SAMARCO – IMMEDIATE CAUSES TO THE FAILURE OF THE FUNDÃO DAM SUMMARY OF CONCLUSIONS PRESENTED BY THE FUNDÃO TAILINGS DAM REVIEW PANEL 2016-10-12 / SVEMIN MILJÖKONFERENS / GÄLLIVARE SWECO GRUVDAMMAR OCH DEPONERINGSHANTERING JONAS JONSSON, MAGNUS LJUNGGREN 1 10/24/2016 SAMARCO – IMMEDIATE CAUSES TO THE FAILURE OF THE FUNDÃO DAM SUMMARY OF CONCLUSIONS PRESENTED BY THE FUNDÃO TAILINGS DAM REVIEW PANEL Rio de Janeiro Sao Paulo 2016-10-12 / SVEMIN MILJÖKONFERENS / GÄLLIVARE SWECO GRUVDAMMAR OCH DEPONERINGSHANTERING JONAS JONSSON, MAGNUS LJUNGGREN 2 10/24/2016 Introduction • In 2015 on November 5 the 110 m high Fundão Tailings Dam failed in a liquefaction flowslide. • More than 60 Mm3 of tailings and water spread as a mud flow in the river system along its 650 km path to the Atlantic Ocean. • In total 18 people lost their lives. • The owner Samarco Mineração S.A. (BHP Billiton Brazil Ltda, Vale S.A.) initiated The Fundão Tailings Dam investigation to determine its cause http://www.samarco.com/en/balanco/ (161011) http://www.argentinaindependent.com/currentaffairs/analy sis/revisiting-brazils-worst-ever-environmental-disaster/ IMMEDIATE CAUSES TO THE FAILURE OF THE FUNDÃO DAM / SVEMIN MILJÖKONFERENS 16-10-12 / JONAS JONSSON, MAGNUS LJUNGGREN 2016-10-24 Introduction • In 2015 on November 5 the 110 m high Fundão Tailings Dam failed in a liquefaction flowslide. Fundão dam • More than 60 Mm3 of tailings and water spread as a mud flow in the river system along its 650 km path to the Atlantic Ocean. • In total 18 people lost their lives. • The owner Samarco Mineração S.A. (BHP Billiton Brazil Ltda, Vale S.A.) initiated The Fundão Tailings Dam investigation to determine its cause Santarém dam http://www.samarco.com/en/balanco/ (161011) http://www.argentinaindependent.com/currentaffairs/analy sis/revisiting-brazils-worst-ever-environmental-disaster/ IMMEDIATE CAUSES TO THE FAILURE OF THE FUNDÃO DAM / SVEMIN MILJÖKONFERENS 16-10-12 / JONAS JONSSON, MAGNUS LJUNGGREN 2016-10-24 Introduction • In 2015 on November 5 the 110 m high Fundão Tailings Dam failed in a liquefaction flowslide. • More than 60 Mm3 of tailings and water spread as a turbidity plume in the river system along its 650 km path to the Atlantic Ocean. • In total 18 people lost their lives. • The owner Samarco Mineração S.A. (BHP Billiton Brazil Ltda, Vale S.A.) initiated The Fundão Tailings Dam investigation to determine its cause http://www.samarco.com/en/balanco/ (161011) http://www.argentinaindependent.com/currentaffairs/analy sis/revisiting-brazils-worst-ever-environmental-disaster/ IMMEDIATE CAUSES TO THE FAILURE OF THE FUNDÃO DAM / SVEMIN MILJÖKONFERENS 16-10-12 / JONAS JONSSON, MAGNUS LJUNGGREN 2016-10-24 Introduction • In 2015 on November 5 the 110 m high Fundão Tailings Dam failed in a liquefaction flowslide. • More than 60 Mm3 of tailings and water spread as a turbidity plume in the river system along its 650 km path to the Atlantic Ocean. • In total 18 people lost their lives. • The owner Samarco Mineração S.A. (BHP Billiton Brazil Ltda, Vale S.A.) initiated The Fundão Tailings Dam investigation to determine its cause http://www.samarco.com/en/balanco/ (161011) http://www.argentinaindependent.com/currentaffairs/analy sis/revisiting-brazils-worst-ever-environmental-disaster/ IMMEDIATE CAUSES TO THE FAILURE OF THE FUNDÃO DAM / SVEMIN MILJÖKONFERENS 16-10-12 / JONAS JONSSON, MAGNUS LJUNGGREN 2016-10-24 Introduction • In 2015 on November 5 the 110 m high Fundão Tailings Dam failed in a liquefaction flowslide. • More than 60 Mm3 of tailings and water spread as a turbidity plume in the river system along its 650 km path to the Atlantic Ocean. • In total 18 people lost their lives. • The owner Samarco Mineração S.A. (BHP Billiton Brazil Ltda, Vale S.A.) initiated The Fundão Tailings Dam investigation to determine its cause http://www.samarco.com/en/balanco/ (161011) http://www.argentinaindependent.com/currentaffairs/analy sis/revisiting-brazils-worst-ever-environmental-disaster/ IMMEDIATE CAUSES TO THE FAILURE OF THE FUNDÃO DAM / SVEMIN MILJÖKONFERENS 16-10-12 / JONAS JONSSON, MAGNUS LJUNGGREN 2016-10-24 70 000 000 Introduction 60 000 000 50 000 000 60 000 000 Overview of release from tailings dam failures during the last 20 years 50 000 000 Approx. release [m3] 40 000 000 30 000 000 20 000 000 10 000 000 0 -10 000 000 Failures with approximated amount of release Failures with unknown amount of release Source: www.Wise-uranium.org / Tailings Dam Incidents, U.S. Committee on Large Dams - USCOLD, Denver, Colorado, ISBN 1-884575-03-X, 1994 8 IMMEDIATE CAUSES TO THE FAILURE OF THE FUNDÃO DAM / SVEMIN MILJÖKONFERENS 16-10-12 / JONAS JONSSON, MAGNUS LJUNGGREN 2016-10-24 Immediate causes to the Fundão dam failure Reference: Fundao Tailings Dam Review Panel – Report on the immediate Causes of the Failure of the Fundao Dam, August 25, 2016 http://fundaoinvestigation.com/ Panel: Norbert R. Morgenstern (Chair), Steven G. Vick, Cassio B. Viotti, Bryan D. Watts • Start of construction: 2007 • Dam type: Upstream raised tailings dam • Dam height at failure: 110 m (EL +900 m) Level crest at failure ADDED TEXT AND SKETCHES ON THE REVIEW PANEL’S REPORT FIGURES ARE FOR EXPLANATORY PURPOSES ONLY DURING THE PRESENTATION. Beach of sand tailings Compacted berms of tailings Starter dam Underdrain IMMEDIATE CAUSES TO THE FAILURE OF THE FUNDÃO DAM / SVEMIN MILJÖKONFERENS 16-10-12 / JONAS JONSSON, MAGNUS LJUNGGREN Original figure from Panel report: http://fundaoinvestigation.com/ 9 2016-10-24 Immediate causes to the Fundão dam failure Reference: Fundao Tailings Dam Review Panel – Report on the immediate Causes of the Failure of the Fundao Dam, August 25, 2016 http://fundaoinvestigation.com/ Panel: Norbert R. Morgenstern (Chair), Steven G. Vick, Cassio B. Viotti, Bryan D. Watts • Start of construction: 2007 • Dam type: Upstream raised tailings dam • Dam height at failure: 110 m (EL +900 m) Level crest at failure ADDED TEXT AND SKETCHES ON THE REVIEW PANEL’S REPORT FIGURES ARE FOR EXPLANATORY PURPOSES ONLY DURING THE PRESENTATION. Beach of sand tailings Compacted berms of tailings Starter dam Underdrain IMMEDIATE CAUSES TO THE FAILURE OF THE FUNDÃO DAM / SVEMIN MILJÖKONFERENS 16-10-12 / JONAS JONSSON, MAGNUS LJUNGGREN Original figure from Panel report: http://fundaoinvestigation.com/ 10 2016-10-24 Immediate causes to the Fundão dam failure Reference: Fundao Tailings Dam Review Panel – Report on the immediate Causes of the Failure of the Fundao Dam, August 25, 2016 http://fundaoinvestigation.com/ Panel: Norbert R. Morgenstern (Chair), Steven G. Vick, Cassio B. Viotti, Bryan D. Watts • Start of construction: 2007 • Dam type: Upstream raised tailings dam • Dam height at failure: 110 m (EL +900 m) Level crest at failure ADDED TEXT AND SKETCHES ON THE REVIEW PANEL’S REPORT FIGURES ARE FOR EXPLANATORY PURPOSES ONLY DURING THE PRESENTATION. Beach of sand tailings Compacted berms of tailings Starter dam Underdrain IMMEDIATE CAUSES TO THE FAILURE OF THE FUNDÃO DAM / SVEMIN MILJÖKONFERENS 16-10-12 / JONAS JONSSON, MAGNUS LJUNGGREN Original figure from Panel report: http://fundaoinvestigation.com/ 11 2016-10-24 Immediate causes to the Fundão dam failure Reference: Fundao Tailings Dam Review Panel – Report on the immediate Causes of the Failure of the Fundao Dam, August 25, 2016 http://fundaoinvestigation.com/ Panel: Norbert R. Morgenstern (Chair), Steven G. Vick, Cassio B. Viotti, Bryan D. Watts • Start of construction: 2007 • Dam type: Upstream raised tailings dam • Dam height at failure: 110 m (EL +900 m) Level crest at failure ADDED TEXT AND SKETCHES ON THE REVIEW PANEL’S REPORT FIGURES ARE FOR EXPLANATORY PURPOSES ONLY DURING THE PRESENTATION. Beach of sand tailings Compacted berms of tailings Starter dam Underdrain IMMEDIATE CAUSES TO THE FAILURE OF THE FUNDÃO DAM / SVEMIN MILJÖKONFERENS 16-10-12 / JONAS JONSSON, MAGNUS LJUNGGREN Original figure from Panel report: http://fundaoinvestigation.com/ 12 2016-10-24 Immediate causes to the Fundão dam failure Reference: Fundao Tailings Dam Review Panel – Report on the immediate Causes of the Failure of the Fundao Dam, August 25, 2016 http://fundaoinvestigation.com/ Panel: Norbert R. Morgenstern (Chair), Steven G. Vick, Cassio B. Viotti, Bryan D. Watts • Start of construction: 2007 • Dam type: Upstream raised tailings dam • Dam height at failure: 110 m (EL +900 m) Level crest at failure ADDED TEXT AND SKETCHES ON THE REVIEW PANEL’S REPORT FIGURES ARE FOR EXPLANATORY PURPOSES ONLY DURING THE PRESENTATION. Beach of sand tailings Compacted berms of tailings Starter dam Underdrain IMMEDIATE CAUSES TO THE FAILURE OF THE FUNDÃO DAM / SVEMIN MILJÖKONFERENS 16-10-12 / JONAS JONSSON, MAGNUS LJUNGGREN Original figure from Panel report: http://fundaoinvestigation.com/ 13 2016-10-24 Liquefaction • Conditions required: o Contractive material > volume decreases during shearing because the particles move together. o Saturation > all voids are filled with water. If shearing occurs in a saturated contractive tailings excessive pore pressure may generate. o Trigger mechanism, rate of loading vs. drainage capacity > if the loading (shearing) is large enough or repeated many times the pore pressure in the voids may increase to such extent that friction between the grains is lost. Sand grains Normal pore water pressure Saturated soft sand. Strength maintained because friction from the grains touching. High pore water pressure Saturated soft sand. High pore water pressure may break the friction between the grains causing liquefaction. 14 IMMEDIATE CAUSES TO THE FAILURE OF THE FUNDÃO DAM / SVEMIN MILJÖKONFERENS 16-10-12 / JONAS JONSSON, MAGNUS LJUNGGREN 2016-10-24 Series of events and conditions • The dam failure occurred because of a series of events and conditions that allowed the failure to take place Main incidents and conditions: a) Year 2009 - Damage to starter dam b) Year 2011,12 - Slime deposition issues c) Year 2012 - Shift of the dam crest alignment (the “set back”) 15 IMMEDIATE CAUSES TO THE FAILURE OF THE FUNDÃO DAM / SVEMIN MILJÖKONFERENS 16-10-12 / JONAS JONSSON, MAGNUS LJUNGGREN 10/24/2016 Year 2009: Damage to the Start dam (Dike 1) • April 2009, large seepage flows carrying tailings on the downstream slope. DAMAGE TO SLOPE • Seepage flows emerged above underdrain outlet level. LEAKAGE WATER Figure from Panel report: http://fundaoinvestigation.com/ 16 IMMEDIATE CAUSES TO THE FAILURE OF THE FUNDÃO DAM / SVEMIN MILJÖKONFERENS 16-10-12 / JONAS JONSSON, MAGNUS LJUNGGREN 2016-10-24 Consequences • Underdrains were sealed as they could not be repaired. One of the most important element became inoperative • A new blanket drain constructed on the surface of the tailings The sand tailings below and upstream of the new blanket drain remained saturated NEW DRAIN ONLY SKETCHED Original figures from Panel report: http://fundaoinvestigation.com/ UNDERDRAIN ONLY SKETCHED IMMEDIATE CAUSES TO THE FAILURE OF THE FUNDÃO DAM / SVEMIN MILJÖKONFERENS 16-10-12 / JONAS JONSSON, MAGNUS LJUNGGREN 17 2016-10-24 Year 2011/12 – Slime deposition issues • During 2011 and 2012 slime was rerouted through an overflow channel into the Fundao reservoir. • The original and revised design specified a minimum 200 m wide beach of sand tailings to control saturation. SAND TAILINGS SLIMES Original figures from Panel report: http://fundaoinvestigation.com/ Figure from Panel report: http://fundaoinvestigation.com/ 18 IMMEDIATE CAUSES TO THE FAILURE OF THE FUNDÃO DAM / SVEMIN MILJÖKONFERENS 16-10-12 / JONAS JONSSON, MAGNUS LJUNGGREN 2016-10-24 Consequences • Deposition of slimes in areas where this was not intended in design At times beach only 60 m wide. Slimes near the downstream slope and below the raised dam construction. BEACH 200 m WIDE S L I M E S Original figures from Panel report: http://fundaoinvestigation.com/ 19 IMMEDIATE CAUSES TO THE FAILURE OF THE FUNDÃO DAM / SVEMIN MILJÖKONFERENS 16-10-12 / JONAS JONSSON, MAGNUS LJUNGGREN 2016-10-24 Year 2012: The left abutment “Set back” • In October 2012 the dam alignment (crest) was moved upstream from its original design, called the “setback crest”. • The change due to structural integrity issues of a abutment concrete gallery, that drained left abutment run-off water. SETBACK CREST Original figures from Panel report: http://fundaoinvestigation.com/ IMMEDIATE CAUSES TO THE FAILURE OF THE FUNDÃO DAM / SVEMIN MILJÖKONFERENS 16-10-12 / JONAS JONSSON, MAGNUS LJUNGGREN 20 10/24/2016 Consequences • The setback had significant effects. Moving the embankment back, toward the impoundment, caused it to be raised over the slimes deposited in 2011 and 2012. SETBACK CREST S L I M E S Original figure from Panel report: http://fundaoinvestigation.com/ 21 IMMEDIATE CAUSES TO THE FAILURE OF THE FUNDÃO DAM / SVEMIN MILJÖKONFERENS 16-10-12 / JONAS JONSSON, MAGNUS LJUNGGREN 2016-10-24 Immediate causes to the Fundão dam failure • Liquefaction: Contractive (loose) material Saturation Trigger mechanism – liquefaction by lateral extrusion [Movie clip 2.5 min, start at 2:53] IMMEDIATE CAUSES TO THE FAILURE OF THE FUNDÃO DAM / SVEMIN MILJÖKONFERENS 16-10-12 / JONAS JONSSON, MAGNUS LJUNGGREN 22 2016-10-24 Thanks for your attention!! Magnus Ljunggren Dam design, inspections, control +46 72-501 17 21 Jonas Jonsson +46 76-109 30 84 Tailings management, dam safety, site selection
© Copyright 2026 Paperzz