EXHIBIT D Transportation Impact Fee Rate Study Update Prepared for: City of Mountlake Terrace October 3, 2016 Updated October 14, 2016 SE16-0475 Mountlake Terrace Impact Fees October 2016 Table of Contents CHAPTER 1: INTRODUCTION ........................................................................................................................... 1 Impact Fee Structure .......................................................................................................................................................... 1 CHAPTER 2: IMPACT FEE PROJECT LIST ......................................................................................................... 2 CHAPTER 3: COST ALLOCATION ...................................................................................................................... 5 Transportation Deficiencies ............................................................................................................................................. 5 Travel Growth ........................................................................................................................................................................ 6 Cost Allocation Results ...................................................................................................................................................... 6 CHAPTER 4 - IMPACT FEE SCHEDULE ...........................................................................................................10 Trip Generation Components ...................................................................................................................................... 10 Pass-by Trip Adjustment........................................................................................................................................ 10 Schedule of Rates ............................................................................................................................................................. 10 Appendices Appendix A: Defeciency Calculation Appendix B: Cost Allocation Results Appendix C: Land Use Definitions List of Figures Figure 1 Steps to Develop a Traffic Impact Fee Program ............................................................................................. 1 Figure 2 Transportation Impact Fee Projects ..................................................................................................................... 4 Figure 3 Impact Fee Cost Allocation Concept ................................................................................................................... 5 Figure 4 Impact Fee Cost Allocation Results ...................................................................................................................... 7 Figure 5 Impact Fee Program Funding Sources ............................................................................................................... 8 i Mountlake Terrace Impact Fees October 2016 List of Tables Table 1: List of Transportation Capacity Projects..................................................................................................................... 3 Table 2: Mountlake Terrace Land Use Growth .......................................................................................................................... 6 Table 3: Impact Fee Schedule ....................................................................................................................................................... 11 ii Mountlake Terrace Impact Fees October 2016 CHAPTER 1: INTRODUCTION The City of Mountlake Terrace developed its current transportation impact fee program in 2007. Since implementation, the City has used its transportation impact fee program to partially fund the 212th Street and 48th Avenue Signal design. In 2015, the City updated its Comprehensive Plan Transportation Element and Transportation Improvement Program (TIP) for 2016-2021. To reflect the new project list, as well as updated assumptions around future growth, the City is updating its transportation impact fee program. This Figure 1 Steps to Develop a Transportation Impact Fee Rate Study documents the updated program, Traffic Impact Fee Program including a transportation impact fee rate schedule. IMPACT FEE STRUCTURE The key steps involved in the impact fee process are shown in Figure 1. Steps include developing a list of roadway system improvements and costs and allocating growth-related costs within the City. The remaining costs can be charged as impact fees, which are displayed in the form of a fee schedule. Each step is described in more detail in subsequent sections of this report. 1 Mountlake Terrace Impact Fees October 2016 CHAPTER 2: IMPACT FEE PROJECT LIST Washington State law (RCW 82.02.050) specifies that Transportation Impact Fees are to be spent on “system improvements.” System improvements can include physical or operational changes to existing roadways, as well as new roadway connections that are built in one location to benefit projected needs at another location. These are generally projects that add capacity (new streets, additional lanes, widening, signalization, new sidewalks and bike lanes). During the City's 2015 Transportation Element Update and TIP Update, the City identified projects needed to maintain the adopted Level of Service (LOS) standards and support planned growth. These capital projects form the basis for the City's impact fee project list. The resulting project list, shown in Table 1, includes 11 projects with a total cost of $39.7M. These projects are also shown in Figure 2. 2 Mountlake Terrace Impact Fees October 2016 TABLE 1: LIST OF TRANSPORTATION CAPACITY PROJECTS Number Project Description Total Cost ($2016) 1 Main Street RevitalizationPhase 2 Reconstruct roadway, widen sidewalks and build bike lanes $10,935,000 2 Main Street RevitalizationPhase 1 Build and widen sidewalks and bike lanes, install traffic signal at 236th Street & Gateway, prepare for 236th Street & 58th Avenue signal $12,168,000 3 236th Street & 58th Avenue Signal Install traffic signal to increase capacity 4 Gateway Connector Build roadway from 236th Street to Gateway Place 5 228th Street & 73rd Place Signal Install traffic signal to increase capacity $555,000 6 220th Street & SR-99 Right Turn Lane Add right turn lane to westbound approach to increase capacity $268,000 7 220th Street Adaptive Signals Install an adaptive traffic signal system from SR99 to I-5 to increase capacity $480,000 8 220th Street and 58th Avenue Roundabout Install roundabout to increase capacity 9 212th Street and 48th Avenue Signal Install signal to increase capacity 10 52nd/53rd Avenue Connector Build street connection to increase capacity $2,800,000 11 244th Street Left Turn Construction Add left turn lanes from 56th Avenue to Cedar Way to increase capacity $5,572,000 $411,000 $4,806,000 $1,300,000 $411,000 Total $39,706,800 3 Project # Project Main Street Revitalization - Phase 2 1 2 Main Street Revitalization - Phase 1 3 236th & 58th Signal 5 228th St SW & 73rd Pl W 4 Gateway Connector 6 220th St & SR 99 Westbound RT lane w Edmonds 220th- SR 99 to I-5 7 8 220th & 58th Roundabout or Signal 9 212th & 48th Signal Construction 9 52nd/53rd Ave W Connector 7 8 220th St SW 66th Ave W 99 10 Mountlake Terrace 5 44th Ave W 220th St SW 48th Ave W 228th St SW Lake view 3 Dr 2 Lake Ballinger 1 236th St SW Pl way Gat 4 244th St SW 11 Cedar Way 6 5 39th Ave W 244th Reconstruction (56th to Cedar) 56th Ave W 11 52nd Ave W 10 \\fpse03\Projects\2016Projects\SE16-0475_MountLake_Terrace_TIF\Graphics\GIS\MXD\fig0x_MLT_prjsMap (3).mxd 212th St SW Figure 2 City of Mountlake Terrace Impact Fee Projects Mountlake Terrace Impact Fees October 2016 CHAPTER 3: COST ALLOCATION The City used an impact fee methodology that distinguishes between facility improvements that address existing deficiencies and those needed to serve new growth. Figure 3 diagrams the process. Figure 3 Impact Fee Cost Allocation Concept TRANSPORTATION DEFICIENCIES RCW 82.02.050(4) (a) requires that the capital facilities element of a jurisdiction’s comprehensive plan identify “deficiencies in public facilities serving existing development.” Future development cannot be held responsible for the portion of added roadway capacity needed to serve existing development. The City’s 2015 Transportation Element established a LOS standard that is based on intersection delay. Intersections are considered deficient if average delay exceeds LOS D in most areas of the city, with some exceptions allowing LOS E. Corridors that must meet LOS E instead of D are signalized intersections within the 212th Street SW corridor, the 244 th Street SW corridor, and the 220th Street SW corridor from SR-99 to 5 Mountlake Terrace Impact Fees October 2016 I-5. As shown in Appendix A, none of the intersections in Mountlake Terrace currently exceed their standard, thus there are no existing deficiencies based on vehicle LOS. TRAVEL GROWTH Information from the City’s 2015 Comprehensive Plan was used to evaluate the growth in Mountlake Terrace housing units and employment. Information in the Comprehensive Plan is in 2013 numbers, but for the purposes of this rate study, these numbers were brought forward using a straight line growth factor in order to evaluate the growth from 2015 to 2035. Table 2 shows Mountlake Terrace land uses in terms of housing units (single family and multi-family) and employment for the years 2015 and 2035. Using these land use forecasts, it is estimated that 2,546 new PM peak hour vehicle trip ends would be generated within the City during the 20-year period. This growth in vehicle trip ends was used to calculate the impact fee rates. TABLE 2: MOUNTLAKE TERRACE LAND USE GROWTH 2015 2035 Volume Growth % Growth Households 8,862 10,593 1,731 20% Employment 7,384 9,486 2,102 28% Source: City of Mountlake Terrace 2015 Comprehensive Plan, Fehr & Peers 2016 COST ALLOCATION RESULTS The cost allocation process distributed the growth costs for each project based upon the travel patterns between the different geographic areas within and outside the City limits. The Snohomish County travel demand model was used for this analysis. A “select link” assignment procedure provided the origin and destination information for each vehicle trip traveling through each project corridor. Trips that pass through Mountlake Terrace, but do not have any origins or destinations internal to Mountlake Terrace, were not allocated to Mountlake Terrace growth. Similarly, half of trips with only an origin or destination inside of Mountlake Terrace are attributed to in city growth. That is, development in Mountlake Terrace would not be charged for impacts by growth in trips passing "through" the City. Figure 4 summarizes the cost allocation results. For discussion purposes, the dollar amounts shown in this figure and the following text descriptions are approximate values expressed in million dollars. The actual amounts used in the calculations are accurate to a single dollar. 6 Mountlake Terrace Impact Fees October 2016 Figure 4 Impact Fee Cost Allocation Results Impact Fee Project Total Cost $39.71 M Growth Costs Existing Deficiency $39.71 M $0 City Growth Outside City Growth $9.03 M (23%) $30.68M (77%) Eligible Project Costs Other Funds Needed $30.68M $9.03 M Previously Collected Impact Fees $289,276 Impact Fees $8.74 M 2,546 Trips $3,432 per trip 7 Mountlake Terrace Impact Fees October 2016 The total cost of the projects on the list is $39.7 million, as previously shown in Table 1. This was divided into growth costs and existing deficiencies; however, there are no deficiencies and that cost is $0. The growth costs were further divided into ‘city growth’ and ‘outside city growth’ components using the Snohomish County travel demand model. The details of this calculation are shown in Appendix B. Using these data, the average percent of City growth responsibility equaled 23 percent. The City growth percentage, applied to the $39.7 million project list, yielded an amount equal to $9.0 million to be funded using impact fees and impact fee revenue previously collected for completed developments1. The remaining $30.7 million would be expected to be obtained from city funds, grants or other outside sources, such as reciprocal impact fees from Snohomish County. Any fees collected from city developers to pay for reciprocal impacts to County roads would be assessed in addition to the proposed City Transportation Impact Fees. As shown in Figure 5, the impact fees would constitute 22 percent of the total $39.7 million cost Figure 5 Impact Fee Program Funding Sources of the improvement projects. Previous impact fee funds collected would contribute 1 percent. City $289,276 matching funds, new grants, and other sources would contribute the remaining 77 percent of the total project costs. $8,737,936 The final step in the cost allocation process dealt with calculating the "cost per new trip end" within Mountlake Terrace, derived by dividing the total $30,679,588 eligible project cost by the total number of new PM peak hour trip ends based in Mountlake Terrace. A total of 2,546 new PM peak hour vehicle trip ends are estimated to occur within the City between 2015 and 2035. Impact Fees Grants and Other City Sources Previously Collected Impact Fees 1 The City has already received $289,276 in impact fees for recently completed developments 8 Mountlake Terrace Impact Fees October 2016 The analysis produced the following results. Impact fee costs $8,737,936 New PM peak hour trip ends ÷ 2,546 Cost per new trip end = $3,432 9 Mountlake Terrace Impact Fees October 2016 CHAPTER 4 - IMPACT FEE SCHEDULE The impact fee schedule was developed by adjusting the "cost per trip end" information to reflect differences in trip-making characteristics for a variety of land use types within the study area. The fee schedule is a table where fees are represented as dollars per unit for each land use category. Table 3 shows the various components of the fee schedule (trip generation rates and new trip percentages). TRIP GENERATION COMPONENTS Trip generation rates for each land use type are derived from the Institute of Transportation Engineers (ITE) Trip Generation (9th Edition). The rates are expressed as vehicle trips entering and leaving a property during the PM peak hour. PASS-BY TRIP ADJUSTMENT The trip generation rates represent total traffic entering and leaving a property at the driveway points. For certain land uses (e.g., general retail), a substantial amount of this traffic is already passing by the property and merely turns into and out of the driveway. These pass-by trips do not significantly impact the surrounding street system and therefore are subtracted out prior to calculating the impact fee. The resulting trips are considered “new” to the street system and are therefore subject to the impact fee calculation. The “new” trip percentages are derived partially from ITE data and from available surveys conducted around the country.2 SCHEDULE OF RATES The impact fee schedule of rates is shown in Table 3, as well as the various components of the fee schedule. In the fee schedule, fees are shown as dollars per unit of development for various land use categories, as defined in Appendix C. The impact fee program is flexible in that if a use does not fit into one of the categories, an impact fee can be calculated based on the development’s projected trip generation. Trip Generation Sources: ITE Trip Generation (9th Edition); ITE Trip Generation Handbook: An ITE Proposed Recommended Practice (2014) 2 10 Mountlake Terrace Impact Fees October 2016 TABLE 3: IMPACT FEE SCHEDULE Land Use Code Land Uses Unit of Measure Basic Rate PM Peak Trips/Unit New Trips % New Trip Rate Impact Fee Rate Industrial 110 Light Industry/ Industrial Park 1000 SF 0.97 100% 0.97 $3,329 140 Manufacturing 1000 SF 0.73 100% 0.73 $2,505 150 Warehousing 1000 SF 0.32 100% 0.32 $1,098 Residential 210 Single Family dwelling 1.00 100% 1.00 $3,432 220 Apartments (general) dwelling 0.62 100% 0.62 $2,128 221 Apartments (1 or 2 floors) dwelling 0.58 100% 0.58 $1,991 223 Apartments (3-10 floors) dwelling 0.39 100% 0.39 $1,339 230 Condominium/Townhomes dwelling 0.52 100% 0.52 $1,785 254 Assisted Living beds 0.22 100% 0.22 $755 Recreational 435 Multipurpose Recreational Facility 1000 SF 3.58 100% 3.58 $12,287 437 Bowling Alley 1000 SF 1.71 100% 1.71 $5,869 488 Soccer Complex Fields 17.70 100% 17.70 $60,749 490 Tennis Courts Courts 3.88 100% 3.88 $13,317 491 Racquet/Tennis Club Courts 3.35 100% 3.35 $11,498 492 Health/Fitness Club 1000 SF 3.53 100% 3.53 $12,116 493 Athletic Club 1000 SF 5.96 100% 5.96 $20,456 495 Recreational Community Center 1000 SF 2.74 100% 2.74 $9,404 100% 0.55 $1,888 Institutional 560 Religious Facility 1000 SF 0.55 11 Mountlake Terrace Impact Fees October 2016 Land Use Code Land Uses Unit of Measure Basic Rate PM Peak Trips/Unit New Trips % New Trip Rate Impact Fee Rate Office 710 Administrative Office 1000 SF 1.49 100% 1.49 $5,114 715 Office- single tenant 1000 SF 1.74 100% 1.74 $5,972 720 Medical Office/Dental Clinic 1000 SF 3.57 100% 3.57 $12,253 Retail & Restaurant 814 Retail-Variety Store 1000 SF 6.82 66% 4.50 $15,449 931 Restaurant 1000 SF 7.49 56% 4.19 $14,396 SF= Square Foot Source: ITE Trip Generation (9th Edition), Trip Generation Handbook: An ITE Recommended Practice (2014), Fehr & Peers 2016 12 APPENDIX A: DEFECIENCY CALCULATION EXHIBIT A: TRANSPORTATION DEFICIENCY CALCULATION Intersection LOS Standard Control Delay LOS 1 244th St SW & Ballinger Way E 30.6 C 2 Drwy/Gateway Blvd & 244th St SW E 12.6 B 3 19th Ave NE/56th Ave W & 244th St SW E 20.3 C 4 I-5 NB Ramps/Park & Ride & 236th St SW D 11.3 B 5 58th Ave W & 236th St SW E 41.9 E 6 56th Ave W @236th St SW D 28.4 C 7 56th Ave W & 232nd St SW D 6.3 A 8 56th Ave W & 230th St ZSW E 22.9 C 9 56th Ave W & 228th St SW E 24.2 C 10 19th Ave NE & Ballinger Wy D 35.2 D 11 I-5 NB Ramps & 220th St SW E 39.6 D 12 58th Ave W & 220th St SW E 32.4 D 13 SR99 & 220th St SW E 55.4 E 14 I-5 SB Ramps & 220th St SW E 65.2 E 15 52nd Ave W & 212th St SW E 41.0 D 16 48th Ave W & 212th St SW E 40.6 E 17 44th Ave W & 212th St SW E 44.1 D 18 70th Ave W & 220th St SW E 47.6 D 19 66th Ave W & 216th St SW D 14.0 B 20 I-5 SB Ramps & 236th St SW NA NA 21 Cedar Way/44th Ave W & 228th St SW D 34.6 C 22 Cedar Way & 236th St SW D 25.4 C 23 Cedar Way & 244th St SW E 16.0 C 24 30th Ave NE/48th Ave W & 244th St SW E 13.7 B 25 44th Ave W & 223rd St SW D 3.1 A Appendix A Intersection LOS Standard Control Delay LOS 26 58th Ave W & 230th St SW E 12.6 B 27 58th Ave W & 232nd St SW E 8.8 A 28 236th St SW & 65th Ave W E 13.1 B 29 39th Ave W & 228th St SW E 31.7 D 30 48th Ave W & 236th St SW E 37.9 E 31 56th Ave W & 220th St SW D 12.9 B 32 44th Ave W & Hawk Way D 7.6 A 33 44th Ave W & 214thSt SW D 3.2 A 34 64th Ave W & 220th St SW E 78.7 E 36 66th Ave W & 220th St SW E 50.7 D 43 48th Ave W & 221st St SW E 10.3 B 44 66th Ave W & 228th St SW E 12.7 B 48 228th St SW & 3rd Pl W E 13.7 B 57 25th Ave NE/52nd Ave W & 244th St SW E 18.7 C 61 52nd Ave W & 220th St SW E 18.9 C 62 48th Ave W & 228th St SW E 12.3 B Source: City of Mountlake Terrace Synchro 9, Fehr & Peers 2016 APPENDIX B: COST ALLOCATION RESULTS The cost allocation results are summarized in this appendix. Exhibit B illustrates how the impact fee project costs (shown in Table 1) were divided into growth-related costs attributable to the City. In order to determine this proportion, the Snohomish County travel demand model was used to identify the portion of trip-making associated with existing and growth-related traffic. A technique called “select-link” analysis was used to isolate the vehicle trips using each of the impact fee projects. Each project used a specific select link. After the percentage of Mountlake Terrace trips and external trips were calculated, the cost of each project was multiplied by the percent of new traffic due to growth within the City. This, as well as the sum of the results, can be seen in Exhibit A. EXHIBIT B: LIST OF TRANSPORTATION CAPACITY PROJECTS Project Total Cost Percent of New Project Traffic due to Growth within City 1 Main Street Revitalization - Phase 2 (56th) $10,935,000 27% $2,901,646 2 Main Street Revitalization - Phase 1 (236th) $12,168,000 22% $2,654,345 3 236th & 58th Signal $411,000 27% $109,061 4 Gateway Connector (236th to Gateway Bridge) $4,806,000 15% $716,263 5 228th St SW and 73rd Pl W Possible Signal $555,000 24% $132,194 6 220th Street & SR 99 Westbound RT lane w/Edmonds (R/W) $268,800 18% $47,662 7 220th SR99 to I-5 Adaptive Signals $480,000 18% $85,112 8 220th & 58th Roundabout or Signal $1,300,000 27% $355,791 9 212th & 48th Signal Construction $411,000 47% $193,592 10 52nd/53rd Ave W Connector $2,800,000 23% $653,989 11 244th Reconstruction (56th to Cedar Way) Including Left Turns $5,572,000 21% $1,177,557 Total $39,706,800 23% $9,027,212 # Source: City of Mountlake Terrace Project List, Snohomish County Travel Demand Model, Fehr & Peers 2016 Project Costs Allowable for Impact Fees APPENDIX C: LAND USE DEFINITIONS The following land use definitions are derived from the ITE Trip Generation (9th Edition). They have been modified as appropriate for the City of Mountlake Terrace. INDUSTRIAL Light Industrial/Industrial Park: Industrial parks are a mix of manufacturing, service, and warehouse facilities with a wide variation in the proportion of each type of use from one location to another. Industrial parks include research centers facilities or groups of facilities that are devoted nearly exclusively to research and development activities. Light industrial facilities include printing plants, material testing laboratories, bio-technology, medical instrumentation or supplies, communications and information technology, and computer hardware and software. (ITE # 110) Manufacturing: Facilities were raw materials or parts are converted into finished products. (ITE # 140) Warehousing/Storage: Facilities that are primarily devoted to the storage of materials, including vehicles. They may also include office and maintenance areas. (ITE # 150) RESIDENTIAL Single Family: One or more detached housing units located on an individual lot. Also includes accessory dwelling units and duplexes. (ITE # 210) Apartments: A building or buildings designed to house three or more families living independently of each other (ITE # 220, 221, 223) Condominium/Townhomes: Ownership units that have at least one other unit within the same building structure. (ITE # 230) Assisted Living: Residential settings that provide routine protective oversight or assistance with activities necessary for independent living. (ITE # 254) RECREATIONAL Multipurpose Recreational Facility: Facilities that contain two or more activities such as miniature golf, batting cages, video arcade, bumper boats, and go-carts. (ITE # 435) Appendix C Bowling Alley: Recreational facilities that include bowling lanes. (ITE # 437) Soccer Complex: Outdoor facilities that are used for non-professional soccer games. (ITE # 488) Tennis Courts: Indoor or outdoor facilities specifically designed for playing tennis. (ITE # 490) Racquet/Tennis Club: Privately owned facilities that cater to racquet sports. (ITE # 491) Health/Fitness Club: Facilities that primarily focus on individual fitness or training. (ITE # 492) Athletic Club: Similar to health/fitness clubs but with the addition of team sports courts, such as tennis, basketball, and volleyball. (ITE # 493) Recreational Community Center: Public facilities that provide similar facilities to athletic clubs. (ITE # 495) INSTITUTIONAL Religious Facility: A building in which religious services are held. (ITE # 560) OFFICE Administrative Office: An administrative office building houses one or more tenants and is the location where affairs of a business, commercial or industrial organization, professional person or firm are conducted. The building or buildings may be limited to one tenant, either the owner or lessee, or contain a mixture of tenants including professional services, insurance companies, investment brokers, and company headquarters. Services such as a bank or savings and loan, a restaurant or cafeteria, miscellaneous retail facilities, and fitness facilities for building tenants may also be included. (ITE # 710) Single-Tenant Office: An office building for one tenant, sometimes containing cafeteria and related services. (ITE # 715) Medical Office/Dental Clinic: A facility which provides diagnoses and outpatient care on a routine basis but which is unable to provide prolonged in-house medical/surgical care. A medical office is generally operated by either a single private physician/dentist or a group of doctors and/or dentist. (ITE # 720) Appendix C COMMERCIAL-RETAIL Retail: The rate is based on the “Retail-Variety Store” ITE trip generation, due it to being most like other types of retail shops in Mountlake Terrace. (ITE # 814) RESTAURANT Restaurant The rate is based on the “Quality Restaurant” ITE trip generation, due it to being similar to other restaurants in terms of new trips, and most similar to the types of restaurants in Mountlake Terrace.
© Copyright 2026 Paperzz