Groundwater Dewatering and Erosion/Sediment Control Plan, Central Artery Tunnel Walsh Construction Company of Illinois, Boston, Massachusetts GEI prepared a groundwater dewatering and erosion/sediment control plan submittal for a major construction company client at a Central Artery Tunnel (CA/T) ventilation building. The erosion and sediment control consisted of: • Sedimentation systems for storm water runoff and groundwater pumped from within the excavation • Silt fencing to protect the planned adjacent railroad ballast • Silt fencing and hay bales along the Charles River, • A wheel wash station The groundwater control plan consisted of sheet pile cutoffs of groundwater flows in upper pervious fill and sediment layers, shallow well dewatering within the cutoff area, and use of one existing deep pump to prevent potential hydrostatic uplift on the lower clay layer. The groundwater dewatering design made use of existing resources to minimize cost to the contractor. Key Elements • Groundwater Dewatering • Erosion & Sediment Control • Sheet Pile Cutoffs
© Copyright 2026 Paperzz