View the Permit Informational Sheet

 PERMIT INFORMATION SHEET 3930 N. Murray Avenue Shorewood, WI 53211 Ph: 414‐847‐2640 Fax: 414‐847‐2648 Do I Need a Permit? Below is an alphabetical reference guide to help you determine which projects require permits. The list also describes any additional requirements that may pertain to a specific project. The list is not all inclusive. If you are unsure or have questions about a proposed project call the Planning and Development office at (414) 847‐2640. List of Acronyms DRB – Design Review Board CDA – Community Development Authority PC – Plan Commission PROW – Public Right of Way Project Permits Required? Additional Information
Additions to 1 or 2 Family Home YES Remodel/Alteration to 1 or 2 Family Home Yes Addition to Commercial Property Yes Air Conditioning Unit – new/replace Attic Alteration/Remodel Yes Yes Basement Alteration/Remodel Yes Bathroom Remodel Yes Bathtub/Shower insert, Mixing Valve Yes Carriage Walk Yes Cellular Telephone Antenna and other transmitters Chimney – new Chimney Liner Commercial – new construction, alteration, remodel Yes Commercial New Occupancy (new commercial space) Yes Construction in Public Right of Way (PROW) Yes Decks Yes Design Review Board (DRB) approval, Building, Plumbing and Electrical Permits (Plans Required) Interior – Building, plumbing and electrical Exterior – depending on work could require DRB approval and building permit DRB approval, Building, Plumbing, Electric, HVAC State Plans Required HVAC and Electrical Permit Various Permits – Building, Electrical, Plumbing, HVAC (Plans Required) Various Permits – Building, Electrical, Plumbing, HVAC (Plans Required) Various Permits – Building, Plumbing, Electrical (Plans Required) Plumbing Permit and Building Permit if walls are opened Alter Permit, Special Privilege Permit if material is other than concrete (decorative) Antenna Permit, Electrical Permit and possibly Building Permit Building Permit DRB approval and Building, Plumbing, Electric and HVAC Possible Plan Commission (PC) and Community Development Authority (CDA) State Plans Required Business owners to meet with Planning and Zoning Administrator, Occupancy permit and possible various other permits such as building, plumbing, electrical and HVAC Alter Permit Building Permit with survey attached, possibly DRB approval Yes No Yes Demolition Yes Dishwasher /Disposal – new/replacement Downspout Disconnection Drain Tile Repairs Driveway Yes Yes Yes Yes Drywall Replacement Yes Ductwork Maybe Dumpsters Yes Electrical Work – Commercial Electrical Work – Residential ** Yes Yes Erosion Control Fence – new/replacement Fire alarm or other signaling device Fireplace Foundation Repairs (Wall Bracing) Front steps/stoop Furnace, Boiler, Heat Pump or other heating unit Garage – new/addition Yes Yes Yes Yes Yes Yes Yes Garbage Disposal Insulation and Vapor Barriers New Business in Existing Commercial Space Yes Maybe Yes Patios Yes Plumbing – Commercial Plumbing – Residential Yes Yes Pool, Spa, Hot Tub etc. Public Way Use Repairs – general Retaining Walls Roof – Including rubberized, Flat and Buildup Sewer – Sanitary/Storm Siding – new/replacement Shed or Other Accessory Outbuilding Sidewalk – public/private Yes Yes Maybe Maybe Yes Yes Yes Yes Private – Maybe Public – yes Yes Building Permit and possibly Electrical and Plumbing Permits Plumbing Permit Building Permit – See Flyer Building Permit Building Permit with survey attached, Alter permit required if doing approach in PROW Any substantial opening of a wall requires a building permit. Contact the Planning and Development Department if the replacement is minimal. Depending on the extent of the ductwork it may require and HVAC permit In the PROW – Obstruct the PROW Permit On Private Property – Temporary Storage Unit and Dumpster on Private Property Permit Electrical Permit, possibly State Approved Plans All new, replacement or repair work requires permit **Some minor electrical repairs do not require an electrical permit contact the Planning and Development Dept. to verify the requirements. Contact Planning and Development Dept. Building Permit with survey attached Electrical Permit HVAC Permit and possibly Electrical Permit Building Permit Building Permit HVAC Permit and Electrical Permit Building Permits are required for the razing as well as the building of a new garage, Electrical Permit for wiring of garage Plumbing and Electrical Permits Contact Planning and Development Dept. Business owners to meet with Planning and Zoning Administrator, Occupancy permit and possible various other permits such as building, plumbing, electrical and HVAC Building Permit with survey attached, DRB approval if in front or corner street side yard Plumbing Permit, possibly State approved plans Homeowner may pull permit for a single family home if they live at the residence Building and Electrical Permits Obstruct Permit Contact Planning and Development Dept. Contact Planning and Development Dept. Building Permit – Max. 2 layers Plumbing Permit, Alter Permit possibly Building Permit Contact Planning and Development Dept. Private – Contact Planning and Development Public – Alter permit Sprinkler System Sprinkler System – Lawn Irrigation Yes Yes Sump Pump/Sump Crock Signs – Temporary or Permanent Water Closet (Toilet) Yes Yes Yes Plumbing Permit (backflow device) Plumbing Permit (backflow device), Alter Permit and Special Privilege Permit (if installation of pipes in PROW) Plumbing and Electrical Permit Contact Planning and Zoning Administrator Plumbing Permit