CON T EN TS 04 The Profile 08 Key Selling Points 12 The Location 14 The Neighbours 20 The Amenities 24 The Design 28Sustainability 32 The Specification 40 The Floorplans 50 Test Fitouts 62 The Team The Fitout The Fitout A C O N S T A N T L Y C H A N G I N G V I E W, WAT ER F R O N T W O R K I N G & L I V I N G. 2 The Reflector, Hanover Quay 2 3 The Reflector The Profile INTRODUCING THE R EFL EC TO R A prominent waterfront setting with a south facing front facade and extensive views of the inner docks. The Reflector is a landmark office and residential development prominently situated in Dublin’s thriving Grand Canal Docks. With impressive water frontage spanning almost 75 meters of Hanover Quay. The Reflector has a distinctive and memorable profile of bronze mesh panels and reclaimed bricks, which contrast and compliment the sleek glass facade. The use of luxurious finishes is carried into the ultra modern building, where premium fixtures have been fitted with exceptional craftmanship and attention to detail. Airbnb & The Reflector, Hanover Quay 4 5 The Fitout The Fitout A SWEEPING VI STA OF DUBLIN B AY & MO UN TA INS , A RO UND TO GRAND CANAL DOCKS Looking west from The Penthouse 6 7 Key Selling Points The Reflector A L ANDMARK HE ADQUARTER BUILDING Dublin is a global city, offering unique access to Europe and strong connections to the UK and US. West ground floor reception Grand Canal Docks is an established national and international business centre in one of the most accessible parts of Dublin City Centre. The Reflector sits in a unique position within the Docks and is a six storey over basement office building, extending to an area of over 123,000 sq.ft. net area. • On site August 2016, delivery expected 2018 • Experienced developer & professional team • Adjacent low rise buildings provide panoramic 215° views from the 3 Arena to the Grand Canal Theatre including views to the Aviva and the iconic Pigeon House • Eye catching elevation with feature facade • Sustainable design to LEED V4 Gold standard with high A3 BER targeted energy rating Typical floor plates of 23,000 sq.ft. will be finished to the highest standards, featuring LEED Gold V4 accreditation and A3 BER Certification. With panoramic views, a unique waterfront setting and beautifully landscaped courtyards, walkways and terraces, The Reflector is set to become an iconic office building. 8 • The building can be split in to two distinct wings each with their own dedicated entrance • Floor plate design that delivers high levels of natural daylight lending itself to flexible subdivision and efficient occupancy • Minimal internal columns with columnless nine meter wide wings • Penthouse suite with set back south facing balconies overlooking the inner docks East ground floor reception 9 The Fitout The Fitout 6 F LO O R S O F P R I M E O FFICE SPACE 2 INDIVIDUAL WINGS , BOTH WI T H T H EI R OWN ENTRANCE Looking east from The Penthouse 10 11 II I II I II IIIIII I I II I I I I I I II II SH Route to Port Tunnel & M1/M50, Airport (10 Minutes – Driving) L II II IIIIIIIII Mayor Sq Spencer Dock L UA S R E The Convention Centre Nor thwal y Tara Street Station Sir John Ro RIVE R L uay 3 Arena l Quay IFFE Y St r on re et rri nd Ro Google IRISHTOWN Bath Aven II ad II Ro Aviva Stadium ss on With five dedicated Dublin bike stations located within the Grand Canal Docks and ample bicycle storage within the building, it is set to serve both the casual and the most perennial of cyclist commuters. RANELAGH BALLSBRIDGE I II II From Hanover Quay – Walking Time DART Grand Canal Dock Station 11 mins Pearse Street Station 10 mins Connolly Station 20 mins Luas Mayor Square 13 mins Dublin Bike Benson Street 1 min Dublin Bus Various Locations SANDYMOUNT VILLAGE I From Hanover Quay – Driving Times Port Tunnel 8 mins Dublin Airport via Port Tunnel 20 mins II ace II t I II re e err nT Dublin Bus, the DART and Luas light rail system all provide reliable access links to this central location with stations within easy reach. The area has excellent road infrastructure with the Samuel Beckett Bridge providing speedy access to the North Docks, IFSC and to Dublin Airport. A new bridge is also planned connecting Grand Canal Docks with Ringsend. 12 SANDYMOUNT II St l to Wi Centrally located and served by all the city’s transport links, Grand Canal Docks offers easy commutes from all parts of Dublin. Be I II Le II I to n LANSDOWNE VILLAGE I II Ha ng d di BEGGAR’S BUSH II et ue I II ce la re tP St er ot rb gg He Ba I II I St. Stephen’s G R E E NGreen oad ot t sR ad Me r la th L er pp ee tU K il d S T. S T E P H E N ’ S Grand Canal Dock Station be ad Road S ou St r e are NL um et s e Ro RINGSEND Barrow St t n Stree D aw s o Grafton Street E IN et re r th n Hou Ringsend R I N G S EPark ND PARK II St IL II No au RA II I ss H II Na Pigeo GRAND CANAL DOCKS II I Merrion Square IS I /I R Proposed Bridge Quay Ringsend RT II DA II I EE t II tre e II se S II I Pe a r Bord Gáis Energy Theatre National Library of Ireland Government Buildings GR The Reflector ast III AS e et E II I LU r St r II I n ove Hanover III Dail Eireann et H an III II re I St II Trinity College Dublin Pearse Street Station III II au t I ss tre e II Na ge S II I C olle LU A 20 S C 17 RO Co SS mp C let IT Y io n I II II gersons Q DUBLIN PORT POINT VILLAGE D LIN E Proposed Bridge City Qua II II IIIIII ion / k St a t to n L i m e r i c s s u in y/ He ‹ To /Galwa ford Tra r Cork o/ Wate S li g THE PERFECT ADDRESS FOR E A S Y ACCESS II I IFSC II III R AI II I I II RI NORTH WALL Connolly Station (Belfast & Commuter) INE CLONTARF EAST WALL II L I I The Location IIIIIII II L UA D S RE II I II II I I CIT Y OS S e tio n l S CR LUA 7 Comp 201 DUBLIN NORTH CITY I II I II I II I II I II II I II I I II DRUMCONDRA II II The Reflector I II 13 ac h Ro ad The Fitout 1 2 The Fitout 3 4 5 6 7 8 THE HEART OF DUBLIN'S BUSINESS DISTRICT 14 15 1 William Fry 5 State Street 2 6 Accenture Bord Gáis Energy Theatre 3Facebook 7Airbnb 4 8 The Marker Hotel The Reflector I II II II I I I II I I I I I I I I I I I I I I I I II I I II II Stre et St r Ringsend RINGSEND PARK Road 19 nd Ro 1 ad oad 8 sR r la 2,5 ot t be 10 II Bath Aven ue Le oad II Aviva Stadium Be I dd nR ac on I II ss Ha to ing II et I II re LANSDOWNE VILLAGE II ce BEGGAR’S BUSH la St 15 tP ot er gg rb Ba He Harcourt Street St h Ro ad t II re e SANDYMOUNT I ace II BALLSBRIDGE Grand Canal Docks houses a broad range of national and multi-national companies. The concentration is such that the area has become Dublin's principal modern office district and business hub. 16 SANDYMOUNT VILLAGE II RANELAGH II err nT I II l to Wi I II 7 II I II et I II re IN GOOD COMPA N Y ad 4 Grand Canal Dock Station rri on RINGSEND 17,24 um s e Ro th L r th n Hou S ou II er pp Merrion Square ee tU No et IL Me St Proposed Bridge I II et St r e are K il d GR ot Pigeo Barrow IIIIIIIIIIIIIIII I III t n Stree RA II ISH II gg Quay 3 II I / IR I Ba 1,2 Propose d Bridg e The Reflector 1,13 II re 23 RT II I St DA t I au tre e II ss se S II I Na Pe a r 22 Bord Gáis Energy Theatre GRAND CANAL DOCKS II National Gallery of Ireland National Library of Ireland Hanover 12 21 ast II D aw s o e et E 18 The Marker Hotel 9 II I Grafton Street r St r III NE n ove P E A R SE S T R EE T S TAT ION Trinity College uS Dublin tre et Government Buildings RIVER L IF F E Y 6,7 III I LI uay 3 Arena II I H an III N gersons Q III II t II Dail Eireann tre e POINT VILLAGE l Quay 16,20 III I sa Nor thwal I Sir John Ro Tara Street Station II ge S SP ENCER D O CK 14 RIVER L IF F E Y 11 y DUBLIN PORT LUAS RE D L IN E The Convention Centre IF S C II I EE NORTH WALL I as AS IL II National College of Ireland RA II C olle LU A 20 S C 17 RO Co SS mp C le IT N tio n Y LU SH II TEMPLE BAR St. Stephen’s Green RI M AYOR S Q City Qua The Neighbours EAST WALL III I I CLONTARF II I n a tio n St e r i ck / o t s eu / L im in s To H Galway ord Tra / rf k r e t o a C o/ W S lig DUBLIN SOUTH CITY II II II II I II Abbey Theatre t ‹ NE D LI St r e e L UA S RE nnell DUBLIN NORTH CITY I II I I II I II I II I II II I II I I Connolly Station (Belfast & Commuter) O’C o Y IT S C tion S e RO pl S C C om A LU 017 2 The Reflector II IIIIII II DRUMCONDRA I II II (Belfast & Commuter) The Neighbours 1 Accenture 2 Airbnb 13HSBC 19Pfizer 8B.T. 14Hubspot 20 Trip Advisor 3Arup 9Facebook 15 LinkedIn 21 Twitter 4 10 Google 16 Logmein 22 State Street 5 Betfair 11 Grant Thornton 17 Mason Hayes & Curran 23 William Fry 6Beauchamps 12HMH 18Matheson 24Zalando Bank of Ireland 7 BNY Mellon 17 The Fitout The Fitout J O I N T H E GLIT TERING SET OF NEIGHBOURS Looking towards Google in Grand Canal Docks 18 19 I II II MAYOR SQ IFSC I tU ee rri on St r No Merrion Square r th um be r la nd Me oad sR 15 et 10 19 14 Bath Aven ue ce II Pl a rt I be Eating Out Bb’s Coffee & Co I II 1 Other Il Valentino Bakery 15 Paulie’s Pizza 21 Donnybrook Fair Market 2Café Bar H 9 Insomnia Coffee 16 Pause Café Bistro 22 Fresh Supermarket 29Educogym 3Café Parigi 10Juniors 23 Spar Supermarket 28 The Spencer Hotel 30 Flyefit Gym I 17 The Art of Coffee I II I 8 24 The Ferryman Hotel 5 Charlotte Quay 12Milanos 19 The Old Spot 25 The Gibson Hotel 6 Herbstreet Brasserie 13Munchies 203FE 26 The Maldron Hotel 33 Safari Crèche 7 HQ Gastro Bar 14 Outdoor Food Market 27 The Marker Hotel 34 Perpetua Cross Fit Gym I 32 Life Pharmacy I I II 31 Grafton Barber I II 4Café Sora 11 KC Peaches 18 The Ferryman Pub I 21 I II 20 H er Due to its immense popularity this area is a lively and cosmopolitan destination for entertainment with a broad range of amenities including theatres, hotels, cafes, bars, restaurants, shops and watersport activities on the Docks. II I II I re ad I St Ro GRAND CANAL DOCK STATION I II ot Proposed re et pp et ot t re IL th L 20 St Road Barrow St RA Ringsend S ou au er ss Bridge eckett Bri treet II Lime S II et St r e are K il d ISH Ringsend 5 I / IR Quay 17 I Na 8 II I RT The Reflector 12 GRAND CANAL DOCKS I DA d Bridge 9 II I gg 1 11 I Ba 6 21 II I t 29 t I D aw s o 22 I tre e Propose 16 II I se S 23 National Library of Ireland Government Buildings 4 27 7 31 I et Pe a r IFFE Y 26 ast I I I II n Stree e et E 3 Arena l Quay 32 33 2 National Gallery of Ireland Dail Eireann Point Village uay Hanover I re I St r St r 18/24 PEARSE STREET STATION I I I II I au 13 gersons Q 30 Trinity College Dublin ss n ove I I I II t II I tre e 34 RIVE R L Sir John Ro II I II Townsend Street H an Nor thwal Samuel B uay 3 I Na D LIN E II gersons Q I III I I I II IFFE Y Sir John Ro II I A P L ACE TO EN T ERTA I N & ESCAPE The Convention Centre l Quay RIVE R L y TARA STREET STATION ge S 25 L UA S R E dge Nor thwal City Qua C olle SPENCER DOCK 28 II I Abbey Theatre IIIIIIIII III The Amenities I I I The Reflector The Fitout The Fitout BISTROS, CAFÉS, BARS & SHOPS LEND A WARM VILL AGE VIBE Bb’s Coffee & Co, Grand Canal Docks 22 23 The Reflector The Design THE ANCHOR OF GRAND CANAL DOCKS The integration of The Reflector with the existing dock-front buildings will create dynamic relationships between old and new within the waterfront context. The Reflector offers space, natural light and great views, making it an exceptional working environment. 24 BKD Architects have designed a layout that provides dynamic, contemporary and flexible buildings which will enhance the existing waterfront environment. The unique exterior mesh design element will also provide solar shading without impacting the views. This cascading feature will be framed within a high quality stone-clad structure which is elevated above the street level to create a setback ground plane which will provide a relief and continuity for the adjoining low level buildings. 25 The Reflector The Design THE VISION “The building elevations will include a dynamic facade design with a pixelated cascading metal outer skin to reflect the southern site aspect and the waterside location. This will consist of high quality bronze coloured mesh panels suspended in front of the clear glazing systems”. BKD Architects The entrances on Hanover Quay Green Street 26 27 The Reflector The Design FINISHED TO THE HIGHEST LEED GOLD ACCR ED I TAT I O N Looking west from The Penthouse SUS TA I N A B I L I T Y 28 The Reflector is being designed to LEED Gold V4 standard. Leadership in Energy and Environmental Design is about consciously designing the building from the early stages of planning right through to its operation in order to create a well-functioning sustainable building. Areas such as water efficiency, heating and energy saving measures, materials used and waste strategies are carefully considered in the design of this building. A LEED accredited professional is appointed to continuously monitor and assess all aspects of the LEED accreditation throughout the design and construction of The Reflector. In addition, this building is set to achieve an A3 BER rating confirming its ranking as a highly energy efficient building. Having a sustainable building ensures that both operational costs and energy usage are kept to a minimum, whilst providing an excellent and healthy working environment. 29 The TheReflector Fitout The TheLocation Fitout EUROPE’ S MOST SOUGHT A F T ER D E S T I N AT I O N 30 31 The Fitout The Reflector THE SP ECI FI C AT I O NS The offices have been designed to LEED V4 Gold standard which includes: Building Management System • Secure car parking for cars and bicycle spaces, bicycle storage with electrical car charging points • Basement shower facilities, lockers and changing rooms Offices • Very efficient and flexible floor plates capable of sub-division to a 9 x 7.5m structural grid • Minimised number of columns • Generous floor to ceiling heights with 2.75m clear floor to ceiling height on standard floors, 4m on ground floor • Generous ceiling void of 500 mm and floor void of 150mm. Raised Access Floors with floor boxes 1 per 10sqm. Office design adhere to BCO (British Council for Offices) Best Practice • Metal suspended ceiling tile • Energy Efficient LED lighting • Four-pipe fan coil air conditioning • M&E planned for optional exposed or concealed finish • Design occupancy for M&E of 1 person per 8sqm • Diverse fibre optic supplies to the building. Early access for tenant fit-outs will be considered and credits in lieu of CAT A landlord finishes The Specification • Expansive reception lobbies with increased floor to ceiling heights (4 metres) and finished to highest standards with tiled floors, seating area and high quality designed reception desks • Generous common areas finished to same exceptional standards • Individual entrances to east and west wings with separate receptions and cores which offer maximum flexibility • 6 high speed passengers lifts delivering superior waiting and travel times; <25 second average wait times and >= 6 & 7 Star rating per CIBSE (Guide D). Destination Control on the West Lift Core • Floor plates fronting the water benefitting from panoramic Dockland views • Superb levels of natural light due to floor to ceiling glazing and lower heights of both adjacent buildings Sustainability • Designed to achieve LEED Gold Certification Version 4, with sustainable principles to achieve a BER A3 rating Luxurious, contemporary finishes throughout S CH ED U L E O F ACCOMO DAT I O N Floor Gross Nett (sqm) (sqm) Restaurant The Ground Floor 1,904.3 329 The First Floor 2,031.1 The Second Floor 2,491.9 The Third Floor 2,491.9 The Fourth Floor 2,491.9 The Penthouse 2,159.6 Sub-total 329 Total 13,570.7 Nett (sqm) Office 1,168.7 1,691.8 2,147.6 2,147.6 2,147.6 1,819.1 11,122.4 11,451.4 General Notes Gross area measured to finished face of external wall/ facade and ignores columns where not projecting from the wall. Net area measured to finish face of external wall/ facade and ignores columns where not projecting from the wall. Net area excludes common circulation areas & cores. 32 33 The Reflector SUMMARY 1.0 Mechanical Services 21°C - 23°C Winter RH Not Controlled Summer Dry Bulb 22°C - 25°C Summer Rh Not Controlled Occupancy Density 1 person / 8sqm² Fresh Air Allowance 10 llsl person Fresh Air Allowance 1 person / 8m² Air Conditioning System Four Pipe FCU Water Storage 45 Litres l person Air Tightness 3 m3/m2/hr at 50 Pa LEED Rating LEED Gold BER Rating A3 3.0 Structural Grid 7.5m x 9.0m generally throughout 4.0 5.0 8Xm² Lighting Type LED Lighting Control KNX DALI Fire Alarm Fully Addressable Category L1 coverage Standby Generator Life Safety Systems for 12 hours Provision for Future Tenants Lift Services 6 no. Passenger Lifts 2 No. Fire Fighting Lifts included above Lift Star Rating 4 no. 7 star lifts 2 no. 6 star lifts Service Zones Floor Void 150mm Ceilling Void 500mm (with LED lighting) Floor to Ceiling Height 2.750m 34 floor slabs throughout, with insitu concrete columns and external walls. 8.0 Walls Floors Ceilings Columns 600mm x 600mm raised access flooring medium grade as per PSAMOB. 600mm x 600mm proprietary metal ceiling tiles with Gypsum MF painted plasterboard feature bulk head detail to perimeters, and junctions with the core areas and the columns. Anodised aluminium with glazed vision to all core area circulation doorways. Painted solid doors frames and architraves to all service ducts openings. Stainless steel ironmongery throughout. Blinds Proprietary roller blind by tenant. Note the requirement to create a uniform appearance to the external facades, tenants will be requested to coordinate exact blind specification to ensure visual consistency. Reception The reception walls will have features panels of backlit perforated anodised aluminium panels to denote key reception locations such as the reception desk and lift lobby entrances. External walls Integrated building and directory signage incl. Floors 600 x 400 honed natural stone floor tiling with contrasting stone feature pattern. High quality matwell to revolving door and entrance to reception space. External landscaped High quality granite paving and areas: planters with feature planting and integrated lighting to all external areas. Ceilings Proprietary ‘Gypsum MF’ plasterboard ceilings with feature strip lighting and acoustic baffle details. Roof Asphalt or similar proprietary waterproofing membrane on high density roof insulation on concrete roof structure laid to falls. Columns Reception columns to be clad in selected natural stone to match wall cladding. A proprietary ‘green’ roof sedum system will be provided for all areas of the roof which do not contain plant / equipment. Reception desk Selected natural stone and feature backlit perforated anodized aluminum reception desk with laminate timber back desk. Separate storage to facilitate reception concierge services. Main entrance doors Feature clear glass and frameless revolving door and double swing side doors for wheel chair access. Revolving door to be power assisted with 3 wings and be 2.9m high Seating High quality reception seating to reception waiting areas. Security gates Reception design to facilitate proprietary turnstile type access control systems. Double glazed high performance curtain walling system, with a structural silicone jointed curtaining walling system with polyester powder coated frame internally and feature metallic mesh solar screening, suspended between a natural stone clad framing. Glazing will include elements of high performance solar clear glass and insulated opacified panels. All glazing cills, flashing, cappings, and louvers to be polyester powder coated aluminium pressings. MDF skirtings and stringer boards. Proprietary vinyl floor covering with proprietary metal nosings with contrasting colour vinyl strip inserts. Painted plasterboard finish balustrades and handrails. Painted solid doors frames and architraves to all escape stairs access doors with clear glass vision panels. Stainless steel ironmongery throughout. 11.0Toilets Walls 600x300 ceramic wall tiling. Painted plasterboard encasement. External Finishes Ceilings Joinery Painted dry lining to all internal office walls with painted mdf skirtings. Joinery 9.0 Floors Internal Office Finishes Selected natural stone tiling to reception walls, with bronze coloured anodized aluminium feature inserts. Façade 10.0 Escape Stairs Walls Painted plasterboard finish with painted U – Values External Wall = 0.21 W/m2K Floor = 0.21 W/m2K Flat Roof = 0.15 W/m2K Glazing = 1.40 W/m2K Spandrel = 0.21 W/m2K(Opaque insulated panels) Airtightness3m3/m2/hr at 50 Pa Internal walls 7.0 Lifts Floor Heights Reception & ground 4.000m typical ground floor to ceiling height, floor, floor to ceiling with elements of double height space Office slab to slab 3.725m Office floor to ceiling 2.750m Raised floor zone 150mm Ceiling zone500mm 6.0 Structure Insitu concrete structure with 325mm flat Mgmt. System Floor Loadings Office floors 4.0kN per sqm (+ 1kN per sqm partitions) 7.5kN per sqm for 10% of floor area in locations Lift lobby & toilet areas 4.0kN per sqm Plant rooms 7.5kN per sqm Roof area outside 1.5kN per sqm of plant areas Car park 2.5kN per sqm Workstation Allowance 1 person per 6sqm 1 person per 8sqm 1 person per 8sqm 1 person per 10sqm as per BCO recommendations and provisions as per BS6564-1 2014 2.0 Planning Module 1.5sqm generally throughout Electrical Services Architectural Specification Means of escape Internal climate Lift provision Toilets Winter Dry Bulb The Fitout Proprietary IPS panel system to match cubicles with selected high quality Formica laminate finish. Full height mirror to one toilet wall. Floors 600x600 stone effect ceramic tile to compliment the nature stone flooring within the lobby areas. Ceilings Proprietary ‘Gypsum MF’ plasterboard ceilings with feature downlighting. Doors Selected hardwood veneer door leaf with solid hardwood frames and architraves, to all core area circulation doorways with glazed vision panels to corridor doors. Vanity units Proprietary linear wash hand basin system with Corian finish with Proprietary over sink mirror with concealed soap dispensers and hand drying. Feature back painted glass surround to vanity units. Sanitary fittings Joinery External wall to reception to be proprietary external glazing system as noted above. High quality ceramic sanitaryware & fittings. Proprietary full height toilet cubicle system with high quality Formica laminate finish, with matching IPS panel system. Metallic laminate feature to rear of toilet cubicles 12.0 Building Maintenance Façade window All facades can be maintained either: cleaning a) from ground level using cherry picker type access, and / or proprietary window cleaning extendable brush system, and b) abseiling mechanisms at roof level. 13.0Accessibility Step free access provided to ground floor from external by way of ramp. Disabled WC and accessible toilet cubicles provided on each floor. 14.0 Car & Bicycle Parking, Locker & Shower Provision Car park spaces 1 car parking space provided per 400sqm Bicycle spaces and lockers Showers floor area 35 of gross floor area, across the development. 1 bicycle spaces provided per 100sqm gross floor area. 1 shower provided per 1000sqm gross. The Reflector The Fitout 15.0 Loading Bay Set Down Areas bays will be located close The fresh air will be introduced through a number of central air handling units located in the basement. The central AHUs will include high efficiency thermal wheels as an energy saving device. The air will be ducted in vertical risers to each floor, at each core. 16.0 Mechanical Specification 16.5 Water Services 24 hour water storage shall be provided based on 45 l/person. Potable water shall be available to each floor for tenant fit-out kitchenette / canteen facilities. 16.6 Fire Fighting First aid firefighting will be provided in accordance with building regulation requirements. This will generally include smoke ventilation shafts and dry risers serving each firefighting core and shall also include first aid and fire extinguishers. to office main entrance. 16.1 Design Criteria Area Open Plan Office Toilet Areas General / Circulation Indoor Climate Winter Temp. Summer Temp RH % db °C db °C. 21°C - 23°C 22°C - 25°C No Control 19°C - 21°C Not controlled No Control 19°C - 21°C Not controlled No Control Fresh air requirement min 10l/s per person @ 1person per 8m² The building will have the ability to operate 24hr. / day, 7 days per week. Internal Heat Gains The following minimum head loads have been used in designing the central cooling and ventilation systems; Occupancy 1 person per 8m2 Lights 10 W/m2 – LED throughout Equipment 25 W per m2 Outside Design Conditions – Dublin Winter Temperature: -5°C db (100% saturated) Summer Temperature: 26°C (dry bulb)/20°C (wet bulb) Background Noise Levels Area NR Open Plan Office 35 Toilets 45 Plantrooms / areas 50db at 30m or site boundary Air Quality Rooms with “bad air” (gaseous and particulate pollutants), such as toilets, shall be put in under negative pressure towards surrounding room spaces, i.e. more exhaust air than make-up air. Exhaust air discharge points shall be placed at high or roof level. Outdoor air intakes shall be installed in such positions that the air can be expected not to be polluted by discharge air, sanitary vents, exhaust from standby generator (diesel) etc. Operating Periods The building can operate on a 24-hour, 7 days a week basis. The office areas shall be assumed to operate on a 12-hour day with extended operation on a floor by floor basis achievable through the BMS. Facility for computer and individual Hub rooms to operate with 24-hour cooling utilizing their own tenant fit-out cooling plant (riser space and plant space provided for such tenant plant). Riser provision also allowed for fully operable staff canteen/kitchen on the second floor adjacent to Office Lobby 2. 16.2 Heating System A gas fired modular condensing boiler installation shall be provided to meet the heating load requirement. CHP may also be provided in this central heating energy centre should it be required to achieve the A3 BER rating the building is targeting. Gas enters the building directly into a dedicated gas meter room in the basement and runs in welded steel in the basement carpark to the basement heating energy centre plantroom. Gas can be extended to the second floor ‘future’ canteen space for tenant fit out if required. 16.3 Cooling System A minimum of two water cooled chillers, each capable of providing 60% of design load shall be installed in the basement. The chillers shall link to a number of dry air coolers on the roof for heat rejection. 16.4 Air-Conditioning System The internal air-conditioning units shall generally be above ceiling concealed 4-pipe Fan Coil Units ducted to high induction diffusers. Return air grilles in the ceiling will allow for a return path. 16.7Sanitary The soils and waste installation shall be in uPVC. 16.8 Sustainability Target The building is targeting LEED V4 Gold accreditation and Building energy Rating (BER) of A3. 17.0 Electrical Specification 17.1 Design Criteria The building shall be designed on the basis of 1 workstation per 8m². A minimum total power requirement of 87w/m² is to be available for building use with a minimum of 40w/m² available on each floor for general services, desk power and lighting. 17.2 Incoming Power Supply As part of this development there will be a new ESB MV Substation provided. The substation will provide the new supplies for the development at Low Voltage for tenants and Medium Voltage for Landlord. The incoming power supply shall have sufficient capacity to increase the contracted load by 20%. The LV switchroom will be designed to accommodate a main distribution board suitable for multi tenancy metering, provision for power factor and surge protection equipment and have spare space of 20% for new equipment. Main power supply cables will have a spare capacity of 25%. Switchgear shall be located in areas protected from flooding or water ingress. 17.3 Switchgear and Distribution Boards Low voltage switchgear shall be designed and installed in accordance with IS EN 62305. All main distribution boards shall be Form 4B Type 2, class 1 protection against direct contact in accordance with IS EN 60439. All new sub-distribution boards are to be Form 2 Type 2, in accordance with IS EN 60439 and of metal construction. A single distribution board shall be provided per each lettable space in separate electrical risers on each floor. Distribution Boards shall have multi-functional energy meters which will record the overall energy consumption for each distribution board. In addition to this, each service on all distribution boards shall be recorded separately, these services include lighting, general services and small power. A series of local landlord distribution boards shall be provided within risers in landlord lobbies to supply landlord services throughout the building. 36 20% spare circuit breakers shall be provided on all switchgear and distribution boards. 17.4 Standby Power Supply A new stand-by diesel generator will be provided complete with a proprietary base oil storage tank to operate the generator to serve the life safety systems for a period of 12 hours. The generator will be complete with a remote fuel fill cabinet recessed into the building façade to allow remote filling of the fuel. A new twin wall stainless steel flue is to be routed within the main mechanical riser and vent at roof level. The generator will be alarmed on the landlord BMS system for status and common fault. In addition, riser space shall be provided to house a future tenant standby generator flue capable of meeting the complete electrical design requirements of the building. 17.5 Power Factor Correction Power Factor Correction equipment shall be provided by the Landlord to ensure a minimum corrected value of 0.95 exists on all phases. 17.6 Cable Distribution (Containment Systems) The containment system shall include for distribution of low voltage, extra low voltage and life safety systems as per ETCI rules and HSA regulations. Cabling will be routed through dedicated electrical vertical risers on cable ladder, tray, trunking or basket depending on the type of service. Internal diverse vertical routes will be provided for all ICT cabling. All containment systems shall have a spare capacity of 20%. 18.0Lifts 18.1 Passenger Lifts All lifts to comply with current EN 81. Lift provision / installation will be in accordance with CIBSE guidelines and BCO Guide for Offices recommendations. Lift Lobby 1 = 4 no. 1,000kg 1.6m/s lifts providing a 7 star rating under the CIBSE rating scheme. Lift Lobby 2 = 2 no. 1,000kg 1.6m/s lifts providing a 6 star rating under the CIBSE rating scheme. Average Wait Time The above star ratings result in passenger lift (AWT) average waiting time significantly less than 25 seconds. This means that the buildings lift installation will meet the British Council of Offices (BCO) compliant solution. Note CIBSE Guide D recommends a minimum 5 star rating for prestige offices. One of the lifts in each of lobby will perform as a fire fighting lift. 18.2 Goods Lift Not provided. 19.0 Building Control System A complete Building Management Control System including all 17.7Workstations For the purposes of calculating electrical requirements workstations shall be provided based on one per 8m². necessary motor control centres and front end PC shall be provided. The Building Management Control System shall allow interface with the following: Lighting Controls Fire Alarm Access Control Security Systems The Building Management Control System shall provide the following: Status of all plant Monitor and adjust temperature set points Monitor and adjust time schedules and sequence of operation of all plant Be compatible for remote connections Have at least two user licences 17.8 General and Emergency Lighting The lighting installation in Landlord areas shall be designed according to the current EN 12464, CIBSE Lighting Guides & SLL Code for Lighting. A fully addressable digital lighting control and management system shall be installed for the building to provide a comprehensive facility to test and manage the operation of the lighting systems including daylighting dimming, occupancy detection and time scheduling. The system shall be the KNX DALI type with din rail mounted control modules/gateways installed in each tenant sub-distribution board. Each tenant and the landlord system will be wired / controlled independently per floor with the facility for each tenant to install a dedicated front end control PC. The landlord system will be provided with a front end control PC to control the landlord areas. Lights in toilet and core areas shall be energy efficient LED recessed down lighters to CIBSE recommended levels. External lighting to highlight the facade of the building in an appropriate manner shall be provided. Vertical Distribution Vertical service risers will have spare capacity to accommodate specialist tenant services such as but not limited to; Kitchen / Canteen Area Computer / IT / IDF Rooms The emergency lighting installation shall comply with IS3217 2013. Emergency lighting shall be provided via battery packs contained within the fittings. In the event of power failure these battery packs will power the fittings for 3 hours and will provide adequate light for safe escape. An emergency lighting central test system shall be installed. Tenants’ Plant Space The following tenant plant areas have been allocated; Air cooled condensers for computer rooms – Locations on roof of each core and also in basement carpark. Future Kitchen Extract Fan on roof of east core should central kitchen be required for large tenant. Uninterrupted Power Supply (UPS) By Tenant (within own demise). Standby Generators By Tenant (utilising own carparking spaces) – Riser provision to roof has been allowed for. 20.0 Plant Space & Riser Strategy Minimum Service Zones 17.9 Protective Installation Systems Fire Alarm System The fire alarm system shall comply with IS3218 2013. The system will be designed for L1 coverage. The fire alarm system will be fully addressable and capable of interfacing with other systems. Security systems The security installation will consist of external and internal CCTV. In addition, intruder alarm and access control systems will be installed. Communication Multiple Telecom Providers are available in the area. Minimum of 2 entry locations for each building shall be provided. Floor Void Ceiling Void 150mm incl. Tile 500mm incl. Tile 21.0 Testing and Commissioning All systems shall be commissioned in accordance with CIBSE and 17.10 Earthing & Bonding Earthing installation shall be provided in line with ETCI requirements. 37 BSRIA codes, including controls and Building Management Systems. The O&M Manuals and Record Drawings should be available in Draft form at PC with the final documents submitted within 4 weeks of PC. Under the LEED Accreditation scheme we are targeting the enhanced commissioning credits. This will involve the appointment of an independent Commissioning Advisor for the project. The Fitout The Fitout Lobby behind the west ground floor reception 38 39 The Fitout The Floorplans The Reflector GREEN STREET EAST Courtyard Residential Office Lobby 1 Courtyard Office Lobby 2 Reception HANOVER WALK Reception Restaurant OFFICE SPACE RECEPTION N OUTDOOR SPACE E W S RESTAURANT RESIDENTIAL T H E G R O U N D FLO O R Floor The Penthouse The Second, Third & Fourth Floor The First Floor The Ground Floor Total Area * Sizes exclusive of outdoor terraces 40 41 Nett (sqm) 1,819.1 2,147.6 1,691.8 1,168.7 11,451.4 The Reflector The The Floorplans Fitout GREEN STREET EAST Courtyard Residential Office Lobby 1 Courtyard HANOVER WALK Office Lobby 2 N OFFICE SPACE E W S RESIDENTIAL OUTDOOR SPACE HANOVER QUAY T H E FI R S T FLO O R Floor The Penthouse The Second, Third & Fourth Floor The First Floor The Ground Floor Total Area * Sizes exclusive of outdoor terraces 42 43 Nett (sqm) 1,819.1 2,147.6 1,691.8 1,168.7 11,451.4 The Reflector The Floorplans The Fitout GREEN STREET EAST Courtyard Residential Office Lobby 1 Courtyard HANOVER WALK Office Lobby 2 N OFFICE SPACE E W S RESIDENTIAL OUTDOOR SPACE Centralised core locations maximise the panoramic views, taking advantage of the 75 metre span of the Docks. HANOVER QUAY T HE SECOND, T HIRD & FO U RT H FLO O R Floor The Penthouse The Second, Third & Fourth Floor The First Floor The Ground Floor Total Area * Sizes exclusive of outdoor terraces 44 45 Nett (sqm) 1,819.1 2,147.6 1,691.8 1,168.7 11,451.4 The Reflector The Floorplans The Fitout GREEN STREET EAST Courtyard Residential Office Lobby 1 Courtyard HANOVER WALK Office Lobby 2 N OFFICE SPACE E W S RESIDENTIAL OUTDOOR SPACE HANOVER QUAY THE PENTHOUSE Floor The Penthouse The Second, Third & Fourth Floor The First Floor The Ground Floor Total Area 46 47 Nett (sqm) 1,819.1 2,147.6 1,691.8 1,168.7 11,451.4 The Fitout The Floorplans The Reflector Bicylce Lane GREEN STREET EAST Office Lobby 1 Office Lobby 2 N CAR SPACES E W S RESIDENTIAL BICYCLE SPACES HANOVER QUAY THE BASEMENT Facility Office Car Spaces Office Bicycle Spaces 48 49 Number 34 135 The Reflector Test Fitout The Fitout GREEN STREET EAST Courtyard Residential Office Lobby 1 Courtyard HANOVER WALK Office Lobby 2 N OFFICE SPACE E W S RESIDENTIAL OUTDOOR SPACE 1:10 sqm ratio with collaboration & town hall space with booths for private calls & increased video conferencing rooms. HANOVER QUAY T Y PI C A L FLO O R ICT L AYOUT Open Plan Workstations 206 Workstations within Celluar Offices 7 Total213 Meeting Rooms/Video Conference 7 x 4p 1 x 10p 2 x 14p* Telephone Booths 6 *Meeting rooms to have flexible wall construction to allow for formation of large ‘town hall’ meeting space 50 51 The TheReflector Fitout Test The Fitout Fitout Courtyard GREEN STREET EAST Office Lobby 1 Courtyard HANOVER WALK Office Lobby 2 N OFFICE SPACE E W S RESIDENTIAL OUTDOOR SPACE HANOVER QUAY 1:8 sqm ratio with a briefing room and booths for private telephone calls. T Y PI C A L FLO O R F I N A N C E L AYO U T 52 Open Plan Workstations 256 Workstations within Celluar Offices 10 Total266 Meeting Rooms/Video Conference 2 x 4p 1 x 6p 2 x 12p 1 x 36p Telephone Booths 5 53 The Reflector Test Fitout The Fitout Courtyard GREEN STREET EAST Office Lobby 1 Courtyard HANOVER WALK Office Lobby 2 N OFFICE SPACE E W S RESIDENTIAL OUTDOOR SPACE 1:12 sqm ratio with an increased number of private cellular offices and meeting rooms for client meetings. HANOVER QUAY T Y PI C A L FLO O R PROFESSIONAL SERVICES 54 Open Plan Workstations 141 Workstations within Celluar Offices 36 Total177 Meeting Rooms/Video Conference 2 x 4p 1 x 10p 3 x 12p 1 x 24p 55 The Reflector The Fitout Courtyard GREEN STREET EAST Office Lobby 1 Courtyard HANOVER WALK Office Lobby 2 Tenancy 1 Tenancy 2 N E W S RESIDENTIAL OUTDOOR SPACE An indicative split for maximum flexibility. Party walls can be at any point on the south facade, allowing for many sizes and the opportunity to expand or contract in the future. HANOVER QUAY F L E X I B L E SP L I T 2 PA R T L AYO U T Tenancy 1 1,644sqm Tenancy 2 502.1sqm 56 57 The Reflector The Fitout Courtyard GREEN STREET EAST Office Lobby 1 Courtyard HANOVER WALK Reception Office Lobby 2 Tenancy 1 Tenancy 2 Tenancy 3 N E W S RESIDENTIAL OUTDOOR SPACE An indicative split for maximum flexibility. Party walls can be at any point on the south facade, allowing for many sizes and the opportunity to expand or contract in the future. HANOVER QUAY FLEXIBLE SPLIT 3 PA R T L AYO U T Tenancy 1 542.6sqm Tenancy 2 1,081.3sqm Tenancy 3 502.1sqm 58 59 The The Fitout Reflector The Team THE D E V ELO P ER Park Developments Group has developed premium properties in Dublin for almost 60 years. It has forged a reputation for commercial buildings and high quality homes through attention to detail which has established its status as a market leader. In a fluid environment, Park Developments Group has taken a lead role in the renaissance of Dublin as a maturing city, working with professional teams regenerating brownfield land / greenfield sites to create developments of superior quality. These skills, combined with innovative designs have enabled Park Developments Group to deliver landmark buildings in key areas, including a significant, award winning residential scheme on the corner of Hanover Quay and Grand Canal Square in 2005 which was the instigator in the regeneration of the area. Park Developments Group are continuing to leave their mark at Hanover Quay with the development of ‘The Reflector’ as a cornerstone of the dock. 60 60 61 The Fitout The Fitout POSITIONAL View 5 – External Dusk CGI THE ICONI C DOCK S I D E LO C AT I O N 62 63 The Fitout THE TEAM Developers Park Development Group The Herbert Building The Park, Carrickmines Dublin 18, Ireland. t. 353 (0)1 213 6000 parkdevelopments.ie Sole Leasing Agents Savills Andrew Cunningham t. +353 (0)1 618 1300 Andrew.Cunningham@ savills.ie David O’Malley t. +353 (0)1 618 1300 David.O’[email protected] CI Studio Peter Owens t. +353 (0)1 618 1300 [email protected] savills.ie LRN: 002233 Maurice Johnson & Partners FIRE SAFETY ENGINEERING & ACCESS CONSULTANTS CI Studio Disclaimer doyle + o’ troithigh landscape - architecture 64 These particulars are issued by Savills Ireland on the understanding that all the negotiations are conducted through them. Whilst every care has been taken in the preparation of these particulars for them and the vendor/lessor whose agent they are, they do not constitute an offer or contract. All descriptions, dimensions, references to condition, permissions or licenses of use or occupation, access and other details are for guidance only, they are given in good faith and believed to be correct, and any intending purchaser/tenant should not rely on them as statements or representation of fact but should satisfy themselves (at their own expense) as to the correctness of the information given. Prices are quoted exclusive of VAT (unless otherwise stated) and all negotiations are conducted on the basis that the purchaser/ lessee shall be liable for any VAT arising on the transaction. Neither Savills Ireland or any of their employees have any authority to make or give any representation or warranty in respect of this property.
© Copyright 2026 Paperzz