Rethinking Nuclear Can We Change the World’s Cumulative Carbon Emissions Soon Enough? Joseph B. Lassiter, III Senior Fellow Senator John Heinz Professor of Management Practice In Environmental Management, Retired Harvard Business School April 2016 Copyright @ 2016 President & Fellows of Harvard College 1 Venture Capital Return Profile 1995 - 2009 636 Investments $1,200 MM Cost / $3,000 MM Value - 2.5X 0.7 62.4% 0.6 52.8% % of Total Cost or Terminal Value 0.5 0.4 0.3 20.1% 0.2 15.7% 15.3% 12.6% 9.1% 0.1 5.3% 3.5% 0 <1X 3.1% 1X to 3X 3X to 6X Multiple on Invested Capital % of Cost 6X to 10X >10X % of Value Can you get into the “Big” Ideas? Private Capital Ecosystem for US and Canadian Privately Funded Nuclear Efforts • Approximately $1.6+ billion invested in last 10 years • Professional Investors: • • • • • Venrock, NEA, RedPoint, Charles River, Lux Capital, Founders Fund, Braemar, Intellectual Ventures, Khosla Ventures, The Wellcome Trust, RussNano, Chrysalix, SDTC, Mithral, Y-Combinator High Net Worth Individuals – Gates, Bezos, Samberg SWF: Saudi, Russian Corporates – Lockheed, General Atomic, Fluor, Toshiba, Existing Industry Strategic Partners • • Many are circling Do they have the “innovators dilemma” • Nuclear utilities engaged in discussions • Prototype Testing Announced: TerraPower (China) , ThorCon (Indonesia) and Terrestrial (Canada) • Industrial MOUs signed in TerraPower (China) and ThorCon Power (Indonesia) Rothrock March 31, 2016 3 Funded Nuclear Efforts: Advanced Reactor Nascent Industry Rothrock March 31, 2016 4 Nuclear Entrants Infrastructure Style Construction Gen-III+ Passive LWRs Gen-IV Passive SFRs Gen-IV Passive HTGRs Gen-IV Passive MSRs Westinghouse AP-1000 GE-Hitachi/Areva (Korea/China/Russia) TerraPower TWR Site Excavation Only Site Excavation Only NuScale GE-PRISM UPower PBMR Areva NGNP General Atomic EM2 (Reactor Module) (Reactor Module and Whole Plant) (Reactor Module and Whole Plant?) Terrestrial Energy ThorCon Transatomic Moltex (Reactor Module and Whole Plant) Repair? Upgrade and Repair Upgrade and Repair Upgrade and Repair By Swap Out Centralized Fuel Processing No Refueling Continuous Refueling Continuous Refueling Centralized Fuel Processing Hi P/Low Temp Water Atm P/Hi Temp Liquid Metal Sodium Hi P/Hi Temp He Gas Atm P/Hi Temp Na/Be/Li Salts Factory Manufacture Service and Fueling Reactor Physics Impact Nuclear Must Be Cheaper Than Coal... Maybe Even Natural Gas (< $0.05/kWh by 2025) Uncertain, Lumpy Investments and Technology Cost Curve Forecasts Cost per kWh Gen-III+ LWRs AP-1000 & NuScale Asian Pulverized SC Coal Gen-IV MSRs Gen-IV SFRs ThorCon, Terrestrial, and Transatomic PRISM, TerraPower, & UPower North America CCGT Gen-IV HTGRs/GFRs GA & Areva NGNP Time Nuclear Must Be As Scalable as Coal (50-100 GWe/yr by 2030) Build Everything on an Assembly Line Make Everything Repairable & Upgradeable On Site ● ● ● ● ● Reactor yard produces 150--500 ton blocks. About 100 blocks per 1GWe plant. Blocks are pre-coated, pre-piped, pre-wired, pre-tested. Focus quality control at the block and sub-block level. Blocks barged to site, dropped into place, and welded together. No major repairs or upgrades on-site....ship the block back to the yard. 100 GWe/year yard block diagram; 2,000,000 tons steel per year
© Copyright 2025 Paperzz