Salt Lake City Public Library Marmalade Branch Construction Project Monthly Project Report July 2014 Prepared by: Salt Lake City Public Library Table of Contents 1. Executive Summary 2. Project Photographs 3. Budget/Cost Summary 4. Schedule Summary 5. Next Month “Look-ahead” Attachment “A” – Project Budget Tracking Log Attachment “B” – Contractor’s Schedule Marmalade Branch Construction Project Monthly Project Report July 2014 Salt Lake City Public Library Marmalade Branch Construction Project Monthly Project Report July 2014 1. Executive Summary After a lot of work in the programming, design, bidding and pre-construction phases of the Marmalade Branch Library project the construction has officially begun. Ascent Construction was selected as the contractor and awarded the contract to construct the Library. The ceremonial ground breaking event was held on May 29, 2014 which was attended by representatives of Salt Lake City including the Salt City Mayor, the Salt Lake City Counsel, the Salt Lake City Public Library, Salt Lake City Engineering, the Redevelopment Agency of Salt Lake City, local students, community members, MOCA, Blalock and Partners, Ascent Construction and others. A formal Notice to Proceed (NTP) effective July 11, 2014 was issued to Ascent Construction requiring a Substantial Completion of the project by August 10, 2015. Ascent mobilized to the site, set up temporary facilities/site fencing and began excavation/rough grading operations required for site preparation. Not unexpectedly, water has been encountered in the building excavation for which Ascent is making accommodations to address. The onsite conditions have been reviewed with the geotechnical engineer (AGEC) and design team for confirmation of the construction approach. Per the recommendation of AGEC, following the start of site dewatering Ascent will construct a test pad for final review and approval by AGEC. Since the RDA’s “dewatering” system for the entire site has not yet been installed it is very likely that a temporary solution addressing groundwater will need to be implemented by the Ascent team, for an extended period of time, in order to address groundwater issues until the new system is installed and brought online. The RDA’s Site Design Team and the Library Design Team are working with RMP to finalize a solution for providing permanent power to the Library as well as the entire RDA development. We are anticipating resolution of this issue next month. Submission of contract submittals by Ascent to Blalock and Partners for review and comment as well as submission of requests for information (RFI’s) to Blalock and Partners for general clarification of drawings and specifications is underway. Page 1 of 6 Salt Lake City Public Library Marmalade Branch Construction Project Monthly Project Report July 2014 2. Project Photographs 2.1. Preparation for the Groundbreaking Ceremony in May. 2.2. SLC Mayor Becker speaking at the Groundbreaking Ceremony. Page 2 of 6 Salt Lake City Public Library Marmalade Branch Construction Project Monthly Project Report July 2014 2.3. Construction access into the site from 300 North. 2.4. Excavation underway. Page 3 of 6 Salt Lake City Public Library Marmalade Branch Construction Project Monthly Project Report July 2014 2.5. Site excavation as seen from the east. 2.6. Site office in the foreground and delivery of the frac tank required for the construction dewatering operations in the background. Page 4 of 6 Salt Lake City Public Library Marmalade Branch Construction Project Monthly Project Report July 2014 3. Budget/Cost Summary As noted in the Executive Summary, Ascent Construction was awarded the contract for the construction of this Branch Library. After a bit of value engineering, through which Ascent was very helpful in navigating, a contract price was established within an acceptable budget for this project. Attachment “A” illustrates the overall budget and its distribution into specific line items. As contracts are awarded, the award amounts are entered into the “Contracted” column. At that point, any budget adjustments (either up or down – budget is moved either from or to “Owner Project Contingency” to account for the delta between the “Contracted” total and the “Budgeted” total) are made. Invoices for services performed are entered, as they are validated and approved, into the “Paid to Date” column. Due to some “coordination” issues between the SDT and LDT designs we are anticipating encountering possible scope gaps in the Library design that may lead to contractor change orders. We are also anticipating some additional costs due to the delay in the installation of the RDA’s site dewatering system. We will continue to work through these issues and have further conversations with the RDA in regard to “distribution” of costs incurred due to the delay in the installation of the site dewatering system. Ultimately, any costs not already included within the contracted totals or the other individual line items shown on the budget sheet will be accounted for in our pre-established “Owner Project Contingency” budget. 4. Schedule Summary The contractually required Substantial Completion date is currently 08/10/15. Ascent submitted an initial schedule (Attachment “B”) demonstrating their preliminary plan for completing the project within the contractually required duration. The attached schedule indicates a Substantial Completion date of 8/7/15 simply because it was prepared in anticipation of receiving a Notice to Proceed earlier than it was actually issued. Progress against this schedule as well as the requirement for further schedule definition will be reviewed and evaluated on a monthly basis. Page 5 of 6 Marmalade Branch Construction Project Monthly Project Report July 2014 Salt Lake City Public Library 5. Next Month “Look-ahead” Activities anticipated to occur next month include: Continued dewatering operations Completion of excavation and backfill Begin excavation of footings Begin footing formwork Finalize the location of RMP permanent power routing Submission and review of project required submittals END OF REPORT Page 6 of 6 Attachment "A" Salt Lake City Public Library Marmalade Branch Construction Project Budget Tracking Log ‐ July 2014 Cost Category Construction Costs* Total Construction Costs FF&E Shelving/Componentry Technology Art* Total FF&E,tech,phone,etc. Architectural & Programming Special Inspection Commissioning Geotech Analysis Survey Public Utilities/Connection Fees Permits Plan Review Development Fee Impact Fees LEED Silver Fees City Engineering Fees Misc. Owner costs PM Services Total Owner Fees Owner Const. Contingency Total Project Costs Collections Owner Start up Land GRAND TOTALS: Budgeted Contracted $5,095,686.00 $ 5,119,986.00 $5,095,686.00 $5,119,986.00 $350,000.00 $0.00 $230,000.00 $0.00 $420,000.00 $0.00 $46,527.00 $90,000.00 $1,046,527.00 $90,000.00 $440,945.00 $437,200.00 $50,000.00 $0.00 $50,000.00 $38,000.00 $20,000.00 $5,733.00 $2,000.00 $0.00 $14,942.00 $0.00 $27,317.44 $27,034.27 $17,756.33 $17,572.28 $500.00 $270.34 $50,116.00 $6,543.60 $4,400.00 $0.00 $47,000.00 $0.00 $22,500.00 $3,871.00 $140,000.00 $140,000.00 $887,476.77 $676,224.49 $466,679.23 $0.00 $7,496,369.00 $5,886,210.49 $800,000.00 $0.00 $476,000.00 $476,000.00 $8,772,369.00 $6,362,210.49 Library budget Delta $8,772,369.00 $0.00 Remaining Budget ($24,300.00) ($24,300.00) $350,000.00 $230,000.00 $420,000.00 ($43,473.00) $956,527.00 $3,745.00 $50,000.00 $12,000.00 $14,267.00 $2,000.00 $14,942.00 $283.17 $184.05 $229.66 $43,572.40 $4,400.00 $47,000.00 $18,629.00 $0.00 $211,252.28 $466,679.23 $1,610,158.51 $800,000.00 $0.00 $2,410,158.51 Paid to Date $0.00 $0.00 $0.00 $0.00 $0.00 $45,000.00 $45,000.00 $334,806.33 $0.00 $2,660.00 $5,733.00 $0.00 $0.00 $27,034.27 $17,572.28 $270.34 $6,543.60 $0.00 $0.00 $3,871.00 $56,852.25 $455,343.07 $0.00 $500,343.07 $0.00 $476,000.00 $976,343.07 Percent of Contracted Spent 0% 0% 0% 0% 0% 50% 50% 77% 0% 7% 100% 0% 0% 100% 100% 100% 100% 0% 0% 100% 41% 67% 0% 9% 0% 100% 15% Remaining to Complete Contract $5,119,986.00 $5,119,986.00 $0.00 $0.00 $0.00 $45,000.00 $45,000.00 $102,393.67 $0.00 $35,340.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $83,147.75 $220,881.42 $0.00 $5,385,867.42 $0.00 $0.00 $5,385,867.42 * The negative "Remaining Balance" figures for both "Construction Costs" and "Art" represent amounts that are being reimbursed by the RDA. 10:30 AM 8/8/2014 ATTACHMENT "B" - Contractor's Schedule
© Copyright 2026 Paperzz