WHITEPAPER
How ISO-NE’s Pay-for-Performance
Initiative Will Shake Up New England
Authors: George Katsigiannakis; Shanthi Muthiah; Himanshu Pande; Rachel Green; and Josh Ghosh
Executive Summary
Regional power markets have shifted in recent years in response to fast-changing supply and demand
parameters. Regional transmission organizations have identified issues in their capacity market designs
that have led to inadequate peak generation capacity or failed to provide appropriate incentives for
investment in flexible capacity. In the Independent System Operator-New England (ISO-NE) region,
these problems have resulted in high-profile “narrowly missed catastrophic events”1 that have spurred
recent proposals for substantial market design changes.
The most significant of these proposals has been the new Pay-for-Performance Initiative (PI) that alters
how a generation resource’s capacity payments are calculated. Approved in May 2014, the PPI will
influence bidding behavior in the upcoming February 2015 auction and performance payments in the
market beginning in 2018. Capacity payments in ISO-NE will be subject to a two-settlement process,
including a capacity base payment and an additional capacity performance payment that redistributes
penalty payments from underperforming resources to overperforming resources. These capacity
performance payments will be allowed to be negative, creating a substantial financial penalty for
underperformance in scarcity conditions.
This new program will have major consequences for suppliers and investors. It introduces uncertainty to
previously reliable expected capacity payments: Settled capacity payments to generators will be
unknown even for the upcoming month and will depend on an expanded set of factors. The program
also changes the bid behavior of generators: Capacity market bids will depend on each supplier’s views
of expected scarcity hours and the historical and expected performance of its units. A premium will be
placed on accurate projections of the market and the reliability of each asset. The PI program also will
likely result in more retirements of oil/gas steam capacity and the construction of new, efficient units—
further accelerating ongoing changes in the generation fleet.
Recent court decisions underscore uncertainties with PI, including a decision on September 17, 2014,
that may make demand response (DR) participation in Federal Energy Regulatory Commission (FERC)
markets illegal. New environmental regulations such as the proposed Clean Power Plan, which sets
Northeastern U.S. existing power plant emission rates for CO2 well below those of any current fossil
power plant, also will interact with this new capacity regime and add uncertainty for generators.
In the context of the PI program and other forward capacity market changes, ICF International has
developed a methodology for estimating performance payments and overall capacity revenues. We
make accurate projections for individual units and help clients in ISO-NE to optimize their strategies,
maximize revenues, and mitigate risks. We are well positioned to provide this assessment because of our
staff expertise, our analytic tools, and our extensive and recent experience in ISO-NE markets.
FCM Performance Problem
The rapid evolution of the power sector in New England—driven by the trends that have reshaped supply
and demand dynamics across the country—has revealed shortcomings in the design of the ISO-NE
forward capacity market (FCM) and the market incentives intended to create for reliable generation
1. Testimony of Peter Brandien on Behalf of ISO-NE, in FERC Docket No. ER14-1050, et al., Attachment I-1b (Jan. 17, 2014).
1
icfi.com
© 2014 ICF International, Inc.
capacity. As a consequence, during the past two years, ISO-NE has grown increasingly concerned with the
underperformance of its generating resources under scarcity conditions.
Three factors have generally driven these performance issues:
Greater dependence on natural gas and a constrained gas pipeline network that have led to
interruption of gas supply during peak cold weather events.
Inflexible oil/gas steam and coal units that cannot provide reliable backup because of increased
outages and operational difficulties.
A loss of generation capacity due to a variety of concerns, including inadequate staffing,
mothballing of dual-fired capability, and failure to maintain adequate oil supplies.
These factors have been implicated in several high-profile instances when underperformance of
generation units resulted in serious operating issues and “narrowly missed catastrophic events.” Perhaps
the most notable of these events stemmed from a five-day cold stretch beginning on January 21, 2013.
This stretch led to a gas shortage and razor-thin reserve margins. These conditions were due in part to
pipelines that were restricted from the west and south and to reserves for backup oil-fired generators that
had not been fully maintained. As a result, reserves became depleted and were not available for dispatch.
By January 28, 2013, these fuel-supply constraints led ISO-NE to recognize a capacity deficiency and
implement operating procedure 4 actions. This process included dispatching gas-fired generating
resources overnight to offset the loss of other fuel-constrained resources, which in turn led to a spiraling
effect of further reducing available gas supplies and making facilities unavailable for further dispatch. Load
ramped up the next day and required ISO to call on demand resources to maintain operating reserves.
In short, although the 2013 cold snap was not as severe as one that hit the region in 2004, the changing
generation mix—including New England’s increasing dependence on natural gas and declining use of
oil—has resulted in lower oil inventories and increasing vulnerability to gas supply constraints. So, even
a relatively milder weather event can have potentially serious consequences in the absence of reliable,
firm capacity.
The ISO-NE’s 2013/2014 winter reliability program improved reliability in the winter of 2014 by creating
incentives for dual-fuel resource capability and participation. ISO-NE described the program as a
short-term solution to reliability problems arising from shortages in gas supplies. By implementing the
program before the PI takes effect, the ISO compensated dual-fired generators for the carrying costs of
unused fuel oil.
Generation underperformance is not only associated with gas capacity shortages. For example, on July
19, 2013, during a heat wave, 15 percent of generating capacity was unavailable. This condition was due
to the significant amount of oil/gas steam units in the supply mix. These units have trouble starting at
their claimed start time and often are offline for months at a time (see Exhibit 1 on the next page). Thus,
planned capacity is not able to perform when called.
The FCM design has failed to provide the appropriate incentives for suppliers to make investments to
address availability concerns and to ensure that capacity is reliable. According to ISO-NE’s FERC filing
(ER14-1050), “capacity resources rarely face financial consequences for failing to perform, and therefore
have little incentive to make investments to ensure that they can reliably provide what the region
needs: energy and reserves when supply is scarce.” 2
2. Order on Tariff Filing and Instituting Section 206 Proceeding, 147 FERC ¶ 61,172, at p. 3, (May 30, 2014).
2
icfi.com
© 2014 ICF International, Inc.
Exhibit 1a: Historical Declining Performance of ISO-NE Operating Units
2,500
26,800
26,600
26,400
2,000
26,000
1,500
25,800
25,600
1,000
25,400
Average Peak Load MW
Average Ecomax Reduction
(CSO - Ecomax)
26,200
25,200
500
25,000
24,800
24,600
0
2010
g CC
g ICU
2011
g Combustine Turbine
g Nuclear
2012
2013
g Fossil Steam
g Other
g Hydro
g Wind
Exhibit 1b: July 19, 2013 Heat Wave Underperformance –
4,611 MW (15% of Capacity Supply Obligation)
g
g
g
g
g
g
g
g
CC
Combustine Turbine
Hydro
ICU
Wind
Fossil Steam
Nuclear
Other
Source: ISO-NE
3
icfi.com
© 2014 ICF International, Inc.
Part of the problem relates to the concept of what is meant by a generation resource’s availability. From
the inception of the market, FCM has measured resource performance during certain types of scarcity
conditions called “shortage events.” 3 Performance is assessed based on a resource’s availability during
shortage events: The resource is assessed as being fully available if it were producing energy at the time
or if it self-reported that it was ready to commence startup procedures. But this assessment does not
mean that a resource was performing as needed to meet the market’s needs. In fact, a resource was
treated as fully available even if it could not start up for a number of reasons.4
Another issue is that resources not available during a shortage event received reduced capacity
payments—approximately 5 percent of annual capacity revenues per shortage event lasting fewer
than 5 hours. Although a financial disincentive for underperformance has existed, it has been
relatively mild. Because capacity payments could not be negative regardless of the number of
shortage events, the lowest performing resources still could garner positive payments. Moreover,
ISO-NE has recognized that its availability measure did not differentiate for unit flexibility and
provided equal payment to flexible and inflexible units, creating a distorted market signal for
investment in flexible generation.
ISO-NE Response
In the past year, ISO-NE has proposed a number of changes meant to reward performance, penalize
underperformance, and create incentives to invest in capacity.
ISO-NE proposed, and on November 1, 2013, FERC approved, a modification in the Transmission,
Markets and Services Tariff which increased ISO’s ability to penalize underperformance. The change
essentially induces shortage events more frequently by redefining the trigger to include instances
when a shortage of 30-minute operating reserves occurs—not just in the previous 10-minute
spinning reserve for 30 contiguous minutes. This change became effective November 3, 2013.
ISO-NE also has moved to increase energy prices during shortage hours to incentivize generators to
be available and benefit from higher energy margins.5 ISO-NE instituted 2013/2014 and 2014/2015
winter reliability programs to guarantee availability of oil reserves in units with dual-fired capability.
The program rewards oil-fired and dual-fuel generators that can establish a specified amount of
on-site oil inventory and switch fuels in a timely manner if necessary. It also adds a special winter
DR program.
Pay for Performance Initiative
The most consequential change is in FCM itself through ISO-NE’s new PI approved by FERC on May 30,
2014, (R14-1050-000; EL14-52-000). Several elements of ISO-NE’s initiative are proposed to be
implemented in the PJM ISO which faced problems similar to those of ISO-NE.6
PI creates a two-settlement process where the capacity revenue of a resource now is comprised of a capacity
base payment (from the forward capacity auction) and an additional capacity performance payment that
redistributes penalty payments from underperforming resources to overperforming resources.
3. Shortage events are scarcity conditions in which the supply of energy and reserves is insufficient to meet
the demand for energy and ISO’s real-time reserve requirements for a duration of 30 minutes or more.
4. During shortage conditions a resource that was offline but had 10-hour startup time was considered available. Similarly,
resources that were not committed due to an outage or derate of transmission equipment were considered available.
5. The reserve constrained penalty factor in 30-minute reserves was increased from $100/MWh to $500/MWh.
6. PJM ISO is proposing the adoption of a new capacity performance product with higher performance requirements and
penalties for underperformance.
4
icfi.com
© 2014 ICF International, Inc.
The capacity performance payment is determined by a resource’s performance whenever scarcity
conditions occur during the capacity commitment period. This payment may be a positive or negative
adjustment to the base payment, reflecting superior or inferior performance during scarcity conditions.
The performance payment is determined by a resource’s performance score, which is calculated during
each 5-minute interval under scarcity conditions. The performance score is the difference between the
resource’s actual performance and a share of its capacity supply obligation (CSO).
How Performance Scores Are Calculated
For each scarcity hour, the capacity penalty (or reward) for each resource i with CSOi
dispatching at MWi is calculated based on the following formula:
Capacity Penaltyi = PPR * (MWi – CSOi * BR)
BR = (Load + Reserve Requirement) / Total CSO of all units in the system
Or
Capacity Penaltyi = PPR * (MWi – CSOi* BR)
BR = (Load + Reserve Requirement) / Total CSO
BR—Balancing Ratio
PPR—Performance Payment Rate
The PI program will phase in increasing PPRs as shown in the table below.
Period
Performance Payment Rate
($/MWh)
2018/2019 – 2020/2021
2,000
2021/2022 – 2023/2024
3,500
2024/2025 +
5,455
From a settlements perspective, capacity payments will be made monthly, and each resource’s monthly
capacity payment will be the sum of the resource’s capacity base payment for the month plus the sum of
the resource’s capacity performance payments for all five-minute intervals in the month, which can be
positive or negative subject to monthly and annual stop-loss provisions. These calculations are performed
for all resources, including both those with and without capacity supply obligations. For resources without
a CSO for which their share of system requirements is zero, any energy or reserves delivered during scarcity
hours are credited at the capacity performance payment rates. Therefore, in a month with H hours of
scarcity, a 1 MW resource without a CSO is expected to receive capacity credits of PPR * BR * H.
The stop-loss provisions ensure that although a supplier’s net FCM revenue can be negative, its total
downside exposure is limited.
There are both monthly and annual provisions. The monthly stop-loss provisions limit the losses from
underperformance to an amount equal to the product of the starting price of the corresponding FCM
auction max {1.6 * Net CONE, CONE} times the capacity supply obligation. The annual stop-loss
5
icfi.com
© 2014 ICF International, Inc.
provisions limit the annual amount of losses for a capacity resource to three times its maximum
monthly potential loss.7
Recognizing that the risk factors for capacity resources are very different from the previous market,
ISO-NE also modified its mitigation procedures. These procedures are used to protect the market from
sell-side manipulation. The new measures are generally more relaxed and incorporate the following:
They are now applicable only for pivotal suppliers. A market participant is considered pivotal if any
of its resources is required to meet system wide capacity requirements (i.e., the installed capacity
requirements [ICRs]) or the capacity requirements of any import-constrained region.
The dynamic delist bids8 —the threshold below which resources may leave the capacity market
without cost review by the independent market monitor (IMM)—were increased from $1/kWmonth to $3.94/kW-month.
Other delist bids (Static, Permanent and Export delists) are provided by components including net
going forward costs, risk premium and expected capacity performance payments. IMM evaluates its
component separately.
Implications of the PI Program
Uncertainty
Previously, capacity resources in ISO-NE could be certain of their expected capacity payments for the next
three years, especially with infrequent shortage events. However, under PI, settled capacity payments to
generators are unknown even for the upcoming month. Payments will depend on a large number of
factors, including the performance of the resource and other resources in the system and scarcity hours. In
2018/2019, for example, if FCM prices clear at equilibrium levels of $11.08/kW-month and about seven9
scarcity hours occur in a specific month during which a power plant is not available, FCM revenue will be
lost. The scarcity hours in which the power plant is unavailable will result in losses.
Modification of the Supply Curve in FCM Auctions
The implementation of PI is expected to have an impact on market participants’ bids in FCM auctions.
Generation owners will be required to develop the most accurate estimates of scarcity hours and
asset performance, as explained below.
In formal terms, the expected bid (Bi) of the resource i in FCM before PI can be expressed as Bi = max {0,
GFCi}; whereas with PI, the expected bid (Bi) of the resource i in FCM can be expressed as the more
complex formula:
Bi = PPR * BR * H + max {0, GFCi – PPR * Ai*H}10 where:
PPR: is the capacity performance payment rate;
BR: is the expected capacity balancing ratio;
H: is the expected number of hours with scarcity conditions;
7. For new resources with multiple-year commitments, the monthly stop-loss limit is based on their applicable FCM
price rather than the auction starting price for the duration of their multiple-year commitment. Therefore, the maximum
potential net loss for these resources is limited to zero.
8. ISO-NE FCM features a descending clock auction, so supply resources could leave the auction through presubmitted
delist bids. Static, dynamic, and permeant delist bids are defined based on submission time (before/during auction) and
threshold levels.
9. 7=11,080$/MW/(2,000 $/MWh* BR) where BR is assumed at 0.7
10. Joint Testimony of David LaPlante and Seyed Parviz Gheblealiv and on behalf of the ISO, in FERC Docket No. ER141050, et al., (Jan. 17, 2014), Attachment I-1e.-
6
icfi.com
© 2014 ICF International, Inc.
GFCi: is the resource going-forward cost net of energy and ancillary service revenue, and
Ai: is the expected average performance of the resource during scarcity hours.
The term PPR * BR * H reflects the opportunity cost of the resource for undertaking CSO. As explained
before, even without CSO, a resource is expected to earn capacity payments at a rate of PPR * BR * H.
Therefore, the resource will require a capacity price of at least at PPR * BR * H to undertake the added
CSO burden. The second term reflects the generator’s views of its going-forward costs that are not
covered by the expected capacity performance payments.
What does the change mean in basic terms? If a generator for which the net going-forward costs are
zero for both regimes (PI and not PI), under PI, the FCM bid of this generator will be higher by PPR *
BR * H. Therefore, the FCM bids of generators with positive going-forward costs will depend on their
views on expected scarcity hours and the historical and expected performance of the unit.
In other words, in order to make the most rational economic decisions, mitigate risks, maximize
revenue, and minimize costs, generators will have to estimate as accurately as possible how many
scarcity hours will occur and how their assets will perform.
Firm Fuel Supply Deliberation
With the potential for capacity payment penalties and lost opportunities in the energy market (with
price spikes during scarcity periods), an additional incentive exists for generators to have firm fuel
supply. When possible, gas-fired generators will consider activating dual-fired capabilities (and
maintaining distillate oil reserves) or firm gas supply contracts. But generators also must consider the
tradeoffs of the additional costs of firm fuel supply relative to decreased revenue potential.
Modernization of the Fleet
In the long term, PI will result in a more efficient, flexible fleet with lower energy prices. Under the
new regime, new, efficient units can arbitrage their flexibility and low forced outage rates at the
expense of less reliable and more inflexible oil/gas steam-fired units. This relative advantage will likely
result in accelerating retirements of oil/gas steam capacity and incentivizing the construction of new,
efficient units. In the long run, this dynamic should result in lower energy prices in ISO-NE, as more
efficient units displace less economic generation. In the near- to medium-term though, the dynamic
could result in periods of capacity shortfall and price spikes if the transition is not orderly.
ICF Methodology for Determining Performance Payments under PI
One of the key components in estimating the performance payment is determining the number of
scarcity hours in a given year under different scenarios on weather and load. ICF uses an in-house Monte
Carlo simulation tool—the Stochastic Resource Adequacy Model (SRAM 11). We benchmark its results to
the information provided by ISO-NE. ISO-NE’s loss of load expectation (LOLE) model12 used to establish ICR
for FCMs also can be used to estimate the expected number of hours per year when insufficient capacity
exists to meet the system’s operating reserve requirements, i.e., scarcity hours. The table below summarizes
ISO-NE’s estimated hours of system operating reserve deficiencies at different capacity levels assuming
normal weather.
11. SRAM is an hourly chronological loss-of-load simulation tool specifically designed to capture treatment of scarcity.
ICF’s SRAM has been developed to analyze the impact of supply and load uncertainty on the reliability of power systems
and wholesale power prices. SRAM forecasts loss of load-related metrics, including scarcity events.
12. ISO-NE is using GE’s MARS model. The GE MARS program is a multi-area model generally meant to compute the
reliability of a system comprising a number of interconnected sub-areas containing generation and load. GE MARS
uses a Monte Carlo process chronologically progressing from hour to hour to evaluate random generation outage
combinations. This process simulates the year repeatedly (multiple replications) to evaluate the impact of the random
generation outage combinations.
7
icfi.com
© 2014 ICF International, Inc.
icfi.com
About ICF International
ICF International (NASDAQ:ICFI)
provides professional services and
technology solutions that deliver
beneficial impact in areas critical
to the world’s future. ICF is fluent
in the language of change,
whether driven by markets,
technology, or policy. Since 1969,
we have combined a passion for
our work with deep industry
expertise to tackle our clients’
most important challenges. We
partner with clients around the
globe—advising, executing,
innovating—to help them define
and achieve success. Our more
than 5,000 employees serve
government and commercial
clients from more than 70 offices
worldwide. ICF’s website is
www.icfi.com.
©2014 ICF International, Inc.
Any views or opinions expressed
in this Whitepaper are solely those
of the author(s) and do not
necessarily represent those of ICF
International. This Whitepaper is
provided for informational
purposes only and the contents
are subject to change without
notice. No contractual obligations
are formed directly or indirectly by
this document. ICF MAKES NO
WARRANTIES, EXPRESS, IMPLIED,
OR STATUTORY, AS TO THE
INFORMATION IN THIS DOCUMENT.
No part of this document may be
reproduced or transmitted in any
form, or by any means (electronic,
mechanical, or otherwise), for any
purpose without prior written
permission.
ICF and ICF INTERNATIONAL
are registered trademarks of ICF
International and/or its affiliates.
Other names may be trademarks
of their respective owners.
Exhibit 2: Estimated Hours of System Operating Reserve Deficiencies Annually
Capacity Level
Expected
5/95
50/50
95/5
ICR plus 2,500 MW
2.9
1.4
2.5
5.8
ICR plus 2,000 MW
4.4
2.1
3.8
8.9
ICR plus 1,500 MW
6.7
3.1
6.0
13.0
ICR plus 1,000 MW
10.0
4.9
8.9
18.7
ICR plus 500 MW
14.7
7.6
13.6
26.7
ICR
21.2
11.4
19.8
36.2
Notes: Estimated system-level operating reserve deficiency hours ‘at criteria’ plus specified additional installed
capacity, using the ICR and capacity planning model assumptions for the 7th Annual Forward Capacity Auction
(see text)
Source: ISO-NE, Operating Reserve Deficiency Information – At Criteria and Extended Results
ICF incorporates its estimate of gas supply shortages and the corresponding impact on power
plant supply and forecasts the number of scarcity hours by month as well as the average
balancing ratio during scarcity hours for each month.
With these parameters available, ICF models the bidding behavior of each power plant in FCM
based on the plant’s historical operating performance and assuming risk averse behavior from
market participants. This approach allows ICF to provide an accurate FCM price forecast and to
estimate FCM market entry (new power plant construction) and exit (retirements or resources
that decide to remain in the system without CSO) and their impact on power prices in the future.
With this methodology, ICF advises clients on strategy optimization, including support on
decisions for firm compared with interruptible gas supply, optimal portfolio commitment to
maximize revenue from the FCM and PI, and the valuation of resources.
Conclusions and Next Steps
The changes in FCM design and the advent of the PI program will create risks and
opportunities for suppliers. Generating assets must reevaluate their FCM bidding behavior in
the next auction (February 2015) and beyond in light of the reliability of their assets and the
likelihood of scarcity conditions. They will need to consider the potential uncertainties of the
new capacity payment system and the possible acceleration of retirements and fuel switching.
Those with more reliable assets may experience a significant competitive edge, while others
may find themselves managing increased risk or considering hedging with more firm fuel
supply. ICF is advising clients on how to best adapt and position themselves to optimize
revenues, minimize costs, and mitigate risks.
Contacts:
George Katsigiannakis § +1.703.934.3223 § [email protected]
Shanthi Muthiah § +1.703.934.3881 § [email protected]
EAS WPR 1014 0325
© Copyright 2026 Paperzz