913 $156,388 $173,467 $180,881 $200,873 $210,637 $209,881 $198,300 $175,583 $236,730 $236,000 $401,920 $401,920 $401,920 $401,920 $401,920 $401,920 $401,920 $401,920 $401,920 $401,920 $8,322 $108,731 $1,275 $1,900 $1,900 $1,900 $1,900 $1,900 $1,900 $1,900 $1,900 $1,900 $405,555 $497,395 $497,851 $533,733 $560,208 $577,287 $584,701 $604,693 $614,457 $613,701 $602,120 $579,403 REVENUES Maintenance Assessments Misc, Penalty, Interest TOTAL AVAILABLE EXPENDITURES Personal Services: $48,907 $76,985 $90,519 $93,101 $95,762 $98,507 $101,338 $104,258 $107,270 $110,378 $113,585 $116,894 Materials and Services: $203,837 $200,040 $245,173 $251,726 $258,460 $265,380 $272,491 $279,798 $287,306 $295,023 $302,953 $311,102 $147 $101,275 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $24,438 $22,246 $22,518 $22,518 $22,518 $0 $0 $0 $0 $0 $0 TOTAL AVAILABLE $252,891 $402,739 $367,938 $377,345 $386,741 $396,405 $383,829 $394,056 $404,577 $415,401 $426,537 $437,996 ENDING CASH $152,664 $94,656 $129,913 $156,388 $173,467 $180,881 $200,873 $210,637 $209,881 $198,300 $175,583 $141,407 Total Capital Outlay (Mach & Equip) Debt Service: loan repayment Option 4: Assessment Review Projected 2014-2024 $500,000 $450,000 $400,000 $350,000 $300,000 $250,000 $200,000 $150,000 FY11/12 FY12/13 FY13/14 FY14/15 FY15/16 FY16/17 FY17/18 FY18/19 FY19/20 FY20/21 FY21/22 FY22/23 FY23/24 ASSESSMENT REVENUE EXPENDITURES
© Copyright 2026 Paperzz