Meter Box Details Head

CERTCLAD Vertical Shiplap Weatherboards Cavity System
Meter Box Details
Head
Internal lining
Additional building wrap
to overlap cavity closer
Framing
Minimum 15mm Drip edge
(Closure of cavity to bottom of cladding)
35mm 'Z' Flashing to
Mini
Building wrap turned
into trimmed opening
with flexible flashing
tape at corners
mum
5mm
capi
llary
Minimum 10mm cover
gap
Seal and rivet Meterbox Head Flashing
to both 35mm 'Z' Flashing and Meterbox
Air seal over backing rod
fitted all sides
around meterbox
Metal
meterbox
Meterbox Head Flashing
Note: Refer to the Vertical Shiplap Cavity System Installation Manual for full details
[email protected]
Website: www.certclad.co.nz
Email:
AUCKLAND
CARTERTON
CHRISTCHURCH
64 Stoddard Rd, Mt Roskill
30 Kent St
9b Francella Place, Bromley
Ph: (09)
Ph: (06)
Ph: (03)
620-0260
620-0261
Fax: (09)
379-9381
379-9382
Fax: (06)
Copyright Timber Specialists Ltd, 2011.
This CAD drawing and all its associated intellectual property rights remain the exclusive property of Timber Specialists Ltd. The User is only authorised to
reproduce and distribute this drawing for the sole purpose of detailing, specifying and/or promoting the use of CERTeCLAD weatherboards supplied by
Timber Specialists Ltd. The User may not, under any circumstances, use or allow the use of this CAD drawing in association with any product or system
which is not endorsed by Timber Specialists Ltd.
384-5287
384-5289
Fax: (03)
File Name:
VC-85 Meter Box - Head