Carnegie Theatre Trust – Business Plan 2015 – 2019 Version 6.4 DRAFT Table of Contents 1. Amendment Log ................................................................................................................................ 3 1. Foreward ........................................................................................................................................... 4 2. Introduction ....................................................................................................................................... 5 3. Carnegie History ................................................................................................................................ 6 4. Current operation .............................................................................................................................. 8 5. Carnegie SWOT Analysis .................................................................................................................. 13 6. Carnegie Trust - “Vision” ................................................................................................................. 17 7. Carnegie Trust - Aims ...................................................................................................................... 18 8. Carnegie Trust - Objectives ............................................................................................................. 19 9. Governance Model .......................................................................................................................... 44 10. Organisation Design .................................................................................................................... 46 11. Accountancy, Payroll & Pensions ................................................................................................ 48 12. Trustee Training & Development ................................................................................................ 49 13. Profit and Loss Forecast for 2015/16 to 2019/20 ....................................................................... 50 14. Capital Priorities for 2015/16 to 2019/20 ................................................................................... 51 15. Risks ............................................................................................................................................. 52 16. Appendices .................................................................................................................................. 56 16.1. Appendix 1 – Floor Plans ..................................................................................................... 57 16.2. Appendix 2 - Allerdale District Description ......................................................................... 59 16.3. Appendix 3 - Allerdale Cultural Strategy ............................................................................. 62 16.4. Appendix 4 - West Cumbria Economic Blueprint ................................................................ 63 16.5. Appendix 5 - Cumbria County Council Policy Position – Arts and Culture .......................... 64 16.6. Appendix 6 – Arts Council England – Achieving Great Art for Everyone Framework ......... 65 16.7. Appendix 8 – Contacts ......................................................................................................... 66 16.8. Appendix 9 – Directors, Managers and Professional Advisors ............................................ 67 2 1. Amendment Log Version Date 6 6.1 6.2 6.3 6.4 Changes 15/09/2014 Initial Draft Version for review 10/10/2014 Minor Amends following ABC Internal Review 02/11/2014 Addition of Charitable Incorporated Organisation Structure 8/11/14 Addition of Trustee Development Module & accountancy, payroll and pensions. 16/11/14 Creation of Operational Plan (Transition Plan) Author Carnegie (Workington) Ltd Carnegie (Workington) Ltd Carnegie (Workington) Ltd Carnegie (Workington) Ltd Carnegie (Workington) Ltd 3 1. Foreward Welcome to the first Carnegie Trust Business Plan. This Plan takes forward the strategic objective set out by Allerdale Borough Council to establish a sustainable ongoing future for the Grade 2 listed Carnegie Theatre & Arts Centre and follows a options appraisal carried out Locality in early 2012 which recommended and was subsequently accepted by Allerdale Borough Council to proceed with a new Carnegie non-profit organisation to take over the Carnegie which incorporates a Company Limited by Guarantee plus Registered Charity. In this Business Plan we set out our structure, strategic objectives, activities, priorities and targets for the period April 2015 – March 2019 operating as the Carnegie Trust. This is where we will focus our efforts and resources. The targets provide the basis for regular monitoring of our performance against our ambition – and at the same time we must not forget the day-to-day management of the venue. We will enhance the quality and range of the offer in terms of the programme and also improve the quality of the experience for our patrons. In addition we have some ambitious and exciting plans to secure the long-term viability of the venue and establish the Carnegie’s position as the principal arts and entertainment venue in Workington and the surrounding area. Much needs to be done to achieve this; not least we need to secure significant external funding. If we are to achieve the Vision for the Carnegie and achieve our objectives we recognise the need to work in partnership with our key stakeholders, not least the community at large and other like-minded venues, arts and leisure operators. Partnership working is therefore very much to our thinking as we set out our proposed journey over the coming years. Lee Martin-White Chairman Carnegie Workington Ltd 4 2. Introduction The Board of Directors for the Carnegie are dedicated to the process of developing, planning and reviewing performance. There are primarily six keys reasons that have been identified for producing a new Business Plan. 1. To demonstrate to Allerdale Borough Council and other stakeholders the way in which the prospective Carnegie Board of Directors will operate the venue using best practice to ensure effective use of charitable and public funds. 2. To enable the Carnegie to draw down external funding which would not otherwise be available to us. 3. To ensure clarity of purpose and direction for everyone associated with the Carnegie. 4. To set out the Carnegie Priorities to March 2020 and to show how these priorities will be delivered. 5. To ensure appropriate development of all aspects of the work of the venue and maximise the full potential of the Carnegie. 6. To facilitate effective and prudent financial planning. 7. To secure a long-term sustainable future for the Carnegie. Evaluation: The Business Plan will be updated annually, and its implementation will be subject to regular review by the Board of Directors. As part of this process – Reports from the Management team will be submitted to the Board of Directors, and circulated to staff and any principal funding bodies and stakeholders, on a half yearly basis, for discussion as appropriate Reports on significant projects and developments will be prepared and circulated as and when required Bi-Monthly meetings of the Board of Directors will discuss the Plan. Bi-Monthly Management Accounts will be provided to the Board, and made available to relevant funding bodies as required At the end of each financial year, a full evaluation of the Plan will be undertaken by the Board of Directors and Management team, with the content updated and operational planning for subsequent years undertaken Monitoring of progress against the Plan will use a range of indicators, such as Box Office data and results, market research, audience and stakeholder feedback etc The outcomes of these regular reviews will be used to: Bring about improvements in performance Encourage managers, staff and volunteers to achieve their potential, and Achieve the Vision and Objectives for the Carnegie 5 3. Carnegie History The Carnegie Library and adjoining Lecture Hall were built by Workington Town Council for the princely sum of £7,500 donated by Scottish / American Philanthropist Andrew Carnegie. The building opened to the public in 1904 and a commemorative plaque is prominently displayed within the cafe area. It seems likely that the Lecture Hall was almost immediately let as a Variety and Cinema venue to earn sufficient income to pay the wages of a Librarian and buy Library books. In 1911, the Council purchased an adjoining house that was then gutted internally to provide an adequate Variety stage. The Hall operated as a Cinema until 1958, often being referred to as ' The Ranch' due to the regularity of western movies being shown. In 1962 the 1100 seat capacity Opera House in Workington was converted for use as a Bingo Hall, and the local amateur operatic and musical societies needed to find a new home. Although inadequate in terms of dressing room accommodation, the Carnegie 'Theatre' was seen as the only viable option. Some modest improvements were made to the 'Theatre' in 1963 and the Librarian initiated a programme of music events. In 1973 the Library Service transferred to a former Co-operative building on Oxford Street, and the Town Council made the bold decision to convert the former library into an Arts Centre. Further improvements were also made to the Theatre, to include an extension to the property to provide dressing rooms, new lighting and sound and a complete refurbishment of the auditorium. A professional manager was appointed at this point to run the theatre and Arts Centre. In 1974 as part of local government reorganisation, the ownership of the building transferred from Workington Town Council to Allerdale District Council. The Theatre's programme of events was expanded during the 1980's and Monroe’s Bar (a live music venue and occasional studio performance space) was constructed in 1985 from what was the former Town Council Chamber. The Carnegie Theatre and Arts Centre was given responsibility for Arts Development within the Borough of Allerdale which led directly to the creation of the annual Keswick Jazz Festival in 1992 and then the annual Maryport Blues Festival in 1999. The whole of the Carnegie Theatre and Arts Centre building was listed as Grade 2 in 1985. Major improvement works to the property commenced in 2008. Most of the roofs were re-slated and the south facing windows to the upper floors were replaced. Further works were carried out in 2010 when a new flat roof over the existing cafe area was constructed and like for like replacements of the decorative roof lights above the arts centre entrance foyer were installed. The Arts Centre was extensively refurbished to include the re-discovery of the original ceiling in what is now the Dance Studio. In 2011, the further development of the Carnegie Theatre and Arts Centre became a priority for Allerdale Borough Council and representatives of local theatrical, dance and musical organisations and the general public established the Carnegie Development Group. From that, a new “Friends of the Carnegie” has evolved and is seeking to increase the level of volunteer support. A funding application was made to the Coalfields Regeneration Trust in 2011 for assistance in improving the Carnegie. Coalfields provided funding of £96,000 which was subsequently matched 6 with £100,000 of funding from Allerdale Borough Council which resulted in a programme of major works in May 2012 to include the replacement of the theatre floor, renovation of the dressing rooms, rebuild of toilets for the public and performers, demolition of the former lighting control room to the rear of the theatre balcony to provide a hospitality area, theatre re-decoration, new seating throughout to include the provision of removable stalls seating, new theatre curtains and a digital PA system. Balcony and stalls seating was re-configured to improve legroom. A new lighting control system was installed at this point. A further pledge of funding was subsequently made by Allerdale Borough Council in 2013 for the total amount of £220,000 that resulted in a full refurbishment of the Theatre Foyer and Monroe’s Bar – key features of the project included bricked up windows being opened up, double glazing installed and new LED Lighting as well as a brand new multi-functional bar. Current estimated usage of people attending classes, courses and events totals approximately 60,000 per annum (excluding cafe customers). Carnegie Development Group This group was set up in 2010 as a way of supporting Allerdale in achieving a long-term future for the Carnegie Theatre and Arts Centre. It was instrumental in establishing a Friends group and the successful refurbishment of the theatre (2012) and Monroe’s (2013). When a shadow Trust board was established in 2013, the role and responsibility of the CDG changed to being responsible for the Friends and Volunteers and it became “The Carnegie Friends and Volunteers Group” The Carnegie relies heavily on a small pool of volunteer staff for stewarding and box office duties for their own productions and promotions. The volunteer staff is coordinated by “The Carnegie Friends and Volunteer Group”. Carnegie (Workington) Ltd The Carnegie Trust (The Carnegie (Workington) Ltd) was established in 2014 with the objective of developing a business plan to lease the entire building and transfer the operational responsibility from Allerdale to the Carnegie Trust. The company is an interim arrangement with no trading activities. Future Whilst the building has had significant resources spent on it in recent years to improve its appearance more capital investment will be required to maintain the quality of experience, develop its full potential and secure the long term sustainability of the business. This is an extremely challenging position, particularly in the light of recent and upcoming public sector cuts. The transfer to a charitable trust is felt to increase the Carnegie’s ability to draw down funding for this purpose. The Carnegie has the potential to offer a contemporary and comfortable setting for audiences, a friendly and accessible community hub, an attractive space for commercial hires and make a significant improvement to the cultural and arts offering currently available in West Cumbria. 7 4. Current operation The Carnegie serves a multitude of purposes including:● ● ● ● ● ● ● Live Theatre Venue Live Music Venue Community Centre Meeting place Café Home of various community groups and social organisations which rely on low cost room rentals in order to operate Home for various businesses which lease units in the design centre The building is open from 08:00 in the morning until 21:00 in the evening (Monday to Friday) and 08:00 to 17:00 (Saturday and Sunday) however hours are flexible and extended for special events and productions or may be reduced in the event that there are no bookings. Staffing The organisation is current staffed by 4 permanent positions Theatre Manager Team leader Clerical Assistant Cleaner 1 FTE 1 FTE 1 FTE 0.4 FTE The cost of employment of this group was around £105,000 in 2013/14. There are a bank of casual staff available for events, these include a bar manager, bar staff & technical staff. Expenditure on casual staff was around £13,000 in 2013/14. Three sub-contracted technical staff provides technical support in the theatre, total expenditure in this area was around £7,500 in 2013/14. Box Office The main Carnegie Office is located adjacent to the café and serves a dual role as an administration centre and box office. The box office offers tickets for sale for many local events in addition to those promoted in the Carnegie. Tickets are sold on a commission basis with the rate depending on the method of payment. The user and not the end customer pay the fee. The volume of ticket sales has not been confirmed, however we believe it to be in excess of £200,000. Commission on ticket Sales averages at about 4.5% which provided a commission income of £9271 in 2013/14. 8 Café The café is operates under a lease since August 2009 and currently terminates end March 2015. The Carnegie café utilises the large space at the centre of the building immediately inside the main entrance. The café is at the heart of the business and has capacity for 90 covers with a regular client base, although much of this client base come to the venue solely for the café and do not provide custom to the Box Office or other Carnegie services. The café has limited accessibility for users with pushchairs and wheelchairs; it operates 7 days a week from 08:00 until 16:00 and is almost always working to capacity. The customers at the café constitute the majority of the daytime footfall in the Carnegie. No evening service is offered by the café except for the occasional special events. The lease has a value £17,250 in 2014/15 Exhibition Space Exhibition space is available in the café and potentially other parts of the building; however, the successful café business often precludes access to any exhibitions. Rentable Spaces (excluding theatre) Leading from the Café area there are 2 rooms available for letting ● Dance Studio ● Art Room These areas have a number of regular customers ● ● ● ● ● ● Judo Carnegie Singers Dance Schools Slimming World Workington Rotary Club Beer Festival Mind Whilst in regular use these rooms are in need of refurbishment particularly to extend and expand use for alternative and new hire options. At the time of submitting the business plan full utilisation data was not available however we have provided an indication of utilisation in a ‘typical week’ over the page highlighting the potential opportunity of the space. 9 Art Room 8am 8.30am 9am 9.30am 10am 10.30am 11am 11.30am 12pm 12.30pm 1pm 1.30pm 2pm 2.30pm 3pm 3.30pm 4pm 4.30pm 5pm 5.30pm 6pm 6.30pm 7pm 7.30pm 8pm 8.30pm 9pm 9.30pm 10pm Dance Studio 8am 8.30am 9am 9.30am 10am 10.30am 11am 11.30am 12pm 12.30pm 1pm 1.30pm 2pm 2.30pm 3pm 3.30pm 4pm 4.30pm 5pm 5.30pm 6pm 6.30pm 7pm 7.30pm 8pm 8.30pm 9pm 9.30pm 10pm Monday Tuesday Wednesday Thursday Friday Saturday Sunday Forum Workshop Natalie Smith Dance & Drama Jade Greaves Theatre Stars Academy Monday Tuesday Wednesday Thursday Friday Saturday Sunday Slimming World Baby Sensory Jade Greaves Mind Jade Greaves Lakes College Performing Arts Sarah Westgarth Dance Festival Jade Greaves Mrs Thompson Coopers Dance Slimming World Martial Arts Carnegie Singers The rooms have a rental value of £18,309 Carnegie Theatre The Theatre seats approximately 325 people; the auditorium and dressing rooms have recently been refurbished to provide a more comfortable and well-equipped performance space. It is used for the Carnegie Theatre and Arts Centre’s own promotions as well as Third Party promotions. ● ● ● The Carnegie stages about 35 of its own productions each year covering a wide variety of genres, the profitability of these events is variable, however the overall result is at best a break event situation when comparing ticket sales versus cost of the performers. Average ticket sales per performance in the theatre stands at 190 tickets sold (58% of capacity) based on figures provided April 2013 to November 2014 covering all productions utilising the space. Excluding amateur and local hires Carnegie only productions average ticket sales of 180 per performance (55% of capacity) based on the same figures (31 separate productions) 10 ● ● ● ● ● The local amateur companies stage between 4 and 6 full-scale productions each year including musicals, pantomime and concerts. Based on the same figures taking into account all amateur and voluntary group hire productions average ticket sales of 198 per performance (60% of capacity) based on the same figures (15 separate productions) The Workington Musical Festival and Dance Festivals use the theatre annually Schools & dance schools use the theatre for their own presentations Workington Town Council and Allerdale Borough Council events such as mayor making Others The theatre rental income is £14,306 Monroe’s Bar Monroe’s bar is a multipurpose space, which has recently been refurbished to a modern high quality specification; it is equipped with its own lighting however lacks an independent lighting control and independent sound system, sharing this with the theatre. Monroe’s has the benefit of a fully equipped and stocked theatre bar, which is used during most theatre and Monroe’s events. Monroe’s also benefits from its own stage. Monroe’s is used for ● ● ● ● Occasional Carnegie promotions of local /national bands Regular hire to MIND on a Tuesday evening One-off hires It serves as a theatre bar when there events in the theatre There are no regular opening hours for Monroe’s Bar Based on figures provided by the Carnegie Box Office between April 2013 and November 2014: Monroe’s averages 95 seats sold per production (11 productions in total) equating to a 47% of total capacity sold. Monroe’s Bar has a separate rental income of £1,829 per annum and a bar gross profit of £26,580 per annum (before staff costs) Carnegie Foyer The Foyer area was refurbished in August 2013, the internal walls were removed and the area opened up to provide a modern open plan space. The Foyer generally operates as an entrance for the theatre and Monroe’s however it has the potential to operate as an independent meeting space. The Foyer presently contributes no income of its own. 11 Design Centre Units There are 8 office units on the upper floors of the arts centre; these are rented by a variety of local businesses. Whilst in the main occupied to attract new hires/leasing opportunities it is of the trust’s view that the first floor requires substantial upgrade and refurbishment. In particular offices have no central heating or direct hot water and electric heaters have been installed as a substitute. The design centre units to have a rental value of £10,200 in 2013/14. (This figure includes the rental income received from a business that is now in receivership). 12 5. Carnegie SWOT Analysis The trust have prepared the following Strengths, Weaknesses, Opportunities and Threats Analysis based on the current operation to assist in the production of this Business Plan. The SWOT represented views of trustees, users and present staff in January 2014. 13 Strengths Established building / venue / name Loyal core of customers Loyal core of users Support of Friends Volunteers Support of Local Amateur Groups High footfall – busy café area, user groups Community hub Attractive auditorium and refurbished bar area Several multifunction spaces that can be utilised in various ways (modular) Mixed Portfolio (rental, entertainment etc) Trust members have wide and varied skills Partnerships with other organisations Allerdale support Local press are supportive Lots of schools in the immediate area Not a tourist area so not seasonal – year round customers New Box Office area in Theatre side Small capacity auditorium – shouldn’t be hard to fill and create a good atmosphere / good experience. More manageable with small staff / limited resources. Accessible Venue for concerts and events ‘Successful’ ticketing operation – festivals / local operators. Willingness for change from Trust - willing to try new things A range of equipment already available Historical background Support of local council(s) Weaknesses No clear vision on what it is / what it should be – who is it for? No General Manager Staffing Resources Variable customer experience No consistent brand Poor online presence (website, social media) Limited use of Databox Volunteers – no policies. Needs to centrally managed Café franchised and not core to Carnegie Brand No direct marketing strategy No direct programming strategy No parking No current relationship with schools Not a tourist area so no seasonal peaks / passing trade On the outskirts of CBD so low passing trade Current box office not in optimum position Small capacity auditorium means difficult to cover costs of professional programme Parts of building in need of maintenance Not marketed as a ‘whole’ – Bar / theatre / arts centre and café should be ‘as one’ No flow through the building – disjointed effect. No regular bar hours Bar décor Cafe decor Signage (internal and external) State of exterior No general hours Access to first floor limited Lack of investment to first and second floors (not hot water or heating) Conflict of existing uses Inflexibility of existing rooms Not marketed as a whole Acoustics Limited disabled access Entrance not welcoming or inviting Technical Limitations – sound / lights / stage etc. Age of specialist equipment - stage lighting etc Training of volunteers High overheads/operates at a deficit Bar prices Limited and run down Kitchen space Limited staff training and development Opportunities Town centre location Was well thought of – can be that again Workington schools market Commercial side: Food and drink offering Weddings/Family occasions Exhibitions Pop up Shops Table Top Sales Meetings and Conferences New business start-up packages Internet Cafe/Hub Hire out equipment Many user groups have own core audiences and skills / resources – adopt joined up approach to maximise ‘Carnegie product’. Focus on ways to encourage ‘additional spend’ from these audiences No local venues for exhibitions / craft fairs etc. Local businesses / organisations using Carnegie as a ‘Roadshow’ location for daytime Limited internal processes resulting in inconsistent service Dependency on local authority to 'keep it going' Threats Free live music in Vine bar, Yankees and Lounge 41 etc. Rosehill / Kirkgate Redevelopment plans Decline of local festivals and events Listed Status Reliance on subsidy Unknown physical state of building Health and safety - old equipment, stage etc Lack of money in people's pockets Change of council Antipathy of local businesses Scaring off current clientele Competition for grants and funding 15 activities Decline of local festivals and events Misconception that it is ‘a dump’ The Trust = new era. New start. Blank canvas. Popular café – look at how this can work to our advantage Lakes College involvement Friends scheme Strategic Programming Network Joined up product for end users (encouraging up spend) More diverse programming to appeal to wider demographic Community Engagement/Awareness (tailored offer) National initiatives Town Centre 'Hub' to advertise (live feed?) Seasonal Events Digital displays throughout whole venue 'The Carnegie' (name) 16 6. Carnegie Trust - “Vision” The Carnegie will be a sustainable business with charitable aims. We will provide a diverse and accessible range of high quality arts and leisure activities in a welcoming and inspiring environment; service provision and programme will promote social inclusion, interaction and engagement for all ages, shared experiences and opportunities to learn. 7. Carnegie Trust - Aims AIM 1: To promote and provide a diverse and accessible range of high quality arts and leisure activities for the residents of Workington and the surrounding areas AIM 2: To develop income streams, maximise efficiency, maintain and invest in the physical infrastructure, operate responsibly and run at a profit to re-invest in the business AIM 3: To develop and work with staff and volunteers to ensure a high quality customer experience and service provision for visitors, hirers and leaseholders alike. AIM 4: To work in partnership with other local groups and businesses creating a natural hub and support network in order to maximise opportunities and embed activities into the core Carnegie offering. 18 8. Carnegie Trust - Objectives 1 Promote a broad range of high quality entertainment offerings focussing on music, live theatre and comedy (AIM 1) 2 Develop partnerships with organisations and individuals looking to promote music, theatre and education in the arts (AIM 4) 3 Develop a communications strategy to support audience development (AIM 1) 4 Enhance the food and drink provision and develop secondary spends (AIM 2) 5 Maximise and developing leasing opportunities (AIM 2/4) 6 Drive down energy consumptions and operate in an environmentally sustainable manner (AIM 2) 7 Provide a welcoming, safe and secure environment for customers, staff, volunteers, users and visitors (AIM 2) 8 Secure the long term future by maintaining and developing the infrastructure (AIM 2) 9 Develop a strong and supportive volunteer base and “Friends” group (AIM 3) 19 Objective 1: Promote a broad range of high quality entertainment offerings focussing on music, live theatre and comedy Background: The Carnegie currently operates a varied programme that can be segmented down to four key groups: Theatre Hire – Amateur Musical Groups and Variety Three local amateur musical groups utilise the venue and the theatre space is also hired by local charitable organisations seeking to raise funds. Amateur groups are seen as valuable community organisations in their own right. They both bring to the stage several amateur versions of mainstream musicals a year, youth productions and the Carnegie annual pantomime. Theatre Hire – Dance & Music Festivals There is an annual dance and music festival that takes place at the Carnegie utilising both Theatre and Monroe’s space. There are also one-off festivals that happen irregularly utilising the same space. Theatre Hire – Junior and Primary Schools A small number of local junior and primary schools hire the Carnegie Theatre for annual school productions. Theatre Hire – Professional A programme of professional theatre events is organised annually to include rock/pop, tribute, variety, clairvoyance, country and children’s shows. More recently ballet and opera have been introduced to the theatre. Monroe’s – Gigs Monroe’s attempts to source contemporary music products (primarily rock) from around the UK and internationally. More recently Monroe’s has utilised its versatility to introduce a comedy club and clairvoyance shows. As in its past Monroe’s also encourages local bands to provide support. Between April 2013 and November 2014 the genres broadly catered for can be split into the following categories: Genres Opera Rock, Pop & Blues Pantomime & Children's Shows Dance & Ballet Community & Schools Comedy Variety Nostalgia Musicals Other Festivals Number of Productions 1 23 3 1 3 1 3 6 10 6 2 20 Opportunities: Develop better links, working relationships and networking with local arts and entertainment venues such as The Wave and The Sands Centre (Culture, Leisure, Life), The Forum – Barrow, Rosehill – Whitehaven, Kirkgate – Cockermouth and Theatre Royal – Workington. Maximise revenue based on a quality programme that we know works for the venue and increases secondary spend (i.e. Bar and Catering – Linked to Objective 5) Improved effectiveness of marketing and develop through customer feedback and market research (Linked to Objective 4 and 8) Explore new opportunities for programme development in genres not currently catered for i.e. Opera, Comedy and Ballet Explore opportunities to develop education in the arts alongside programme development (Working with Theatre By The Lake) Expected Results: ● ● Shared benefits from networking with other like-minded organisations (i.e. cost sharing on marketing etc.) Increased ticket sales by a minimum of 10% per annum as indicated in financial forecast whilst maintaining control of costs and margins. Future Focus / Strategy: Short to Medium Term – o Effective cost control (i.e. negotiate better terms with promoters) o Development of volunteer core (Linked to Objective 8,10) o Develop relationships with other like-minded venues o Marketing and communications strategy (Linked to Objective 4) Medium to Long Term – o o Audience Development Explore future opportunities for development of programme o Development of Friends Network (Linked to Objective 10) 21 Objective 2: Develop partnerships with organisations and individuals looking to promote music, theatre and education in the arts Background: There is limited development of partnerships with organisations and individuals looking to promote music, theatre and education in the arts which we recognise has the potential to be increased over time and is a priority for the trust. Opportunities: Schools ● Develop school based events such as competitions (choir, crafts, dance, drama etc) pantomimes and summer schools ran by the ‘Carnegie’ brand, at a discounted offer. ● Offer a ‘Put on a show’ package to encourage schools to use the Carnegie for their school performances. ● Provide workshops and performances that complement the school curriculum by working with arts practitioners. ● Develop a program with schools to encourage young people to ‘Bring their parents’ to the theatre. Amateur Dramatic Societies ● Offer an improved theatre hirer package to the societies including bar opening hours, light and sound technicians, full FOH stewarding option. ● Offer a bespoke marketing package for each society that will maintain the high standards of the Carnegie Brand - including promotion via the Carnegie website, social media and local news. ● Provide an ‘After show event’ offer included in the price of hiring out the theatre. Colleges ● Provide a work experience scheme with the college where students can develop their work ethic in an operational theatre and gain experience in stage management, lighting, sound, events management and general administration. ● Provide a new venue for student led events where students can confidently host their own productions under the safety of the Carnegie banner. ● Introduce the Carnegie as a host for the college to run recruitment/open days/conferences from, providing a town centre location for the college to use as a hub. 22 Dance Schools/Drama Schools/Community Groups (Hirers) ● Produce an improved room hirer package to encourage hirers to spend more time in the venue, such as discounts on block bookings for rooms, an invitation to book the theatre/dance studio/Monroe’s to put on performances. ● Invite small playgroups (mother and toddler) in to use the art room and dance studio during the day. Make the cafe baby friendly, adding a microwave for baby food etc. Event Organisers ● Provide music events throughout the year to act as showcases for local talent, this will boost the local community’s moral for The Carnegie while providing an opportunity for new and old musicians to put on a show. ● Provide a support system for promoters in order to help them with their event to keep up the standard that the Carnegie wants to achieve. This will be reflected in everything from promotion material to event delivery. Commercial Groups ● Approach commercial firms in the area to introduce our conference facilities a small investment into equipment may be needed before this is carried out e.g. projector and screen, communal laptop etc. ● Approach local wedding shops/cars/bands to look at providing a wedding event using all the rooms on the ground floor and providing a stage for bands/singers to perform on ranging from full band in the theatre to acoustic act in Monroe’s. ● Provide options for other major industries for showcasing, i.e. Vintage fairs, museums, councils events etc. Expected Results: ● Developing a creative future for West Cumbria (Links between school children and the Carnegie developed from a very young age) ● Better utilisation of the building space ● Increased footfall and secondary spends (Linked to Objective 1, 4, 5,8,10) Future Focus / Strategy: Short to Medium Term – o Staff Development & Training o Establish links with all groups o Regular formal consultation with groups o Explore opportunities with Lakes College West Cumbria and University of Cumbria to understand potential for work experience and training. 23 o Work with Theatre by the Lake to produce a programme of education and participation Medium to Long Term – o Explore future opportunities with commercial groups 24 Objective 3: Develop a communications strategy to support audience development Background: There are opportunities for the development of a strategic approach to marketing and communications which will result in consistent messages and regular contact with the customer base, local press and staff / volunteers building on good practise of targeting certain segments of the audience (eg. the gig guide) There are also opportunities to cross promote/market the Carnegie offering as a whole including developing a regular annual schedule for print materials. Website navigation should be reviewed to ensure that it along with Social media are used to their fullest potential. Brand development is key to the communications strategy along with Public Relations, content, frequency and number of publications. Opportunities: The Carnegie has a long and illustrious history in the town and has lots of character – so plenty of scope to develop a new and attractive brand to bring everything together (with sub brands attached to different income strands etc.) People are interested in hearing about the venue and are keen to learn about forthcoming programme. Multi-function aspect of the venue and range of activities on offer should give us opportunities to market to specific audience segments and tailor communication – both in terms of method and content. It also means that there is plenty of opportunity to cross promote and put in place procedures for upselling and increase ancillary sales (provide refreshment facilities for parents waiting at dance class etc. Ensure that every child who comes on education visit goes home with a brochure.) Local press contacts are supportive and want to see the venue succeed. Wide variety of local publications (print and online) publishing entertainment news plus local radio stations BBC Radio Cumbria and CFM. The venue has a large group of volunteers who act as ambassadors – word of mouth is the best recommendation a venue / product can have. Volunteers could also be used to distribute flyers / brochures etc. 25 Expected Results: ● A more attractive and welcoming venue – both in terms of appearance and customer service ● Increased contact and communication with customer base ● Increased dialogue (two way communication) between venue and customer base ● A clearer and more consistent message ● Increased overall ticket sales (10% per annum) ● Increased number of unique and robust customer records on Databox ● Initiate e-newsletter (by capturing email addresses) ● Develop number of FB users / Twitter followers ● Increased media coverage - weekly presence in either radio or local news publication Future Focus / Strategy: ● Focus on building a programme of high quality activities and services promoted under a high quality and consistent brand. ● Ensure that efficient procedures and robust schedules are put in place to allow regular contact with customers through a variety of communication tools (PR, social media, online, print etc.) – all with a consistent message. ● Reuse and repackage content for different platforms. ● Ensure activities can be monitored and measured in order to determine most effective use of resources. ● Apply a ‘joined up’ approach and market the offering as a whole by working closely with user groups and lease-holders etc. ● Develop online sales to reduce pressure on Box Office. ● Work more closely with user groups to share skills and maximise resources. ● Build and develop relationships with local press contacts in order to keep them informed of progress and activities. Activities: ● Work with an external designer to rebrand venue as ‘The Carnegie’. Use branding guidelines as the basis for all internal and external marketing and communications materials. Introduce sub-brands where relevant to showcase individual income strands etc. ● Compile a PR schedule to ensure regular feed of stories to local press & radio etc. Include reviews and competitions where appropriate. Create updated (and standardised) notes to the editor to accompany all releases. ● Build up an approved image bank for promotional use, tracking all copyright and necessary photo credits. ● Set up regular listings distribution to local and regional entertainment publications and websites. 26 ● Devise social media strategy and compile social media plan, primarily concentrating on Facebook and Twitter but exploring other channels for opportunities. ● Look at ways of improving website both in terms of design, content, usability and functionality. ● Develop an annual print schedule to include brochures and leaflets where appropriate (format and regularity to be agreed) ● Allocate advertising budget to cover key points in year (with contingency for low sales events) and create schedule ● Compile a distribution list and schedule for print materials with ‘zones’ that can be allocated to volunteer ‘street team’ (volunteers or Lakes College etc.) ● Ensure delivery of a monthly e-newsletter on a specific day of the month to include upcoming shows, regular community activities, Trust updates and personality led features and or / competitions. Encourage sign up through social media, in-venue flyers / posters etc. ● Fully utilise databox, clean up data and explore targeted direct mail opportunities. Compile schedule according to allocated budget. ● Carry out audit of poster boards and information points throughout the venue and look at better ways to display information. Standardise number, size, format and location of sites and ensure regular rotation in accordance to sales targets. Look at better ways to utilise the café in order to promote events / activities / facilities. ● Review external signage and look at ways to improve. ● Work with Operations / Buildings team to review internal signage and produce relevant materials in line with branding guidelines. ● Develop a programme of town centre activities to promote The Carnegie, either by taking part in existing events / festivals or carrying out activity in the Hub / empty shops. ● Set up regular meetings / team briefings to review marketing & comms activity and prioritise tasks according to sales targets. 27 Objective 4: Enhance the food and drink provision and develop secondary spends Background: There are two food and drink providers in the Carnegie, the Carnegie Café and Monroe’s Bar The Carnegie Café ● The cafe is operated as a concession offering a daily food service between 0800 and 1600 each day including Sundays. (Lease does state 0900 opening). ● The business occupies the area immediately adjacent to the main entrance. ● The kitchen facilities need modernisation and the serving area is very basic with very little in the way of display areas. ● The food is self-service and is of a reasonable quality at a very competitive price and is offered together with soft drinks, coffee and tea but no alcohol. ● The cafe is popular and very well patronised. ● There is no clear delineation between the café area and the access to the office other rooms etc. It would help the atmosphere in the café for it to be a clearly defined and portioned space. ● It is unclear how much net income it generates for the Carnegie. The annual concession cost is fixed at £17,250 for 2013/14 however the electric, space heating and rates costs are borne by the Carnegie and there is no accurate way of determining the energy usage. It is expected that the rates bill for the Carnegie Trust will be fully rebated as a Charity however this will not apply to the Café. ● At times the café is also used by people which have hired the adjoining rooms (Art Room and Dance Studio) and this can conflict with the café business Monroe’s Bar ● Monroe’s bar has recently been refurbished; a new bar has been constructed together with flexible space seating around 100 people but capacity is 200. ● A new lighting system has been installed which allows different moods to be easily generated ● The bar only offers a service when there are events in the theatre or bar, which on average is less 4 days per month. ● The bar is not tied to a brewery so there is opportunity to negotiate on prices and beers to maximise profit as reflected in financial accounts. ● Monroe’s bar has recently purchased a coffee machine so there is opportunity to offer tea and coffee. ● Prices are relatively high compared with nearby pubs however they are not unusually high for a business of this type. ● Monroe’s bar has a full stage with lighting and sound facilities. 28 ● A restriction is that the lighting and sound control desks are shared with the theatre. Technical help is needed to move equipment from one performance space to the other and also for operation as the control equipment is of a very sophisticated nature. This restriction increases the running costs when a mix of events is held across the two performance spaces. Opportunities: Carnegie Café ● Renegotiate the existing concession to ensure that after covering all direct costs the Carnegie Trust is left with an acceptable profit in relation to the business turnover. Monroe’s Bar ● Minimise the cost of supplies through active negotiation with multiple suppliers ● Daytime service to complement what is offered by the Carnegie Café. ● Facility for private parties offering anything from a room only to a full service – room, bar, food and entertainment. ● Specialist events run in conjunction with the café with authentic food and drink ● Promote small intimate productions such as comedy, magic, acoustic, folk ● Purchase dedicated lighting and sound control for the bar, which is relatively simple to operate and permanently installed. This will reduce long term operational costs and make it more attractive for potential hirers Future Focus / Strategy: ● It is currently not our intention to run the Café as a integral part of the Carnegie Trust. We will instead concentrate on achieving best value from the concession and make a acceptable margin on the turnover whilst still encouraging development and improvement. ● There should be a focus on developing increased usage of the Monroe’s Bar in order to increase turnover from bar sales. ● We should strive to get the best commercial deal possible from our suppliers on the cost of stock and maximise operating margins ● Develop cross selling with other activities in the Carnegie. Expected Results: ● We should achieve a utilisation of Monroe’s bar on at least 8 nights per month in the first year increasing to 16 nights per month at the end of this business planning period. 29 ● The gross profit generation from the bar needs to increase from £38,708k today to £58,063k by the end of the business planning period. This is crucial to the ongoing success of the Carnegie as a business. ● We should aim for a profit margin on the concession, which relates to approximately 5% of turnover after all costs have been considered. Activities: Carnegie Café ● ● ● ● Establish accurate energy consumption figures for the café Establish all other direct costs relating to the café Renegotiate café lease, aiming at an income equating to 5% of turnover. Discuss with the café concessionaires how we can work together to promote joint events in Monroe’s Bar and the Café such as pre-theatre meals, themed speciality evenings, private parties, corporate events etc. ● Aim to delineate the café space so as to have a clearly defined passage between other spaces and to offer customers an improved experience. This would also allow for a reception desk to be included in the main space Monroe’s Bar ● ● ● ● New simplified dedicated sound and lighting control Develop new and improve existing entertainment genres – Comedy, Rock Music Renegotiate Bar stock prices. Tender stock supply contracts. 30 Objective 5: Maximise and developing leasing opportunities Background: The Carnegie Theatre and Arts Centre currently has 8 office units which are leased to other businesses. These units are leased on short-term leases: ● ● ● ● ● ● ● ● Unit 1 – Singing School Unit 2 – Cumbria Theatre Trust Unit 3 – Cumbria Theatre Trust Unit 4 – Carnegie (Workington) Ltd - Trust Unit 5 – VACANT Unit 6 – Cumbria Theatre Trust Unit 7 – Soundwave Unit 8 – Soundwave Opportunities: The existing units could be modernised ensuring adequate heating, communications and office facilities with the view of increasing lease income to offer increased potential to business start-ups and existing businesses who are looking for serviced office accommodation in the centre of town. Expected Results: An income stream of £6,000 in the financial year ending 31 st March 2016 rising to £10,000 for the financial year ending 31st March 2018. Future Focus / Strategy: Short to Medium Term – o Effective cost control o Marketing and communications strategy (Linked to Objective 4) Medium to Long Term – o Identification of funding stream for improvements to design centre o Creation of multi-functional ‘serviced’ business centre incorporating fully functioning office environment (furniture, telephony, heating, lighting etc) 31 Objective 6: Drive down energy consumptions and operate in an environmentally sustainable manner Background: 1. Utility bills account for around one third of the Carnegie’s building overhead, at £30k p.a. 1 2. Gas central heating in turn accounts for around £10k p.a.: 2.1. This figure is based on the use of relatively inefficient 2 gas boilers, formerly in use. 2.2. Similarly, there has previously been no facility to heat separate public areas individually. Where, for example the bar area was to be heated prior to an event, all other areas of the building have also been heated. The wastage was twofold – 2.2.1. Unused areas were heated unnecessarily. 2.2.2. Inability to target individual areas necessitated running the boilers at full output for a prolonged period (often up to 48hrs in advance) to achieve temperature in the required area. 3. Mains electricity accounts for two thirds of utility costs. It is supplied to all user groups and subletters through one meter, paid exclusively by the Carnegie. 3.1. The Carnegie Café concession is conservatively estimated to account for 60% of the electrical energy usage of the building. 3 3.2. The gas boilers are supplemented by a number of electric water and room heaters on the first floor with relatively expensive running costs. 4 4. Waste segregation is limited to paper/cardboard and general waste streams. Waste collection for sub-letters is paid for by the Carnegie. 1 £30,288 p.a. actual utility cost 2013-2014, supplied by Allerdale BC. Electricity £17,451 (58%). Gas £9756 (32%). Water £3081 (10%) 2 Manufacturer’s efficiency figures unavailable for previously installed Ideal Concord CXi boilers, now out of production. Estimated efficiency of 70% based on boiler type (gas atmospheric) and age. 3 Awaiting quotation for installation of electrical sub-meter into café kitchen, which will in turn give us exact usage figures. Research conducted on a number of commercial hospitality operations suggests that typically 63% of building energy usage is in the catering kitchen (Mudie, 2013). Applying the protocol of financial prudence, we reduce this to 60%. 4 While operating at high efficiency (typically 100% energy conversion), electric heaters and boilers are currently less cost effective than the existing gas boilers due to higher mains electricity vs gas charges per unit of energy. Cost per kWh electricity 10p x 1 (i.e. max efficiency) = 10 pence per kWh. Cost per kWh of gas 3.4p x 1.3 (i.e. 0.3 wastage) = 4.42 pence per kWh. 32 Opportunities: Utilisation of upgraded gas central heating system. Potential availability of grant funding from e.g. ABC and Energy Savings Trust for: 1 o Further upgrade of building insulation. o Installation of electrical sub-meters to individual user groups/areas to allocate and transfer costs, thereby also encouraging energy savings. Currently under consideration by Allerdale B.C. Property Services. o Introduction of renewable energy sources e.g. photovoltaic - a large south facing roof space is available – approx. 400m2. We consider the combination of high efficiency appliances, yet high mains supply costs makes the 1st floor area (see point 3.2) an ideal candidate for supply by renewable sources. 1 Further segregation of waste. Other recyclables separated from ‘general waste’ would attract no disposal charge, as is currently implemented with paper waste. A separate collection point for café general waste will be provided, charged directly. Next priority item - secondary double glazing. Expected Results: 1. Lowering financial overhead by £15,044. 1 2 2. Lowered carbon footprint - 22 metric tonne p.a. reduction in CO2 emissions. 3. Reduction of waste to landfill. 4. Potential for income generation and enhanced public perception by use of renewable energy sources. 1 Financial savings Gas – we conservatively expect 30-40% usage savings with the upgrade of the central heating system: ● ● 15-20% by the introduction of zoning technology (US DoE estimate) 15-20% through boiler upgrades – increase from approx. 70+% to 90+% efficiency. Applying the prudent lower figure of 30% saving, we expect to reduce gas usage by 77,593kWh to 181,050kWh p.a. In addition to usage savings, we have tentatively negotiated a 13% reduction in price by transferring supply from British Gas to SSE PLC for a 4 year fixed period from April 2015, which combined with the reduction in use above will result in a cost saving of £3,588 p.a. Electricity – we conservatively expect cost savings of 66% yielding £10,456: We have tentatively negotiated a 15% reduction in price by transferring supply from nPower to Scottish Power for a 1 year fixed period from April 2015, resulting in £2,448 p.a. savings. 33 In addition to the lowered overall supply price, we expect further savings of 60% through transfer of costs directly to sub-letters. We expect further cost savings of £8008 p.a. on the renegotiated supply tariff. Further reductions in electrical usage are expected with the proposed introduction of renewable energy sources to power st the 1 floor electrical lighting and heating. Figures for this will be available after the renewable energy feasibility survey in 2015 and have not been factored into the business plan financials. Waste – some savings are expected from ‘general waste’ disposal costs being passed on to the café. We estimate this at £1,000 p.a. 2 Carbon emission reduction of 24 tonnes p.a. derived from: Gas –258,644kWh usage (Allerdale supplied figures) which translates to 47,600kg of CO2 (Defra 2013 conversion factor). Efficiency increases providing a reduction of 30% = 14,280kg saving. Electricity – initially, CO2 savings from electricity usage in the main will be at the discretion of the café operators, when usage costs are met directly. The Carbon Trust (2014) advises that moderate improvements in behavioural factors and appliance maintenance may yield 20% savings in a typical commercial kitchen. We will advise and assist the café operators in order to achieve this figure. Cafe current electricity usage estimated at 82,347kWh (60% of annual usage) which translates to 36,684kg of CO2 (Defra 2013). With a reduction of 20% we aim to achieve a saving of 7,337kgs of CO2. Further reductions in carbon footprint are expected with the proposed introduction of renewable energy sources to power st the 1 floor electrical lighting and heating. Figures for this will be available after the renewable energy feasibility survey in 2015. Future Focus / Strategy: ● Near-term strategy - to enhance commercial viability by reducing: ● Energy usage, and in doing so reduce environmental impact. ● Energy costs per unit. ● Mid to long term the Carnegie aims to become a regional ‘flagship’ retrofitted sustainable building. Activities: ● Firm up energy supply contracts. ● Conduct waste survey (volume, types and source) by end 2014. Identify recycling opportunities, develop waste streaming systems and renegotiate leases. KT now has this action. ● Install electrical energy sub-meters (Allerdale Property Services) and draw up user group billing agreements (Carnegie Trust) by March 2015. ● Work with partner groups (James Watson Ltd, and Groundwater & Geothermal Services Ltd) to conduct renewable energy feasibility study by Jun 2015. Costs to be borne through energy efficiency grant. 34 Objective 7: Provide a welcoming, safe and secure environment for customers, staff, volunteers, users and visitors Background: The Carnegie is known to regular users and locals however there is an unclear branding strategy incorporating the venue as a whole which results in a perception of the overall product being of lower quality despite the programme being completely to the contrary. The venue operates as singular entities (Box Office, Theatre, Monroe’s Bar, Café, Dance Studio etc.) and whilst much work has been done to improve the facilities in the theatre, Monroe’s Bar and Theatre Foyer, the rest of the building feels very disconnected and in need of investment – as a result customers find the building difficult to navigate. In particular customers with disabilities are inhibited due to the disconnection and free flow of the building. The central point of contact for any customer wishing to use the Carnegie should be its staff. Presently staff and the central box office are hidden in a corner of the café behind a glass screen. New customers find it very difficult to identify where the box office is or who the staff are – frequently café staff are a new customers first point of contact. When a customer finds the box office the glass screen severely inhibits two way communication and equally it is very difficult for a customer/member of staff to select seats for a production because the monitor sits on a desk in the office, at least 1 metre away from the customer. In similar venues the central box office is an open counter, which is suitable for all customers with visible uniformed staff and appropriate security measures deployed (The Sands Centre - Carlisle, The Wave - Maryport, The Forum - Barrow, Theatre By The Lake Keswick). Aside from layout and visible staff/volunteer presence the venue also lacks any form of CCTV (Internal and external). For a venue this size, especially when on occasion there is only one member of staff present CCTV is a necessary measure to ensure safety of all our staff, volunteers and customers. Invariably the venue operates under local authority procedures and policies and whilst they are sufficient to operate there are clear limitations in the ability to apply in full the traits of an outward facing, welcoming arts and entertainment venue. Opportunities: Develop clear brand and marketing strategy – brand guidelines etc Develop a range of customer service policies and procedures Develop a robust customer feedback and complaints process with appropriate service level agreements 35 Deploy an ethos of continuous improvement based on the above Invest in formal staff/volunteer customer service training (either supplied by partners such as Lakes College West Cumbria, Culture Leisure Life, or formal training procured – Welcome Host Gold which then leads on the City & Guilds Qualifications for staff to undertake) Source organisational accreditation schemes Identify quick wins in terms of building flow – applying lean principles. Removing waste throughout the building – everything should have a place. Improve signage and increase visibility of services and flow throughout building Develop a full range of volunteers policies and procedures (Linked to Objective 9) Employ a Volunteer Manager (Either in a voluntary capacity or linked to future funding strategy) Develop clear reporting lines for Volunteers to Carnegie Management Structure Formally procure ‘Include Arts: Access and Inclusion’ to carry out a full review taking into account physical environment, training, Evaluation Report – which will then form the basis of future bids for funding. Expected Results: ● Recognisable brand both internally and externally – improved reputational benefits, quality of service etc. ● Undertaking formal customer service training such as Welcome Host provides staff with additional qualifications – improving staff morale and improves the reputation of the business at the same time. ● A clear and direct understanding of customer satisfaction based on fact, establishing baseline figures on which to improve – regular customer surveys and feedback. Enabling the business to identify areas for improvement (AFI’s) ● % increase in sales both direct ticket sales and subsequent secondary spends (Linked to objective 1, 3, 4, 9) Future Focus / Strategy: Short to Medium Term – o To undertake necessary steps to deploy absolutely necessary activities to improve customer service and safety and security of staff, volunteers and customers: Creation of appropriate policies and procedures Undertake essential staff training Identify quick wins 36 Medium to Long Term – o To concrete long term viability of business by undertaking formal reviews by accredited partners and undertake external/internal structural changes to comply with identified needs: Include Arts – Access and Inclusion Review Findings Formal Accreditation of Staff/Volunteers and Organisation Activities: Lined to Objective 1 – Promote a broad range of high quality entertainment offerings focussing on music, live theatre and comedy Linked to Objective 3 – Develop a Communications Strategy to support Audience Development Linked to Objective 8 – Secure the long term future by maintaining and developing the infrastructure Linked to Objective 9 – Develop a strong and supportive volunteer base and ‘Friends’ Group Short to Medium term – I. Apply for funding to undertake ‘Include Arts – Access and Inclusion’ Survey. (Already underway – October 2014) II. Identify, create or update relevant staff/volunteer policies and procedures (To include Unacceptable Actions policy (Aggressive or Abusive Behaviour etc)). (By March 2015) III. Develop customer feedback and complaints procedures and processes. (By March 2015) IV. Identify quick wins to improve building flow and accessibility using lean principles (No cost – can be done internally with Trustees). (By March 2015) V. As above identify quick wins for central box office. (By March 2015) VI. Identify staff training needs. (By Mid-January 2015) VII. Begin discussions with Lakes College West Cumbria and Culture Leisure Life to identify possible training opportunities. (By February 2015) VIII. Agree immediate training needs and source appropriate funding sources. (By March 2015) IX. Improve visibility of staff/volunteers by adopting uniform policy (including name badges). (By March 2015) X. Identify optimum position and plan for improving the layout of the central box office taking into account flow, access and appearance. (By January 2015) XI. Undertake review of security procedures and identify CCTV requirements. (By January 2015) 37 Medium to Long term – I. Develop brand strategy and guidelines II. Complete ‘Include Arts – Access and Inclusion’ Survey. (By December 2015) III. Identify AFI’s from Include Arts Survey and appropriate sources of funding. (By end December 2015) IV. Externally publish customer feedback and complaints process. (By 1st April 2015) V. Externally publish Unacceptable Actions Policy. (By 1st April 2015) 38 Objective 8: Secure the long term future by maintaining and developing the infrastructure Background: 1. The Carnegie is an Edwardian building of stone and slate, in “reasonable” condition and considered to be structurally sound subject to works outlined in the May 2014 Building Survey conducted by Day Cummings Ltd.1 2. Other than legal compliance testing, building maintenance is currently of a reactive nature as issues are reported to Allerdale Borough Council Property Services. 3. All costs for building maintenance and development are currently met by Allerdale BC. 4. An extensive refurbishment of the main stage and bar area was undertaken in 2013. Other parts of the building suffer from poor public perceptions2 and require similar cosmetic improvement. 1 2 Building survey by Craig Wallace RICS of Day Cummins, May 2014. We have received poor comments from the public regarding, for example - bricked up windows, dirty and crumbling exterior stonework, interior décor in the cafe and outdated fittings and fixtures. Opportunities: “Stave off decay by daily care” – William Morris. 1. Develop a strategic plan for preventative maintenance through a combination of: 1.1. Planned maintenance: 1.1.1. Ensure legislative and best practice compliance through equipment inspection and servicing scheduling3. 1.1.2. Establish ‘maintenance calendar’ for routine/in-house works to the building4, 1.2. Condition based maintenance: 1.2.1. Initiate quarterly building fabric condition walkthrough to include B+I Trustee, Theatre Manager and other staff on a rota basis – to identify issues preemptively, and increase staff engagement with building condition. 5 1.2.2. Schedule five yearly building survey, conducted by chartered surveyor to assess e.g. structural issues. Next due in 2019. 39 1.3. Predictive maintenance: 1.3.1. Introduce usage records for equipment (e.g. stage lighting, sound) and plot against failure data to determine lifespans with regard to establishing future predictive maintenance strategy. 1.4. Budget prioritisation by business criticality – e.g. failure of the main stage sound system or room lighting takes priority over an individual stage light (show stopper vs reduced functionality/income) 3 Carnegie servicing and inspection by external resources sample workflow: Based on incremental budgeting, we anticipate costs of £6,250 p.a. for compliance testing (LOLER, PAT, gas appliance, Legionella, fire safety). 4 The calendar would include, for example: ● ● ● ● ● ● 5 ‘Feb – check flow in rainwater goods on a rainy day’ ‘Mar – spring clean by volunteer group and host after party’ ‘Apr – inspect roofs with binoculars as per check sheet’ ‘May – remove weeds from exterior of building’ ‘Jun - check all window catches, opening/closing and paintwork’ Etc. We anticipate costs of £19,750 p.a. for emergent repairs, based on previous year’s costs (adjusted to remove large/one-off capital projects). 40 2. Building development: Building development and usage plans to be formulated based on sound commercial strategies in liaison with Board of Trustees and General Manager, e.g. (£ yield per m2) / payback period. 2.2. Improve the cosmetic appearance of public areas to enhance customer experience and brand perception – exterior façade cleaning, installation of exterior lighting, interior redecoration. 2.1. Expected Results: 1. Preventative maintenance of building fabric and equipment resulting in: 1.1. Overall 8-12% reduction in routine repair costs (US Dept of Energy figures), to be potentially realised within 5 years as emergent repairs decrease. 1.2. Reduced probability of the necessity for major remedial works (roofs, water damage to walls). 2. Long term availability and dependability of building and equipment, resulting in reduction in potential commercial downtime. 3. Improve strategic maintenance costing resulting in: 3.1. Increased distribution of expenditure across budget period, improving cashflow. 3.2. Reducing the probability of tapping into financial reserves and/or seeking emergency funding from external sources, e.g. Allerdale BC. 4. Enhanced decision making potential on building development through strategic market and commercial focus. Future Focus / Strategy: 1. Development decisions to be prioritised on the basis of commercial sustainability/customer experience: 1.1. Safety and legal compliance issues - avoid fines and claims, keep insurance costs down. 1.2. Existing business continuity – keeping the building and infrastructure functioning and available to support sales (even during works) – increase revenue through building development. 2. To work closely with commercial and marketing departments to identify market opportunities and incorporate into building development plans. 3. Investigate potential grants from external agencies for building repairs and upgrades. 4. Longer term to invest in ‘wow’ factor improvements to enhance customer experience. 41 Activities: 1. Develop planned maintenance schedule by Mar 2015. 2. Implement condition monitoring processes e.g. quarterly inspections. Mar 2015. 3. Introduce processes for predictive maintenance. Jun 2015. 4. Building development plan. Schedule meeting Mar 2015. 42 Objective 9: Develop a strong and supportive volunteer base and “Friends” group. Background: ● There is a small “Friends” membership of around 100 managed by a constituted “Carnegie Friends and Volunteers” group; It is run at arms-length from the Trust. From the “Friends” group there are a small number of dedicated people who volunteer to provide Front of House and additional administrative support. It is often difficult to find sufficient volunteers to fully staff events and this can only get harder as the number of events increases. There are no benefits provided to the volunteers. Opportunities: ● There is a lot of interest in the Music and Theatre within the wider community. We must tap into this group to develop and enhance the volunteer group from a broad demographic. Examples are Amateur Theatre Groups, Schools, Colleges etc. Expected Results: ● A strong volunteer group of at least 30 who can be called on for a range of support services for the business predominantly Front of House services Future Focus / Strategy: ● Volunteers are an essential resource for the Carnegie if we are to become a profitable business. It is a key part of the strategy to develop and promote the volunteers and Friends. Activities: ● ● ● ● ● Develop Health and Safety and Customer Service Training for Volunteers Identify and appoint Volunteer Manager Identify a permanent member of staff responsible for volunteers and training Put together a package of benefits for volunteers Promote volunteering opportunities to a wider audience aiming to recruit 30 members by the end of 2015 ● Provide support for the group in developing and promoting the “Friends” 43 9. Governance Model The preferred governance model suggested for the organisation is that of a Charitable Incorporated Organisation (CIO), a relatively new legal structure designed exclusively for charities. The CIO is designed to provide the benefits of incorporation to registered charities within a more attractive legal framework that is regulated purely by the Charity Commission. Legal Framework The legal framework for the CIO is set out in the Charities Act 2011 and in two sets of regulations and an Order. These are: the Charitable Incorporated Organisations (General) Regulations 2012 (General Regulations) the Charitable Incorporated Organisations (Insolvency and Dissolution) Regulations 2012 (Dissolution Regulations) The Charity Tribunal (Amendment) Order 2012 Types of CIO available There are two different types of CIO available. There are model constitutions recommended by the Charity Commission for each: Foundation CIOs Under this type of CIO, the voting members and charity trustees are one and the same (known as 'closed' membership). This model is ideal if the CIO is to be run by a small group of individuals (the charity trustees) who are to be responsible for making the key decisions. Association CIOs This type of CIO has a wider membership than the Foundation CIO, including members who are not trustees (known as 'open' membership). In accordance with the Charities Act 2011, the CIO constitution must be in English if the principal office is to be in England, or in English or Welsh if the principal office is in Wales. The CIO constitution must also be in a form specified by Charity Commission regulations or as near as circumstances admit. It is recommended that at least initially the Carnegie Trust opt for Foundation CIO status with consideration being given to converting to association status over a period of time. This will allow effective and immediate management of the venue and charity. Consultation with wider public will still be a principle maintained by the trust. It is also recommended that the trust opt for the the Charity Commission model constitution to avoid the Charity Commission rejecting the application for registration. (Approximate time frame for incorporation 40 days). 44 Advantages of a Charitable Incorporated Organisation There will be no dual regulation. CIOs will only need to be registered with the Charity Commission, will come into being once registered with the Charity Commission, will be regulated by the Charity Commission and subject to charity law Trustees of CIOs will benefit from limited liability. This means that their liability in relation to the organisation is limited to the amount they have invested in the CIO / have guaranteed upon the winding up of the organisation. As the CIO is a separate legal entity it will enter into contracts, hold property and employ staff itself. Consequently, it is the organisation rather than the trustees that will be liable for any liabilities arising from such arrangements There is no minimum registration threshold that will apply in relation to the registration of such organisations at the Charity Commission (unlike the current rules for registration of charities which must have a minimum of £5k income before they can apply) Every CIO will have a registered charity number. This assists an organisation with fundraising / donations and providing the public with confidence that the charity is appropriately regulated The structure is specifically designed for charities No fines will apply for administrative errors CIOs with income of £250,000 or over can produce simpler receipt and payment accounts to the Charity Commission. 45 10. Organisation Design Present Organisation Structure Carnegie Workington Ltd will inherit the following staff: Manager 1 FTE Grade K Front of House 1 FTE Grade G Clerical Assistant Janitor/Cleaner 1 FTE 0.40 FTE Grade C Grade C Bar Supervisor Clerical Assistant 0.20 FTE 0.20 FTE Existing Staffing Structure Notes: 1 FTE Clerical Assistant post is currently a job share between two people Bar Supervisor averages 8 hours per week Additional Clerical Assistant Post is a post which is occupied by an employee who for four days per week works at Allerdale Borough Council. Future Organisation Structure The new governance structure for the Carnegie follows the suggested model shown below. The appointed Board will be overall responsible for the strategic direction, profitable and efficient running of the venue, with day-to-day responsibility of the same delegated to the General Manager who will be responsible to the Board. The management layer is to ensure the profitable and efficient running of the Carnegie Theatre & Arts Centre incorporating all hire spaces including the Design Centre, to the highest professional standard’s and to develop the venue for the future. 46 The organisation structure is a blended model recommended following the options appraisal carried out by Locality in March 2012. The suggested model has the Board responsible for the overarching strategy of the organisation. Each Board Director will be responsible for specific areas of activity. The role structure indicated for the Board may change, depending on the ability to fill all roles. To enable the set-up of a Charitable Incorporated Organisation the Board should have a minimum of 3 Directors/Trustee’s as recommended by the Charity Commission. It is recommended that on acceptance of the Business Plan that a further recruitment exercise is undertaken to try and appoint further trustees to those roles indicated. Where essential experience is required, but not appointed to the Board (such as Legal and Finance) it is expected the service will be procured. The existing bank of casual staff would be retained if they wish to transfer to the Trust to be used as and when required. User organisations and volunteers need to be involved in supporting and planning events. Partnerships and partnership working would be key to the operation, however the charitable organisation would retain ultimate control of all aspects of the building and operation and work with partners through a range of contracts and agreements. It is not envisaged that any activities or facilities would be sub-contracted or sub-let. Volunteers Carnegie Workington Ltd would seek to develop a pool of volunteer staff to support the work and operation of the Carnegie. Volunteers would play a key role in providing clerical support (box office administration) and supporting performances, particularly as ushers. Volunteers will not only complement the existing workforce but also by recruiting the right type of volunteer be wonderful ambassadors and advocates for the organisation. 47 Future Governance/Staffing Model 11. Accountancy, Payroll & Pensions As well as providing accountancy (including VAT) and business support services the trust would appoint Lamont Pridmore to undertake Payroll and Pensions services on our behalf. The five year accounts provided reflect the service our accountants will provide. In summary these are: Calculating wages PAYE Producing pay slips Paying staff Calculate NI due to HMRC Pension auto-enrolment Over time Lamont Pridmore would train Carnegie staff to undertake the payroll service themselves thus reducing the overall cost of accountancy service year on year. Lamont Pridmore have also indicated their ongoing support to the trust as an advisor in all matters arising through their Workington based office. 48 12. Trustee Training & Development “Trustees have, and must accept, ultimate responsibility for directing the affairs of a charity, and ensuring that it is solvent, well-run, and meeting the needs for which it has been set up.” From CC3:The Essential Trustee (Charity Commission, 2005) As part of their role, trustees joining the ‘board’ have to be open to learning, at each stage of their experience. This learning is indicated by the spiral diagram below, as trustees work through each governance cycle and through the stages of organisational life. Trustee Journey Spiral To ensure good governance practise trustee’s will undergo initial training and development to establish the following outcomes: understanding legal responsibilities and duties as Charity Trustees understanding the roles of the main officers with a management board have an overview of relevant legal issues e.g. Health and Safety, insurances, licences and permissions Independent review of the current business plan including making any recommendations The schedule and outcomes for this have already been established between the Trust and Cumbria Voluntary Service via a draft Provision of Service Agreement. Longer term trustees will adhere to National Occupational Standards (NOS) set down specifically for Trustees which are based on agreed good practice. They contain detail about what ‘competent performance’ really means. The NOS also provides a framework and map that can accompany trustees through the stages indicated by the journey spiral. In turn, experienced trustees will then be able to recruit, induct and support others. This level of detail will enables the individuals performing the role and the Carnegie Trust to work towards a clear picture of what it means to be a trustee by; 49 • defining a framework of good practice in the way people work, based on the functions of their job/role • describe the knowledge and skills required to carry out a specific task • are outcomes based – they look at what needs to be done, not how you should do it • provide a guide for developing materials for induction, training or development • serve as a useful ‘knowledge and skills checklist’ for self-assessment or recruitment purposes. Further sources of training and advice will be utilised to ensure that trustee’s comply with recommendations laid down by Charities Commission and similar bodies. 13. Profit and Loss Forecast for 2015/16 to 2019/20 See accompanying Financial Business Plan provided by Carnegie Workington Ltd 50 14. Capital Priorities for 2015/16 to 2019/20 Capital priorities are indicatively indicated based on objectives outlined previously. On acceptance of business plan further work will be undertaken by the trust to obtain detailed costs and identify appropriate funding streams to deliver. Description Priority Refurbishment of Dance Studio - Small Stage, Lighting and Curtains for Dance Studio. Refurbishment of Dance and Arts Room Refurbishment of Art Room – To account for new uses and users as per refurbishment of Dance Studio Independent lighting and sound controls for Monroe’s to allow it to be used as an independent venue from the theatre. Design and Procurement of Services to delineate Café/Box Office/Exhibition Space. Installation of Wifi Network Refurbishment of Business Centre to provide self-contained office space. Conference Facilities – purchase conference equipment to make space more attractive to business users, public meetings etc. Cinema Screen – Bar Cinema Screen – Theatre Theatre Lighting – Upgrading of Theatre Equipment Brand Design/Website Kitchen Refit (Fully established Catering Kitchen) Renewable energy sources Double Glazing 6 6 4 3 2 8 7 11 12 5 1 10 9 9 51 15. Risks We have taken an initial risk analysis to determine the most likely areas of exposure of our proposed model and operation. The evaluation includes measures likely to mitigate those risks. Control Measures Factor Gross Scoring Risk Owner Gross Impact Details of Risk Gross Likelihood No Critical Success Risk We fail to achieve our income targets 1 Financial Consequence The financial projections would be under threat and the operational model would be at risk The financial projections are based on available historical information and informed advice from professional expertise. Targets have been set realistically. Monitoring of income will be reported on a weekly basis and financial controls will be put in place. Monthly reporting on overall financial performance against budget. Continued marketing activities. Close liaison with user groups. 3 iv Undesirable In practise the major risk is Allerdale Borough Council being unable to sustain its revenue investment. This would fundamentally change the business operation and require a review of activities, staffing and viability of the trust being able to operate the Carnegie. 2 v Undesirable Risk Decrease or withdrawal of annual funding 2 Financial Consequence Our entire budget will cease to work and we would have to significantly scale back our resources and plans very quickly. The venue could become unsustainable. 52 Risk Performances or other activities do not attract required level of customers. 3 Market Consequence The financial projections would be under threat and the operational model would be at risk. Regular review of both programme and marketing. Weekly monitoring of advance ticket sales against projections. Flexibility of market response by calling on resources of other professional Marketing departments i.e. TBTL, CLL 3 iv Undesirable Negotiate to bring new partners into operation. Period of change arising from new operations. 4 iii Undesirable There is reasonable strength in depth with crossover in responsibilities. In particular the Trust could call on support from TBTL, CLL to support on a temporary basis. Management support could be delegated while longer term measures are taken. 3 iii Tolerable 2 iii Acceptable Risk A key partner in the delivery of activities withdraws 4 Programme Consequence A significant gap in the programme of activities, impacting on public perception, range of services and possibly earned income Risk A key member of staff leaves the organisation suddenly (i.e. long term sick/contract termination) 5 People Consequence There is a gap in terms of knowledge and experience that will take time to replace. Risk 6 Programme Insufficient performance activity is available to sustain a credible programme. Variety and range of proposed programme makes it less likely that any deficiency in one area of performance activity cannot be compensated by increases in another 53 area. Consequence Loss of audiences and public credibility. Reduction in earned income. Risk We do not respond effectively to a crisis – resulting in a loss of operating capability Process/ 7 Operation Consequence The development of adequate contingency plans in key areas. Call upon partner organisations such as TBTL or CLL to support the Carnegie team in the event of circumstances beyond their control or expertise. 4 iii Undesirable Appropriate and qualified HR and legal advice to ensure that processes are robust. 3 iv Undesirable Appropriate and qualified industry compliance advice through partner organisations such as Allerdale Borough Council, TBTL or CLL. Cultivate good proactive relationships with regulatory bodies 2 iv Tolerable We are not able to sustain parts of the programme for a period of time resulting in a failure to meet targets and a loss of credibility Risk We are sued by an individual over our HR procedures (disability/equal ops etc) 8 People Consequence There is a financial risk to the organisation and our reputation as a good employer is damaged. Risk We are found to have failed to comply with licensing or H&S regulations Process/ 9 Operation Consequence Could be stopped from operating for a period of time and would be subject to media scrutiny. Loss of income and 54 reputation. Risk The Charity Commission questions the achievement of our charitable objectives, such as the public benefit of our work. 10 Governance Consequence Unable to incorporate. If operating, likely to involve an audit taking significant management time and resulting in possible alteration of activities or structure of business. Trading activities will be reviewed and action taken to operate trading through a wholly owned with professional advice, subsidiary company, if appropriate. 1 v Tolerable 55 16. Appendices 56 16.1. Appendix 1 – Floor Plans 57 58 16.2. Appendix 2 - Allerdale District Description Allerdale is an area of diversity, contrast and outstanding natural beauty and is largely made up of the urban triangle of Cockermouth, Maryport and Workington; the dispersed hill farms, forests, fells and lakes of the Lake District National Park incorporating the market town of Keswick; and the rural and fertile Solway Coast Area of Outstanding Natural Beauty stretching to the north towards Carlisle, encompassing the towns and villages surrounding Wigton, Silloth and Aspatria. The district lies west of the urban centre of Carlisle and the principal north-south arteries – the M6 and the west coast main rail line. The A66 provides the main road link to the motorway, about an hours drive from Workington, and there is a coastal rail link from Carlisle to Wigton, Aspatria, Maryport, Workington and further south. The population is around 94,300. Workington and the Surrounding area Workington is the largest town in the Borough with a proud history of steel making and coal mining. The town still retains a significant industrial base, though in recent times it has diversified into a more service based economy. In addition, tourism is of growing importance to the west coast area and has a significant impact on the local economy. The redevelopment of the town centre has been the catalyst for regeneration of the town and this is now entering a phase two regeneration programme which will include improvements in and around the railway station. Workington has pockets of both affluence and deprivation across a population of around 27,000. The Carnegie Theatre The Carnegie building occupies a prominent site close to Workington Town Centre and is a listed Grade 2 structure. Originally built in 1904 by the former Workington Town Council, the building served as the town’s library until 1973 when the library service relocated to a former co-operative building. The original building incorporated a lecture hall and a theatre stage was added in 1911 by purchasing the adjoining house which was subsequently gutted internally to provide the necessary stage space. Ownership of the building was transferred to Allerdale Borough Council at the time of local government re – organisation in 1974, by which time the Carnegie Theatre and Arts Centre had been operational for one year. Now regarded as a focal point for the community, the building encompasses a 324 seat traditional proscenium arch theatre with dressing rooms, a 200 capacity bar area which is also used as a performance space, a coffee shop with 90 covers which provides a space for exhibitions and two multi – use Community rooms accommodating a total of 160 people. The Carnegie Design Centre is located on the upper floors of the building and provides office accommodation and workspaces mostly used for arts and crafts related businesses. Many of these office spaces are now used by two arts organizations providing music and drama opportunities for young people in Workington and the surrounding district. 59 An extensive programme of external refurbishment works commenced in 2008 when most of the roof slates were replaced. Further works included the renovation of windows on the upper floors of the building, a new flat roof above the existing cafe area and like for - like replacement of the original and decorative roof lights above the Arts Centre foyer area. The Arts Centre was extensively refurbished internally in 2010 to include the re-discovery, repair and decoration of an original ceiling. In 2012, the theatre, dressing rooms and toilets were refurbished and in 2013, Monroe’s Bar and the theatre foyer also underwent a significant refurbishment. Approximately 60,000 people are recorded as attending classes, courses and events each year (excluding café customers), although most would recognise a significant need for further investment in the building. Area Demographics Population In 2011 Workington had an estimated urban population of Allerdale has a lower proportion of young adults and a higher proportion of over 60s than the national average. It is also very ethnically un-diverse with over 95% of the population being white English or Irish. (Source: ONS) Unemployment The Carnegie Theatre and Arts Centre is located in St Michaels Ward in Workington. The catchment area of the theatre also includes the coalfield wards of Maryport. There are much higher than average levels of unemployment in the area, as the following table shows: Male Female Overall 5% 2.5% 3.8% St Michael’s Ward 8.2% 3.9% 6.1% Workington 7.3% 3.2% 5.2% Maryport coalfield areas 7.8% 2.8% 5.2% UK (Source: June 2011 claimant count) The problem is especially acute among younger people. In the first quarter of 2011 there were 265 16-24 year old people in Workington claiming Job Seekers Allowance, making up a third of total claimants, higher than the UK rate. There were a further 150 in Maryport. These figures need updating for 2013 Deprivation 60 The index of multiple deprivation takes a number of socio-economic indicators and calculates a value for each super output area (SOA). This is an area smaller than a ward typically made up of around 1,500 people. Within Workington there is 1 SOA in the 2% most deprived, 1 SOA in the 5% most deprived, 2 in the 10% most deprived and a further 5 in the 20% most deprived in the country. This means a significant proportion of the town is officially categorised as deprived. The SOA containing the Carnegie is within the 12% most deprived overall. There are particular issues with employment, with the area being within the 7% most deprived, and also health and disability, being within the 3% most deprived. The Maryport coalfield areas are also very deprived, with the Ewanrigg estate being within the 5% most deprived in the country. Coalfield SOAs are within the 4% most deprived in employment and health, 5% in income, 1% in education, skills and training Specifically, Workington and Maryport SOAs are heavily deprived in terms of: ● ● ● ● ● ● ● ● Income Employment health and disability education skills and training children and young people crime and living environment areas also feature highly in the combined children’s and also older persons indices. (Source: Indices of Multiple Deprivation 2010) The majority of Workington and Maryport is categorised in the least wealthy and successful two of five categories: ‘moderate means’ and ‘hard pressed’. (Source: CACI/ACORN classification 2010 - the socio-economic profiling tool using a range of information to classify postcodes into five main categories). 61 16.3. Appendix 3 - Allerdale Cultural Strategy The Council approved a revised cultural strategy in 2007, which is relevant. “If we are to successfully retain young people in Allerdale and attract new workers into the area we will need to ensure that we can offer them a rich and attractive quality of life underpinned by excellent facilities, services and opportunities. Arts, sports, heritage and tourism are not optional extras. They put the life into Allerdale and if Allerdale is to take advantage of the opportunities it now faces these services must form a central part of our contribution to the future.” The overall aims of this strategy include: ● To encourage local people to enjoy more active, creative and healthy lifestyles through participation in cultural activity. ● To encourage learning and skills development through cultural activities. ● To support development of creative and cultural industries. ● To promote and develop cultural activity and initiatives to stimulate the local economy. ● To strengthen the cultural offer for tourists, visitors and the local community by developing the physical infrastructure and enhancing the public realm. Allerdale Borough Council - Council Plan The current Council Plan includes securing alternative delivery arrangements for the Carnegie Theatre and Arts Centre as a key action. The Council administration and Executive agreed that ‘arts and leisure’ are one of their four priorities. Previous reports have highlighted five types of justification for the continued support of the Carnegie Theatre and Arts Centre: - The enhancement of the quality of life for local residents by facilitating the provision of a broader range of cultural and popular events than the commercial market could offer in the absence of subsidy. Linked with this is the idea that public sector support can help to reduce prices and allow lower income groups greater access to events at the Carnegie which might otherwise be beyond their financial means. - The Carnegie Theatre and Arts Centre acts as a focal point for the community – bringing local people together and promoting social cohesion. - The Carnegie Theatre and Arts Centre occupies a prominent place in the Town Centre and is seen as part of the local cultural heritage which should be sustained. - Events and activities held at the Carnegie Theatre attract day trippers and tourists on the one hand and investment on the other, as companies seek locations which provide a congenial working environment for staff. - The Carnegie encourages artistic excellence and offers opportunities for innovation. 62 16.4. Appendix 4 - West Cumbria Economic Blueprint Britain’s Energy Coast is a £2 billion package of regeneration projects that will establish the West Coast of Cumbria as a major national hub for low carbon and renewable energy generation. The current West Cumbria Economic Blueprint (Nov 2011) states “Investment in recreational and cultural facilities and public realm will be critical to retaining ambitious people and attracting skilled newcomers.” It is clear that the Carnegie Theatre and Arts Centre could and should be an integral part of the delivery of this vision. 63 16.5. Appendix 5 - Cumbria County Council Policy Position – Arts and Culture Cumbria County Council’s policy framework for arts and culture states culture and the provision of a wide range of cultural activity is important in Cumbria because:● There are many evidence based examples of how arts and creative activity has had a positive impact on all aspects of community and individual well-being ● Cultural activities are important to individuals, add value and enrich their lives ● Cultural activity can have a real impact on achieving the council’s priorities and outcomes ● Creative industries are especially important in Cumbria. They provide opportunities for growth and micro businesses can be set up anywhere ● Community engagement in cultural activity enables individuals and communities to express themselves ● Cultural activities can result in changes in behaviours and attitudes (emotional, physical, behavioural) and can result in a product which might be tangible ● Heritage/arts and cultural activity attract tourists to the county ● Culture defines a village/town/area and shows what people find important which may be to do with heritage, sport, or entertainment ● Cultural diversity is important and should be fully reflected across Cumbria. ● All cultural behaviours impact on council decisions and vice-versa ● Sharing information on what has been commissioned, what worked well and why and providing more advice (e.g. on the intranet and elsewhere) to help staff know how to commission cultural/creative activity ● Making staff better aware of Cumbria’s cultural resources and encouraging Cumbria County Council staff to engage in cultural/creative activities and lead by example Cumbria County Council values activity that has been evidenced to support and address:● ● ● ● ● ● ● ● ● ● ● ● ● ● The disengagement of young people, giving them a sense of belonging and improving their life chances The needs of disadvantaged or vulnerable people The way people think or do things and the challenging of assumptions Dignity and respect amongst individuals and in communities Community cohesion, engagement of ‘hard-to-reach’ groups and Improved access to activities for people who don’t normally have opportunities to engage Stimulating learning in schools, as part of the curriculum Low self esteem, low levels of confidence, raising aspirations and ambition, worklessness and removing barriers to success Giving people a voice Prevention, with a focus on unhealthy lifestyles and behaviours including alcohol and substance misuse among children and young people Improving the environment including activities to reduce waste and increase recycling Economic growth (e.g. tourism, employment, creative industries including artisans, craftspeople and micro businesses) An improved understanding of Cumbria’s heritage Skills development Crime and anti-social behaviour. Particularly alcohol related. 64 16.6. Appendix 6 – Arts Council England – Achieving Great Art for Everyone Framework Arts Council England (ACE) is the lead body charged with developing the arts in England. In 2010, they produced a ten year framework (Achieving great art for everyone) to focus their work over the next ten years. It is likely that the Carnegie will make both applications for project support and potential capital investment. At the heart of the Arts Council framework are five 10 year goals: 1. 2. 3. 4. 5. Talent and artistic excellence are thriving and celebrated. More people experience and are inspired by the arts The arts are sustainable, resilient and innovative The arts leadership and workforce are diverse and highly skilled Every child and young person has the opportunity to experience the richness of the arts ACE state that they will seek to ensure the following outcomes from their work and investments: Excellence – outstanding art and outstanding art experiences; Reach – more people attending and taking part in the arts; Engagement – more people feeling that the arts are meaningful to them; Diversity – the arts reflecting the diversity of contemporary England; Innovation – artists and organisations having the freedom and being challenged to innovate. The Carnegie Arts Trust aims to address these local, regional and national strategies, and other similar strategies, through its offer, location, ability to adapt and change to meet local needs and to address new opportunities as they arise. 65 16.7. Main Contact: Appendix 8 – Contacts Lee Martin-White Chairman Address: Carnegie (Workington) Ltd Unit 4 Carnegie Theatre & Arts Centre Finkle Street Workington Cumbria CA14 2BD Telephone: 07947 887215 Email: [email protected] 66 16.8. Advisors Appendix 9 – Directors, Managers and Professional Directors (Trustees of the Board) Chairman: Lee Martin-White Vice Chairman: Ian Johnston Secretary: Marlene Johnston Treasurer: Vacant Trustees: Jonathan Higgins Rachel Suddart Nick Sloan Vacant Cllr Mark Fryer ** Cllr Barbara Cannon ** (** Nominees of Allerdale Borough Council) Professional Advisors Annie McCourt Head of Education & Participation Theatre by the Lake James Cobbold General Manager Theatre by the Lake Patric Gilchrist Executive Director Theatre by the Lake Danny Braithwaite Head of Faculty Lakes College West Cumbria Julie Lewis Programme Area Manager Lakes College West Cumbria Bill Knowles Director 67 Wingspan Associates Guy Huxtable Director Wingspan Associates Glyn Griffiths Business Advisor Britain’s Energy Coast Les Walker Managing Director Lamont Pridmore (Workington) Catherine Eve HR Advisor Core Training Ltd Jacky Beasley HR Advisor Core Training Ltd Ian Sharman Solicitor Brockbanks Solicitor Craig Wallace Building Surveyor Day Cummins Helen Conway West Cumbria Advisor Cumbria Voluntary Service Andy King Managing Director Culture Leisure Life (CLL) Kirsty Hoyle Manager & Consultant Include Arts: Access & Inclusion Amy Ferguson Arts and Events Officer Workington Town Council 68
© Copyright 2026 Paperzz