Quantities of metal and sand required Mandal wise Tender schedule - Annexure II Name of the work: Supply of Metal and Sand for MG-NREGS works in Guntur District during the year 2012-13 S. No Material Description Probable quantities in figures Unit 4218 1006 2278 2150 765 0 2046 2982 1088 1609 5689 332 2312 4440 383 Cu.m Rate in Rs. Figures Words Amount in Rs. Figures Words I Metal 1 Collection and supply of mixer of stone aggregates consisting of 96% of 63mm to 45 mm IRC HBG metal ,and 4% of 19mm to 22mm IRC HBG metal including cost ,conveyance, seigniorage charges, loading, unloading and stacking to departmental gauge for pre measurements for WBM Grade.II surfaces per MORD standards excluding VAT any where in the following mandals (CSSR) 1 Amaravathi 2 Amarthaluru 3 Atchampet 4 Bapatla 5 Bellamkonda 6 Bhattiprolu 7 Bollapalli 8 Chebrolu 9 Cherukupalli 10 Chilakaluripet 11 Dachepalli 12 Duggirala 13 Durgi 14 Edlapadu 15 Guntur Rural CONRTRACTOR Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Page 1 of 12 SUPERINTENDING ENGINEER, P.R.CIRCLE,GUNTUR S. No Material Description 16 Gurazala 17 Ipur 18 Kakumanu 19 Karempudi 20 Karlapalem 21 Kollipara 22 Kollur 23 Krosuru 24 Machavaram 25 Macherla 26 Mangalagiri 27 Medikonduru 28 Muppalla 29 Nadendla 30 Nagaram 31 Narasaraopet 32 Nekarikallu 33 Nizampatnam 34 Nuzendla 36 Pittalavanipalem 37 Pedakakani 38 Pedakurapadu 35 Pedanandipadu 39 Phirangipuram 40 Piduguralla 41 Ponnur 42 Prathipadu 43 Rajupalem 45 Rentachintala CONRTRACTOR Probable quantities in figures Unit 2998 803 889 2441 998 658 804 2030 1716 1981 337 1496 3282 2515 1229 3126 2085 1365 4559 723 3592 2650 185 1172 1066 3342 1370 1025 854 Cu.m Rate in Rs. Figures Words Amount in Rs. Figures Words Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Page 2 of 12 SUPERINTENDING ENGINEER, P.R.CIRCLE,GUNTUR S. No Material Description 44 Repalle 47 Rompicherla 48 Sattenapalli 46 Savalyapuram 49 Tadepalli 50 Tadikonda 52 Tenali 53 Thullur 51 Tsunduru 54 Vatticherukuru 55 Veldurthy 56 Vemuru 57 Vinukonda Collection and supply of Crushed stone coarse 2 aggregate of 20mm to 12mm HBG graded metal (consisting 60% of 20 mm metal and 40% 12 mm metal), conforming to IS 383 specifications for concrete including cost,conveyance, labour and seigniorage charges and stacking to Departmental guage for pre measurements but excluding VAT charges (CSSR) 1 Amaravathi 2 Amarthaluru 3 Atchampet 4 Bapatla 5 Bellamkonda 6 Bhattiprolu 7 Bollapalli 8 Chebrolu 9 Cherukupalli CONRTRACTOR Probable quantities in figures Unit 630 4862 2227 436 216 2481 943 3695 1399 2976 2024 503 579 Cu.m 3515 2921 2541 1584 1693 2121 1489 5196 2240 Cu.m Rate in Rs. Figures Words Amount in Rs. Figures Words Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Page 3 of 12 SUPERINTENDING ENGINEER, P.R.CIRCLE,GUNTUR S. No Material Description 10 Chilakaluripet 11 Dachepalli 12 Duggirala 13 Durgi 14 Edlapadu 15 Guntur Rural 16 Gurazala 17 Ipur 18 Kakumanu 19 Karempudi 20 Karlapalem 21 Kollipara 22 Kollur 23 Krosuru 24 Machavaram 25 Macherla 26 Mangalagiri 27 Medikonduru 28 Muppalla 29 Nadendla 30 Nagaram 31 Narasaraopet 32 Nekarikallu 33 Nizampatnam 34 Nuzendla 35 Pittalavanipalem 36 Pedakakani 37 Pedakurapadu 38 Pedanandipadu CONRTRACTOR Probable quantities in figures Unit 2297 5879 1234 1556 3361 1032 1112 1302 1554 4016 1945 1629 3007 3228 2266 2231 1097 944 3022 2252 955 2634 4128 4323 1800 3889 4930 2814 568 Cu.m Rate in Rs. Figures Words Amount in Rs. Figures Words Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Page 4 of 12 SUPERINTENDING ENGINEER, P.R.CIRCLE,GUNTUR S. No Material Description 39 Phirangipuram 40 Piduguralla 41 Ponnur 42 Prathipadu 43 Rajupalem 44 Rentachintala 45 Repalle 46 Rompicherla 47 Sattenapalli 48 Savalyapuram 49 Tadepalli 50 Tadikonda 51 Tenali 52 Thullur 53 Tsunduru 54 Vatticherukuru 55 Veldurthy 56 Vemuru 3 57 Vinukonda Collection and supply of Crushed stone coarse aggregates of 40mm nominal HBG graded metal conforming to IS 383 specifications for concrete including cost,conveyance, labour and seigniorage charges and stacking to Departmental guage for pre measurements but excluding VAT charges (CSSR) 1 Amaravathi 2 Amarthaluru 3 Atchampet 4 Bapatla CONRTRACTOR Probable quantities in figures Unit 618 1046 917 1341 3180 1905 2558 2371 3452 621 691 6910 1618 6549 3018 1511 2232 1273 837 Cu.m 106 0 25 139 Cu.m Rate in Rs. Figures Words Amount in Rs. Figures Words Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Page 5 of 12 SUPERINTENDING ENGINEER, P.R.CIRCLE,GUNTUR S. No Material Description 5 Bellamkonda 6 Bhattiprolu 7 Bollapalli 8 Chebrolu 9 Cherukupalli 10 Chilakaluripet 11 Dachepalli 12 Duggirala 13 Durgi 14 Edlapadu 15 Guntur Rural 16 Gurazala 17 Ipur 18 Kakumanu 19 Karempudi 20 Karlapalem 21 Kollipara 22 Kollur 23 Krosuru 24 Machavaram 25 Macherla 26 Mangalagiri 27 Medikonduru 28 Muppalla 29 Nadendla 30 Nagaram 31 Narasaraopet 32 Nekarikallu 33 Nizampatnam CONRTRACTOR Probable quantities in figures Unit 4 0 56 1 5 12 0 1 12 34 1 18 0 1 0 9 257 0 141 0 14 1 0 132 36 28 80 3 41 Cu.m Rate in Rs. Figures Words Amount in Rs. Figures Words Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Page 6 of 12 SUPERINTENDING ENGINEER, P.R.CIRCLE,GUNTUR S. No Material Description 34 Nuzendla 35 Pittalavanipalem 36 Pedakakani 37 Pedakurapadu 38 Pedanandipadu 39 Phirangipuram 40 Piduguralla 41 Ponnur 42 Prathipadu 43 Rajupalem 44 Rentachintala 45 Repalle 46 Rompicherla 47 Sattenapalli 48 Savalyapuram 49 Tadepalli 50 Tadikonda 51 Tenali 52 Thullur 53 Tsunduru 54 Vatticherukuru 55 Veldurthy 56 Vemuru 57 Vinukonda Probable quantities in figures Unit 56 48 0 166 1 0 0 1 1 0 0 54 208 510 0 1 0 217 0 185 1 100 0 0 Cu.m Rate in Rs. Figures Words Amount in Rs. Figures Words Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m II SAND CONRTRACTOR Page 7 of 12 SUPERINTENDING ENGINEER, P.R.CIRCLE,GUNTUR S. No 4 Material Description Probable quantities in figures Unit 1735 1559 1232 964 814 1169 773 2732 1247 1155 2939 617 784 1698 516 565 651 777 2008 1084 980 1695 1618 Cu.m Rate in Rs. Figures Words Amount in Rs. Figures Words Collection and supply of Sand for MORTAR including cost,conveyance, labour and seigniorage charges and stacking to Departmental guage for pre measurements but excluding VAT charges conforming to IS 383 specifications (CSSR) 1 Amaravathi 2 Amarthaluru 3 Atchampet 4 Bapatla 5 Bellamkonda 6 Bhattiprolu 7 Bollapalli 8 Chebrolu 9 Cherukupalli 10 Chilakaluripet 11 Dachepalli 12 Duggirala 13 Durgi 14 Edlapadu 15 Guntur Rural 16 Gurazala 17 Ipur 18 Kakumanu 19 Karempudi 20 Karlapalem 21 Kollipara 22 Kollur 23 Krosuru CONRTRACTOR Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Page 8 of 12 SUPERINTENDING ENGINEER, P.R.CIRCLE,GUNTUR S. No Material Description 24 Machavaram 25 Macherla 26 Mangalagiri 27 Medikonduru 28 Muppalla 29 Nadendla 30 Nagaram 31 Narasaraopet 32 Nekarikallu 33 Nizampatnam 34 Nuzendla 35 Pittalavanipalem 36 Pedakakani 37 Pedakurapadu 38 Pedanandipadu 39 Phirangipuram 40 Piduguralla 41 Ponnur 42 Prathipadu 43 Rajupalem 44 Rentachintala 45 Repalle 46 Rompicherla 47 Sattenapalli 48 Savalyapuram 49 Tadepalli 50 Tadikonda 51 Tenali 52 Thullur CONRTRACTOR Probable quantities in figures Unit 1133 1122 548 472 1579 1447 588 1360 2065 2780 929 2178 2469 1500 284 317 523 458 671 1537 952 1475 1295 1981 310 346 3456 1022 3283 Cu.m Rate in Rs. Figures Words Amount in Rs. Figures Words Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Page 9 of 12 SUPERINTENDING ENGINEER, P.R.CIRCLE,GUNTUR S. No Material Description 53 Tsunduru 54 Vatticherukuru 55 Veldurthy 56 Vemuru 57 Vinukonda 5 Probable quantities in figures Unit 1685 756 1166 688 418 Cu.m 3663 3986 2060 5052 626 4719 0 9652 1030 4504 7900 903 1757 6760 0 1757 576 2625 Cu.m Rate in Rs. Figures Words Amount in Rs. Figures Words Cu.m Cu.m Cu.m Cu.m Collection and supply of Sand for FILLING including cost,conveyance, labour and seigniorage charges and stacking to Departmental guage for pre measurements but excluding VAT charges conforming to IS 383 specifications (CSSR) 1 Amaravathi 2 Amarthaluru 3 Atchampet 4 Bapatla 5 Bellamkonda 6 Bhattiprolu 7 Bollapalli 8 Chebrolu 9 Cherukupalli 10 Chilakaluripet 11 Dachepalli 12 Duggirala 13 Durgi 14 Edlapadu 15 Guntur Rural 16 Gurazala 17 Ipur 18 Kakumanu CONRTRACTOR Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Page 10 of 12 SUPERINTENDING ENGINEER, P.R.CIRCLE,GUNTUR S. No Material Description 19 Karempudi 20 Karlapalem 21 Kollipara 22 Kollur 23 Krosuru 24 Machavaram 25 Macherla 26 Mangalagiri 27 Medikonduru 28 Muppalla 29 Nadendla 30 Nagaram 31 Narasaraopet 32 Nekarikallu 33 Nizampatnam 34 Nuzendla 35 Pittalavanipalem 36 Pedakakani 37 Pedakurapadu 38 Pedanandipadu 39 Phirangipuram 40 Piduguralla 41 Ponnur 42 Prathipadu 43 Rajupalem 44 Rentachintala 45 Repalle 46 Rompicherla 47 Sattenapalli CONRTRACTOR Probable quantities in figures Unit 3038 2621 2900 7715 1946 1038 2220 3883 2297 6003 3883 1731 2683 129 5938 3850 7193 7200 2846 0 1889 738 4055 1149 5963 1149 2002 4609 572 Cu.m Rate in Rs. Figures Words Amount in Rs. Figures Words Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Page 11 of 12 SUPERINTENDING ENGINEER, P.R.CIRCLE,GUNTUR S. No Material Description 48 Savalyapuram 49 Tadepalli 50 Tadikonda 51 Tenali 52 Thullur 53 Tsunduru 54 Vatticherukuru 55 Veldurthy 56 Vemuru 57 Vinukonda CONRTRACTOR Probable quantities in figures Unit 313 0 9661 3910 10848 6646 0 2550 3480 415 Cu.m Rate in Rs. Figures Words Amount in Rs. Figures Words Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Page 12 of 12 SUPERINTENDING ENGINEER, P.R.CIRCLE,GUNTUR
© Copyright 2026 Paperzz